 Issue dateTitleTopic
05000323/LER-2017-0013 October 2017Relief Valve Leakage Resulting in Inoperable Pressurizer Power Operated Relief Valve
LER 17-001-00 for Diablo Canyon, Unit 2, Regarding Relief Valve Leakage Resulting in Inoperable Pressurizer Power Operated Relief Valve
Safe Shutdown
Probabilistic Risk Assessment
Significance Determination Process
05000323/LER-2016-00128 July 2016Reactor Trip Breakers Manually Opened During Shutdown Due to a Control Rod Movable Gripper Fuse Failure
LER 16-001-00 for Diablo Canyon, Unit 2, Regarding Reactor Trip Breakers Manually Opened During Shutdown Due to a Control Rod Movable Gripper Fuse Failure
Shutdown Margin
05000275/LER-2015-00111 February 2016Both Trains of Residual Heat Removal Inoperable Due to Circumferential Crack on a Socket Weld
LER 15-001-01 for Diablo Canyon, Unit 1, Regarding Both Trains of Residual Heat Removal Inoperable Due to Circumferential Crack on a Socket Weld
Boric Acid
DCL-15-042, Supplemental Licensee Event Report 1-2014-004-01 for Diablo Canyon, Units 1 and 2 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power30 March 2015Supplemental Licensee Event Report 1-2014-004-01 for Diablo Canyon, Units 1 and 2 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite PowerNew Project Manager
Significance Determination Process
DCL-15-041, Supplemental LER 2-13-004-01 for Diablo Canyon, Unit 2 Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-330 March 2015Supplemental LER 2-13-004-01 for Diablo Canyon, Unit 2 Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-3
DCL-13-034, Licensee Event Report 12-005-00 for Diablo Canyon Regarding Expected Submittal Date1 April 2013Licensee Event Report 12-005-00 for Diablo Canyon Regarding Expected Submittal DateUnanalyzed Condition
DCL-11-118, LER 11-05-001 for Diablo Canyon Unit 1, Emergency Diesel Generator Actuations Upon Loss of 230 Kv Startup Due to Electrical Maintenance Testing Activities8 November 2011LER 11-05-001 for Diablo Canyon Unit 1, Emergency Diesel Generator Actuations Upon Loss of 230 Kv Startup Due to Electrical Maintenance Testing ActivitiesAnticipated operational occurrence
DCL-11-119, LER 11-04-001 for Diablo, Unit 1, Regarding Emergency Diesel Generator Actuated Upon 230 Kv Isolation Due to Maintenance Activities on Relay Panel8 November 2011LER 11-04-001 for Diablo, Unit 1, Regarding Emergency Diesel Generator Actuated Upon 230 Kv Isolation Due to Maintenance Activities on Relay PanelAnticipated operational occurrence
Offsite Circuit