ML110800306

From kanterella
Revision as of 23:21, 8 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Cancelled - 03/24/2011 Public Meeting with Exelon Generation Co., LLC, Three Mile Island to Discuss the Nrc'S Assessment of Safety Performance for Calendar Year 2010
ML110800306
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/21/2011
From: Bellamy R R
NRC/RGN-I/DRP/PB6
To:
BELLAMY RR
References
Download: ML110800306 (3)


Text

MN No.11-002 Licensee: Facilities:

Docket No(s).U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING March 2L, 2OII CANCELLED Exelon Generation Company, LLC Three Mile lsland Power Station, Unit 1 50-289 Time and Date: March 24,2011, 6:00 - 7:30 pm Location: Londonderry Township Municipal Building 738 South Geyers Church Road Middletown, PA 17057 The U.S. Nuclear Regulatory Commission (NRC) will conduct an open house meeting to discuss the NRC's assessment of safety performance at Three Mile lsland Power Station for calendar year 201Q, as described in the Annual Assessment Letter, dated March 4,2011. The NRC will also be available to engage interested stakeholders on specific performance issues at the plant and our role in ensuring safe plant operations.

Purpose: NRC Attendees:

R. Bellamy, Chief, Projects Branch 6, Region I D. Kern, Senior Resident lnspector, Three Mile lsland S. Barber, Senior Projects Engineer, Project Branch 6, Region I Public Participation:

This is a Category 3 Meeting. The public is invited to this open house and will have an opportunity to interact with NRC personnel regarding our assessment of the safety performance at Three Mile lsland Power Station for the previous year.The NRC's Annual Assessment Letter for Three Mile lsland Unit 1 can be located in ADAMS with Accession Number ML110620216.

ADAMS is accessible from the NRC Web Site at h tt p : //www. n rc. o ov/rea d i n o - rm/ad a m s. htm l.Additional information relative to the NRC's Annual Assessment process and the safety performance of the Three Mile lsland Power Station can be found on the NRC's web site at: http://www.

nrc.qov/NRR/OVERSI GHT/ASQESS/index.

html.The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28,2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.qov/readino-rm/doc-collections/commission/poljcy/67fr36920,htm1 and contains information regarding visitors and security.

Meeting Contact: Dr. Ronald R. Bellamy, Chief, Projects Branch 6 610-337-5200 E-mail: ronald.bellamv@nrc.gov..Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated.

Attendance by NRC personnel at this meeting should be made known by March 10,2011, via telephone to the NRC meeting contact.\Approved by: ]Ronald R. Bellamy, Ph'.D., Chief Projects Branch 6 Division of Reactor Projects cc: Distribution via ListServ 2 Meeting Contact: Dr. Ronald R. Bellamy, Chief, Projects Branch 6 61 0-337-5200 E-mail: ronald. bellamv@nrc.qov."Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting, to provide the NRC staff adequate notice to determine whether the request can be accommodated.

Attendance by NRC personnel at this meeting should be made known by March 10,2011, via telephone to the NRC meeting contact.Approved by:/RA/Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects cc: Distribution via ListServ Distribution w/encl: (VlA E-MAIL)Executive Director for Operations, OEDO Deputy Executive Direclor for Reactor Programs,OEDO Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nucelar Reactor Regulation, NR Director, Division of Inspection and Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRR/DORL Asst. General Counsel Materials Litigation and Enforcement, OGC W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford.

DRP P. Wilson, DRS S. Weerakkody, DRS J. Trapp, Rl OEDO R. Bellamy, DRP S.8arber.

DRP N. Lafferty, DRP A. Dugandzic, DRP T. Ziev, DRP D. Kern, DRP, SRI (RI DSEDOMAILCENTER RESOURCE)(RTDSEDOMATLCENTER RESOURCE)(RTDSNRROD)(RIDSNRROD)(RTDSNRRDtRS)(RTDSNRRDORL)(RIDSOGCMAILCENTER)

J. Heinly, DRP, Rl C. LaRegina, DRP N. Sheehan. PAO D. Screnci, PAO R. Barkley, ORA N. McNamara.

SLO D. Tifft, SLO G. Matakas, ORA K. Heater, DRP V. Lewis, Rl Receptionist ROPreportsResource@nrc.qov RidsNrrPMThreeMilelsland Resource SUNSI REVIEW COMPLETE:

RRB (Reviewer's Initials)ML110800306 DOC NAME:G:\DRP\BRANCH6\ROP Assessment Folders\ROP

't1\Three Mile lsland\End-of-Cycle\TMl AA Meeting Notice ROP 11 Cancelled.docx After declaring this document "An OfficialAgency Record" it will be released to the Public."E" = Copy with attachmenUenclosure "N' = No copy indicate in the box: "C' =