ML17209A526

From kanterella
Revision as of 19:16, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Licensed Operator Requalification Program, Revision 8, Administrative Procedure 0005720
ML17209A526
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/21/1980
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A525 List:
References
NUDOCS 8101130339
Download: ML17209A526 (20)


Text

f03 IMIIIATNltl IIItII.Y verify information with a controlled document.FLORIDA POVER 6 LIGHT COHPANY ST.LUCIE UNIT 81 ADHINISTRATIVE PROCEDURE NO.0005720, REVISION 8 1.0 Title: Licensed Operator Requalif ication Program 2.0~Avoval: Reviewed by PNSC e.h~ac,r l 3 Approved by k Af H ar p's Plant tanager 19 7>eh~<y~4 19 7W Rev.8 Reviewed b Approved by/3.0~3oo e: Facility Review Group~ant tanager 19 ZO 19 0 3.1~Poo oee: This procedure provides instructions for conducting a requalification program which vill assure that licensed operators and senior reactor operators maintain their proficiency.

3.2 Discussion

Individuals actively engaged as licensed operators or senior operators are required by federal regulations to participate in a USNRC approved requalification program.Non-shift personnel who hold licenses and desire to keep their licenses effective shall participate fully in the program except for off-shift sessions devoted to subjects where their specialized knowledge precludes the need to attend.As individual licenses near the expiration date, participation in the program will be reviewed, evaluations of performance will be analyzed, deficiencies vill be rectified and a request for license renewal will be submitted to the USNRC.The program will repeat on a continuing one year cycle, and in brief, will consist of: 3.2.1 Off Shift Training which will consist of a series and examinations, and may also include discussion and simulator training.'e)of lectures sessions R E C E I'4~-'.ppvrr.n r:E"~/R8 SyO l<OCT 3'i980 GEHEaaL u,...

4>'k AD)lXNXSTRATXVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR RE UALXFICATION PROGRP2i Page 2 of 16 3.0~Sco e: (continued) 3.2 (continued) 3.2.2 On Shift Training wherein plant changes/modifications, operating proceduxe revisions and reportable occurrences are discussed, and perfoxmance under both simulated and actual off-normal and emergency situations is evaluated.

The required control manipulations may be perfoxmed either at a simulator or as a part of this on shift training.10 CFR 50,54 (i-l), 10 CFR 55.31 (e)and Appendix A to 10 CFR 55 3.4 Definitions:

3.4.1 Licensed 0 eratox', or Licensee-An individual who holds an effective USNRC operator or senior operator license for St.Lucie Plant and who intends to maintain his license current.3.4.2 Lectuxe Se ment-Hay consist of several lecture sessions covering a particular topic or category.3.4.3 Off-Site Licensee-A licensee who is: 1.Not permanently assigned to the St.Lucie Plant, or 2.Assigned to the St.Lucie Plant but who has been absent from the site for greater than 90 days at a time.3.4.4 Trainin De artment Staff-The training organization, consisting of the Training Supervisor, and Licensed Instructors who are permanently assigned to the department.

4.0 Precautions

None 5.0 Res onsibilities:

5.1 The Trainin Su ervisor: 5.1.1 From the results of prior examinations, evaluations and suggestions by licensed opexators, determine topics to be included in regularly scheduled lectures.Prepare the material and give lectures on these specific topics ox appoint a ccmpetent individual to prepare and give lectures on specific topics./R8 ADHINISTRATIVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR REQUALIFICATION PROGRAH Page 3 of 16 5.0 Res onsibilities: (continued) 5.1 The Trainin Su ervisor: (continued) 5.1~2 5.1.3 Prepare examinations on lecture topics and an annual operator and senior operator NRC type examination.

Schedule off-shift lecture and/or discussion sessions on topics suggested by licensed operators or of current interest, such as plant changes and modifications, plant operating problems, reportable occurrences and plant operating procedures.

Where deemed advisable, appoint an individual fully conversant wi.th the topic to lead the di,scussion.

5.1.4 Arrange for competent examiners to perform oral evaluations as necessary.

5.1.5 Review the results of written exams and evaluations and, where required, provide intensive individual training.5.1.6 Haintain the records required to document the training given each licensee.5.2 The 0 erations Su ervisor-Nuclear;Shall coordinate with the Training Supervisor to prepare a schedule for off-shift training sessions.5.3 The Nuclear Plant Su ervisor in char e of each shift: 5.3.1 Shall be familiar with the performance of operators on his shif t.He shall, on the form provided, evaluate the performance of members of his crew during actual off-normal/emergency situations and discuss the evaluations with the individuals.

5.3.2 Copies of all documents distributed pursuant to Section 7.1 will be posted in a binder provided for their receipt.Each Nuclear Plant Supervisor shall ensure that each member of his crew reviews these documents and initials the acknowledgment section of the cover letter associated with these changes./R8 ADHINISTRATIVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR RE UALIFICATION PROGRAM Page 4 of 16 5.0 Responsibilities: (continued) 5.3 (continued) 5.3.3 An individual log of control manipulations, for licensed crew members shall be kept.The licensee is to make entries which shall be validated by the Nuclear Plant Supervisor, Operations Supervisor, Operations Superintendent, or Training Department Staff Hember.At intervals, the supervisor is to review the logs of his shift members to assure that the required manipulations will be performed within the appropriate cycle.5.4 Each Licensee: 5.4.1 Attend required off-shift lectures, discussion sessions, and any secheduled simulator training, and take scheduled written examinations and evaluations.

5.4.2 Haintain his control manipulation log.5.4.3 Ensure that he understands documents distributed pursuant to Section 7.1 and signify his understanding by initialing the acknowledgment letter associated with these changes.5.4.4 Participate in special training programs where written examinations and evaluations indicate the need.6.0

References:

6.1 10 CFR 50.54 (i-l), Conditions of Licenses 6.2 10 CFR 55.31 (e), Conditions of Licenses 6.3 10 CFR 55, Appendix A, Requalif ication Programs for Licensed Operators of Production and Utilization Facilities 6.4 Letter from Harold R.Denton to all power reactor applicants and licensees, dated Harch 28, 1980.

Subject:

Qualifications of Reactor Operators.

7.0 Records and Notifications:

7.1 Trainin Re ort A copy of each plant change/modification (or a summary of the plant change/Hodification), reportable occurrence, FSAR supplement, facility license amendment, and applicable procedure change shall/R8 ADt'1IN I STRAT IVE PROCEDURE NO 0005 7 20>REV I SION 8 LICENSED OPERATOR RE UALIFICATION PROGRAH Page 5 of 16 7.0 Records and No t if ica t ions: (continued) 7.1 Trainin Re ort (continued) be sent to the Nuclear Control Room, (for shift operators) and to the Training Department (for non-shift operators).

These locations should maintain these documents in loose leaf binders, designated for the receipt of Training Reports.Each licensee shall review these documents and shall so indicate by initialing the acknowledgment section of the Training Report Cover Letter associated with each posting~The completed training report cover letters shall be filed in Document Control.(See Figure 1).7.2 Control Hani ulation Lo Each licensee shall maintain his own log.The logs for shift operators will be maintained in the Nuclear Plant Supervisor's office.The logs for non-shift operators will be maintained in the Training Department.

At the completion of each cycle, the log will be placed in the licensee's Requalification File.When the control manipulations take place at a simulator, the word"simulator" may be entered in the signature column, and the documentation provided by the simulator facility attached to the form.(See Figure 2 and 3).7.3 Lo of On-Watch Dut-Off-Site Licensed Personnel:

This log will be displayed in a conspicuous location.Its purpose is to enable both the licensee and the Training Supervisor to assure that shift operation requirements are met.The logs need not be retained.Refer to Figure 4.7.4 Records Relatin to Off-Shift Trainin 7.4.1 Pos ted Schedule: To be displayed in conspicuous locations and shall show: Shifts on Training Schedule Dates of lecturess and the subject matter Dates of procedure review and prcedures to be discussed Dates of discussion sessions and the topics to be discussed Dates of scheduled examinations Dates of any simulator training IR8 0~J E ADHINISTRATIVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR R UALIFICATION PROGRAM Page 6 of 16 7.0 Records and Notifications: (continued) 7.4 (continued) 7.4.1 (continued)

Multiple sessions will be required and the schedule shall be posted sufficiently in advance to make the schedule arrangements necessary to allow licensees to attend a session.Completed schedules shall be kept in the requalification program file.7.4.2 Attendance Records: The lecturer or discussion leader shall maintain a record of attendance.

Hultiple scheduling of sessions should assist in assuring that all licensed operators can attend.Where circumstances cause an absence, the necessity of make up shall be determined by the Training Supervisor.

The Attendance Record is to be kept in the Requalification Program File.7.4.3 Written Examination:

The questions, together with the answers for examination on lecture topics and the annual OP, SOP examination together with the grades made by each licensee shall be kept in the Requalification Program File.7.5 A licable NRC Bulletins Circulars and Information Notices Copies of the applicable correspondence shall be routed to the Training Department, posted in the binder provided, and logged on the cover letter.Each member of the Training Department Staff shall review these documents and shall so indicate by initialing the cover letter for the applicable month.Completed cover letters shall be filed in Document Controls (See Figure 5)~7~6 Lo Review Sheet Each member of the Training Department Staff shall maintain his own sheet.The sheets will be maintained in the Training Department..Control Room Logs (NPS and RCO)shall be reviewed by the Training Department Staff at regular intervals not exceeding one month, and this review documented by initialing this sheet.When the sheet is completed, it shall be placed in the individual's Requalification File.(See Figure 6)./R8 ADMINISTRATIVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR RE UALIFICATION PROGRAM Page 7 of 16 7.0 Records and Notifications: (continued) 7.7 Re uest for License Renewal As the date for license renewal approaches, the Training Supervisor shall review program participation to insure eligibility and prepare and submit applications fox license renewal to the USNRC.8.0 Instructions:

8.1 Off-Shift Trainin 8.1.1 A minimum of 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> of off-shift training shall be scheduled for each operating shift.This training may include discussion sessions and simulator training, but as a minimum shall consist of lectures covering topics which fall under general headings as listed.1.Theory and Principles of Operation 2.General and Specific Plant Operating Characteristics 3.Plant Instrumentation and Control Systems 4.Plant Protection Systems 5.Engineered Safety Systems 6.Normal, Off-Normal, and,Emergency'perating Procedures 7.Radiation Control and Safety 8.Technical Specif ications 9.Applicable portions of Title 10, Chapter I, Code of Federal Regulations 10.Thermodynamic%, Heat Transfer, and Fluid Flow 11.Mitigation of Accidents involving a Degraded Core$.1.2 Hhen discussion sessions are scheduled to fulfill any off-shift training requirement, a member of the Training Department Staff, the Nuclear Plant Supervisor, or an individual well versed in the topic shall be designated as leader of the session.

ADHINISTRATIVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR RE UALIFICATION PROGRAH Page 8 of 16 8.0 Instructions: (continued) 8.1, (continued) 8.1.3 When a simulator is used for off-shift training, one hour of simulator time shall count as two hours of training time for the purpose of fulfilling the minimum time requirement of Step 8.1.1.8.1.4 The results of the annual examinations shall be analyzed to determine subjects to be emphasized.

Additionally, any plant or industry problems which develop and are deemed as useful information for the operator shall be discussed, and the underlying theory, nuclear, mechanical, or thermodynamics shall be taught to the depth required.8.1.5 Each shift shall be rotated from the operating shift schedule to the training shift schedule in order to provide off-shift training.8.1.6 The majority of the off-shift training will be conducted by the Training Department Staff.Where the specialized knowledge of an individual outside the training organization is available or desirable, this individual may conduct the session.8.1.7 The Training Department Staff shall participate in any simulator training which is conducted as part of this program.8.2 On-Shif t Tra inin 8.2.1 Control Hani ula t ions All licensees, within the cycle indicated, shall, where possible, perform or direct the activities listed on the Control ifanipulations Logs (Figures 2 and 3)~These manipulations may be performed either on the plant or a simulator.

When actual performance of certain manipulations is not possible, oral examinations shall be administered in accordance with step 8.3.3~Those manipulations indicated by an asterisk (*)on'the log shall be performed either on the plant or a simulator.

Oral examination is not sufficient to meet the requirement for these manipulations.

See Figures 2 and 3 for details./R8 ADHINISTRATIVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR RE UALIFICATION PROGRAH Page 9 of 16 8.0 Instructions: (continued) 8.2 On-Shift Trainin (continued) 8.2.2 Trainin Re orts Training Report Cover Letters shall accompany documents distributed pursuant to Section 7.1.Each shift operator should review and initial the Cover Letter acknowledgment section within time specified.

See Figure 1 for details.8.2.3 Off-Site Licensee l.Each off-site licensee shall participate fully in the Licensed Operator Requalification Program.In addition, each off-site licensee shall stand periodic control room watches in order to maintain his proficiency as a watch stander.The min&urn requirement is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of watch standing within any three month period.2.Periods exceeding 4 months without actively performing the functions of a licensed operator shall require a demonstration of competency prior to resuming licensed activities by passing a written and oral examination.

To the extent practicable, the licensee is to stand the watch when major evolutions are taking place.Refer to Figure 4.8.2.4 Trainin De artment Staff 1.The Training Department Staff shall participate fully in the On-Shift Training portion of this program.2.In addition, the Training Department Staff shall review the following:

(1)Applicable NRC Bulletins, Circulars, and Information Notices.This review shall be documented by initialing the cover letter accompanying these documents.

See Figure 5.(2)Control Room Operating Logs (NPS and RCO)~This review shall be documented by initialing the Log Review Sheet at one month intervals.

See Figure 6.8.3 Examinations 8.3.1 Periodic written quizzes shall be administered following lecture segments.0/R8 ADHINISTRATXVE PROCEDURE NO.0005720, REVISION 8 LICENSED OPERATOR RE UALIFICATION PROGRA11 Page 10 of 16 8.0 Instructions: (continued) 8.3 Examinations (continued) 8.3.2 Written examinations similar in scope and depth to NRC written examinations shall be administered on an annual basis to each licensed individual.

The Reactor Operator Examination shall be completed within 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />, and the Senior Reactor Operator Examination shall be completed within?hours.8.3.3 Oral examinations shall be conducted on control manipulations not performed on the plant or a simulator.

8.3.4 The Training Department Staff shall not be required to take the Examinations since the staff administers these examinations.

They shall, however, demonstrate and maintain their proficiency by preparing, conducting, and evaluating training programs designed to maintain or increase proficiencies of licensed operators and license candidates, and in addition, by fulfilling the requirements of Step 8.2.8.4 Evaluation Criteria 8'.1 A score of less than 80%on periodic quizzes administered in accordance with Step 8.3.1 shall require further study and completion of an additional quiz within 60 days of the previous quiz date.8.4.2 The following criteria shall apply to written examinations administered in accordance with Step 8.3.2.l.A score of less than 80%on any section of the examination shall require mandatory attendance at lecture sessions covering material falling under that section in the following requalif ication program year.2.A score of less than 80%overall, or less than 70%on any section of the annual examination shall require that the individual be placed in an intensive training program until the responsible supervisors are satisfied that the individual is again prof icient.Prof iciency shall be demonstrated by successfully passing another written examination.

The licensee shall be relieved of duties requiring a license until deemed proficient.

8.4.3 Unsatisfactory

performance on control manipulations performed in accordance with Step 8,2.1 shall require further study and completion of an additional evaluation within 60 days of the previous evaluation date./R8 0

AONIH ISTRATI VE PROCEDURE.OOOS7ZO~EV 8 L ICFl P RAT R RF A!F ICAT ON PP i'l0-1-13 DATE DISTRraUTEO gUARiER: 1st.(JAil~'1AR)(APR-JU'l) 3rd.(JUl-SEP)4th.(OCi-DEC)WEEX ()FIGURE 1 LICENS'EO OPERATORS TRAItlIHG REPORT COVER LETTER ITEN IDEi'lTIF ICATIOl'l i'lUiMBER:

1-Plant Change/ilodification 2-Reportable Occurrence 3-FSAR Supplement 4-Operating License Arrendr.ent (Tech Spec Change).5-Operating Procedure Change 6-Other ITEN<l0.IOE!lTIFICATIO~

REV.>lo./DATE ITEH i'l0.IDENT IF ICAT IOi'l REV.i'l0./DATE IH ITIALS/DATE have reviewed and discussed the data vurnished by this cover letter, and have so indicated by initialing bel o!1.I H I TI ALS/DATE tiAt lE ilGTE TO LICEllSFE:

'r'LE" S REV IEH Af'l0 ACl(HO"ILEDGE THE CHANGES ID'lTIF IcD Oi'l THIS COVER LETTFR'klITHIi'l

  • DAYS AFT R Tl'IS"RAI'llllG RFPORT IS POSTED-"'to be filled by Training Dept.P AUi~lll'IISlRAI'[YE PRUCEUURE REV,.8 LICE['ISE OPERATOR RE UAI IF ICATIO;l PROG tl (C FIGURC 2 COHTROL HA/'llPULAT ION LOG AHi'IUAL From To i<arne: License'(o."Reactor Startuo to nuclear Heat~I I~d I~"ilanual S/G Level Control Our~in S/U or S/0 ltllll ll littd Loss of Reactor Coolant Flow Loss'of All FeedNater Normal and Emeraenc Exc.RCS Leakage Incl, Rate Determination Steam Cener'a'tor lube Ru ture Loss of Reactor Coolant: Inside Conta"inment Outside Containmi.

nt Lal ge Bleak Small Break Sa':erat.".d RCS Res at>se DATE SAT/Ui'(SAT S IGi'IATURE

'"ilust be perform d on plant or simulator." Procedure ical!(through not sufficient.

RFH!>Rl<S: (Unsat evaluation requ'i res explanation)

AUHli'I IS I RA I'lt YOUL.RUUKt.

pppg72p~q 8 LICENSE OPERATOR RE UALIFICAT[0i'f PROGRAH FIGURE 3 COHTROl HAtl IPULATIOil LOG T'Fl0.YEAR CYCLE From To i(ass.e: License No."Plant Shutdo>>n"At Poser Boration or Dilution)100 cm Loss of Instrunent Air Loss or Offsite Po<;er Loss of Condenser Vacuum Loss or Intake Coolin<';!ater Floe/Loss of Shutdo>>n Cool in (RHR Loss ot'omoonen't C~oo I in Fle<<Los..o=lior;.al Feed<<atpr Loss or Frotective S stem Cl!annal ilis>ositioned or Groped Control Rod Inabiiit', to Orive Control Rods/Emeroency aeration Excess'I'/e P.CS Act1'/1 t P, actn;Tri iurbin-:.",r G r,.rato~rTri Boron Concentration Control Malfunction lialfunction of Pressurizer Pressure Control i!aliunct;on of Pressurizer Level Control llain Steam Line Break Source Ranae ilIS Failure In'" rr.ediate Ranae ilIS Failure Po:.er Rankle ilIS Failure GATE SAT/Ui'(SAT S I Cii'NTUR E!lust be performed on plant or simulator.

Procedure;.alk through not sufficient.

REHAR'(S: (Unsat evaluation requires explanation)

ADMXNXSTRATlVE PROCEDURE NO.0005720, REV 8 LlCENSED OPERATOR REgUALIFlCATlON PROGRAM IHSTRVCTIOHS:

FIGURE 4 OFF-SITE LICEHSED PERSOHHEL-LOG OF OH MATCH DUTY IH COHTROL ROON 1.8 Hours within any 3 month period is recommended.

Over 4 months without watch time-suspension until competency i demonstrated.

2.Document date, time start-end, evolutions directed/performed, sign.3.Hake entry in shift personnel record book kept-in control room to document on watch duty.YEAR 19 HAt lE JAH or JULY FEB or AUG"tlAR or SEPT APR or OCT HAY or HOV JUHE or DEC c\r Aot~STRATIVE PROCEOUR Rzv 8 LICE)MO OPERATOR REOUAL IFICATIOH P~RAH FIGURE 5 TRAINIi'IG OEPARTHE)HT STAFF NRC CORRESPONOE)NCE COVER LETTER Month 19 Each applicable NRC Bulletin, Circular, or Information Notice shall be placed in the binder following this cover letter and logged i n the appropriate space below.Each staff member shall review these documents and indicate by, initialing below within the first 14 days of the fo)lowing month.BULLETI)'(S:

CIRCULARS:

I NFORP,ATI0)'(NOTICES: I H ITIALS/OATE 0, 4'I I)--e,'

,II 4~~'Ol I IH I STRAT I'/E PROC OURE REV EHSEO 0.ERATOR RE UALIFICATIWPRCGRAH

'IGURE 6 TRAIHIHG OEPARTHEHT STAFF LGREVI WS~a r~~Hare: License Ho: Position: Requal Program Year l9~~~I, Reviewer HPS and RCO log books at r'egular.intervals not exceeding one month, an=indi cate that revi equi by i ni ti al i ng the appropri ate l inc bel ow within the'f i rst 19 day=-o f the f o I l oui ng month.January February i'larch Aoril Hay June July.,August September October Hovember Oecember IHITIALS/OATE 0