Pages that link to "PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul"
Jump to navigation
Jump to search
The following pages link to PNO-V-89-039, on 890620,util Announced That Licensee Open to Offers to Purchase Facility Until 890630.Of All Bidders,Only Quadrex Corp Proposes to Operate Facility as Nuclear Plant. Evaluation of Bids Expected to Be Completed by End of Jul:
Displayed 50 items.
- IR 05000312/1985036 (← links)
- PNO-V-85-066, on 851002,loss of Main Feedwater Event Occurred.Plant Being Maintained in Hot Shutdown Condition Pending Determination of Exact Scenario,Causes & Appropriate Corrective Action.Region Evaluating Response (← links)
- ML20137X819 (← links)
- ML20137X795 (← links)
- ML20137X776 (← links)
- IR 05000312/1985032 (← links)
- IR 05000312/1985030 (← links)
- IR 05000928/2010031 (← links)
- IR 05000312/1985033 (← links)
- ML20137G897 (← links)
- IR 05000312/1997001 (← links)
- IR 05000312/1985027 (← links)
- ML20136J106 (← links)
- IR 05000312/1985031 (← links)
- PNO-V-85-092, on 851226,reactor Tripped.Caused by Loss of Electrical Power to Integrated Control Sys.Augmented Investigation Team Onsite on 851228 & Completed All Initial Interviews of All Operating Staff as of 851229 (← links)
- ML20136B030 (← links)
- IR 05000312/1985018 (← links)
- ML20135G579 (← links)
- IR 05000312/1985019 (← links)
- IR 05000312/1985022 (← links)
- ML20148T152 (← links)
- IR 05000312/1978015 (← links)
- IR 05000312/1978017 (← links)
- PNO-V-88-023, on 880323,undervoltage Attachment of CRD Breaker Failed to Operate.Interference of Undervoltage Attachment Trip Lever W/Exterior Label Plate,Noted. Investigation Continuing (← links)
- IR 05000312/1987049 (← links)
- IR 05000312/1987042 (← links)
- PNO-V-88-021, on 880315,leak of About 100 Gpm Occurred from Downstream Pressure Relief Valve While Opening Upstream Isolation Valve.Approx 650 Gallons of Water Released.No Radioactivity Released.Investigation Underway (← links)
- ML20148B706 (← links)
- ML20148B432 (← links)
- ML20148B421 (← links)
- ML20147H084 (← links)
- PNO-V-88-016, on 880224,RK Byrne Recommended Closure of Plant to Board of Directors at 880224 Meeting.Recommendation Will Be Considered by Board for Action on 880303.Licensee Continuing Loss of Offsite Power Testing (← links)
- ML20141N972 (← links)
- IR 05000312/1986005 (← links)
- ML20141J050 (← links)
- ML20141F228 (← links)
- IR 05000312/1997003 (← links)
- PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake (← links)
- IR 05000312/1997002 (← links)
- PNO-V-85-090, on 851226,reactor Trip Occurred Due to Loss of Electrical Power to Integrated Control Sys.Reactor Coolant Pressure Stabilized.Power Restored.Plant Will Go to Cold Shutdown Until Root Cause Analysis Completed (← links)
- PNO-V-85-089, on 851222,shutdown Occurred When RCS Leak Detected.Caused by Loose Valve Stem Packing on Pressurizer Sample Line Valve Sfv 70001.Loose Packing Readjusted. Repacking of Valve Planned.Power Will Be Resumed by 851224 (← links)
- PNO-V-85-087, on 851215,steam Leak Discovered in Room Where Normal Reactor Coolant Makeup Pump Located.Simultaneously, Auxiliary Bldg Radiation Alarm Received.Leak Isolated to Discharge Piping Weld (← links)
- ML20138H590 (← links)
- PNO-V-85-083, on 851205,reactor Tripped from 91% Full Power on High RCS Pressure.Caused by Stuck High Indicating Pin on Feedwater Flow Monitor Causing Operator to Manually Underfeed Both once-through Steam Generators (← links)
- IR 05000312/1985016 (← links)
- IR 05000312/1985024 (← links)
- IR 05000312/1985021 (← links)
- IR 05000312/1985023 (← links)
- ML20134F009 (← links)
- IR 05000312/1985013 (← links)