ML21256A141
| ML21256A141 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/12/2021 |
| From: | Chuck Zoia NRC/RGN-III/DRS/OLB |
| To: | |
| Zoia C | |
| Shared Package | |
| ML20139A040 | List: |
| References | |
| Download: ML21256A141 (2) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 TEAM 1 Facility: Point Beach Date of Exam: 26 July 2021 Operating Test No.: 2021 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 3
1 1
1 0
NOR 1
2 2
1 1
1 I/C 2, 3, 5, 6 3, 4, 5, 7 1, 4, 5
11 4
4 2
MAJ 4
6 6
3 2
2 1
TS 2, 3 1, 3 4
0 2
2 RO SRO-I SRO-U RX 1
1 1
1 0
NOR 0
1 1
1 I/C 2, 6 3
3, 7 5
4 4
2 MAJ 4
6 6
3 2
2 1
TS 0
0 2
2 RO SRO-I SRO-U RX 2
2 2
1 1
0 NOR 1
1 1
1 1
I/C 3, 5 4, 5, 7
5 4
4 2
MAJ 4
6 2
2 2
1 TS 0
2 2
RO SRO-I SRO-U RX 1
1 0
NOR 1
1 1
I/C 4
4 2
MAJ 2
2 1
TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 TEAMS 2 & 3 Facility: Point Beach Date of Exam: 26 July 2021 Operating Test No.: 2021 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 2, 3, 5, 6 4, 5, 7
3, 7 9
4 4
2 MAJ 4
6 6
3 2
2 1
TS 2, 3 2
0 2
2 RO SRO-I SRO-U RX 1
3 2
1 1
0 NOR 2
1 1
1 1
I/C 2, 6 3, 4, 5, 7 1, 4, 5, 7 10 4
4 2
MAJ 4
6 6
3 2
2 1
TS 1, 3 2, 4 4
0 2
2 RO SRO-I SRO-U RX 2
3 2
1 1
0 NOR 1
1 1
1 1
I/C 3, 5 3
1, 4, 5
6 4
4 2
MAJ 4
6 6
3 2
2 1
TS 0
0 2
2 RO SRO-I SRO-U RX 1
1 0
NOR 1
1 1
I/C 4
4 2
MAJ 2
2 1
TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.