Pages that link to "PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress"
Jump to navigation
Jump to search
The following pages link to PNO-V-86-073, GL Mcchain,In Custody by FBI on Parole Violation,Issued Claims of Evading Security Background Checks for 6 Yrs While Working at Listed Facilities & Knows of Falsified Weld Records.Investigation in Progress:
Displayed 50 items.
- ML20138B487 (← links)
- PNO-V-85-067, on 851002,earthquake of Magnitude 5.0 on Richter Scale Occurred.Epicenter Located Approx 50 Miles North of Site.Event Minor,Not Felt by Site Personnel & Did Not Activate Recording Instruments (← links)
- PNO-IV-85-052, on 851003,plant Outage Initiated from Hot Standby to Replace Failed Seal on Reactor Coolant Pump 2B. Cause Not Stated (← links)
- PNO-V-85-081, on 851201,turbine & Reactor Trips Occurred. Caused by High Steam Generator Level Due to Sluggish Automatic Steam Generator Level Control Sys Response.No Safety Injection or ECCS Activated (← links)
- PNO-V-85-082, on 851202,low Tide Concurrent W/High Seas Caused Kelp to Be Injected Into Condenser Circulating Water Intake Structure.Control RPI Lost & Reactor Manually Tripped.Cause Under Investigation (← links)
- PNO-V-85-080, on 851128,oscillation of Steam Flow Resulted in Reactor Trip Due to Completion of Steam Generator Low Level Coincident W/Steam Flow/Feedwater Flow Mismatch Logic. Cause Will Be Determined Prior to Resuming Operations (← links)
- ML20137L392 (← links)
- PNO-V-85-079, on 851126,safety Injection Occurred on High Steam Flow Signal.Cause Under Investigation.Plant Stabilized & Maintaining Hot Standby Conditions.Licensee Plans to Evaluate Data & Make Appropriate Adjustments (← links)
- PNO-I-86-005, on 860118,licensee Conducted Normal Reactor Shutdown After Discovering Potential for Overstressing Containment Penetration in Event of Postulated Emergency Condenser Steam Line Break.Evaluation Continuing (← links)
- ML20137H596 (← links)
- PNO-V-85-055, on 850820,initial Criticality Achieved W/Boron Concentration within Expected Acceptance Criteria for Estimated Critical Conditions.Low Power Physics Testing in Progress & Expected to Be Completed in 7 Days (← links)
- PNO-V-85-078, on 851121,unit Experienced Loss of Auxiliary Transformer C,Resulting in Loss of Control Room Lighting Due to Abnormal Breaker Lineup.Plant Shut Down (← links)
- PNO-V-86-001, on 860102,unusual Event Declared When Reactor Tripped on lo-lo Steam Generator Level Following Feedwater Pump Trip.Caused by Reactor Coolant Pumps Tripping on Undervoltage.Pumps Restarted in 3 to 5 Minutes (← links)
- PNO-V-85-056, on 850829,reactor Tripped from 4% Power.Caused by Low Steam Generator Level Concurrent W/Steam Flow/ Feedwater Flow Mismatch During Surveillance Testing. Licensee Investigating Potential Equipment Problems (← links)
- PNO-IV-85-045, on 850829,unusual Event Declared Due to Hurricane Elena,w/75 Plus Mph Winds.Emergency Procedures Implemented & Site Prepared for Adverse Weather Conditions (← links)
- PNO-I-88-007, on 880115,present Unplanned Outage to Inspect & Repair Feedwater Sys Components & Supports Extended for Approx 3 Wks to Perform Insp of Bushings in Reactor Vessel Flange Which Hold 6-inch Diameter Reactor Vessel Head Studs (← links)
- PNO-IV-88-006, on 880105,licensee Determined That Reactor Vessel Flange Inner O-ring Leaking.Inner Leakoff Monitor Tube Isolated to Contain Leakage.Outage of Approx 21 Days Expected in Order to Replace O-ring Seals (← links)
- PNO-I-88-010, on 880120,reactor Scrammed from 42% Power Based on Low Reactor Vessel Water Level.Caused by Equipment Operator Error.Nrc Dispatched Augmented Insp Team to Site to Review Generic Safety Implications of Event (← links)
- PNO-I-88-009, on 880120,unusual Event Declared as Result of Worker Injured After Stepping Through Hole in Grating Between Reactor Vessel Flange & Refueling Cavity Floor.No Contamination Involved (← links)
- PNO-IV-88-020, on 880308,bag Containing Used anti-C Clothing Found to Contain Hot Particle in Shoulder Area of Garment. Mobile Particle Was Approx 725 Uci of Cobalt/Manganese Compound.Four Personnel Examined W/No Skin Irregularities (← links)
- PNO-V-86-010, on 860312,reactor Brought Critical Following Negative Rate Trip During Net Load Startup Test on 860311. Reactor Declared in Commercial Operation on 860313 (← links)
- PNO-IV-97-038, on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned (← links)
- PNO-V-86-012, on 860327,loss of Both Shutdown Cooling Trains Experienced Due to Loss of Pump Suction & Cavitation.Caused by Reactor Vessel Water Vortexing Causing Air to Be Pulled Into Shutdown Cooling Lines (← links)
- PNO-V-85-038, on 850626,press Conference Held to Announce That Nine People Charged W/Felony Sale of Drugs Offsite as Result of 8 Months Undercover Drug Investigation.No Licensee Employees Charged (← links)
- ML20140G325 (← links)
- ML20140F593 (← links)
- PNO-IV-97-035, on 970611,licensee Issued Press Release That Stated That Current Anticipated Restart Date of Waterford 3 Will Be mid-July.Caused by Internal Fault in Startup Transformer.State of La Has Been Informed (← links)
- PNO-I-86-006, on 860123,facility Achieved Initial Criticality.Criticality Boron Concentration Was 1,591 Ppm, 32 Ppm Above Predicted Concentration & within Tech Spec Max Margin of 100 Ppm (← links)
- PNO-V-85-091, on 851225,during Full Load Rejection Test, Reactor Tripped on lo-lo Steam Generator Level & Coolant Pumps Tripped.Caused by over-responsive Turbine Control Sys & under-responsive Steam Dump Sys.Pumps Restarted (← links)
- ML20138P075 (← links)
- PNO-V-85-074, on 851030,cold Shutdown Occurred.Caused by Condenser Tube Leak.Leak Location Not Determined.Plans to Drain & Refill Steam Generators Underway (← links)
- PNO-IV-85-063, on 851206,reactor Inadvertently Tripped.Caused by Operator Incorrectly Initiating Steps of Surveillance Tests on Control Element Assembly Calculators.Cold Shutdown Planned to Replace Reactor Coolant Pump Seals (← links)
- PNO-V-85-085, on 851210,reactor Tripped from 100% Power. Caused by Low Steam Generator Water Level Resulting from Main Feedwater Header Containment Isolation Valve Drifting Shut.All ESF Sys Functioned as Required.Reactor Restarted (← links)
- PNO-IV-97-015, on 970320,alert Declared at Waterford 3 Site as Result of Release of Gaseous Ammonia from Nearby Chemical Processing Plant.Licensee Notified Coast Guard of Event. State of La Informed (← links)
- ML20138E194 (← links)
- PNO-V-85-053, on 850814,grass Fire Occurred,Burning Approx 80 Acres.Caused by Automobile Accident on Plant Access Road, Approx 2.5 Miles South of Plant.Licensee Requested Assistance from State of CA Div of Forestry (← links)
- ML20134A975 (← links)
- ML20133N392 (← links)
- PNO-I-85-082, on 851018,4 Kv nonsafety-related Electrical Breaker Exploded,Injuring Two Const Workers.Workers Taken to Hosp for Treatment.Vendor Representatives & OSHA Investigating Cause of Event (← links)
- PNO-IV-97-006, on 970118,tanker Carrying Gasoline Spilled Portion of Cargo Into Mississippi River.State of Ms Has Been Informed (← links)
- PNO-V-85-051, on 850804,two Earthquakes Measuring 4.6 & 5.5 on Richter Scale Occurred 70 Miles from Facility.Primary Seismic Recording Equipment Failed to Trigger as Setpoint Higher than Acceleration Experienced at Site (← links)
- PNO-V-85-047, on 850721-22,interference Problem W/Upper Lateral Support Bumper Block Assemblies on Steam Generators Identified.Originally Discovered During Hot Functional Testing in Late 1984.Bumper Installation Modified (← links)
- PNO-IV-85-035, on 850718,high Vibration Detected in Main Turbine.Vibrations in Vicinity of Generator End of Low Pressure Turbine.Plant Shut Down to Inspect for Damage. Followup Rept Will Be Issued If Significant Damage Found (← links)
- PNO-V-85-040, on 850708,licensee Informed Region That Site Unaffected by Current Brush Fires.On 850707,fire Caused 45 Minute Outage to Emergency Notification Sys (← links)
- PNO-IV-85-029, increase in Gaseous Activity in Accessible Radiological Control Areas,Including Auxiliary Bldg,Reported Since Reaching 100% Power.Probably Caused by Positive Displacement Charging Pump Gland Leak Off (← links)
- PNO-V-85-029, on 850518 & 20,reactor Trip & Safety Injection Occurred Due to Loss of Vital Instrument Ac Power.Caused by Failure of Transformer in Vital Instrument Ac Inverter IY-13 & IY-12 Output Breaker Tripping Open (← links)
- ML20126L822 (← links)
- PNO-III-80-050, on 800315,two Pipe Fitters Attempting to Find Gas Leak,Broke Hose Coupling Containing Gas Pressure of 40 Psi.Gas Denotated by Activation of two-way Radio.Three Men Received Second & Third Degree Burns Over 15% of Body (← links)
- PNO-V-85-034, on 850603,maint Electrician Injured While Working in Machine Shop Outside of Protected Area.Caused by Piece of Matl Penetrating Electrician Skull During Buffing.Worker Died (← links)
- PNO-V-86-013, on 860330,while Reducing Power Due to Indications of Condenser Tube Rupture,Operator Initiated Manual Unit Trip Resulting in Safety Injection on High Steam Flow & lo-lo Tavg.Caused by Switch Problem & Stuck Valve (← links)