IR 05000456/2019410

From kanterella
Jump to navigation Jump to search
Cyber Security Inspection Report 05000456/2019410 and 05000457/2019410 - Cover Letter Only (DRS-J.Gilliam)
ML19184A565
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/03/2019
From: Robert Daley
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019410
Download: ML19184A565 (3)


Text

uly 3, 2019

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2CYBER SECURITY INSPECTION REPORT 05000456/2019410 AND 05000457/2019410

Dear Mr. Hanson:

On June 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Braidwood Station, Units 1, and 2, and discussed the results of this inspection with Site Vice President, Ms. M. Marchionda and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Braidwood Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Braidwood Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Docket Nos.: 05000456 and 05000457 License Nos.: NPF-72 and NPF-77 Enclosure:

IR 05000456/2019410 and 05000457/2019410 cc: B. Finlay, Braidwood Station Security Manager A. Khayyat, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV ML19184A565 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RIII RIII NAME JGilliam:cl/vv RDaley DATE 07/02/19 07/03/19