IR 05000263/2015407; on 07/17/2015 - 07/21/2015; Monticello Nuclear Generating Plant; Supplemental Inspection - Inspection Procedure (IP) 95001. (Cover Letter Only)
ML15245A345
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/02/2015
From: Brian Kemker
Plant Support Branch II
To: Gardner P
Northern States Power Co
References
EA-14-165 IR 2015407
Download: ML15245A345 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 2, 2015

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - NRC SUPPLEMENTAL INSPECTION REPORT 05000263/2015407 AND ASSESSMENT FOLLOW-UP LETTER

Dear Mr. Gardner:

On July 21, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection at your Monticello Nuclear Generating Plant (MNGP). The enclosed report documents the results of this inspection, which were discussed during an exit meeting and regulatory performance meeting on July 21, 2014, with you and members of your staff.

During this meeting, Mr. K. OBrien and Mr. G. Hansen discussed the associated performance deficiency and corrective actions, which fulfills NRC policy for a regulatory performance meeting.

In accordance with the NRC Reactor Oversight Process (ROP) Action Matrix, this supplemental inspection was performed to follow up on a performance issue that was identified in the fourth quarter of 2014. The issue was previously documented and assessed in NRC Inspection Report (IR) 05000263/2014406 and NRC letter dated February 26, 2015. The NRC was informed of your readiness for the inspection on June 8, 2015.

The objectives of this supplemental inspection were to determine whether or not: (1) the root and contributing causes for the significant issue were understood; (2) the extent of condition and the extent of cause of the issue were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.

After reviewing the MNGPs performance in addressing the Greater-Than-Green inspection finding that was the subject of this inspection, the NRC concluded your actions met the objectives. Therefore, in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the Greater-Than-Green finding will only be considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at the MNGP will transition to the Licensee Response Column of the ROP Action Matrix at the start of the fourth quarter of 2015, absent the identification of any additional significant performance deficiencies.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from the enclosure, this transmittal document is decontrolled. No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Brian J. Kemker, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure:

IR 05000263/2015407 w/Attachment: