05000263/FIN-2015003-01

From kanterella
Revision as of 07:57, 25 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
01
Site: Monticello Xcel Energy icon.png
Report IR 05000263/2015003 Section 1R18
Date counted Sep 30, 2015 (2015Q3)
Type: NCV: Green
cornerstone Barrier Integrity
Identified by: NRC identified
Inspection Procedure: IP 71111.18
Inspectors (proximate) C Hunt
K Riemer
M Doyle
M Ziolkowski
N Shah
P Laflamme
P Voss
P Zurawski
R Elliott
S Bell
J Havertape
Violation of: 10 CFR 50 Appendix B Criterion III, Design Control
INPO aspect
'