L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | 26 January 2024 | Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | |
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years | 18 January 2024 | Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years | |
L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 18 January 2024 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | |
L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 11 January 2024 | NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | Stretch Power Uprate |
L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump | 8 January 2024 | Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump | |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-179, Unusual or Important Environmental Event - Turtle Mortality | 14 December 2023 | Unusual or Important Environmental Event - Turtle Mortality | |
L-2023-180, Submittal of Changes to the Technical Specification Bases | 13 December 2023 | Submittal of Changes to the Technical Specification Bases | Surveillance Frequency Control Program |
L-2023-174, Subsequent License Renewal Application - Third Annual Update | 13 December 2023 | Subsequent License Renewal Application - Third Annual Update | Boric Acid Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal |
L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 | 12 December 2023 | License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 | |
L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | 6 December 2023 | Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Exemption Request |
L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Time of Discovery Contraband Exemption Request |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-162, Response to 50.69 2nd Round of Rals | 21 November 2023 | Response to 50.69 2nd Round of Rals | Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi |
L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | 16 November 2023 | Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule | Exemption Request |
L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | 15 November 2023 | License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Coatings Surveillance Frequency Control Program Operability Determination Exemption Request Subsequent License Renewal Earthquake Fuel cladding Recently irradiated fuel Offsite Circuit Grace period GOTHIC Unidentified leakage Accident Tolerant Fuel Power Uprate Affidavit |
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis | 11 October 2023 | License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis | Surveillance Frequency Control Program Power Uprate |
L-2023-131, Subsequent License Renewal Application - Second Annual Update | 28 September 2023 | Subsequent License Renewal Application - Second Annual Update | Boric Acid Aging Management License Renewal |
L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 26 September 2023 | Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Internal Flooding Probabilistic Risk Assessment FLEX |
L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report | 20 September 2023 | Corrections to the 2022 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | 19 September 2023 | License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | Incorporated by reference |
L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report | 18 September 2023 | Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report | 14 September 2023 | Correction to the 2020 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
L-2023-108, Report of 10 CFR 50.59 Plant Changes | 11 September 2023 | Report of 10 CFR 50.59 Plant Changes | Turbine Missile |
L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 11 September 2023 | Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX B.5.b |
L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 | 6 September 2023 | Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Tornado Missile Hydrostatic Missed surveillance Surveillance Frequency Control Program Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Downpower Unidentified leakage |
L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report | 6 September 2023 | Corrections to the 2021 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 25 August 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Hydrostatic Probabilistic Risk Assessment Large early release frequency Time Critical Operator Action Fire Protection Program Coast down Exclusive Use Affidavit |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | 17 August 2023 | Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
L-2023-104, Preparation and Scheduling of Operator Licensing Examinations | 3 August 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-103, Inservice Inspection Examination Report | 3 August 2023 | Inservice Inspection Examination Report | Moisture barrier |
L-2023-105, Preparation and Scheduling of Operator Licensing Examinations | 3 August 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | 27 July 2023 | Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project | Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Earthquake Fire Protection Program |
L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump | 26 July 2023 | Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump | |
L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches | 26 July 2023 | Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches | VT-2 |
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | 24 July 2023 | Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | |
L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 6 | 13 July 2023 | Subsequent License Renewal Application Revision 1 - Supplement 6 | Aging Management |
L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1) | 11 July 2023 | In-Service Inspection Program Owner'S Activity Report (OAR-1) | |
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | 29 June 2023 | Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | |
L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. | 28 June 2023 | Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. | |
L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | 27 June 2023 | 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval | |
L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 5 | 14 June 2023 | Subsequent License Renewal Application Revision 1, Supplement 5 | Coatings Aging Management Through-Wall Leakage |
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | 9 June 2023 | Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | Boric Acid Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Coatings Functionality Assessment Condition Adverse to Quality Aging Management Exemption Request Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Grace period |