ML14262A330

From kanterella
Revision as of 06:17, 1 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation
ML14262A330
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/16/2014
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Hon A DORL/LPL2-2 301-415-8480
References
Download: ML14262A330 (17)


Text

ASTPresentationSeptember16,2014 NuclearSequoyahNuclearPlant(SQN)

TVA Nuclear Power Group 2 Introduction Introduction Purpose of Meeting

  • Discussion of AST as it pertains to RAI KAB-044

-Current Licensing Bases

-Improved Technical Specification Impact

Introductions

  • NRC*TVA TVA Nuclear Power Group 3 Current Licensing Bases Current Licensing Bases
  • TVA-SQN-TS-02-08 submitted to NRC, January 14, 2003

-Request to modify TS 3.9.4 "Containment Building Penetrations" and Partial scope

implementation of the alternate source

term-Modified applicability requirement for the containment building equipment door (CBED)-CBED closure only required during "recently irradiated fuel"

  • NRC approval received on October 28, 2003 TVA Nuclear Power Group 4 Current Licensing Basis Current Licensing BasisCurrent wording for T/S 3.9.4 TVA Nuclear Power Group 5 Current Licensing Basis Current Licensing Basis
  • TVA and NRC recognized that the Fuel Handling Accident (FHA) within

containment is the only Design Basis Accident (DBA) affected by the proposed

change*TVA evaluated a FHA both inside and outside containment

  • NRC found that the change to replace the current accident source term used in

the design basis FHA within containment

with an AST was acceptable TVA Nuclear Power Group 6 Current Licensing Basis Current Licensing BasisExcerpt from NRC SE TVA Nuclear Power Group 7 Current Licensing Basis Current Licensing BasisExcerpt from NRC SE TVA Nuclear Power Group 8 Current Licensing Basis Current Licensing Basis

  • Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
  • TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013

-Changed the time of the CVI from 30 to 300 seconds

-Changed the containment air volume for mixing from 5% to 50%-Change was done under 10 CFR 50.59

-Consequences to the FHA decreased by ~7%

TVA Nuclear Power Group 9 Current Licensing Basis Current Licensing Basis

  • Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
  • TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013

-Changed the time of the CVI from 30 to 300 seconds

-Changed the containment air volume for mixing from 5% to 50%-Change was done under 10 CFR 50.59

-Consequences to the FHA decreased by ~7%

TVA Nuclear Power Group 10 Current Licensing Basis Current Licensing Basis TVA Nuclear Power Group 11 Current Licensing Basis Current Licensing Basis TVA Nuclear Power Group 12 Current Licensing Basis Current Licensing Basis TVA Nuclear Power Group 13 Improved Tech Spec Impact Improved Tech Spec Impact

  • Four T/S were changed in this conversation by changing the APPLICABILITY from "During movement of irradiated fuel" to "During movement of recently irradiated fuel"

-3.3.6 Containment Ventilation Isolation Instrumentation

-3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation

-3.7.12 Auxiliary Building Gas Treatment System

-3.9.4 Containment Penetrations

  • In none of these specifications, does SQN CTS have DURING CORE ALTERATIONS TVA Nuclear Power Group 14 Improved Tech Spec Impact Improved Tech Spec Impact
  • 3.3.6 Containment Ventilation Isolation Instrumentation TVA Nuclear Power Group 15 Improved Tech Spec Impact Improved Tech Spec Impact
  • 3.9.4 Containment Penetrations