Pages that link to "PNO-IV-88-073, on 880830,personnel Heat Exhaustion Occurred Due to Physical Exertion While Wearing Anticontamination Clothing in High Temp Environ.Personnel Treated in Hosp. Restrictions Placed on Future Work Activities"
Jump to navigation
Jump to search
The following pages link to PNO-IV-88-073, on 880830,personnel Heat Exhaustion Occurred Due to Physical Exertion While Wearing Anticontamination Clothing in High Temp Environ.Personnel Treated in Hosp. Restrictions Placed on Future Work Activities:
Displayed 50 items.
- PNO-IV-85-061, on 851206,scheduled Maint Outage Will Begin. Replacement of Expansion Joint in Feedwater Heater & Repair of Main Generator Cooling Sys Hydrogen Leak Will Be Completed.Restart Scheduled for 851211 (← links)
- PNO-IV-85-049, on 850928,cooldown Commenced to Replace Seal on Reactor Coolant Pump C.Seal Cartridge Developed Crack Where Middle Cavity Seal Pressure Sensing Line Joins Cartridge.Startup Scheduled for 851003 (← links)
- PNO-IV-86-005, on 860113,emergency Diesel Generator Declared Inoperable Due to Failing Monthly Surveillance Test.On 860116,reactor Shut Down for Outage to Repair Generator. Several Damaged Piston Wrist Pin Bearings Found (← links)
- PNO-IV-97-017, on 970324,Arkansas Nuclear One Initiated Loading of Third VSC-24 Canister for Storage of Spent Fuel at Plant Isfsi.Licensee Initiated Repair of Crack by Grinding Out Defective Area (← links)
- PNO-IV-85-042, on 850819,manual Reactor Trip Occurred When Main Feedwater Pump B Turbine Speed Governor Failed, Causing Transient.Repairs Underway on Leaking Secondary Handhole of Steam generator.One-wk Outage to End 850726 (← links)
- PNO-IV-85-047, on 850913,during Shutdown for Replacement of Seals on Two Reactor Contact Pumps,Main Steam Isolation Actuated.Caused by Personnel Error.Unit Will Be Shut Down for Approx 1 Wk.Press Release Will Be Issued by Licensee (← links)
- PNO-IV-96-063, on 960603,licensee Restricted from Loading Spent Fuel Into Sierra Nuclear VSC-24 Casks Per Terms of Confirmatory Action Ltr (Cal).Licensee Responded to Both CAL & Bulletin & NRC Completed Review of Responses (← links)
- PNO-IV-80-032, on 800905,uncontrolled Release of Radioactive Gases Through Plant Stack Occurred When During Cooldown Letdown,Sys Relief Valve Lifted & Remained Open About 5 Minutes.Estimated Release Less than Tech Spec Limit (← links)
- PNO-IV-88-014, on 880224,contractor Employee Fell & Received Gash on Forehead After Hitting Head on Overhead Duck.Individual Surveyed But No Contamination Found.Employee Transported to Local Hosp.State of AR Not Informed (← links)
- PNO-IV-85-056, on 851108,info Pickets Established at Const Contractor Entrance Following 851107 Press Release by State of AR.AFL-CIO Protesting Replacement of Bechtel W/Daniel Const.Security Will Be Increased for 851123 Protest (← links)
- PNO-IV-96-061, on 961116,ANO Unit 2 Shutdown for Small SG Tube Leak.Licensee Plans to Conduct Insps to Locate, Characterize & Repair Leaking Tube.State of AR Informed & Plans to Issue Press Release (← links)
- PNO-IV-85-033, on 850715,licensee Announced Significant Cost Curtailment Program Due to State of AR PSC Rejection of Licensee Settlement Proposal for Sharing Const Cost of Grand Gulf (← links)
- PNO-IV-85-025, on 850531,unit Tripped from 100% Power Due to Unexplained Closure of Main Turbine Intercept Valves.Steam Pressure from Valves Caused Long,Narrow Crack in Expansion Joint.Steam Leak Isolated When Turbine Tripped (← links)
- PNO-IV-85-026, on 850607,unit Placed in Mode 2 for More than 2 Days.Caused by Listed Maint Needed After Operation at 95% Full Power.Unit Scheduled to Return to Power on 850612 (← links)
- PNO-IV-80-004, licensee Discovered Cracks in One of Two Containment Spray Sys in Reactor Bldg.Licensee Will Inspect. Plant Presently in Cold Shutdown While Performing Mods Required by NUREG-0578 (← links)
- PNO-IV-79-010, on 791017,inadvertent Release of Radioactive Gas.Air Sample in Makeup Tank Initiated,Stack Monitor Alarmed & Sampling Terminated.Rate of Radioactive Release Exceeded Tech Spec Limit by 2.36 (← links)
- PNO-IV-79-009, on 791016,reporter Interviewed Plant Manager Re Repts of Radioactive Leakage instances:790926,leakage Past Packing on Two Primary Sys Valves Into Bldg & 791012, Shutdown Cooling Heat Exchanger Leak to Svc Water Sys (← links)
- PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends (← links)
- PNO-IV-88-038, on 880507,outage Extension Occurred Due to Uncoupled Control Element Assembly.Cause Under Investigation.Initial Investigation Indicates Vessel Assembly Weight Coupling Checks Performed (← links)
- PNO-IV-88-035, on 880503,control Element Assembly Exceeded Tech Spec Limit of 3 During Rod Drop Test.Plant Startup on Hold Pending Resolution of Issue.Licensee Reviewing Safety Analysis Assumptions & Anticipate Tech Spec Amend (← links)
- ML20153E732 (redirect page) (← links)
- PNO-IV-88-073 (redirect page) (← links)
- PNO-IV-88-074, on 880901,addl Case of Personnel Heat Exhaustion & Transport of Contaminated Individual Occurred. Individual Became Ill After 25 Minutes in Area W/Wbgt of 86.6 F.Program to Reduce Risk of Exhaustion Instituted (← links)
- PNO-IV-88-059, on 880724,unit Shut Down & Cooldown Commenced to Replace Leaking Gaskets for Two Flanges on Pressurizer. Plant Restart Expected to Begin by 880727 (← links)
- PNO-IV-98-066, on 981225,large Influx of Fish (Shad) Affected Unit 1 Intake Structure,Resulting in Degraded Available Circulating Water Pump Suction Pressure.Shade Runs Have Historically Occurred as Result of Cyclic Changes (← links)
- PNO-IV-88-086, on 881102,individual Performing Maint Activities on Steam Generator B Insp Cover Received Radiological Exposure of 3.216 Rem to Right Thigh.Nrc Dispatched to Site on 881103.Region IV Informed (← links)
- PNO-IV-85-048, on 850917,control Rod Dropped,Causing Plant Runback to Approx 38% Power.Caused by Repair to CRD Stator. Cooldown Commenced to Repair Stator (← links)
- ML20207H125 (← links)
- PNO-IV-86-025, during Refueling Outage & Valve Insp of Unit 2,valve Operator Environ Qualification Deficiencies Identified in Limitorque motor-operated Valves.Cause Unknown.Insp & Rework of Valves Continuing (← links)
- PNO-IV-88-091, on 881123,hot Particle Was Identified by Portal Monitor as Worker Was Exiting non-radiological Work Area Located on Turbine Bldg Roof.Licensee Conducting Investigation to Determine Origin (← links)
- PNO-IV-87-003, on 870109,commenced Unit Shutdown & Cooldown to Repair Small Tube Leak in Steam Generator A.On 870110, Plant in Cold Shutdown.Licensee Plans to Place Unit Back on Line on 870118 (← links)
- PNO-IV-89-028, on 890418,reactor Trip Due to Main Turbine Trip Occurred.Cause Unknown.Pump Reset & Restarted & Both Turbine Driven & Motor Driven Emergency Feedwater Pumps Operated to Maintain Steam Generator Water Level (← links)
- PNO-IV-87-038, region Initiated Augmented Insp Team (AIT) to Review Circumstances Associated W/Elevated Reactor Bldg Temps & Assess Impact on Equipment Operability & USAR Accident Analysis.Ait Scheduled to Begin Work on 870818 (← links)
- ML20249B899 (← links)
- ML20249A899 (← links)
- ML20249A893 (← links)
- ML20248L328 (← links)
- ML20248L138 (← links)
- ML20248F324 (← links)
- PNO-IV-89-034, on 890517,unisolable RCS Pressure Boundary Leak Identified on Socket Weld on Cold Leg Drain Line. Possible Control Rod Drive Flange Leak Being Investigated & Insp of Reactor Bldg Continuing (← links)
- PNO-IV-89-042, on 890623,plant Shutdown Commenced Due to Increased RCS Leakage.Caused by Fatigue in Vent Line on Reactor Coolant Pump C Seal Pressure Sensing Line.Plant Heatup Expected to Begin on 890626 (← links)
- ML20236W781 (← links)
- PNO-IV-89-012, on 890204,licensee Issued Condition Rept Re DHR Suction Line Pipe Support Damage.Damage Involves Obvious Unexpected Movement at Pipe Support Which Caused Damage to Lugs.Conference Call to Review Scheduled for 890301 (← links)
- PNO-IV-87-032, on 870706,leakage Found in RCS Pressure Boundary.Caused by Leaking Seal Weld on Dummy Heater Plug on Bottom of Pressurizer.Rcs Drained & Seal Weld Repaired. Outage Duration About 1 Wk.State of AR Informed (← links)
- ML20217A350 (← links)
- ML20217A020 (← links)
- PNO-IV-87-038A, preliminary Results of Investigations of Reported High Containment Temps at Facility Substantiated Basis for Justifications for Continued Operations Submitted by Licensee on 870814 & 18 (← links)
- PNO-IV-86-033, on 861104,power Reduced from 100% to Go to Cold Shutdown to Repair body-to-bonnet Seal Ring Leak on Check Valve a in Main Feed Header to Steam Generator B.Leak Rate Estimated to Be Approx 2 to 3 Gpm (← links)
- PNO-IV-86-032, on 861023,boric Acid Corrosion on HPI Nozzle for Penetration Into Reactor Coolant Pump a Discharge Pipe discovered.Body-to-bonnet Leak on Manual Isolation Valve in HPI Apparent Source.B&W to Assist in Evaluation of Problem (← links)
- PNO-IV-86-030, on 860924,following Reactor Trip on High RCS Pressure,Quench Tank Parameters & Tail Pipe Temp Indicated That One or Both Pressurizer Safety Valves Lifted.Caused by Improper Setup During Lift Test.Retest in Progress (← links)