MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] Category:Licensee Response to Notice of Violation
[Table view] |
Text
MAR 1 3 2006 FPL L-2006-066 10CFR50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Florida Power and Light Company Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Response to NRC Integrated Inspection Report Preliminary White Finding Apparent Violation
Reference:
Letter, C. A. Casto to J. A. Stall, Turkey Point Nuclear Plant - Integrated Inspection Report 05000250/2005005 and 05000251/2005005; Preliminary White Finding, dated January 27, 2005[6]
Gentlemen:
On December 31, 2005, the Nuclear Regulatory Commission ("NRC") completed its final 2005 integrated inspection at Turkey Point Units 3 and 4. The results of that inspection were discussed during an exit meeting held on January 12, 2006, documented in the above referenced letter, and received at Turkey Point Plant on January 31, 2006.
Florida Power and Light Company ("FPL") appreciates this opportunity to provide the NRC with its perspectives on the facts and assumptions used by the NRC to arrive at the preliminary White finding and its significance. In its letter dated February 24, 2006 (FPL letter L-2006-069), FPL committed to submit its position on the finding in writing by March 13, 2006.
The FPL response is provided in three (3) attachments. Attachment 1 addresses the apparent violation of Technical Specification ("TS") 3.7.1.2 for the Auxiliary Feedwater ("AFW")
System, and the apparent contributing violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action". Attachment 2 outlines the additional information considered by FPL regarding the applicable Significance Determination Process ("SDP") Phase 3 Risk Analysis.
Attachment 3 provides the corresponding FPL SDP Phase 3 calculation.
FPL agrees that a violation of TS 3.7.1.2 occurred as a result of the inoperable "B" AFW pump and that a violation of 10 CFR Part 50, Appendix B, Criterion XVI occurred as a result of the failure to promptly identify and correct this problem. Corrective action included prompt replacement of the defective pump bearing, improvement in FPL risk assessment processes, and long-term corrective action focused on improved vendor oversight for critical equipment/components.
an FPL Group c mpany
L-2006-066 FPL's assessment of safety significance, as set forth more fully in Attachments 2 and 3, concludes that the event is of very low safety significance (Green). FPL performed its assessment using additional plant-specific factors beyond those included in the NRC's SDP assessment. These included the following:
- Tim--dependent degradation of the "B" AFW pump
- More recent industry generic failure data [MSPI guidance]
- Additional and diverse plant-specific features for secondary heat removal If there are any questions regarding this letter, please contact Walter Parker at 305-246-6632.
Sincerely Yours, Terry 0. Jones Vice President Turkey Point Nuclear Plant Attachments: 1) Turkey Point Response to Preliminary White Finding Apparent Violation 05000250/2005005-02 and 05000251/2005005-02:
- Apparent Violation (AV) of Technical Specification (TS) 3.7.1.2 for the Auxiliary Feedwater (AFW) System
- Contributing Violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action"
- 2) Turkey Point Response to Preliminary White Finding Apparent Violation 05000250/2005005-02 and 05000251/2005005-02:
- Comments on NRC Phase 3 SDP of Turkey Point "B" AFW Pump
- 3) Calculation PTN-BFJR-06-001, Phase 3 SDP For Turkey Point "B" AFW Pump Failure cc: NRC' Regional Administrator Director, Division of Reactor Projects Senior Resident Inspector, USNRC, Turkey Point 2
L-2006-066 ATTACHMENT 1 Turkey Point Response to Preliminary White Finding Apparent Violation 05000250/2005005-02 and 05000251/2005005-02
- 1. Apparent Violation (AV) of Technical Specification 3.7.1.2 for the Auxiliary Feedwater (AFW) System:
FPL agrees that a violation of Technical Specification 3.7.1.2 occurred, due to the "B" Auxiliary Feedwater (AFW) Pump being inoperable beyond its allowed outage time of 30 days. The "past operability" assessment for this pump determined that the pump would not have been able to fulfill its safety function mission run time of 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> for some period of time in the past. Based upon the required mission run time, it is estimated that the "B" AFW pump was inoperable (would not have been able to perform its safety function mission run time) from at least December 14, 2004 to its inservice test failure date on November 7, 2005. This TS violation, pursuant to the requirements of 10 CFR 50.73(a)(2)(i)(B), was reported under Licensee Event Report (LER) 250/251-2005-006-00, dated February 21, 2006.
- 2. Contributing Violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action":
FPL agrees that a violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action" contributed to the inoperable "B " Auxiliary Feedwater (AFW) pump, due to a failure to promptly identify and correct a significant condition adverse to quality affecting the pump. Although numerous corrective actions were taken throughout the 2-year period during which the "B" AFW pump inboard journal bearing was misaligned, these corrective actions failed to identity the cause of the pump high vibration condition during this period.
This condition has been entered into the FPL corrective action program under Condition Report 2005-30750. In order to reduce recurrence of untimely and/or ineffective corrective action for critical equipment, FPL has implemented a Risk Screening and Prioritization work management process that includes documented operational decision making for risk sensitive equipment. The steps in this process are focused on identification of the consequences of the intended corrective actions and a determination regarding whether the planned actions are sufficiently intrusive to resolve the root cause of the observed condition. Additionally, the corrective actions have been implemented in the specification, procurement and inspection processes as long-term commitments to improving vendor oversight for critical equipment/components. Improved vendor controls is focused on providing appropriate technical purchase/repair guidance in the procurement and contracting process to ensure that delivered products will perform their intended functions, without experiencing unexpected defects from materials or workmanship.
1
ATTACHMENT 2 Turkey Point Response to Preliminary White Finding Apparent Violation 05000250/2005005-02 and 05000251/2005005-02 Comments on NRC Phase 3 SDP of Turkey Point "B" AFW Pump FPL reviewed the Turkey Point Nuclear Plant Integrated Inspection Report, 5000250/2005005 and 05000251/2005005 Preliminary White Finding, dated January 27, 2006.
- FPL believes that the time-dependent nature of the "B" AFW pump failure does contribute to the SDP analysis and determines certain assumptions and inputs used in the analysis approach. It has been demonstrated that the "B" AFW pump has had sufficient run-time available from its installation in 2003 to the discovery of the misaligned bearing in November 2005 (61 pump starts for 54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> run time), such that it would have started and run upon demand throughout this period. If the pump were to then fail after start, plant off-normal procedures would direct the recovery of heat removal capability through the diverse plant-specific features available for secondary heat removal. The version of Turkey Point PSA model used by the NRC is overly conservative for Phase 3 SDP analysis and may not adequately account for this type of degradation.
- The risk impact of one failed AFW pump for Turkey Point must be analyzed considering the unique plant features of Turkey Point, its multiple heat sink capabilities and its proceduralized operator response to loss of auxiliary feedwater.
The following provides FPL's insights on the Phase 3 Significance Determination Process (SDP).
- 1) Because the degradation of B AFW pump is time-dependent, its safety significance is asses;sed by including the following factors:
A. Based on the test data and operating experience of the B AFW pump, the B AFW pump would run at least one hour on or before October 30, 2005. Afterwards, the performance of B AFW pump is not determined, and is conservatively assumed to fail within the first hour. See Table 1 in Attachment 3.
B. If B AFW pump runs for an hour and then fails, the decay heat is significantly lower, allowing more time for operators to take actions stipulated in the EOP.
C'. The lower decay heat after one hour from hypothetical accidents also allows a less stringent success criterion for feed and bleed.
I). Credit for operator actions (e.g., certain offsite power recovery actions) not included in the original baseline PSA model, which were not important due to lower probability of the sequences, should be included for consistency.
E1. Using a mission time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for 3 AFW pumps and 2 standby steam generator feed pumps overestimates the probability of selected sequences.
L-2006-066 When these factors are incorporated in the SDP, the CDP increase over a year is estimated to be approximately 4.3 E-7; this is below the threshold of 1.OE-6 for the risk significance color of GREEN.
- 2) The version of the Turkey Point PSA model used was appropriate for a Phase 2 SDP, but overly conservative for a Phase 3 SDP. As part of the effort to prepare Mitigation Systems Performance Index (MSPI) basis document, it was determined that the generic data used in the PSA model overestimates the failure probability of Turbine Driven AFW pumps by as high as a factor of 6. The new generic data in the MSPI and SPAR programs were used in the Turkey Point PSA model to perform a sensitivity study. The resulting Turkey Point PSA CDP increase over a year is comparable to that based on the NRC's SPAR model using the new generic data, with time-dependent considerations.
The same conclusion is reached; the CDP increase is below the threshold of 1.OE-6 for the risk significance color of GREEN.
The details of the above two items are elaborated in Attachment 3, a signed off calculation entitled: PHASE 3 SDP FOR TURKEY POINT "B" AFW PUMP FAILURE.
- 3) Fault exposure time does not reflect the time-dependent nature of the "B" AFW condition. The Mitigation System Performance Index (MSPI) program eliminates the fault exposure time by considering the failures explicitly in the unreliability index. Based on the conservative weighting factors, the 12-quarter performance data, and the INPO MSPI calculator, MSPI for the AFW system is GREEN.
- 4) Qualitatively, the risk impact of failing one AFW pump for Turkey Point is minimal, due to the plant unique features. Turkey Point secondary heat removal function can be accomplished by the three turbine-driven AFW pumps, two main feedwater pumps, one motor-driven standby steam generator feedwater (SSGFW) pump, one diesel-driven SSGFW pump, three condensate pumps, and bleed and feed via four high head safety injection (HHSI) pumps. EOP FR-H.1, Response to Loss of Secondary Heat Sink, includes the following recovery strategies, in order of priority:
A. Restore AFW B. IRe-establish Main Feedwater (FW)
C. Establish SSGFW D. Establish feed from Condensate Pumps E. Feed and Bleed Compared with a majority of other PWRs, even with a failure of one AFW pump, the secondary heat removal function at Turkey Point still has the same degree of defense-in-depth arid margin of safety. The number and the diversity of the systems that can accomplish secondary heat removal at Turkey Point provides a strong basis that loss of one AFW pump is not risk-significant.
3
L-2006-066 In conclusion, three different approaches were used in evaluating the safety significance of the degraded condition of the "B" AFW pump. When realistic time-dependent factors are incorporated and more recent generic failure data are incorporated, all three approaches, the SPAR model, the MSPI model, and the revised Turkey Point PSA model (Attachment 3), yield comparable results of delta CDF increase less than l.OE-6/Yr. The risk impact of B AFW pump degradation is determined to be low safety significance, i.e., GREEN.
4