IR 05000272/2018403

From kanterella
Jump to navigation Jump to search
Cyber Security Inspection Report 05000272/2018403 and 05000311/2018403 (Cover Letter Only)
ML18218A506
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/06/2018
From: Glenn Dentel
Engineering Region 1 Branch 2
To: Sena P
Public Service Enterprise Group
Dentel G
References
IR 2018403
Preceding documents:
Download: ML18218A506 (3)


Text

August 6, 2018

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - CYBER SECURITY INSPECTION REPORT 05000272/2018403 AND 05000311/2018403

Dear Mr. Sena:

On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Salem Nuclear Generating Stations (Salem), Units 1 and 2. On the same day, the NRC inspectors discussed the results of this inspection with Mr. Charles McFeaters, Salem Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC requirements. Additionally, inspectors documented a licensee-identified violation which was determined to be of very low safety significance. The NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

One cross-cutting aspect was assigned to a finding in the area of Problem Identification and Resolution. Specifically, PSEG failed to thor oughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance, [P.2].

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC

Resident Inspector at Salem.

Enclosure(s) transmitted herewith contain(s) Sensitive, Unclassified, Non-Safeguards Information. When separated from the Enclosure(s), the transmittal document is decontrolled. In addition, if you disagree with the cross-cutting aspect assignment, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I and the NRC

Resident Inspector at Salem.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/ Glenn T. Dentel, Chief Engineering Branch 2

Division of Reactor Safety Docket Numbers: 50-272 and 50-311 License Numbers: DPR-70 and DPR-75

Enclosure:

Inspection Report 05000272/2018403 and 05000311/2018403 (OUO-SRI)

cc w/o encl: Distribution via ListServ

ML18218A506 (Cover letter) ADAMS ACCESSION NUMBER: ML18218A487 (Cover letter w/enclosure-NP)

Cover Letter SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRP RI/DRS NAME DWerkheiser FArner/AAR for FBower GDentel DATE 8/06/18 8/06/18 8/06/18 8/06/18