02-11-2016 | On December 31, 2014, while performing a walkdown as part of a surveillance test procedure, plant personnel identified through-wall seepage in a Diablo Canyon Power Plant Unit 1 socket weld inside containment that provides a flow path to a relief valve protecting a common portion of both trains of the residual heat removal system. Subsequent cleanup of the boric acid accumulation revealed active seepage of 30 drops per minute. A visual inspection identified that the source of the seepage was a circumferential crack on the socket weld.
Pacific Gas and Electric Company determined that the root cause of the cracked socket weld was containment fan cooler unit (CFCU) vibration inducing a resonant condition in the residual heat removal piping that generated stresses above the material endurance limit of the socket weld. Corrective actions included replacing two socket welds, modifying pipe supports, and correcting the condition causing the CFCU vibrations.
This condition did not have an adverse effect on the health and safety of the public. |
---|
|
---|
Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000323/LER-2017-0012017-10-0303 October 2017 Relief Valve Leakage Resulting in Inoperable Pressurizer Power Operated Relief Valve, LER 17-001-00 for Diablo Canyon, Unit 2, Regarding Relief Valve Leakage Resulting in Inoperable Pressurizer Power Operated Relief Valve 05000323/LER-2016-0012016-07-28028 July 2016 Reactor Trip Breakers Manually Opened During Shutdown Due to a Control Rod Movable Gripper Fuse Failure, LER 16-001-00 for Diablo Canyon, Unit 2, Regarding Reactor Trip Breakers Manually Opened During Shutdown Due to a Control Rod Movable Gripper Fuse Failure 05000275/LER-2015-0012016-02-11011 February 2016 Both Trains of Residual Heat Removal Inoperable Due to Circumferential Crack on a Socket Weld, LER 15-001-01 for Diablo Canyon, Unit 1, Regarding Both Trains of Residual Heat Removal Inoperable Due to Circumferential Crack on a Socket Weld DCL-15-042, Supplemental Licensee Event Report 1-2014-004-01 for Diablo Canyon, Units 1 and 2 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power2015-03-30030 March 2015 Supplemental Licensee Event Report 1-2014-004-01 for Diablo Canyon, Units 1 and 2 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power DCL-15-041, Supplemental LER 2-13-004-01 for Diablo Canyon, Unit 2 Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-32015-03-30030 March 2015 Supplemental LER 2-13-004-01 for Diablo Canyon, Unit 2 Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-3 DCL-13-034, Licensee Event Report 12-005-00 for Diablo Canyon Regarding Expected Submittal Date2013-04-0101 April 2013 Licensee Event Report 12-005-00 for Diablo Canyon Regarding Expected Submittal Date DCL-11-118, LER 11-05-001 for Diablo Canyon Unit 1, Emergency Diesel Generator Actuations Upon Loss of 230 Kv Startup Due to Electrical Maintenance Testing Activities2011-11-0808 November 2011 LER 11-05-001 for Diablo Canyon Unit 1, Emergency Diesel Generator Actuations Upon Loss of 230 Kv Startup Due to Electrical Maintenance Testing Activities DCL-11-119, LER 11-04-001 for Diablo, Unit 1, Regarding Emergency Diesel Generator Actuated Upon 230 Kv Isolation Due to Maintenance Activities on Relay Panel2011-11-0808 November 2011 LER 11-04-001 for Diablo, Unit 1, Regarding Emergency Diesel Generator Actuated Upon 230 Kv Isolation Due to Maintenance Activities on Relay Panel 2017-10-03
[Table view] |
comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
I. Reportable Event Classification
This event is reportable pursuant to the following criteria:
- 10 CFR 50.73(a)(2)(v)(B&D), "Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to: Remove Residual Heat and Mitigate the consequences of an accident"
- 10 CFR 50. 73(a)(2)(vii), "Any event where a single cause or condition caused at least one independent train or channel to become inoperable in multiple systems or two independent trains or channels to become inoperable in a single system designed to: Remove Residual Heat, and Mitigate the consequences of an accident"
II. Plant Conditions
At the time of the event, Diablo Canyon Power Plant (DCPP) Unit 1 was in Mode 3 (Hot Standby) at normal operating reactor coolant temperature and pressure conditions.
III. Problem Description
A. Background
The function of the emergency core cooling system (ECCS) is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
a) loss-of-coolant accident, non-isolable coolant leakage greater than the capability of the normal charging system [CB] b) rod ejection accident c) loss-of-secondary-coolant accident, including uncontrolled steam release or loss of feedwater and d) steam generator tube rupture.
The addition of negative reactivity is designed primarily for the loss-of-secondary-coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant reactor power. The ECCS consists of three separate subsystems: centrifugal charging (high head) [BQ], safety injection (intermediate head), and residual heat removal (RHR) (low head) [BP]. Each subsystem consists of 2 redundant 100 percent capacity trains.
The design function of Relief Valve [RV] RHR-1-RV-8708 is to protect the RHR discharge piping from exceeding its design pressure rating. The inlet pipe to the valve is connected to a 12-inch RHR header line, which provides a flow path for injection to reactor coolant system (RCS) [AB] Hot Legs 1 and 2. This line is occasionally used to fill the reactor cavity during refueling outages. The normal flow path for shutdown cooling (Modes 4 and 5) does not use this line.
B. Event Description
On December 31, 2014, while performing a walkdown as part of a surveillance test procedure, plant personnel identified an accumulation of boric acid on the inlet pipe to Relief Valve RHR-1-RV-8708. The problem was entered into the corrective action program. Subsequent cleanup of the boric acid accumulation revealed active seepage of 30 drops per minute (dpm). A visual inspection identified a circumferential crack on the socket weld.
The active boric acid leak was located on the socket welded connection of the relief valve inlet pipe to the common header from the RHR pump [P] discharge to RCS Hot Legs 1 and 2. The active boric acid seepage could not be isolated. Both trains of the RHR system were declared inoperable and Technical Specification (TS) 3.0.3 was entered on December 31, 2014, at 1105 PST. DCPP made an 8-hour notification to the NRC regarding an event or condition that could have prevented fulfillment of a safety function (NRC Event Notification Number 50711).
C. Status of Inoperable Structure, Systems, or Components That Contributed to the Event None.
D. Other Systems or Secondary Functions Affected
None.
E. Method of Discovery
On December 31, 2014, while performing a walkdown as part of a surveillance test procedure, plant personnel identified an accumulation of boric acid on the inlet pipe to Relief Valve RHR-1-RV-8708. Subsequent cleanup of the boric acid accumulation revealed active seepage of 30 dpm. A visual inspection identified that the source of the leak was a circumferential crack on the socket weld at the connection of the relief valve inlet pipe to the RHR line.
F. Operator Actions
Operators declared both RHR trains inoperable. TS 3.0.3 was entered on December 31, 2014, at 1105 PST and was exited at 2256 PST, when the plant entered Mode 4. Additionally, in accordance with TS 3.6.3.C, the associated containment penetration flow path was isolated.
G. Safety System Responses
None.
IV. Cause of the Problem
Pacific Gas and Electric Company determined that the root cause of the cracked socket weld was containment fan cooler unit (CFCU) vibration inducing a resonant condition in the RHR piping that generated stresses above the material endurance limit of the socket weld.
V. Assessment of Safety Consequences
DCPP assessed the Unit 1 risk significance of seepage in the vent line of the RHR supply line to the Hot Leg 1 and 2 supply lines. This assessment concluded that the incremental conditional core damage probability was less than 1.0E-06 per year. Therefore, this event is not considered risk significant and did not adversely affect the health and safety of the public.
VI. Corrective Actions
A. Immediate Actions
1. Performed repair on cracked socket weld.
2. Installed pipe support on RV-8708 piping.
B. Other Corrective Actions
1. Replaced the previously repaired socket weld and one additional socket weld on the relief valve discharge pipe, during the subsequent Unit 1 nineteenth refueling outage (1R19).
2. Relocated the previously installed pipe supports.
3. Corrected the condition that caused the CFCU vibrations, during the subsequent 1R19.
VII. Additional Information
A. Failed Components
DCPP discovered a circumferential crack on the socket weld on the inlet pipe connection of Relief Valve RHR-1-RV-8708.
B. Previous Similar Events
"Unit 1 Licensee Event Report 2013-005-00, Both Trains of Residual Heat Removal Inoperable Due to Circumferential Crack on a Socket Weld," dated August 22, 2013, is similar to this event.
A. Industry Reports