Other: ML13338A644, ML15309A326, ULNRC-05962, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (EA-12-049), ULNRC-06024, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ULNRC-06026, First Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), ULNRC-06184, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ULNRC-06185, Fourth Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), ULNRC-06240, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ULNRC-06241, Fifth Six Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
|
MONTHYEARULNRC-05962, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (EA-12-049)2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (EA-12-049) Project stage: Other ML13121A1872013-06-0707 June 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI ULNRC-06008, Response to Request for Additional Information with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2013-07-0303 July 2013 Response to Request for Additional Information with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) Project stage: Response to RAI ULNRC-06026, First Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-29029 August 2013 First Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ULNRC-06024, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-08-29029 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML13283A0332013-10-0909 October 2013 Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Request ML13323A1112013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML13338A6442013-12-0909 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Callaway Plant, Unit 1, (TAC No. MF00772) Project stage: Other ML13224A1952013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Acceptance Review ULNRC-06131, Request for Relaxation from NRC Order EA-12-049, Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.2014-08-0101 August 2014 Request for Relaxation from NRC Order EA-12-049, Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Project stage: Request ULNRC-06192, Retraction of Request for Relaxation from NRC Order EA-12-0492015-02-18018 February 2015 Retraction of Request for Relaxation from NRC Order EA-12-049 Project stage: Request ML15051A2722015-02-23023 February 2015 Withdrawal of Request for Relaxation for Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events Project stage: Withdrawal ULNRC-06185, Fourth Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-26026 February 2015 Fourth Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ULNRC-06184, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-26026 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ULNRC-06240, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-27027 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ULNRC-06241, Fifth Six Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-27027 August 2015 Fifth Six Month Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML15309A3262015-11-0909 November 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other 2013-07-03
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
W Ameren MISSOURI Callaway Plant **********************************************************************************************************************************************************************************************************************************************
- **********************************************************************************************************************************************************************************************************************************************
- August 29, 2013 ULNRC-06024 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10CFR2.202 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 FIRST SIX-MONTH STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (ORDER NUMBER EA-12-049)
References:
- 1. Letter dated March 12,2012 from E. J. Leeds and M. R. Johnson, USNRC, to Adam C. Heflin, Callaway Plant, Union Electric Company, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Basis External Events" (ADAMS Accession Number ML12054A736)
- 2. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, August 29, 2012 (ADAMS Accession Number ML12229A174)
- 3. ULNRC-05924, "Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated October 29, 2012 4. ULNRC-05962, "Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated February 28, 2013 ************************************************************************************************************************
PO Box 620 ************************************************************************************************************************
Fulton, MO 65251 AmerenMissour i.com ULNRC-06024 August 29, 2013 Page 2 of4 On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued the order identified above as Reference 1 to Union Electric Company ( dba Ameren Missouri) for Callaway Plant. Reference 1 was immediately effective and directs Ameren Missouri to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference
- 1. Reference 1 required submission of an initial status report 60 days following issuance of final interim staff guidance from the NRC (Reference
- 2) and an Overall Integrated Plan pursuant to Section IV, Condition C. Reference 3 provided Ameren Missouri's initial status report regarding mitigation strategies.
Reference 4 provided Ameren Missouri's Overall Integrated Plan.Section IV, Condition C.2 ofReference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide," provides direction regarding the content of the status reports. The enclosure to this letter provides Ameren Missouri's first six-month status report pursuant to Section IV, Condition C.2 of Reference
- 1. This letter does not contain new commitments.
If you have any questions concerning the content of this letter, please contact Scott Maglio, Regulatory Affairs Manager, at 573-676-8719.
I declare under penalty of perjury that the foregoing is true and correct. Executed on:
Enclosure:
Sincerely, -----------------
Regulatory Affairs Manager Ameren Missouri's First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ULNRC-06024 August 29, 2013 Page 3 of4 cc: Mr. Steven A. Reynolds Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Eric Leeds Director, Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-13H16M Washington, DC 20555-0001 Mr. Jack Davis Director, Mitigation Strategies Directorate Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ULNRC-06024 August 29, 2013 Page 4 of4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III D.W. Neterer L. H. Graessle S. A. Maglio T. B. Elwood J. L. Fortman J. T. Patterson Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Enclosure to ULNRC-06024 Ameren Missouri's First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events 1 Introduction Ameren Missouri developed an Overall Integrated Plan (OIP) (Reference
- 1) for the Callaway Plant, documenting the diverse and flexible strategies (FLEX), in response to NRC Order Number EA-12-049 (Reference 2). This enclosure provides an update of milestone accomplishments since submittal of the OIP (Reference 1), including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any. Refer to Section 8 of this enclosure for a list of References.
2 Milestone Accomplishments The following milestones have been completed since the development of the OIP (Reference 1 ), and are current as of July 31, 2013.
- PWROG has issued the NSSS-specific guidance
- ECA-0.0, Rev 2+, Loss of all AC Power
- Submittal of six-month status report for implementation of order EA-12-049 (this document) 3 Milestone Schedule Status The following table provides an update to Attachment 2 of the OIP (Reference 1). The table provides the activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed.
The revised milestone target completion dates do not impact the Order EA-12-049 (Reference
- 2) implementation date. Page 1 of6 Enclosure to ULNRC-06024 Callaway Milestone Schedule Status Revised Target Original Target (Will be Activity Date updated every Completion 6 months) Date Submit Overall Integrated February-2013 Complete Implementation Plan 6 Month Status Updates February-2015 Started Update 1 August-20 13 Complete Update 2 February-2014 Not Started Update 3 August-2014 Not Started Update 4 February-2015 Not Started FLEX Strategy Evaluation April-2013 Complete Perform Staffing Analysis December-2013 Not Started June 2014 Modifications November-2014 Started Modifications Evaluation April-2013 Started October 2013 Engineering and Implementation November-2014 Started N-1 Walkdown April-2013 Started December-20 13 Design Engineering March-2014 Started Unit 1 Implementation Outage November-2014 Not Started On-site FLEX Equipment December-2013 Started April2014 Purchase June-2013 Started March 2014 Procure December-2013 Started April2014 Off-site FLEX Equipment September-2014 Started Develop Strategies with RRC November-20 13 Started Install Off-site Delivery Station (if September-2014 Started necessary)
Procedures June-2014 Started PWROG issues NSSS-specific guidelines June-2013 Complete Create Callaway FSG April-2014 Started Create Maintenance Procedures June-2014 Not Started Training November-2014 Started Develop Training Plan April-2014 Started Implement Training May-2014 Not Started November-2014 Submit Completion Report November-2014 Not Started Page 2 of6 Enclosure to ULNRC-06024 4 Changes to Compliance Method The following changes have been made to Ameren Missouri's FLEX response documented in Reference
- 1. 4.1 Nitrogen Backup Capacity The Ameren Missouri FLEX response (Reference I) identified that Callaway Plant is designing a modification that will supplement the existing backup nitrogen capacity.
The concept was to provide sufficient nitrogen bottle capacity to provide nitrogen for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of operation.
In lieu of this modification, Ameren Missouri is revising its Phase I FLEX Strategy to provide a portable air compressor to supply the Atmospheric Relief Valves (ARVs) and the Turbine Driven Auxiliary Feedwater Pump (TDAFP) Flow Control Valves with compressed air. The installed nitrogen backup supply has sufficient capacity for approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of operation.
The portable air compressor is planned to be connected to test connections upstream of the nitrogen accumulator tanks that supply the back-up nitrogen to these valves. The portable air compressors will be powered from a Phase 2 portable generator.
4.2 NK Battery Load Shed The Ameren Missouri FLEX response (Reference I) indicated that after NK (Class IE I25-VDC) load shedding, only ARVs ABPVOOOI and ABPV0002 would have DC power available for operation and the Control Room would only be able to remotely control Auxiliary Feedwater (AFW) to Steam Generator (SG) A and D. The original strategy was to open the disconnects to Class IE I25 VDC Batteries NK13 and NKI4 to preserve these batteries until after Class IE I25-VDC Batteries NKII and NKI2 were depleted.
However, to preserve symmetrical cooldown Class IE I25-VDC Batteries NKI3 and NKI4 will be load shed except for the power to ARVs ABPV0003 and ABPV0004, as well as power to the TDAFP Flow Control Valves for SG Band SG D. Preliminary evaluation by Engineering indicates that this load is a low power draw from the batteries and would not cause a significant reduction in the amount oftime NK13 and NKI4 are able to supply I25-VDC power. 4.3 Storage/Protection of Equipment The Ameren Missouri FLEX response (Reference I) identified two locations for storage of Callaway Plant FLEX equipment.
Callaway Plant is evaluating the use of one (I) storage location meeting the requirements ofNEI I2-06, Sections 4 through 9. 4.4 Deployment of Phase 2 480 V AC Diesel Generators The Ameren Missouri FLEX response (Reference I) identified that FLEX connection panels would be installed in Corridor 130I of the Auxiliary Building 2000 elevation and the plant west wall of the Control Building.
Permanent sealed penetrations with grommets will be made in the walls of these buildings to provide access to the FLEX panels. Further evaluation has determined that it is not necessary to install the permanent sealed penetrations to the outside walls. In lieu of the wall penetrations, the cables from the Phase 2 portable 480-V AC diesel generators will be run through existing doorways.
Page 3 of6 Enclosure to ULNRC-06024 4.5 Deployment of Phase 3 4160 VAC Diesel Generators The Ameren Missouri FLEX response (Reference
- 1) identified that to facilitate connection of the generator cables to the Class 1E 4160-V AC switchgear, two new sealed penetrations will be installed in the west wall of the control building.
Further evaluation has determined that it is not necessary to install the permanent sealed penetrations to the outside walls. In lieu of the wall penetrations, the cables from the Phase 3 portable 4160-V AC diesel generators will be run through existing doorways.
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation As described in Reference 1, Ameren Missouri is evaluating seismically qualifying the Condensate Storage Tank (CST) or installing a 670,000 gallon seismically qualified and missile protected CST. Ameren Missouri is evaluating the need for relaxation of Section N.A.2 of Order EA-12-049 regarding full implementation no later than two (2) refueling cycles after submittal of the OIP, so that the option to install a new seismically qualified and missile protected CST may be pursued. Refer to Open Item 5 in Section 6 below. If an extension is requested, the specific details will be provided to the NRC in a separate submittal.
The Ameren Missouri FLEX response (Reference
- 1) also stated that Ameren Missouri is crediting use of the RCP SHIELD Seal in our FLEX Strategies.
There is an industry identified issue, documented under 10CFR50 Part 21, with the current performance ofthis seal. The vendor (Westinghouse) has developed a plan to improve the RCP SHIELD Seal performance.
Ameren Missouri is evaluating the need for relaxation from the requirement of Section N.A.2 of Order EA-12-049 regarding full implementation no later than two (2) refueling cycles after submittal of the OIP, so that the option to credit the RCP SHIELD Seals may be pursued. The current required implementation date for Callaway Plant is the Fall 2014 refueling outage. An extension of one additional refueling cycle may be requested which would move the implementation date to the spring of 2016, still within the maximum allowed time frame of December 2016. The extension would provide additional time to resolve the RCP Seal performance issue and to fully design and safely implement modifications to the Callaway Plant. A new Open Item, OI8 has been created to track resolution of this issue and is included in Section 6 below. If an extension is requested, the specific details will be provided to the NRC in a separate submittal.
6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following tables provide a summary of the open items documented in the OIP or the Draft Safety Evaluation (SE) and the status of each item. Overall Integrated Plan Open Item Status 011 The RWST will need to be missile protected to credit its use Started in FLEX strategies.
Page 4 of6 Enclosure to ULNRC-06024 Overall Integrated Plan Open Item Status 012 GOTHIC analysis needs to be performed to demonstrate that Not started Containment pressure and temperature remain at acceptable levels and that instrumentation EQ requirements will be maintained.
013 An analysis will need to be performed to demonstrate Not started acceptable SFP cooling pump performance with the SFP in boil-off.
014 For non-Class IE instrumentation that will be repowered Not started using a temporary battery, an analysis will need to be performed to determine battery life and frequency of replacing battery 015 The current CST and CST pipe chase are non-seismic.
Started. Relaxation of Order Callaway may pursue the construction of a new seismically requirements regarding the date qualified and missile protected CST. Current FLEX of full implementation may be strategies rely on the existing CST tank. Future evaluation needed to pursue the option to is required to determine the impact on FLEX strategies install a new CST. should the new CST be constructed.
016 The method for isolating accumulators during RCS inventory Started control has not been fmalized 017 The method for repowering the SFP cooling pumps has not Started been finalized.
018 The Westinghouse RCP SHIELD Seal issue has not been Started. Relaxation of Order resolved.
requirements regarding the date of full implementation may be needed to pursue the option to credit the Westinghouse RCP SHIELD Seal as part of the Callaway Energy Center FLEX Strategies.
Draft Safety Evaluation Open Item Status Draft NRC Safety Evaluation has not been received.
N/A Page 5 of6 Enclosure to ULNRC-06024 7 Potential Draft Safety Evaluation Impacts There are no potential impacts to the Draft Safety Evaluation identified at this time. 8 References The following references support the updates to the OIP described in this enclosure.
- 1. ULNRC-05962, "Overall Integrated Plan in Response to March 12 , 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Basis External Events," dated February 28, 2013 2. NRC Order Number EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," dated March 12, 2012 Page 6 o f 6