Pages that link to "PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends"
Jump to navigation
Jump to search
The following pages link to PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends:
Displayed 50 items.
- IR 05000335/1986013 (← links)
- PNO-IV-85-061, on 851206,scheduled Maint Outage Will Begin. Replacement of Expansion Joint in Feedwater Heater & Repair of Main Generator Cooling Sys Hydrogen Leak Will Be Completed.Restart Scheduled for 851211 (← links)
- PNO-IV-85-052, on 851003,plant Outage Initiated from Hot Standby to Replace Failed Seal on Reactor Coolant Pump 2B. Cause Not Stated (← links)
- PNO-IV-85-049, on 850928,cooldown Commenced to Replace Seal on Reactor Coolant Pump C.Seal Cartridge Developed Crack Where Middle Cavity Seal Pressure Sensing Line Joins Cartridge.Startup Scheduled for 851003 (← links)
- PNO-IV-86-005, on 860113,emergency Diesel Generator Declared Inoperable Due to Failing Monthly Surveillance Test.On 860116,reactor Shut Down for Outage to Repair Generator. Several Damaged Piston Wrist Pin Bearings Found (← links)
- PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures (← links)
- IR 05000264/1977002 (← links)
- ML20137G926 (← links)
- ML20137G908 (← links)
- IR 05000264/1975001 (← links)
- IR 05000264/1973001 (← links)
- ML20137G614 (← links)
- ML20137G478 (← links)
- PNO-IV-97-017, on 970324,Arkansas Nuclear One Initiated Loading of Third VSC-24 Canister for Storage of Spent Fuel at Plant Isfsi.Licensee Initiated Repair of Crack by Grinding Out Defective Area (← links)
- ML20137G417 (← links)
- PNO-IV-85-042, on 850819,manual Reactor Trip Occurred When Main Feedwater Pump B Turbine Speed Governor Failed, Causing Transient.Repairs Underway on Leaking Secondary Handhole of Steam generator.One-wk Outage to End 850726 (← links)
- PNO-IV-85-047, on 850913,during Shutdown for Replacement of Seals on Two Reactor Contact Pumps,Main Steam Isolation Actuated.Caused by Personnel Error.Unit Will Be Shut Down for Approx 1 Wk.Press Release Will Be Issued by Licensee (← links)
- PNO-IV-96-063, on 960603,licensee Restricted from Loading Spent Fuel Into Sierra Nuclear VSC-24 Casks Per Terms of Confirmatory Action Ltr (Cal).Licensee Responded to Both CAL & Bulletin & NRC Completed Review of Responses (← links)
- PNO-IV-85-045, on 850829,unusual Event Declared Due to Hurricane Elena,w/75 Plus Mph Winds.Emergency Procedures Implemented & Site Prepared for Adverse Weather Conditions (← links)
- IR 05000272/1986099 (← links)
- PNO-IV-88-006, on 880105,licensee Determined That Reactor Vessel Flange Inner O-ring Leaking.Inner Leakoff Monitor Tube Isolated to Contain Leakage.Outage of Approx 21 Days Expected in Order to Replace O-ring Seals (← links)
- PNO-IV-80-032, on 800905,uncontrolled Release of Radioactive Gases Through Plant Stack Occurred When During Cooldown Letdown,Sys Relief Valve Lifted & Remained Open About 5 Minutes.Estimated Release Less than Tech Spec Limit (← links)
- PNO-IV-88-020, on 880308,bag Containing Used anti-C Clothing Found to Contain Hot Particle in Shoulder Area of Garment. Mobile Particle Was Approx 725 Uci of Cobalt/Manganese Compound.Four Personnel Examined W/No Skin Irregularities (← links)
- PNO-IV-88-014, on 880224,contractor Employee Fell & Received Gash on Forehead After Hitting Head on Overhead Duck.Individual Surveyed But No Contamination Found.Employee Transported to Local Hosp.State of AR Not Informed (← links)
- PNO-IV-85-056, on 851108,info Pickets Established at Const Contractor Entrance Following 851107 Press Release by State of AR.AFL-CIO Protesting Replacement of Bechtel W/Daniel Const.Security Will Be Increased for 851123 Protest (← links)
- PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake (← links)
- IR 05000330/1977002 (← links)
- ML20140G343 (← links)
- ML20140G325 (← links)
- ML20140F593 (← links)
- PNO-IV-97-035, on 970611,licensee Issued Press Release That Stated That Current Anticipated Restart Date of Waterford 3 Will Be mid-July.Caused by Internal Fault in Startup Transformer.State of La Has Been Informed (← links)
- IR 05000083/1982001 (← links)
- IR 05000124/1983001 (← links)
- IR 05000124/1984001 (← links)
- PNO-I-86-006, on 860123,facility Achieved Initial Criticality.Criticality Boron Concentration Was 1,591 Ppm, 32 Ppm Above Predicted Concentration & within Tech Spec Max Margin of 100 Ppm (← links)
- PNO-II-85-108, on 851107,emergency Diesel Generator Overspeed Occurred.Util & Tdi Disassembling & Inspecting for Damage. Cause Under Review.Link Pin Bushing & Main Bearing Cracked (← links)
- PNO-II-85-106, on 851105,design Engineer Fell Approx 40 Ft Inside Cooling Tower.Victim Transferred to Hosp (← links)
- PNO-IV-85-063, on 851206,reactor Inadvertently Tripped.Caused by Operator Incorrectly Initiating Steps of Surveillance Tests on Control Element Assembly Calculators.Cold Shutdown Planned to Replace Reactor Coolant Pump Seals (← links)
- PNO-IV-97-015, on 970320,alert Declared at Waterford 3 Site as Result of Release of Gaseous Ammonia from Nearby Chemical Processing Plant.Licensee Notified Coast Guard of Event. State of La Informed (← links)
- PNO-IV-96-061, on 961116,ANO Unit 2 Shutdown for Small SG Tube Leak.Licensee Plans to Conduct Insps to Locate, Characterize & Repair Leaking Tube.State of AR Informed & Plans to Issue Press Release (← links)
- IR 05000546/1982007 (← links)
- ML20134A975 (← links)
- PNO-II-85-102, crack-like Indications Discovered on Surface of Cross Assembly Which Ties 24-inch Discharge Piping of Recirculation Pump to Jet Pump 16-inch Ring Supply Header. Util & Nutech Performing Evaluation (← links)
- PNO-IV-97-006, on 970118,tanker Carrying Gasoline Spilled Portion of Cargo Into Mississippi River.State of Ms Has Been Informed (← links)
- PNO-II-85-092, on 850926,Hurricane Gloria Located About 240 Miles South of Cape Hatteras,Nc,Moving North Northwest at 15 to 20 Miles Per Hour.Brunswick Unit 1 in Refueling Shutdown,Unit 2 Shut Down & Surry 1 & 2 at Full Power (← links)
- IR 05000269/1984031 (← links)
- ML20132E516 (← links)
- PNO-V-85-060, on 850919,NOAA Pacific Tsunami Warning Ctr Issued Tsunami Watch Bulletin.Caused by Earthquake Northwest of Acapulco,Mexico.Watch Terminated (← links)
- PNO-IV-85-035, on 850718,high Vibration Detected in Main Turbine.Vibrations in Vicinity of Generator End of Low Pressure Turbine.Plant Shut Down to Inspect for Damage. Followup Rept Will Be Issued If Significant Damage Found (← links)
- PNO-IV-85-033, on 850715,licensee Announced Significant Cost Curtailment Program Due to State of AR PSC Rejection of Licensee Settlement Proposal for Sharing Const Cost of Grand Gulf (← links)