Pages that link to "PNO-V-86-084, on 861120,plant Shut Down Due to Inoperability of Acoustic Monitor for Safety Relief Valve 5c.Caused by Lack of Environ Qualification Documentation for Connector. Investigation Underway.Plant Will Be Restarted on 861125"
Jump to navigation
Jump to search
The following pages link to PNO-V-86-084, on 861120,plant Shut Down Due to Inoperability of Acoustic Monitor for Safety Relief Valve 5c.Caused by Lack of Environ Qualification Documentation for Connector. Investigation Underway.Plant Will Be Restarted on 861125:
Displayed 50 items.
- IR 05000397/1997002 (← links)
- PNO-V-85-077, on 851113,blown Fuse in Water Level Control Sys Resulted in Reactor Feedpumps Overfeeding & Reactor Trip.Caused by Faulty Inverter.Facility Shut Down to Allow Installation of Instrumentation to Monitor Vibrations (← links)
- ML20135B551 (← links)
- ML20134Q038 (← links)
- IR 05000397/1997006 (← links)
- IR 05000397/1985013 (← links)
- IR 05000397/1985034 (← links)
- IR 05000397/1996023 (← links)
- IR 05000397/1985010 (← links)
- PNO-V-93-004, on 930121,automatic Reactor Scram Received Due to Low Level in Reactor Pressure Vessel.Licensee Estimates That Plant Will Be Shut Down for Repairs & Maint for 3 to 5 Days.Inspector Onsite During Event.Press Release Issued (← links)
- IR 05000397/1992034 (← links)
- IR 05000397/1985007 (← links)
- ML20154H750 (← links)
- ML20153H028 (← links)
- IR 05000397/1988022 (← links)
- ML20150F977 (← links)
- PNO-V-88-013, on 880213,plant Experienced Condenser Tube Failure & Shut Down Manually Scramming Plant from 35% Power. on 880214,reactor Bldg Air Supply Fan Started W/O Trip Circuit Being Energized.Cause Under Investigation (← links)
- IR 05000397/1997007 (← links)
- ML20199E316 (← links)
- PNO-V-86-031, on 860609,operation Resumed After Completing First Refueling Outage.Licensee Plans to Complete post-refueling Startup Testing & Fuel Preconditioning. Facility May Be Placed in Reserve Shutdown Status (← links)
- PNO-V-90-049, on 901207,w/plant Operating at Full Power, Explosion Occurred in Area of B Phase Insulator of Plant Main Transformer,Which Caused Turbine & Reactor Trip.Unusual Event Was Declared Due to Explosion (← links)
- PNO-IV-90-028, on 900603,while Attempting to Energize Station Normal Auxiliary Power Transformers,Short Circuit Failure in Bus Works for 25 Kv Sys.Fire Brigade Responded But No Fire Was Reported.Event Under Investigation (← links)
- IR 05000397/1985026 (← links)
- ML20197A556 (← links)
- IR 05000397/1986016 (← links)
- IR 05000397/1987003 (← links)
- ML20205G660 (← links)
- PNO-V-87-022, on 870319,licensee Found Pressure Switch on Discharge Side of RHR Sys Pump B Isolated.Licensee Unisolated Switch & Restored Sys to Full Operability.Region V Followup Continuing (← links)
- IR 05000397/1999001 (← links)
- IR 05000397/1986008 (← links)
- PNO-V-86-064, on 860918,licensee Declared Unusual Event Due to High Winds of 85 Mph.Svc Water Pump B out-of-svc Resulting in Emergency Diesel Generator B Being out-of-svc. Rupture in Low Pressure Fire Main Also Reported (← links)
- IR 05000397/1986011 (← links)
- PNO-IV-95-007, on 950218,plant Reactor Scrammed from 80% Power Due to Turbine Trip.News Media Was Notified of Event (← links)
- PNO-V-92-024, on 920711,while Retesting Main Steam SRV at Approx 14% Reactor Power,Srv 3B Opened When Operated from Control Room But Would Not Close.Reactor Operators Reduced Reactor Pressure in Effort to Reseat Valve (← links)
- PNO-V-91-031, on 911119,licensee Declared Unusual Event Following Low Reactor Pressure Vessel Level Condition W/Eccs Injecting.Reactor Tripped on Turbine Trip.All ECCS Sys Responded as Designed (← links)
- ML20203C223 (← links)
- IR 05000397/1986003 (← links)
- ML20206U738 (← links)
- IR 05000397/1986031 (← links)
- ML20206U186 (← links)
- PNO-V-86-034, on 860620,licensee Measured 1.3 Gpm Leakage Into RHR Sys B.Caused by Leak Through LPCI Injection Valve 53B.Util Repairing Valve.Startup Will Be Delayed Until 860629 Due to BPA Load Requirements (← links)
- IR 05000397/1987001 (← links)
- PNO-V-86-060, on 860903,reactor Feedwater Pump B Tripped Due to Failure of Overspeed Controls.Caused by Partial Control Valve Closure Re Tripping of Hydraulic Power Units. Investigation Underway (← links)
- ML20214K207 (redirect page) (← links)
- PNO-V-86-084 (redirect page) (← links)
- PNO-V-86-078, on 861107 & 09 Increased Vibration from Reactor Recirculating Water Pump a Occurred.Licensee Reduced Reactor Power & Shifted Pumps Into Low Frequency Operation, Decreasing Vibration Level (← links)
- IR 05000397/1986037 (← links)
- IR 05000397/1986038 (← links)
- PNO-V-88-054, on 880824,licensee Declared Unusual Event as Result of Increase in Unidentified Leakage to Level Above TS Limit of 5 Gpm.Reactor Was Later Shutdown & Unidentified Leakage Rate Had Correspondingly Decreased to Approx 8 Gpm (← links)
- IR 05000397/1987027 (← links)