ML102880495

From kanterella
Revision as of 18:21, 20 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
5.3 Exhibit 1 Interviews Regarding Maintenance
ML102880495
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/20/2010
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102880495 (1)


Text

FM 5.3 Exhibit 1 page 1 of 1 1/20/2010 Interview with Richard Portmann( Tendon Engineer) and Richard Pipin(Maintenance Manager)Interviewer:

Gary Hughes P11 Maintenance Issues S S Added Linseed oil to the Dome when damaged in1976(Documents provided to Dr. Avi Mor)Have grease leaching out under equipment hatch- no idea where coming from and have not treated it- pictures in Concrete-tendon Interaction

  1. 74 Grease below equipment hatch.Wax initially in sleeves 0 I Do not power wash per PII information request 101 from Tommie Sassard.INo PMs to do any cleaning of the containment I Grease Issues 0 0 Add Visconorust 2090-p4 grease to tendons per F&Q 17.0 'Grease Replacement" F&Q 17.0 has provisions to report to the NRC if specifically add more grease than take out.* Have grease leaching out under equipment hatch- no idea where coming from and have not treated it- pictures in Concrete-tendon Interaction
  1. 74 Grease below equipment hatch-work order has been written and will be worked soon* Over the years adding higher density grease to reduce grease loss. Added more to vertical tendons a few years ago to make up for losses. Thought losses were grease settling at the bottom or oil separating from the grease