ML17286A360

From kanterella
Revision as of 20:35, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Plant 2 Exercise 90, Consisting of Exercise Packet & Exercise Packet Control Cell Addendum for 900911 Exercise
ML17286A360
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/11/1990
From: CHITWOOD R A, LANDON J A, SHOCKLEY V E
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
NUDOCS 9010230044
Download: ML17286A360 (560)


Text

ACCELERATED DIS BUTION DEMONS ION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9010230044 DOC.DATE: 90/09/11 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION CHITWOOD,R.A.

Washington Public Power Supply System SHOCKLEY,V.E.

Washington Public Power Supply System LANDON,U.A.

washington Public Power SuPPIF SFstem g Pg 4 RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

"Plant 2 Exercise 90" exercise packet&exercise packet control cell addendum.DISTRIBUTION CODE: DF01D COPIES RECEIVED:LTR Q ENCL i SIZE: TITLE: Direct Flow Distribution:

50 Docket (PDR Avail)NOTES: R I D/A RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL REG F NSIC 01 RECIPIENT ID CODE/NAME COPIES LTTR ENCL D D S D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!CY TOTAL NUMBER OF COPIES REQUIRED: LTTR~ENCL D D N I'I t 4 I I ,~'k~*0I V f A gP I)'I I I~f

~18 p~pg p y'ASHINGTON PUBLIC POWER 4 SUPPLY SYSTEM STRICTLY PRIVATE LOCKED STORAGE REQUIRED)UNTIL AFTER 9/11/90 (THE ATI'ACHED DOCUMENT MUST NOT BE LEFT UNATTENDED OR WHERE ANY UNAUTHORIZED PERSON MAY HAVE ACCESS TO IT.WHEN NOT IN USE, IT MUST BE STORED IN A LOCKED REPOSITORY.

WHILE IN YOUR POSSESSION IT IS YOUR RESPONSIBILITY TO PROTECT IT AND ITS CONTENTS FROM ANY UNAUTHORIZED PERSON.AFTER PROCESSING)

WHEN THE ATI'ACHED DOCUMENT IS READY TO BE FILED IN A LOCKED REPOSITORY, THIS COVER SHEET MAY BE DETACHED AND DESTROYED.

~Vt W4~"~~WV'.%CD kml g, 2PU,)q s,t~>

DR II L NOt Exercise 90 WAINICC100 tI'Ilt t0'alt 43 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGK ot~KT NOa 10 RESPONSIBLE CONTROLLER (LOCATION)

Control Cell 0 0 0800~PM 1200 Q PM VALID FOR TIMES OF: AM AM 0 RILL TIME TO HOURS , HOURS ASSOCIATKD WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic gueries A.10 a-i 10j-y 10z-ap 10ag-bh 10bi-bx 10 by-c 10 co-dd 10 de-dt 0800-0830 0830-0900 0900-0930 0930-1000 1000-1030-1100-1130-1030 (State, Fa)1100 (Counties/ck, du, dw, dx, ec, ed, eg, eh, ei)(State-ga thru gk)1130 (County-ct, cw, cx, cy, cz, da-c, dv, dy, dz)(State-ha thru hr)1200 (County-de-f, dm-t, ea-b, ee-f, ej)(State-ia thru iz)0930-1000 Protestors are coming to Plant 2 from all across the United States j i I~~0830-0900 Armed terrorists have attacked Plant 2 10r, s, t 10aq, ar, as 1030-1100 1100-1130 Terrorists have caused a radiation release at Plant 2 Plant 2 is being abandoned because of danger of a meltdown 10cq, ch, ci 10co, cp, cq 1130-1200 Run on banks and grocery stores 10iw 966 I5222 RI I7 62)

I 0, I , I~'

ORII L NQs Exercise 90 IIEET NOs See below 4S SUPPLY SYSTEM~CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACE of VALIQ POR TIME5 QPa AM REAL T>>K See belowM See belo~0AM Q pM ORILL TIME To HOURS HOURS ASSQCIATKO WITH MKSSAOES INPORMATION APPLIE5 TQ Control Cell.Telephone queries'(Sheet 10a real time of 0800 to 0830)~aessa e: This is an exercise.This is an exercise.This is Gardner Damon at KHQ Radio in Spokane.I'e gotten a report about a demonstration that is supposed to be held near vour nuke plant today.Is this report correct?How many people are involved?What's your response to the demonstration?

Antici ated Res onse: A concise status report of the situation, if known at this time.An"Emergencv Telephone Response Log" form should be prepared and forwarded to the JIC Info..'Igr, upon JIC activation.

R~es ease: 'message To~Team Called Actual Response Time Correct?Summarv JIC Iedia JIC Public Info.8/F County 999 IS@SR Rl (7~9) sn~s?aasnrs I DRILl NOe Exercise 90 CV.NOe ee belo~4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAGE oi VALID POR TIMES OPt AM RKALTIMK See below PM See below 0AM DRILL TIME TO HOURS HOURS CIATKD WITH MESSAGES INPORMATION APPI IES TO Control Cell Telephone Queries-48heet 10b real time of 0800 to 0830)~sensa e: This is an exercise.This is an exercise.This is Fred Lassos at the Spokane D~ail Chronicle.

Has the demonstration at Plant 2 begun yet?How many people are involved'?

Nhere are the protestors in relation to the plant?Antici ated Res onse: A concise status report of the situation, if known at this time.An"Emergencv Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

R~es onse: Message To ITeam)Actual Response Called Time Correct?Summary JIC'media JIC Public Info.B/F County DRILL NOe Exercise 90 KKT NOr See below Irk SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller

~QJI jl<<e"'brM" s*'"/s s" ,r s<<I JFAf VALID FOR TINES OPB RKAI TIMP See below AM See below CI AM'DRILI TIME TO HOURS.sCDP,~'HOURS ASSOCIATED WITH MESSAGES INFORMATION APPI IKS TO Control Cej,l Telephone Queries (Sheet 10c real time of 0800 to 0830)~Bassa e: This is an exercise.This is an exercise.This is Bernie Littlefield at the Columbia Basin Herald in Noses Lake.I just received information about the demonstration at Plant 2.What are the details?Can we send a reporter and photographer out there?Is plant operation affected?Antici ated Res onse: A concise status report of the situation, if known at this time.An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

R~es onse:.'Iessage To~Team Called Time Actual Response Correct?Summarv JIC Nedia JIC Public Info.B/F County 9$4rlSXSS Rl Il<S)

C afL~Oe Exercise 90 HO.N-nO, See below Mal SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATION)

Control Cell Lead Contx'oiler PACE>LID POR TIMES OPs AM s'",EAL>><<See belo~M See below P\~~MCIATED WITH ME55AOES 0AM TO HOURS Q PM DRILL TIME INPORMATION APPLIES TO Control Cell Telephone Queries HOURS (Sheet 10d real time of 0&00 to 0830)~Massa e: This is an exercise.This is an exercise.Hi, this is John Splaine at KFAE Radio.We'e received a report about some kind of demonstration at the Hanford nuke plant.Is something unusual going on there?(Pause for response.)

How many people are involved?What do vou I'now about the demonstrators?

What are vou doing about this?Antici ated Res onse: A concise status report of the situation.

An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

~Res ease: 'message To~Team JIC Nedia Called Time Actual Response Correct'Summarv JIC Public Info.B/F County sCQSCsR1 I7 45)

DRILL NQe Exercise 90 EKT NOe See below SW SUPPLY SYSTEM CONTROLLER (NFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LQCATIQNI Control Cell Lead Controller PACK~r VALID FOR TIMES QFa QAM REAL TIME See below PM CIAM'DRILI TIME TO HOURS AVPR S ASSQCIATKD WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10e real time of 0800 to 0830)~%essa e: This is an exercise.This is an exercise.This is Nancy Mozley at KALE Radio, Kennewick.

I'd like an update on the uprising at the nuclear plant.What caused the problem?Is the plant shut down?Was anybody injured'ntici ated Res onse: A concise status report of the situation.

This is not an uprising.Plant is at about 10 percent thermal power level.An"Emergencv Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

message To: Actual Response (Team)Called Time Correct?Summar JIC!acedia JIC Public Info.I a'444 15222 Rl (7W2)st e aawas&at DR)IdmaIOa Exercise 90 Ia)CEKP NOa See below 4N SUPPLY SYSTEM CONTROLLER lNFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (I OCATION)Control Cell Lead Controller PAGE AIM(mal FOR TIMES OP: AM~AM R~T>>E See below PM See below DRII t TIME TO HOURS HOURS QCIATED WITM MESSAGES INPORMATION APPI IES TO Control Cell Telephone Queries (Sheet 10f real time of 0800 to 0830)~Tease e: This is an exercise.This is an exercise.This is Carol Dumas at the Associated Press in Yakima.I need an update on the situation at your nuclear plant.What measures are being taken to control the demonstration?

Is this affecting any of the plant emplovees?

Is this affecting plant operations?

Antici ated Res onse: concise status report of the situation.

Plant is at about 10 percent thermal power levels An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

R~es esse: Message To ITeam)Called Time Actual Response Correct?Summarv JIC Media JIC Public Info.B/F County 58m ISSUES R'I (7WQ)

DRILl NOe Exercise 90 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAQK HKET NOe RESPONSIBLE CONTROLLER ILOCATIONI See below Control Cell Lead Controller VALID FOR TIMES OP1 QAM REAL TIME See below PM See,below 0AM 0 PM DRILL TIME TO HOURS HMRS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10g real time of 0800 to 0830)~??essa e: This is an exercise.This is an exercise.This is Bill Powell, with Radio KUMA in Pendleton.

Some organization called"Friends of the Bivalve" told us there's a demonstration this morning at the Hanford nuclear plant.What can you tell me about this report?(Pause for a response)I'd like to tape record your comments, if that's all right with you.Hold on a minute.All right, I'm ready.Please begin by stating your name and position.Antici ated Res onse: A concise status report of the situation.

Plant is at about 10 percent thermal power level.Plant Security is monitoring the demonstration.

An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ãgr.upon JIC activation.

~aes oase: Message To Actual Response~?sam Called Time Correct?.JIC acedia Summar JIC Public Info.B/F County 914 15222 R1 I7&9)

Qgg+L NO e Exercise 90 wmsmsmcTOm srmtlc sotesm 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACIK NOa RKSPON5IBLK CONTROLLKR ILOCATION)

See belo~Control Cell Lead Controller VAI ID POR TIMKS OPt QAM AM CIATKD WITH MKSSAOKS RKALT,MK See below PM See below@PM TO HOURS D RILL TIMK INPORMATION APPUKS TO HOURS Control Cell Telephone queries (Sheet 10h real time 0800 to 0830)~xessa e: This is an exercise.This is an exercise.This is maxwell Kent.I'm a reporter with The 0~1 m ian.There's an item on the news wire about a group demonstrating at the nuclear plant near Richland.What can you tell me about this report?(Pause for a response).

Are these'emonstrators going to have a protest at the Satsop plant, too'?Antici ated Res onse: A concise status report of the situation.

Plant is at about 10 percent thermal power level.No indication of whether or not the group intends to involve WNP-3 in their demonstration.

An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

~Res ense: message To~Team Called Time Actual Response~Correct?Summar JIC Iedia JIC Public Info.B/P Countv Im:$4$w15252 Rl (7%5)

DRILI NQe Exercise 90 HKKT NOe See below 4N SUPPI Y SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER lLQCATIONI Control Cell Lead Controller

~~st a PAOK'o'.VALID FQR TIMES OFI QAM AM REAL T,ME See below PM See below QPM DR II L TIME TQ HOURS ASSOCIATED WITH MESSAGES INFORMATION APPUKS TO Control Call Telephone Queries (Sheet 10i real time of 0800 to 0830~odessa e: This is an exercise.This is an exercise.This is Ron Saito trom the Yakima Herald-Re ublic.Is there a demonstration going on at your nuclear plant?What group is involved?What are they doing?Are they affecting plant operation?

Antici ated Res onse: A concise status report of the situation.

Plant is at about 10 percent thermal power level.An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Igr.upon JIC'ctivation.

l~tea ossa: 'message To ITeam)JIC'acedia Actual Response Called Time Cotteot2 l Summar JIC Public Info.B/F County 995 15522 Rl I7&9)

ORIEL NOe Exercise 90 4N'UF FLY SYSTEN CONTROLLER INFORMATION GENERAL DATA SHEET PAQK ot~HKKT NOe RK5PONSIBLK CONTROLLER

{LOCATION)

See below Control Cell Lead Controller VAPO FOR TIMKS OF I AM RKATIMK See below PM See below QAM Q PM OR)u.TIMK TO HOURS HOURS ASSOCIATKD WITH M K5SAOKS INFORMATION APPI IKS TO Control Cell Telephone Queries (Sheet 10j real time of 0830 to 0900)~Tease e: This is an exercise.This is an exercise.This is Tina Allaway with KOLA Radio.We just received a radio broadcast from our reporter covering the demonstration at WHOOPS".He said one of the demonstrators just climbed over the security fence and into the plant area.I want to know what the federal regulations are for dealing with this kind of unauthorized entry into the plant.Antici ated Res onse: Responder should fill out an Emergency Telephone Response Log form and give it to a Public Affairs media coordinator to handle.~aes ease:!message To ITeam)Called Time Actual Response CorrectP Summarv JZC Hedia X JIC Public Info.B/F County See-15222 RI I7%2)

Iav<<m TamaeT DRILL NO V Exercise 90 SN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOE or SHEET NOv RESPONSIBLE CONTROI LER (LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFT QAM REALT,ME See belo~PM See below@AM DRII I TIME TO HOURS HOURS ASSOCIAVED Wire MESSAOES INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10k real time of 0830 to 0900)~odessa e: This is an exercise.This is an exercise.This is Rose Quintal with the Aberdeen Daily World.I'm looking for some more information about this protestor group at the Hanford nuclear plant.Do you know where they are headquartered?

Is there any indication that they may have a demonstration at the Satsop nuke?What's going on now at the Hanford plant?Antici ated Res onse: Provide a concise report using the most accurate information available.

The responder might pass this caller on to a Public Affairs media coordinator to handle.R~es esse: Message To ITeam)JIC Media Calleli Time Actual Response Correct?Summarv JIC Public Info.3/F County DRILI NO, Exercise 90 4S SUPPLY SYSTEiVI CONTROLLER INFORMATlON GENERAL DATA SHEET PACK<<<<e,q KKT NQe RESPQNSIBLK CONTROLLER (LOCATION)

See below Control Cell Lead Controller VAl ID POR TIMES QPt QAM REAL TIME See below'M See belo~QAM Q PM DRILL TIME TO HOURS HOURS ASSQCIATKD WITH MKSSAOES INPQ RMATIQN APPLIES TO Control Cell.Telephone queries (Sheet 101 real time of 0830 to 0900)~(essa e: This is an exercise.This is an exercise.This is Don Chandler at The 0~re onian in Portland, Oregon.How long has this demonstration at the WNP plant been going on?Is it still in progress?Is the plant operating, and if so, is this demonstration affecting operation?

Antici ated Res onse: Provide a concise report using the most accurate information available.

The responder might pass this caller on to a Public Affairs media coordinator to handle.~Res ense: Message To~Team JIC 1tedia Actual Response Called Time Correct?Summarv JlC Public Info.BIF county 959 IM?g R1 P 99)a se rprm QRII I NOe Exercise 90 SHKKT NOe See below 4W SUFPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RKSPONSIBLK CONTROLLER (LQCATIQNI Control Cell Lead Controller PACK of VALIQ FOR TIMKS OFR AM RKALTIMK See below PM See below QAM QRI LL TIMK TO HOURS HOURS ASSQCIATKQ WITH MKSSAQKS?INFORMATION APPI IKS TO Control Cell Telephone eries (Sheet 10m real time of 0830 to 0900)~odessa e: This is an exercise.This is an exercise.This is Linda HirakaIfa at The Seattle Times.We'e just gotten a report from one of our stringers that a person has climbed over the security fence at Plant 2.Do vou have this person's name and address yet?Is he being charged Ifith any crime?Antici ated Res onse: Provide a concise report using the most accurate information available.

The responder might pass this caller on to a Public Affairs media coordinator to handle.R~es ossa:.'lessage To~Team Actual Response Called Time Correct?Summar'IC acedia JIC Public Info.B/F County i98$eISZZZ RI{7&9)

DR ILI NOe Exercise 90 KET NOe See below 4 s7Vp7z svsmH CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead,.Controller PAGE Ot~VAL ID FOR TIMES OFt QAM RKALTIMK See below PM See below QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAOES INFORMATION APPLIES TO Control Ce3.1 Telephone Queries (Sheet 10n real time of 0830-0900)~essacee: This is an exercise.This is an exercise.This is Irwin Starr at KREIS-TV, Spokane.We have a crew on the way to the Hanford Nuclear plant to film the demonstration.

I just got a report that a protestor climbed over the plant fence.I wonder if you have a camera team filming this demonstration and might have some footage of the person climbing the fence that ve could copy?Antici ated Res onse: Provide a concise report using the most accurate information available.

The responder might pass this caller on to a Public Affairs media coordinator to handle.R~es ease: Message To~Team Called JXC media X Actual Response Time Correct?Summar JIC Public Info.B/F County SII IM2S RI{7&5)

~s DRILL NOe Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK ot i a SHEET NOe RESPONSIBLE CONTROLLER (t QCATION)See below Control Cell Lead Controller VALID FOR TIMES OFt QAM REAL TIME See below PM See below QAM Q PM DRILI TIMK TO HOURS HOURS ASSOCIATED WITH MKSSAOKS INFORMATION APPLIES TO Control Cell, Telephone Queries ,h a (Sheet 10o real time of 0830 to 0900)~Ãessa e: This is an exercise.This is an exercise.This is Narilyn Sawyer, from Radio KSEN, Noses lake.I'd like an update on the AP story about the demonstration at the Hanford nuclear plant.Just where is this plant?How far is it from Noses Lake?How many demonstrators are there?Antici ated Res ouse: Provide a concise summary of the situation using the latest information on hand.l~tee csee: Nessage To~Team Actual Response Called Time Correctt Summarv JIC Nedia JIC Public Info.B/F County OR ILL NO.Exercise 90 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE HEKT NOe RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALIO FOR TIMES OF a QAM RKALTIMK See below PM See below 0AM QFM ORILLTIMK TO HOURS HOURS ASSOCIATED WITH MESSAOKS INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10p real time of 0830 to 0900)~Massa e: This is an exercise.This is an exercise.This is Billy Harrison, Seattle P-I.I'd like to talk with Don Nazur about the accident this morning at Plant 2.Ny editor wants quotes from your top man, so don't trv to shuffle me off to somebody else.(Be persistent in asking for access to DV Nazur)Antici ated Res onse: Explain that the JIC is being set up to provide information, and that Nr.Nazur is a busy person at this time.Get reporter's telephone number and pass request on to team supervisor.

a~as esse: Message To~Team Actual Response Called Time Correct2 Summar JIC media X JIC Public Info.B/P County ddd I5222 Rl (7&2)

DRIL I NOa Exercise 90 SHKET NO>>See below 4N'UPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROI LER{LOCATION)

Control Cell Lead Controller PAD K'VALID FOR TIMES QP: AM REAL TIME See below PM See below QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAQKS INFORMATION APPLIES TO Control Call Telephone gueries (Sheet 10q real time of 0830 to 0900)~nessa e: This is an exercise.This is an exercise.This is Carol Dumas with the A-P in Yakima.I'e just received a report that one of the demonstrators at Plant 2 has climbed over your security fence there.Is that truest Is this intrusion part of the demonstration or something separate?Did this person have help in getting into the security area?Tell me as much as you know about the situation.

Antici ated Res onse: ', I 1i A concise report using the most accurate information known about the intrusion.

Depending on the status of JIC activation, this call could be handled by a Public Affairs media coordinator or by the Information or.'Iedia Nanagers.R~es ense:.'Iessage To~Team Called Actual Response Time Corrects Summarv JIC Media JIC Public Info.B/F County DRILL NOe Exercise 90 4P SUPPLY SYSTEM CONTROLLER INFORMATION'ENERAL DATA SHEET PACK Ot KKT NOe RESPONSIBLE CONTROLLER ILOCATION)

See below Control Cell LeadController VALID FOR TIMES OFs QAM See below FM See below 0AM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Ce3.1 Telephone queries (Sheet 10r real time of 0830 to 0900)(RIOR!IO.1)R~essa e: This is an ezercise.This is an exercise.I'm concerned about a radio report I heard about the terrorists at the nuclear plant.Have thev caused any damage that will release radiation and harm people?What's the situation at the plant now?Antici ated Res onse:-Provide concise account of the situation, using best available information.

Demonstrators are not terrorists.

County officials have been alerted.Any information needed for public protection will be broadcast on KONA Radio.An"Emergencv Telephone Response Logss form should be prepared and forwarded to the JIC Info.Mgr.upon JIC activation.

R~es ease: Message To ITeamj JIC Media Actual Response Called Time Correct?Summarv JIC Public X Info.B/F County 989 1M?2 R'I IT&9)

DRILL NO Exercise 90 4N SUPPLY SYSTEM CONTROLLER iNFORMATION GENERAL DATA SHEET or SHKKT NOe RESPONSIBLE CONTROLLKR

{LOCATION)

See below Control Cell Lead Controller VA!ID PQR TIMES QPs QAM RKALT,MK See below PM See below 0AM DRILL TIMK TO HOURS HOURS ASSQCIATKD WITH MKSSAOKS INPORMATION APPLIKS TO Control Cell Te1ephone Queries (Sheet 10s real time of 0830 to 0900)i~icosa e: This is an exercise.This is an exercise.(RU'AOR'tO 1)Hey, what's going on at that nuke plant across the river?I heard something on the radio about a terrorist attack there.Is that true?Is there any danger to me and mv familv?(Caller is Lester'Ayers, resident at"600 Amber Rd, Franklin Countv.)Antici ated Res onse: Provide concise account of the situation, using best available information.

Demonstrators are not terrorists.

County officials have been alerted.Any information needed for public protection will be broadcast on KONA Radio.An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC Info.Ngr.upon JIC activation.

R~es oase:!Iessage To~Team Actual Response Called Time Cotteott Summar JIC'Media JIC Public X Info.B/F County 989el$122 Rl (7&SI ORILI NOe Exercise 90 Mal SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAQsK of EET NOe RESPONSIBLE CONTROLLER ILQCATION)

See below Control Cell Lead Controller VALID FQR TIMES QFR AM RKALTIMK See below PM See below QAM'DRILL TIME TO HOURS HOURS ASSOCIATED WITM MESSAGES INFORMATION APPI IES TO Control Cell Te1ephone/nerves (Sheet 10t real time of 0830 to 0900)(RlDfOR NO.1)~Reams e: This is an exercise.This is an exercise.I heard a radio report that armed terrorists attacked the nuclear plant, Were any plant workers injured in the attack?'l(y brother-in-law is a Security guard there and all the family is.worried for him.Antici ated Res onse: Provide concise account of the situation, using best available information.

Demonstrators are not terrorists.

County officials have been alerted.Any information needed for public protection will be broadcast on KONA Radio.An"Emergency Telephone Response Log" form should be prepared and forwarded to the JIC'nfo.Mgr.upon JIC activation.

R~es ouse: lfessage To Actual Response~Team Called Time.Cottactt Summarv JIC media JIC Public I Info.B/F County DR LI NOe Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE ot SHEET NOe RESPONSIBLE CONTROLLER ILOCATIONI See below Control Cell Lead Controller V LID I OR TIMES OFR AM REAL TIME See below PM See below ASSOCIATED WITH IVIESSAOES

@AM TO HOURS DRILL TIME INFORMATION APPI,IES TO HOURS Control Cell Telephone eries (Sheet 10u real time of 0830 to 0900)~Tasse e: This is an exercise.This is an exercise.This is Linda at the WNP-3 site.The employees here are very anxious to hear what the situation is now at Plant 2.Can you give me an update?Antici ated Res onse: Provide information based on facts on hand.Employees can expect updated information on the telephone hotline and in HOTLI!IES.

~Res ause:!Iessage To ITTaaaamml Called Time Actual Response Correct?Summarv JIC RIedia JTC Public X info.B/F County 505el5222 R I (7&2I DRILL, NO Exercise 90~fKKT NOe See belov 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACK of VALID FOR TIMES OFt QAM L T,MK See belov FM See belov CI AM@PM DRILI TIME TO HOURS HOURS ASSOCIATED WITM MESSAQKS INFORMATION APPLIES TO Control Cell Te1ephone eries (Sheet 10v real time of 0830 to 0900)~??essa e: This is an exercise.This is an exercise.This is Elton Galloway.I work at Bechtel"at WNP-1.I called your telephone hotline to get information about the Plant 2 protest, but the connection was terrible and I didn't understand the message.Can you tell me what the situation is?If you want to send some of those protestors this wav, we'l take care of them.Antici ated Res onse: A concise report of the emergency situation.

Plant Security, DOE Security, and Benton County Sheriff deputies are on hand at the demostration site.~Res oose: Message To~Team Actual Response Called Time.Correct'Summar JIC Media JIC Public'Info.B/F County 908e15ZZZ Rl (7HZ)

DRILL NOa Exercise 90 SP sUperz SVSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACK of SHKKT Noa RKSPONSI BLK CQNTROLLKR

{LOCATION)

See below Control Cell Lead Controller VALID POR TIMKSOrs AM See below PM See below ASSOC IATKD WITH MKSSAQ KS@AM TO HOURS Q PM DRILL TIMK INPORMATIQN APPLIES TO HOURS Control Cell Telephone queries (Sheet 10'eal time of 0830 to 0900)~!essa e: This is an exercise.This is an exercise.This is Carol Foxier.I'e been listening to radio reports about the problem at the nuclear plant.I'm part of a group that is scheduled for a tour at the nuclear plant this afternoon.

Mill the tour be cancelled because of this problems Antici ated Res onse: Call should be forIfarded to Public Affairs for response.R~es ease: Message To~Team Called Time Actual Response Correct?Summarv JIC acedia JIC Public X Info.8/F County 944aISZ24 R'I (7%9)

DRILL NOe Exercise 90 KKT NOe See below'SW" SUPPLY SYSTEM CONTROLLER INFORMATION

.GENERAL DATA SHEET RKSPONSIBLK CQNTRQLLKR

{LOCATION)

Control Cell Lead Controller PAOK of VALID POR TIMES QPR AM RKALT,MK See below PM See below 0AM Q PM DRILI TIMK TO HOURS HO R ASSOCIATKD WITH MKSSAOKS INPORMATIQN APPI IKS TO Control Cell Te1ephone queries (Sheet 10x real time of 0830-0900)~Ressa e: This is an exercise.This is an exercise.Hi.This is Fran Prudek.Has anyone else called from our group to ask if the problem at the power plant will affect our tour this afternoon?

I didn't know if I were the only one or not.Well, we'e supposed to have this tour so I thought I better ask what's likely to come of it all.Antici ated Res onse: Refer call to Public Affairs for response.~Res ease: message To ITeam)Actual Response Called Time Correct?Summarv JIC RIedia JIC Public Info.B/F County DRILL NQa Exercise 90 SHKKT NOe See belo~M SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET RKSPONSIKLK CONTROLLKR

{LOCATION)

Control Cell Lead Controller PACK of VAl ID PQR TIMKS OPf RKALT>>K See below PM See below ASSQCIATKD WITH MKSSAQKS QAM TO HOURS Q PM'DRILL TIMK INSQRMATION APPLIKS TO HOURS Control Ce3.1 Telephone Queries (Sheet 10~real time of 0830 to 0900)~Massa e: This is an exercise.This is an exercise.I live right across the river from the nuclear plant.I'e been listening to radio reports about the trouble there this morning, and I Infant you to know the situation has me)Iorried.Can those people affect the operation of the plant?I'm going to have to be out)worl'ing in my field near there and I don't want to be surprised.

Antici ated Res onse: A concise report of the emergencv situation.

Plant Securitv, DOE Security, and Benton County Sheriff deputies are on hand at the demostration site.Emergency siren will sound if there is a need to leave the area.R~es ease: Message To~Team)Actual Response Called Time Correct?Summary JIC Media JIC Public X Info.B/F County eee Isssz R)(1~el PRII I NOe Exercise 90 HEET NQ See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RE5PON5IBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAGE VAI IQ POR TIMES QPT AM REAL T,ME See below PM See below QAM Q PM'DRILL TIME TO HOURS HOURS ASSQCIATED WITH MESSAGES INPORMATION APPLIES TO Control Cell Telephone/nerves (Sheet 10z real time of 0900 to 0930)T~essa e: This is an exercise.This is an exercise.This is Carol Dumas at the Associated Press, Yakima.IIe'll have some staff people headed.to your JIC shortly.They'e not familiar with the Tri-Cities, however, and need directions on how to get to the JIC.If you give them to me, I'l make sure thev get them.By the way, what's happening at the plant now?Antici ated Res onse: Determine the direction from which the news team will be approaching the Tri-Cities and then provide information on the best route to the JIC.Provide concise status report using.the latest available information.

R~es esse: Iiessage To~(Team Actual Response Called Time Correct?Summar JIC'acedia X JIC Public Info.B/F County 90$ISZZZ Rl I7<9)

DRILL NO Exerci.se 90 SHEET NO.See below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHE ET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAQE of VALID POR TIMES OP?QAM RE L T>>K See below PM See below QAM DRILL TIME TO HOURS HOURS ASSOCIATED WITH IvIESSAQES INPORMATION APPLIES TO Control Ce3,1 Telephone Queries (Sheet 10aa real time of 0900 to 0930)~?tease e: This is an exercise.This is an exercise.This is Dean'Aason, news director at KHQ-TV, Spokane.We want to fly a team down to Richland to film the incident for the evening news, Can we fly over the accident scene?Where can we land the airplane?Are your employees available for interviews?

Antici ated Res onse: Provide status report using latest available information.

Check air space status with team supervisor.

Richland airport is closest to site.Check accesibility of employees with team supervisor.

~aes case:.'message To~Team JIC Media Actual Response Callea Time ccttect?Summar JIC Public Info.B/F County 909eIS222 RI (7%2)

DRILL NOe Exercise 90 EKT NOa See below 4N'UPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATION)

Control Cell Lead Controller PAGE ot VALID POR TIMES OP(QAM REAL TIME See below PM See below QAM Q PM DRILl TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INPORMATION APPLIES TO Control Cell.Telephone Queries (Sheet 10ab real time of 0900 to 0930)~Massa e: This is an exercise.This is an exercise This is Warren Van Orden from the public radio system in Pullman.We'e preparing to feed information on the Plant 2 accident to the National Public Radio network and I'd like to get some taped comments.Are you the person who can help me?What is vour name and position?Is it O.K.to roll a tape?Please tell me what happened at the Whoops nuclear plant this morning and what the situation there is now.Antici ated Res onse: Provide an accurate, concise account of the accident and present status using the latest available information.

~Res ease: Message To~Team Called Actual Response Time Correct?Summar JIC Media JIC Public Inf o.8/F Countv$6$slSR22 Rl I7&S)

OR ILL Noe Exercise 90 SHEET NOa See belo~4Q SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROI LER ILOCATION)

Control Cell Lead Controller PAQE of VALIO POR TIMES OP AM TIME See below PM See below ASSOCIATEO WITH MESSAGES QAM TO HOURS ORII L TIME INPORMATION APPI IES TO HOURS Control Cej,l Te1ephone+eries (Sheet 10ac real time of 0900 to 0930)~??essa e: This is an exercise.This is an exercise.This is Steve Quinn at KIRO Radio, Seattle.I'd like a report on the demonstration at the nuclear plant near Richland.Is this where I can get information on the incident?Who is this speaking?(Pause for identification.)

I'd like to get this on tape, if that's alright with you.Go ahead and tell me what's happening at the Richland nuke plant.(Pause for account)Has this affected the power plant itself?How many people are in the group of demonstrators?

Have any of them gotten into the plant?Antici ated Res onse: Provide a concise account, using the latest information available.

~Res oose:)(essage To~Team JIC Hedia Actual Response Called Time Correct?X Summarv JIC Public Info.B/F County 90$ISZSS Rl P<S)

DRILI NOe Exercise 90 rlKKT NOe See below 4S'UPPLY SYSTEM CONTROLLER IN f ORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROLLER (LOCATION)

Control Cell Lead Controller PAQK of VALID POR TIMKS OP1@AM RKALT,MK See below PM See below 0AM D RILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSACKS IN>ORMATION APPI.IKS TO Control Cell.Telephone/nerves Sheet 10ad real time of 0900 to 0930)~<essa e: This is an exercise.This is an exercise.This is Willis 1Iitchell at KOTY Radio.I heard you can call this number for information about the incident at the nuke plant.Has an emergency been declared at the plant?Do you have any news conferences planned?Where are thev going to be held?What warning should I broadcast to our listeners?

Antici ated Res onse: Provide status report and definition of ALERT using the Telephone Team resource book.Contact the County EOC PIO for the latest EBS message information.

~aes ense: message To~ream Actual Response Called Time Correct?Summar JIC Media JIC Public Info.B/F County 90$ISIIZS RI (7%9)s DRILL NOe Exercise 90 IVX SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of SHEET NOe RESPONSIBLE CONTROI LER (LOCATION)

See below Control Cell Lead Controller VALID FOR TINES OFI REAL TIME See below PM See below ASSOCIATED WITH MESSAOKS 0AM TO HOURS'DRILI TIME INFORMATION APPLIES TO HOURS Control Ce3,1 Telephone Queries (Sheet 10ae real time of 0900 to 0930)~aessa e: This is an exercise.This is an exercise.This is Kelly Van Fleet, KliVG Radio, Seattle.I heard that some demonstrators have gotten into the secured area around your nuclear plant.What's the situation now?Is this having an impact on plant operations?

How many of the demonstrators have been arrested?Antici ated Res onse: Provide concise, accurate information based on present knowledge of plant status and demonstration.

~Res oase: message To~Team Actual Response Called Time Correct?Summary JIC Media X JIC Public Info.B/F County 444 14222 R1 (7<2)

DRILL.NOe Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE o(aEET NO.RESPONSIBLE CONTROLLER

{LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFt AM REAL T>>E See below PM See below To Cl@PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Ce3.1 Telephone queries (Sheet 10af real time of 0900 to 0930)~nessa e: This is an exercise.This is an exercise.This is Tony Spinelli at Radio KXLY, Spokane.I'm calling to get the latest information about the incident at the nuclear plant there at Hanford..chic company operates this plant?Have any employees been harmed by the demonstrators?

Has any radioactive material been released?Antici ated Res onse: Provide concise, status.Provide resource book.accurate information based on present knowledge of plant information on Supply System using material in telephone R~es onse: message To~Team Called Actual Response Time Contest?Summary JIC Media JIC Public Info.B/P County 909e1$222 R1 (7~9)

DRILL NOe Exercise 90 SHEET NOe See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LOCATIONI Control Cell Lead Controller PAO E of VAI ID FOR TIMES OF AM REAL TIME See below>>See below ASSOCIATED WITH MKSSAO ES@AM TO HOURS D R I I.L TIME INFORMATION APPLIES TO HOURS Control Ce2,1 Telephone Queries (Sheet 10ag real time of 0900 to 0930)~odessa e: This is an exercise.This is an exercise.This is Larry Naylor at The Neeklv in Seattle.Nell, l see your security measures at the NHoops nul'e are about as good as your operating record.Hos did the demonstrators get into your secured area?What are vou going to do to them?Are the rest of the demonstrators still there at the plant?Antici ated Res onse: Provide concise status report using the latest available information.

~Res onse: message To ITeam)Called Time Actual Response Correct?Summar JIC Media JIC Public Info.B/F County SOS'I 5222 Rl I7&2I DRILL NOo"Exercise 90 KKT NOo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CQNTROLLKR (LOCATION)

Control Cell Lead Controller PAD K VAI ID FQR TIMKS OFB AM RKALTIMK See below PM See below QAM Q>>DRILL TIMK TQ HOURS HOURS ASSOCIATKD WITH MKSSAOKS INFORMATION APPLIKS TO Control Cell Telephone Queries (Sheet 10ah real time of 0900 to 0930)This is a exercise.This is an exercise.(Caller is Neva Smith)I'm a Seattle resident and my daughter is a member of Friends of Bivalve.I understand they are protesting your plant today.I need to know if you are going to put her in jail or wi11 your guards just shoot a11 the protesters.

Concise report of protest status.Security is there to protect property..Protestors will not be arrested as long as they obey the laws.EQlKQR~Message To Actual Response~m GuxaaIZ.JIC Media JIC Pub1ic Info.B/P County 9$4 1922K Rl I7&$)

ORILI NO Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAQK ot SHEET NOo RESPONSIBLE CONTROI LER ILOCATION)

See below Control Cell Lead Controller VALIO FOR TIMES OFI AM RKAI TIME See below PM See below ASSOCIATED WITH MKSSAQ ES@AM To HOURS Q PM O RILL TIME INFORMATION APPLIES TO HOURS Control Cell Telephone Queries (Sheet 10ai real time of 0900 to 0930 d~RZ This is an exercise.This is an exercise.This is John Nance.ily nephew works at the Plant.Have the protesters caused any problems with the plant for me to be concerned about him'e is the only family I have left.Give current consise report of any activity.Tell him to listen to KONA for updates.j aamva'.fessage To Actual Response Qa3.Lad, JIC Media JIC Public Info.B/y County~IBBlI!t 969 I5222 RI I7%2)

DRILL NQu Exercise 90 HKKT NOu See below 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAI.DATA SHEET RKSPONSIBLK CQNTROI LKR (LOCATION)

Control Cell Lead Controller PACK ot VALID PQR TIMKS OPB QAM RKAL TIMK See below PM See below~AM@PM DR)I I TIMK TO HOURS HOURS ASSQCIATKD WITH MKSSAQKS INPORMATION APPI IKS TQ Control Cal.l Telephone eries (Sheet 10aj real time of 0900 to 0930 This is an ezercise.This is an exercise.This is Jeff Arnold.BIy buddy's son works at the Plant.I was wondering if I could pick him up early today seeing you have an emergency out there.Can I get through any road blocks you might have set up.a Give current consise report of any activity.Tell him to listen to KONA for updates.'.Iessage To Actual Response JIC iIedia JJC Pubiit Info.B/y County tut MtBlrh 95$15222 RI (7&9)

DRILL NOc Exercise 90 431 SUPPLY SYSTEM CONTROLLER IN FORMAT lON GENERAL DATA SHEET PAGE RESPONSIBLE CONTROLLER

{LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFI AM REALTIME See below PM See below ASSOCIATEO WITH MESSAGES@AM TO HOURS Q PM DRILL TIME INFORMATION APPLIES TO HOURS Control Cell, Telephone Queries (Sheet 10ak real time of 0900 to 0930 This is an exercise.This is an exercise.This is.'mrs.Edwards.Ny husband forgot his lunch today.I wanted to drive it out to him but heard you had some protesters out there.Is it alright for me to come out?Give current consise report of any activity.Emuu~tfessage To Actual Response Mao Qm~~JIC Media JFC Public Info.B/F County~IBBlIA 99$1SRR2 Rl (7&8)

DRILL NOc Exercise 90 HKKT NOc See below 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET.RKSPONSISLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PAQK of VALIO POR TIMKS OPI QAM RKALTIMK See belo~PM See below QAM Q PM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAQKS INPORMATION APPLIKS TO Control Ce3.1 Telephone queries (Sheet 10al real time of 0900 to 0930 Jam'his is an exercise.This is an exercise.This is Nr.Seneker.I live in Franklin County.I'm real concerned about how you people are handling the protesters at the plant.I'd like to come to your information center where management might be so I can see for myself what you'e doing to control the situation.

Give current consise report of any activity.Kmumaa 1Iessage To Actual Respons'e Cur;aud'IC

'.Iedia JIC Pcb1ic Info'09 ISSUES Rl (7&9)

OR ILL NO Exercise 90 SHEET NOo See below kp sUnuŽpp7v srsr7M CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACE of VALIO POR TIMES OPM QAM REAL TIME See below PM See below 0AM Q PM'CI RILL TIME TO HOURS HOURS ASSOCIATEO WITM MESSACnES INFORMATION APPI IES TO Control Cell Telephone Queries (Sheet 10am real time of 0900 to 0930 This is an exercise.This is an exercise.This is Jane Fredericks.

I know you have protesters out there.Can you tell me if anyone has been ki11ed yet.Is there danger of them doing damage to your plant2 Or are these peaceful protesters2 Give current consise report of any activity.!Iessage To Qaaml Actual Response Q~i'lima JIC'Iedia JIC Public Info.B/F County~IF bIBIM See.iezzs RI I7ws)

DRILI NO Exercise 90 EKT NOo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LOCATION)

Control Cell Lead Controller PAGE of QAM VALIO FOR TIMES OFt AM REAL TIME See belowM See below@PM DRILL TIME TO HOURS HO RS ASSOCIATEO WITH MKSSAQLS INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10an real time of 0900 to 0930 This is an exercise.This is an exercise.Say, if you people need any help out there controlling your protesters, I was on special security duty in Vietnam.I'm sure my specialty service would benefit you guys.Give current consise report of any activity.Explain that we have trained security personnel for this.He can also call in local law enforcement if it is needed.EQRIOOl~'Iessage To~sQ=Actual Response Gakkai~m Qu~~JlC."Iedia JXC public info.'/E'ounty Qa JLe tttIt DRILI NOu Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACK oI SHKKT NOu RKSPONSIQI K CONTROLLKR ILOCATION)

See below Control Ce11 Lead Controller VAI IO FOR TIMES OFF 0AM AM RKALT,MK See below PM See below@PM DRILL TIMK TO HOURS HOURS ASSOCIATED WITH MKSSAOKS INFORMATION APPLIKS TO Control Cell Telephone Queries (Sheet 10ao rea1 time of 0900 to 0930 This is an exercise This is an exercise.Yeah, this is Tracy Blue.I was just wonderin if all your workers wi11 be sent home early due to the protesters?

Give current consise report of any activity.)~oi~~Message To Actual Response~@a Quxxa~JIC Media JIC Public Info.B/F County~IBBIZA 904 I9922 R'I I7&9)

DRII L NOo Exercise 90 KKT NOo See below SN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSI ELK CONTROLLER (LQCATIONI Control Cell Lead Controller PAOK at VALID FOR TIMES OFt AM REAL TIME See below PM See below QAM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAOKS 5 INFORMATION APPI IKS TO Control Cell Telephone eries (Sheet 10ap real time of 0900 to 0930 This is an exercise.This is an exercise.Yeah, this is Butrays supermarket.

Should we be stocking up more inventory incase the protesters get through your fence-line and cause an accident?Give current consise report of any activity.Tell him to listen to KOHL.Eaaacum Message To Actual Response Qaam~fM;Lak~IL Jl'C Media JIC Public Info.B/y county~IBBllIt 905oI522S Rl I7%5)

I DRILl NOe Exercise 90 EET NO, See below 4k SUPP'rsrM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATIONI Control Cell Lead Controller PAOE of VAt ID POR TIMES OPs AM R~L TIME See below PM, See below 0AM DRILl TIME TO HOURS HOURS ASSOCIATED WITH MESSACES INPORMATION APPLIES TO Control Call.Telephone Queries (Sheet 10aq real time of 0930 to 1000~Sessa e: Rumor No.2)7his is an ezercise.This is an exercise.7his is Tina Allaway with KOALA Radio.I was talking with some of the protestors out at Plant" earlier this morning.Thev told me that there are people coming to Richland from all over the region to join the protest.Do you know anything about this?Antici ated Res onse: Zo information on such a movement, but will have a Public Affairs media coordinator check further and get back to her.~aes oese: message To ITeam)JIC Media Called X Time Actual Response Correct?Summa rv JIC Public Info.B/F County 9oseIMRR RI I'1&9)

PRII NOe Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of SHEET NOs RESPONSIBLE CONTROLLER (I OCATION)ee below Control Cell Lead Controller AL, P POR TIMES OPl AM KALT,ME See below PM See below TO 0@PM ASS CIATEP WITH MKSSAOES TO HOURS P RILL TIME INPORMATION APPLIES TO HOURS Control Cal.l, Telephone Queries (Sheet 10ar real time of 0930 to 1000 Rumor!IO.")~Bassa e: This is an exercise.This is an exercise.This is Richard Reeder of KNDU-TV.Our camera crew at WNP-2 got quotes from some of the protestors to the effect that people are coming to Richland from all over the region to join the portest.Is that true?We'd like to stop.bv Supply Svstem headquarters and film someone on vour staff giving us a reaction to this protest.Would you have someone ready in about 20 minutes?Antici ated Res onse: No information, on such a movement.Turn call over to supervisor for further handling.~Res ease:!Iessage To~Team Actual Response Called Time Correct'Summar JIC Media JIC Public Info.B/F County 944 l5242 Rl (7&4)

OR ILL NQe Exercise 90 EET NQ.See below 4N SUPPLY, SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACE of VALIO FOR TIMES QFS 0AM AM REALT,ME See belowM See below@PM 0 RILL TIME TO HOURS HOURS ASSQCIATEO WITM MESSAOES INFORMATION APPLIES TQ Control Ce3,1 Telephone queries (Sheet 10as real time of 0930 to 1000 Rumor No.2)H~essa e: This is an exercise.This is an exercise.This is Brad Cross sith the T~ri-Cit Herald.Some of the protestors at Plant" were saying this morning that there are people coming to Richland from all over the region to join the protest.Do vou have any information on such a,move?Antici ated Res onse: No information to that effect.Turn call over to team supervisor for further handling.~Res onse: message To~Team Actual Response Called Time Correctt Summarv JIC Media JIC Public Info'/F County 98$ISSUES Rl I7%$)

ORIL NO.Exercise 90 SHEET NOe See below 4N'UPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROL LER (LOCATIONI Control Cell Lead Controller PAQK oe VAI IO FOR TIMES OFT 0AM AM REAL TIME See below PM See below@PM ORILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAOKS INFORMATION APPt IKS TO Control Cell Telephone Queries (Sheet at zeal time of 0930 to 1000)~sessa e: This is an exercise.This is an exercise.This is Ann Lessard from NBC network tv in Los Angeles.tI'e have received reports of the accident at the Hanford nuclear plant.I'd like an update on the situation so I can determine if we should send a network camera crew over there from Seattle.Antici ated Res onse: Provide a concise update using the latest information available.

R~es oose: message To~Team JIC acedia Actual Response Called Time Correct?Summar JIC Public Inf o.B/F Countv SSSeIM22 RI (7&0)

ORILI NOo Exercise 90 4N SUPPLY SYSTEM CONTROLLER lNFORMATtON GENERAL DATA SHEET PACE ot EET No.RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller 0AM REALT,ME See below PM See below CIAM DRILI TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFQRMATION APPLIES TO Control Cell Telephone Queries Sheet 10au real time of 0930 to 1000~ALP'4.This is an exercise.This is an exercise.This is Gardner Damon from KHQ in Spokane.Since I last called, I heard about the fire you are having.Does it have anything to do with the protesters2 Is anyone hurt2 Is the fire going to cause any hazard to the public.Give current status report.An"Emergency Teleophone Response Log" form should be prepared and forwarded to the the phone team supervisor.

Lammas.'!essage To LXaamL~~~ma Actual Response Qazx@M JIC iledia JZC Public Info.B/P County~ItbtIBit ORII LNOc Exercise 90 SHEET NO.See below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSISLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAOE VAI IO FOR TIMES OFI AM R~L TIME See below PM o See below 0AM Q PM OR!t LTIME TO HOURS HOURS ASSOCIATEO WITH MESSAOES INFORMATION APPLIES TO Control Cell Telephone Queries Sheet 10av zeal time of 0930 to 1000 This is an exercise.This is an exercise.This is Fred Lawson again from the~~~~~~.What's the current status of the protesters.

Ne got word of the fire.Were the protesters involved.Has anyone been hurts Give curzent status report.An"Emergency Teleophone Response Log" form should be prepared and forwarded to the the phone team supervisor.

.'message To Actual Response Q~~o~g JIC Nedia JIC Pub1ic Info.B/I County~IBBIIlI'96$15222 RI (7&2)

P RILL NOo Exercise 90 KET NOo See below kN SUPPLY'SYSTEM CONTROLLER'INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAGE VALIO FOR TIMES OFB QAM RKALTIMK See below PM See below CI AM Q PM 0 RILL TIME TO HOURS HO RS ASSOCIATKO WITH M GKS INFORMATION APPI IKS TO Control Cell Telephone eries Sheet 10aw real time of 0930 to 1000 This is an exercise.This is an exercise.This is Bernie Littlefield, from the QQg~~~~.I send a reporter and photographer out there earlier.I heard there was a fire out there since the time they left.Can someone give me an update on the situation.

I know my people probably aren't there yet and we need to keep up on any status changes.Give current status report.An."Emergency Teleophone Response Log" form should be prepared and forwarded to the the phone team supervisor.

Nessage To ZXmQ Actual Response MMj~m JIC Hedia JIC Public Info.B/F County~lBB1lli 999oISR2Z Rl (7<9)

DRILL NO, Exercise 90 SHEET NO.See below SN SUPPLY SYSTEM CONTROLLER INFORNIATION GENERAL OATA SHEET RESPONSIBLE CONTROLLER (l OCATION)Control Cell Lead Controller PACK VALID PQR TIMES OPB AM REAL TIME See bel ow PM See be 1 ow ASSOCIATED WITH MESSAGES 0AM TO HOURS Q PM DRILL TIME INPORMATION APPLIES TO HOURS Control Ce3.1 Telephone Queries Sheet 10ax real time of 0930 to 1000 This is an exercise.This is an exercise.This is Bill Powell again from Radio KUMA in Pendleton.

I'd again like to tape our conversation to be sure I don't miss anything.Hold for a second.Alright, I'm ready.What is the current status of the plant since the fire broke out and has it affected the protesters or any Supply System employees.

Give current status report.An"Emergency Telephone Response Log" form should be prepared and forwarded to the the phone team supervisor.

Message To LXa uaL, Actual Response G~i~m kuraaEJ.JIC Media JIG Pub1ic Info.B/y County.~IBBtIIIt 999 ISSSZ RI{7<9)

DRILL NOo Exercise 90 , 4P SUnŽppr V SYSTEM CONTROLLER lNFORMATION GENERAL DATA SHEET PAOK ot KKT NOo RESPONSIBLE CONTROLLER

{LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFB QAM REAL TIME See below PM See below QAM Q PM'DRILL TIME TO HOURS HOURS ASSO C I ATE D WITH MESSAO ES INFORMATION APPLIES TO Control Cell.Telephone Queries Sheet 10ay zeal time of 0930 to 1000~RRQ'his is an exercise.This is an exercise.This is Maxwell Kent of~~g~.Please tell me what the danger is to the public from this alert status at your plant.Do you expect things to get worse.Hill workers be sent home2 Give current status report.An"Emergency Telephone Response Log" form should be prepared and forwarded to the the phone team supervisor.

Message To Actual Response Gal~~ma JIC Media JZC Public info.B/P County tBIlh$114 15222 RI Q~S)

DRII L NOo Exercise 90 SHKKT NOo See belo~4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROI LKR (LOCATION)

Control Cell Lead Controller PACK ot VAI ID FOR TIMKS OPB AM RKALT>>K See below PM See below ASSOCIATKD WITH MKSSAQKS QAM DRILL TIMK TO HOURS INFORMATION APPLIKS TO Control Cell Telephone Queries HOURS Sheet 10az real time of 0930 to 1000~~iXQZdha.

This is an exercise.This is an exercise.I live in Richland.I heard about the problems at your plant this morning.What are you doing to protect the public.Do you expect any radiation to escape.I have little ones and know radiation affects them more than adults.Give current consise report.Repeat EBS message if available.

Message To QamaL.Actual Response QalJai~m Qaxx,~JIC Media JIC Public Info.B/F County~L" I)III$0$ISNESS Rl Il&$)

DRILL NOc Exercise 90 KKT NO.See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RK5PONSIBLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PAD K 01 VALID FOR TIMKS OFP AM RKALTIMK See below PM See below@AM Q PM DRI!L TIMK To HOURS HOURS ASSOCIATKD WITH MKSSAOKS INFORMATION APPLIKS TO Control Ce3.1 Te1ephone Queries (hect 10ba real time of 0930 to 1000)is is an exercise.This is an exercise.My emergency radio came on earlier in the morning but the kids were so noisy that I couldn't hear the message clearly.Then I heard about the accident at the nuclear plant.We live in Section 1 according, to the tag on the radio.Could you tell me what the radio message said'I Does it affect my family'If EBS message content is known, repeat it for the caller.-If not, give brief status of plant using facts on hand, and most recent broadcast PADs, if any.Remind caller of information listed in emergency calendar, and to keep listening to KONA.M ssage To Actual Response Qa3.Lad.~ra J C Media J C Public Info.B E County 909 I9222 Rl II~2)

DRILI NOs Exercise 90 SHEET NQs See belo~43k SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CQNTRQLLER ILOCATIONI Control Cell Lead Controller PAGE or VAI IQ POR TIMES OPr AM REALTIME S e belo9r PM See below 0AM DRILL TIME TQ HOURS HOURS ASSOCIATED WITH MESSAOES INPORMATION APPL IES TO Control Ce3.1 Telephone Queries (Sheet 10bb real time of 0930 to 1000)~Bassa e: This is an exercise.This is an exercise.(Caller is Laura Weese, Richland)I'e been listening to the radio reports about the terrorists at the plant in the Hanford area.I'm worried that this violence may spread into town, and Nother is even more worried than I am.She'80 years old and isn't used to all this technology.

She wants us to leave town and go to our cabin on the American River.Would vou recommend that?Antici ated Res onse: Determine where the caller lives.Provide brief status report on situation.

There is no need for anyone to leave Richland at this time because of the incident at Plant 2.~Res ense: Nessage To~(Team JIC Nedia Actual Response Called Time Correct?Summarv JIC Public Info.8/F Countv 944 ISZRR Rl[7&SI DRILL NOs Exercise 90 KKT NOs See below 4N SUPPLY SYSTEM.CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LOCATION)

Control Cell Lead Controller PAQK of VALID FOR TIMES OFB QAM RKALTIMK See below FM See below ASSOCIATED WITH MKSSAQES QAM TO HOURS Q PM DRILL TIME INFORMATION APPLIES TO HOURS Control Ce3.1 Telephone gueries (Sheet 10bc real time of 0930 to 1000 This is an exercise.This is an exercise.Yeah, this is Mrs.Hayes.My emergency radio came on earlier.It gave a message about a section of some sort but the sticker on my radio was 1ost a while ago and I forgot to tell my county person.Can you tell me if I have to do anything'etermine current address.Give current consise report.If EBS message content is known, repeat it for the caller.Tell her to refer to emergency calendar and listen to KONA.~Rs onss: iiessage To Qo uaL Actual Response g~f)~y~o~c Summer JIC Media JZC Public Info.B/P Counuy Qa-'tBBltli 9$$ISZZZ Rl (7%9)

DRILL NOu Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOE ot SHEET NO.RESPONSIBLE CONTROLLER ILOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OF: AM REAL TIME See belowM See below QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAOES INFORMATION APPLIES TO Control Cej,l Telephone queries (Sheet 10bd real time of 0930 to 1000~~RRka This is an exercise.This is an exercise.I need your help.Iy neighbors are leaving because they'e afraid of any kind of accident at WPPSS.tIy radio didn't go off and I don't believe my neighbors the way they react to anything.Can you tell me if I have to do anything?Determine current address.Give current consise report.If EBS message content is known, repeat it for the caller.Tell her to refer to emergency calendar and listen to KONA.She should call her county representative to get a radio or battery replacement.

'.Iessage To Actual Response JIC.'Iedia JIC Pub1io Info.B/I County P~IBBIIJI$5$o15422 R 1 Il&Q)

DRILL NO Exercise 90 KKT NO+See below 4p s5~p7v svsrEM CONTROLLER INFORMATtON GENERAL DATA SHEET RKSPONSIBLK CONTROI LKR (LOCATION)

Control Cell Lead Controller PACK VALID FOR TIMKS OF1 AM RKALT>>K See below PM See below DRILL TIMK TO HOURS HOU S ASSOCIATKD WITH MKSSAOKS INFORMATION APPLIKS TO Control Cell Telephone Queries (Sheet 10be real time of 0930 to 1000 This is an exercise.This is an exercise.I live in Richland.I heard about the protesters.

If you put them in jail, are they going to rebel by destroying the whole town knowing most of us who live here are pro nucleary I'm really worried about my kids with these people in town.Give current consise report.Tell her about our security force and local law enforcement.

If EBS message content is known, repeat it for the caller.Tell her to listen to KONA.EQ'il?QJViLi Nessage To Q~Q=Actual Response GaLML~ma JIC Media JIC Public Info.B/F County~haLZdl,$04 ISSUES RI PWSI DRILL NO.Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET FAG K ol SHKKT NOo RKSPONSIBLK CONTROLLKR

{LOCATION)

See below Control Cell Lead Controller VALID FOR TIMKS OFB QAM AM ASSOC IATKD WITH MKSSAQ KS RKALTIMK See belo~PM See below@PM TO HOURS DRILL TIMK INFORMATION APPLIKS TO HOURS Control Cell Telephone Queries Sheet 10bf real time of 0930 to 1000~RRki.This is an exercise.This is an exercise.I live in Frankiin County.do when they go off.I heard some sirens but forgot what I was suppose to Give current consise report.Repeat EBS message if available and listen to KONA for instructions.

'.Iessage To Actual Response Qahhul,~I a JIC IIedia JIC Fub1ic Info.B/F County Ga~tIJlt 9ddoIS222 Rl I7~2)

DRILL NOc Exercise 90 HKKT NO See below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RKSPONSIBLK CONTROLLKR (t OCATION)Control Cell Lead Controller PAOK QAM VAI ID POR TIMKS OPB AM RKALTIMK See below PM See below@PM ORIL!TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAQKS INPQRMATION APPLIKS TO Control Cej,l Te3.ephone

+eries Sheet 10bg real time of 0930 to 1000 This is an exercise.This is an exercise.Hey.Ny brother works out there.He called and said there was a fire.Is the smoke'going to come my way?Give current consise report.Repeat EBS message if available and 1isten to KOBVA for instructions.

fessage To L.XmQ Actual Response Ga1huk D~@Qarx,aa$2.JIC Media JIC Public Info.B/P County BBLPJt 95$cl5R 2 Rl (1&5)

DRILL NO.Exercise 90 KKT NOc See belo~4N SUFPI Y SYSTEM CONTROLLER lNFORMATtON GENERAL DATA SHEET RKSPONSISLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PAD K QAM VALID POR TIMKS OPI AM RKAL TIMK See below PM See below QPM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAQKS INPORMATION APPLIKS TO Control Cell Telephone Queries Sheet 10bh real time of 0930 to 1000<~OggO.This is an exercise.This is an exercise.This is Janell Dudley.My husband works out there.I can't seem to get in touch with him.His daughter is sick.Re think its appendicitis.

I need him to meet me at the hospita1 emergency room.Can you he1p me out.Finds out what group he is in and pass message on to Team Supervisor for action.LcÃSULLQ Message To Actual Response JIC Media JIC Public Info.B/F County DRILL NO, Exercise 90 HKKT NO, See below 4W SUPPLY SYSTEM CONTROLLER

!NFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAGE O1 VALID FOR TIMES OFt QAM RKALTIMK See below PM T See below C3 AM'DRILL TIMK TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell.Telephone queries Sheet 10bi real time of 1000 to 1030 5QRRW~This is an exercise.This is an exercise;This is Marilyn Sawyer, Radio KSEM in Moses Lake.Rhat type of radioactive material do you expect to be released2 Give current status report.An"Emergency Telephone Response Log" form should be prepared and forwarded to the the phone team supervisor.

Message To Usmc=Actual Response Qa.Llew~z Gmw~JIC Media JIC Pub1ic Info.8/F County~hei!Jt 905oISZZZ Rl (7~>I ORILI NOh Exercise 90 SHEET NO, See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CQNTROLI ER{LOCATIQN)

Control Cell Lead Controller PAD E of VALID POR TIMES QP: Q*M REAL TIME See below PM See below QAM Q PM DR)LI, TIME TO HOURS HOURS ASSOCIATEO WITH MESSAGES INPORMATIQN APPLIES TD Control Cell Telephone guerfes Sheet 20bj real time of 1000 to 1030 This is an exercise.This is an exercise.This is Billy Harrison of the Seattle P-Z.Hhy has the situation worsened at the plant?Give current status report.An"Emergency Telephone Response Log" form should be prepared and forwarded to the the phone team supervisor.

.'Iessage To Actual Response~m JIC IIedia JIC Public Info.yly County~halrk 91$hISZRZ R'I (7&9)

DRILL NO, Exercise 90 43k SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAO E of EKT NO.RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFI QAM REAL TIME See below PM To See below'AM ORILL TIME TO HOURS HOUR ASSOCIATKO WITH MESSAQKS INFORMATION APPLIES TO Contxol Cell Telephone Queries Sheet 10bk real time of 1000 to 1030 This is an exercise.This is an exercise.This is Dean Mason.of KHQ-TV, Spokane.Which bui1ding at Plant 2 has the high radiation sources Can people enter into the bui1dingf Give information.

Log in log book and pass on to phone team supervisor.

Message To Actual Response Lani~ra Qarxe~JIC Media JIC Pub1ic Info.8/F County~lttttIIIt 95$15EE?RI I7&51 Q RILL NOe Exercise 90 Mal SUPPLY SYSTEM CONTROLLER INFORMAT1ON GENERAL DATA SHEET PAOK ot SHKKT NOe RKSPONSIBLK CONTROLLKR

{LOCATION)

See belo~Control Cell Lead Controller VAI IO FOR TIMKS OFt AM RKALTIMK See below PM See below TO Q@PM ORILI TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAOKS INFORMATION APPI IKS TO Control Ce3.1 Telephone eries Sheet 10bl real time of 1000 to 1030 This is an exercise.This is an exercise.This is Rose Quintal, Aberdeen Daily World.Could you tell us who built your plant2 How much did it cost2 When did it go into operation..

Give information.

Log in log book and pass on to phone team supervisor.

This information is in the teams resource book.'.fessage To Actual Response QmQ=R~~m Qaxr~JIC Media JIC Public Info.B/y County o~JlatIJ Jt 909 1M'1 I7%9)

OR ILL NO Exercise 90 HKKT NOo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET'KSPONSIBLK CONTROLLKR

{LOCATION)

Control Cell Lead Controller PACK of VALIO FOR TIMKS OFt QAM RKALTIMK See below FM See below@AM Q PM.ORILL TIMK TO HOURS HOURS ASSOCIATKO WITH MKSSAQKS INFORMATION APPLIKS TO Control Ce3,1 Telephone queries Sheet 10bm real time of 1000 to 1030 This is an ezercise.This is an exercise.This is Don Chandler, The Oregonian.

Could you give us a listing of three or four motels in the area of the plant?4~Give information.

Log in log book and pass on to phone team supervisor.

This information is in the teams resource book.,"tessage To LXaamL Actual Response~uk Gian Qaxzaak'..

JIC itedia JIC Public Info.8/y County Ga fiatlth 965 ISZZZ Rl (7%2)

DRILI NOo Exercise 90 kN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK SHKKT NOo RKSPONSIBLK CONTROLLKR ILOCATION)

See below Control Cell Lead Controller VALID FOR TIMLS OFB QAM RKALTIMK See belo~PM See below QAM Q PM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSA(ofKS INFORMATION APPI IKS TO Control Cell Telephone Queries Sheet 10bn real time of 1000 to 1030 This is an exercise.This is an exercise.This is Linda Hirakawa, The Seattle Times.Please give me a listing of all the communities surrounding your plant.Which of these are affected by the Alert event.Give information.

Log in log book and pass on to phone team supervisor.

This information is in the teams resource book.Message To ZXauad Actual Response Quxe~JIC Nedia JIC Public Info.B/y County~f(B~90$ISZRII RB I7%9) 0 RILL NOo Exercise 90 wotHIuoyou tt'otic yowuI kW SUPPlY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAQK oI HKKT NQo RKSPONSIBLK CQNTROI LKR (I QCATIQN)See below Control Cell Lead Controller VALIQ FOR TIMES OFt AM RKAL TIMK See below PM See below 0AM ORILI TIMK TO HOURS HOURS ASSOC IATKD WITH MKSSAQKS INFORMATION APPI IKS TO Control Cal.l Telephone Queries Sheet 10bo real time of 1000 to 1030 Uhi.This is an exercise.This is an exercise.This is Viillis Hitchell, KOTY Radio in Kennewick.

Hhere are all the people at the p1ant being sent to in case the situation gets worse.Do you have some sort of evacuation plan.How does this plan effect the public.Give information.

Log in 1og book.and pass on to phone team supervisor.

LL'~1M message To Qa@M Actual Response Gulhti Mam JIC tIedia JIC Public Info.B/y county~I9 tItJt 9$8ol52ZR RI (7&9)

DRII L Noo Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACK KKT Oo RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OPt AM REAL TIME See below PM See below ASSOCIATED WITH MESSAOES@AM TO HOURS DRILL TIME INFORMATION APPI IKS TO URS Control Ce3,1, Te1ephone queries Sheet 10bp rea1 time of 1000 to 1030 This is an exercise This is an exercise.This is Warren VanOrden, PBS Radio in Pullman.I'm getting ready to go on the air in about 10 minutes.Can you give a very accurate concensus of the status of the plant.My radio station is known for accuracy so I'd rather get the story right the first time.Give information.

Log in log book and pass on to phone team supervisor.

Lci2QQLc Message To Qms?=Actual Response~QuLlai~ra Guxxm~JIC Media JIG Pubiio Info.B/o County Ca'htuLih%III ISED Rl (7~>I DRILI Non Exercise 90 HKKT NOc See below 4N SUPPLY SYSTEM CONTROLLER'INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACK oP VALID FOR TIMES OPB QAM REAL TIMK See below PM See below QAM DRII L, TIME TO HOURS HOURS ASSOCIATED WITH MKSSACKS INPORMATION APPLIES TO Control Cell Telephone Queries Sheet 10bq real time of 1000 to 1030 This is an exercise.This is an exercise.Ny name is Carl Doright.I heard on my scanner about the fire at Hanford.Ny relatives all work there so I'd like to know if anyone is hurt.Is there going to be radiation leaked to the world like Chernoybl?

Are workers going to have time to get out?Give current conditions and EBS contents if available.

'.message To QmaL Actual Response+~g~o'~)JIC Media JXC Pub1ic Info.B/P County~Itu~.555 15222 Rl IV&5)

DRILL Non Exercise 90 SHEET NOo See below 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LQCATIQNI Control Cell Lead Controller PAOK VAL)D POR TIMES QPt QAM REALTIME See below M See below CI A M'DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAOES INPQRMATIQN APPLIES TO Control Cell Telephone Queries Sheet 10br real time of 1000 to 1030~ogy tn~This is an exercise.This is an exercise.If you got a fire out there, what happens to all those protestersf Their just innocent people trying to make the area safe.Looks like they waited too long to get people to listen to them.Now 1ookl You got a fire that will'robably kill all your workers and the public too.What are you doing to protect any of us.Give current conditions and EBS contents if available.

Iessage To Actual Response Calhul,'Lhm JIC FIedia JIC Public Info.B/F County~heal?h 96$olSSSZ Rl{7%9)

DRILI NQ=-Exercise 90 kS SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAOK ot HKET NO>>See below r RESPONSIBLE CONTROLLER (LQCATIONI Control Cell LeadController

@PM DRILI TIME VAI IQ POR TIMES OFB QAM REAL T,ME See below PM See below TQ HOURS HOU S ASSOCIATED WITH MKSSAOES INPORMATIQN APPIJES TO Control Cell Telephone Queries Sheet 10bs real time of 1000 to 1030 This is an exercise.This is an exercise.This Ada McKinney.My neighbors are saying they are packing up and leaving the area cause their afraid of the nuke plant fire problem.I live on Heilsian May in Richland.If everyone rushes on account of fright, you could have car accidents on your hands and have to live with that.Give current conditions and EBS contents if available.

Message To Bimah=Actual Response&Led JIC Media JIC Pubiic Info.B/B County~laalilt 9$$>>1599II RI (7&9)

QRILI NOo Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAOE SHEET NOc RESPONSIBLE CQNTRQI LER ILOCATIQN)

See below Control Cell Lead Controller VALIO FOR TIMES OPF AM REAL TIME See below PM See below QAM QRILL TIMK TO HOURS HOURS AssQcIATKQ wlTH MEssAQEs INPORMATIQN APPLIES TO Control Cell Telephone Queries Sheet 10bt real time of 1000 to 1030 UQ'ikey~This is an exercise.This is an exercise.This is'like C1ark from Standard 6 Poors.The news media have picked up that there is a fire at P1ant 2.What do we tell bond holders2 I'e already gotten a coup1e of calls from concerned bond holders.I have to tell them something.

Give current conditions.

logging the ca11.Person should pass message on to Supervisor after llessage To Actual Response Qaxxm~JIC.'ledia JFC Public Info.B/F County 999 I5222 RI (7%2)

DRILL NO Exercise 90 HKKT NOc See below 4S SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACK of VALID FOR TIMES OFB AM REAL TIME See below PM, See below ASSOCIATED WITH MKSSAOKS C3 AM TO HOURS'DRILL TIME INFORMATION APPLIES TO HOURS Control Cell Telephone Queries Sheet 10bu real time of 1000 to 1030 This is an exercise.This is an exercise.This is Jerry Larkin from Franklin Co.Ny wife works at your plant.After hearing about the fire, I'm concerned about her safety.Even though she just works in the Harehouse, she just found out she's pregnant.If the ac'cident gets worse, I'm afraid she'l lose the baby.Has any of your employees evacuatedf She didn't answer the phone.Hhat should I dof Give current conditions.

Repeat EBS message if available.

Message To Qaaad=Actual Response MMi~m Mzw$2.JIC Media JXC Public Info.B/P County~IBLLBIt SSSclSX22 Rl (7WQ)

ORILL NO+Exercise 90 WiIIIIII4104

~I'llIC)Orll 4tN SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAOC ot SHKKT NO+RKSPONSISLC CONTROLLKR (LOCATION)

See below Control Cell Lead Controller VALIO FOR TIMKS OFI QAM RKAL TIMK See below PM See below 0AM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAQKS INFORMATION APPLIKS TO Control Cell Telephone Queries Sheet 10bv real time of 1000 to 1030 This is an exercise.This is an exercise.This is Cindy Pavlich from Hermiston.

My husband is a member of Friends of Bivalve.He told me he was going on a business trip.I'm concerned.

that he really was going to be protesting with the rest of the group but didn't want to tell me.Can 1 find out if he is there.Is going to be safe?I'm going to have a baby any day now and do not want him in jail or dead.Has your fire hurt anyone.Give current status ofprotesters.

Repeat any news releases if available.

~lQJLiL'essage To LXmQ=Actual Response Qa3~~ma Quxcz~JIC Media JIC Public Info'/P County OSI 15222 Rl (7&2)

DR II L NOo Exercise 90 HKKT NOo See below 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSI BLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PACK VALIO FOR TIMKS OF1 QAM RKALTIMK See below FM See below QAM Q PM'DRILL TIMK TO HOURS ASSOCIATKD WITH MKSSAOKS INFORMATION APPLIES TO Control Ce3,1 Telephone Queries Sheet 10bw real time of 1000 to 1030 This is an exercise.This is an exercise.This is Judy Harrod.I'm a student at CBC this summer.I heard about the, problems you are having at Plant 2.I was wondering if I could go somewhere where I could get some information to write a paper for a class project.I also have a camcorder to video any management giving briefings.

Hhere should I go to get the best information.

Give current conditions.

Tells Supervisor of cail after she logs it.Tells student to possibly call back.Jhm.xaam Message To QmM Actual Response Qua~~JIC Media JIC Public Info.B/y county Ga JhBISh 91$15222 Ri (7<2)

ORILI NO, Exercise 90 bN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK SHKKT NOo RKSPONSISLK CONTROLLKR (LOCATIONI See below Control Cell Lead Controller VALIQ POR TIMES OI: QAM RKAL TIMe See belowM See below DRILL TIMK TO HOURS HOURS ASSQCIATKQ WITH MKSSACRKS INPQRMATIQN APPLIKS TO Control Cell Telephone queries Sheet 10bx real time of 1000 to 1030 This is an exercise.This is an exercise.This is Larry Kewitt.I'm a prof at CBC.I was wondering if I could bring my Nuclear Technology students over to your JIC to watch the process you go through during emergencies.

They could get some other kinds of experience this way.Give current conditions.

Tells Supervisor of call after she logs it.Tells him to possibly call back.'Iessage To QmM Actual Response Qa2Mk~m Qmw~JIC'Iedia JlC Public Info.B/F County il u u 1$04o15222 R1 I7&5I DRILL NOo Exercise 90 WAtlllOOtOX tttllt tO'laI1 49 SUPPLY SYSTEM CONTROLLER iNFORMATION GENERAL DATA SHEET PAGE ot SHEET NOo 10fa RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF1@AM REAL TIME 1 000 P PM 1 030 0AM PPM'DRILL TIME.TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic

(}ueries To: Media (State)From: Tri City Herald Message: Have any additional security measures been taken, and if so what are they?Anticipated Response: Tell, if any, what they are.Actual Response Il 968 15222 R1 (7 82)

RILL NO Exercise 90 43k SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE of aHKET NQo RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALIQ FOR TINES OF: QAM REAL TIME See below>>See below CI AM 0 RILL TIMK-TO HOURS HOU S ASSOCIATKO WITH NESSAQES INFORMATION APPLIES TQ Control Cell Telephone queries Sheet 10by real time of 1030 to 1100 JQ'ikey" This is an exercise.This is an exercise.This is Richard Reeder, KNDU-TV.How much radiation has been released to the atmosphere?

How many children are you expecting to evacuate Edwin liarkham School?Give information.

Log in log book and pass on to phone team supervisor.

.'message To Actual Response Ca3.Lak d~Guxo~~JIC,'media JIC Public Info.B/y County Qu JhtIBIt 909 ISIS@Rl I7&9)

OR ILL, NO Exercise 90 SHPKT Non See below 4N SUPPLY SYSTEM CONTROLLER lNFORMATlON

'ENERAL DATA SHEET RKSPONSIBLK CONTROLLKR

{LOCATION)

Control Cell Lead Controller PAOK ot VALID PQR TIMKS OPB AM RKAL TIMK See below PM See below QAM DRILI TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAOKS INPORMATION APPLIKS TO Control Cell Telephone Queries Sheet 10bz real time of 1030 to 1100 This is an exercise.This is an exercise.This is Kelly VanFleet, KING Radio, Seattle.Where are all the kids from school going to be sent2 Are your field teams going to be dressed in PC's.This sight of your field teams could scare the public, especially children.Give information.

Log in log book and pass on to phone team supervisor.

Ehamuaa'message To Actual Response JIC media JIC Public Info.B/B County C~IBBlBIt 95$ol5222 Rl (7&5) 0 RILL NOo Exercise 90 HKKT NOo See below kW SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PACK of VALIO FOR TIMKS OFy AM RKAL>>MK See below PM See below@AM Q PM ORILL TIMK TO HOURS HOURS ASSOCIATKP WITH MKSSAQKS INFORMATION APPLIKS TO Control Ce3.1 Telephone Queries Sheet 10ca real time of 1030 to 1100 This is an exercise.This is an exercise.This is Tony Spinelli, Radio KZLY, Spokane.He're getting to broadcast the news and I'd like a run down of the status of your accident.Has anyone been hurt2 Are the protesters under control yet..Hhat has happened to them2 Nhere do you plan to send employees that are not part of the emergency team2 Give information.

Log in log book and pass on to phone team supervisor.

Ehauum.tiessage To Actual Response JIC IIedia JIC Public Info.B/y County~ha3JJt 944 14222 R'I I7'4$)

DRILI NO Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAOK ol SHEET NOe RESPONSIBLE CONTRO!LER ILOCATION)

See below Control Cell Lead Controller VALID I OR TIMES OFt 0AM REAL TIME See below PM See below@PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAQKS INFORMATION APPI IKS TO Contro3.Cell Telephone Queries Sheet 10cb real time of 1030 to 1100 This is an exercise.This is an exercise.This is Lar'ry Naylor,~gga~.Seattle.We'e got an exclusive that you are getting ready to classify to a General Emergency status.What type of protective measures should the public take to assure their safety?Give information.

Log in log book and pass on to phone team supervisor.

LciRU1RL ifessage To Qaa~M Actual Response Q,LLak Dhe Guxx,~JIC Bedta JIC Public Info.B/y County ltd'buBIIIt 989eISXXZ Rl@&9)

OR ILL NO, Exercise 90 HKKT NOo See below 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROLLKR (I OCATION)Control Cell Lead Controller PACK af VALID FOR TIMKS OFB QAM RKAL TIMK See below PM See below 0AM@PM DRILl TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSACKS INPORMATION APPLIKS TO Contro3.Cell Telephone Queries Sheet 10cc real time of 1030 to 1100 This is an exezcise.This is an exercise.This is Brad Cross,'Q~~has been zeleased.How long how much'his needs to be to do.I undersand a substantial radiation dose before you have measurements as to what type and know right away so people can be instructed on what Give information.

Log in log book and pass on to phone team supervisor.

'.Iessage To Actual Response~'lima Garou J'IC Media JIC Public Info.B/y County~ltB~$1$o1$222 R'I I7&$)

DRILI Non Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET SHKKT NOo RKSPONSISLE CONTROLLER

{LOCATION)

See below Control Cell Lead Controller VAI IO FOR TIMES OPI RKALT>>K See below PM T See below ASSOCIATED WITM MESSAOKS TO HOURS DRILL TIME INPORMATION APPLIKS TO HOURS Control Cell Telephone Queries Sheet 10cd real time of 1030 to 1100 This is an exercise.This is an exercise.This is Ann Lessard, NBC-TV Network.Vie would like to interview one of your company management people about your accident.Could you please get them on the phoneme Give information.

Log in log book and pass on to phone team supervisor.

Message To QamL Actual Response@~i~is Qux~M JIC Niedia JIC Public Info.t/t County~ICttLII 981 ISSUES Rl (7&S)

QRILI NQo Exercise 90 4P SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAQE ot HEET NO.RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES QFS QAM REALTI'MK See below FM See belov 0AM DRILL TIMK To HOURS HOURS ASSOCIATED WITH MESSAOES INFORMATION APPLIES TQ Control Ce3,1 Telephone Queries Sheet 10ce real time of 1030 to 1100 yo~This is an exercise.This is an exercise.This is Bill Powell, Radio KUMA, Pendleton.

Are all the problems you're having at the plant related to each other or is each item a problem all its own?What are you doing to prevent anything else from happening?

Give information.

Log in log book and pass on to phone team supervisor.

Message To QauM Actual Response Quxu~JIC Media JIC Public Info.B/y County~IBBIIA 999 15222 R'I I7%2)

DRILl Noe Exercise 90 43l SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK ot SHEET NOI RESPONSIBLE CONTROLLER (LOCATIONI See below Control Cell Lead Controller

'VALID FOR TIMES OFB AM'KALTIMK See below PM.See below 0AM@PM DRILl TIME TO HOURS HOURS ASSOCIATED WITH MKSSACES INFORMATION APPLIES TO Control Ce3.1 Telephone Queries Sheet 10cf real time of 1030 to 1100 Ma&1R V This is an exercise.This is an exercise.This is Bernie-Littlefield,~g~~fQg~$.What do you think the total impact to environment will be due to the accident this morning's If you don'know now, just how long before you will knowf Now that you can't operate, how is electricity supplied to your customers.

Also, I'd like to know if any of your workers are contaminatedf Give information.

Log in log book and pass on to phone team supervisor.

.'Iessage To QaaaQ=Actual Response Gian JIC Media JIC Public Info.B/B CounBy ORILI NOc Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK ot HKET NOo RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALIO FOR TIMES OFB AM RKALTIMK See below>>See below TO Q>>Cl ORILL TIME To HOURS HOURS ASSOC IATKO WITH MKSSAOKS INFORMATION APPLIES TO Contxol Ce3,1.Telephone Queries (Sheet 10cg real time of 1030 to 1100 iJ"~~This is an exercise.This is an exercise.Rumor No.3)This is John Shippell from Pasco.I'e got a load of furniture I need to deliver to Richland..'Iy boss said some terrorists caused a release at Plant 2.Can I still deliver my load to Rich1and or.is unsafe.Tell him it isn't true.Give current consise report of any activity.Teil her to listen to KONA for updates.iIessage To Q usL.Actual Response~IN 5d?xxRQXZ., JIC Media JIG Public Info.B/P County~ItB~98$ISSUES Rl Il&9)

DRILL NOc Exercise 90 SHKKT NO See below 4N SUPPLY SYSTEiVI CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIGLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PACK or 0AM VAl ID FOR TIMES OFP AM RKALT,MK See below PM See below@PM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH NKSSAQKS INFORMATION APPI IKS TO Contro3.Cell.Telephone Queries (Sheet 10ch real time of 1030 to.1100 Rumor lIO.3)This is an exercise.This is an exercise.This is IIeva Smith again from Seattle.I heard the protesters are really terrorists and they have caused a radiation leak at Plant 2.Like I said before, my daughter is a member of Friends of Bivalve.I can't believe she would take part in other than just protesting.

I'm worried she is dead from the release.Can you give me update.I just don't know what to do.Give her current report of protesters.

Also give report of cause of any plant conditions.

Jhamuw.'Iessage To~mL=Actual Response Lma Buzz~JIC ifedia JIG Public Info.B/F County~~DXJ1 RILL NO, Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of HKET Noo RESPONSIBLE CONTROI LKR (LOCATION)

See,,below Control Cell Lead Controller VALID FOR TIMES OFt 0AM RKALT,ME See below PM See below DRILL TIME TO HOURS HOUR ASSOCIATKD WITH MK55AQKS INFORMATION APPI IKS TO Control Cell Telephone/nerves{Sheet 10ci real time of 1030 to 1100 URRRP~This is an exercise.This is an exercise.Rumor No.3)This is Judy Johnson from Kennewick.

."Iy son lives in Richland.I'm really concerned about the radiation release caused by the terrorists at P1ant 2.Can you tell me if'e is going to be alright.Did he maybe evacuate somewhere2 Tell her it isn t true.Give current consise zeport of any activity.Tell her to listen to KONA for updates.Mmurm.'!essage To Actual Response Rima Qauw~JIC tiedia JIG yub1io Info.8/y County~ha.Ltit 555 I5555 RI I7&$)

OR ILL NO.Exercise 90 4W SUPPLY SYSTEiVI CONTROLLER INFORMATION GENERAL DATA SHEET PACK of ALID FOR TIMES QFF AM QAM RKAL TIMK See belowM See below Q FM OR ILL TIMK SHKKT NOo RKSPQNSISLK CONTRQLLKR ILOCATIQN)

See below Control Cell Lead Controller V TO HOURS HOURS QCIATKD WITH MKSSAOKS INFORMATION APPLIKS TO Control Ce3,1 Telephone Queries (Sheet 10cj zeal time of 1030 to 1100)a1URLRRL This is an exercise.This is an exercise.(Caller is Gene Rider)I heard about the problem at your plant.My son is riding his cycle in the ORV park.Does he have to evacuatef No.Give current advisories.

'Message To ZXamQ=Actual Response Gu3.Lad.Dima hexa~JIC Media JZC Public Info.B/F County$12cIS222 R1 (7&2)

DRILL NOc Exercise 90 4N'UPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACK of HKKT NO, RKSPONSIBLK CONTROLLKR ILOCATIONI See below Control Cell Lead Controller VAl IO FOR TIMKS Opt QAM RKALT,MK See below PM See below QAM Q PM DRILL TIMK TO HOURS HOURS ASSOCIATKO WITH MKSSAQKS INFORMATION APPLIKS TO Control Cell Telephone Queries~(Sheet 10ck real time of 1030 to 1100)-'his is an exercise.This is an exercise.'I This is Andy Steiner, resident on Dogwood.I'm just letting your team members know that there are people at the accident scene who may be exposed to the plume).'/F County: This is Sgt.Roy Glass, Washington State Patrol.I'm on the scene of an accident at the corner of Cedar and Dayton.How much time do we have until we we are impacted by that Hanford emergency2 Is the plume heading our way2 Should we move the cable off the road or block off a section of the road.If you want us to block.traffic, what intersections do you want us to do it on2 We don't want to be standing in the plume.Acknowledge and thank them.B/F County: You are in the projected plume path.Evacuate the injured immediately.

Reroute traffic around the blocked intersection of Cedar and Dayton.1~Eaaumm: 1'.Message To'mQ=Actual Response~Mi~z Qmza~: JIC Media'J1C Pub1ic Info./P County 999cI522x Rl Il&9)

DRILL.NO Exercise 90 SHEET NOe See below 4k SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILQCATIQN)

Control Cell Lead Controller PAQK VALIO FQR TIMES OI I QAM AM REAL TIME See below PM o See below QPM ORILL TIME TQ HOURS HOURS ASSOCIATED WITH MESSAQKS INFORMATION APPLIES TO Control Ce3,1 Telephone queries (Sheet 10cl real time of 1030 to 1100)~!lessa e: This is an exercise.This is an exercise.This is Brad Reeve in Sen.Slade Gorton's office in Spokane.The Senator has asl'ed us to keep him updated on the situation at Plant 2.What's the status there nowP How can we contact Don Aazur if the Senator should want to talk with himP Antici ated Res onse: Provide status report using factural information on hand.The llanaging Director can be contacted through the Crisis lIanagement Center when it is activated.

Otherwise, the team member should note the request and ensure it gets to the team supervisor for forwarding to the JIC Director.~Res esse: '.Iessage To (Team)Actual Response~Called Time Corr'ect?Summarv JIC Media JIC Public Info.964eISR?S Rl (7W>)

DRILL NOs Exercise 90 4N SUPPLY SYSTEM CONTROLLER-INFORMATtON GENERAL OATA SHEET PAQ K HKKT NO, RKSPONSIBLK CONTROLLKR

{LOCATION)

See belo~Control Cell Lead Controller VALID FOR TIMES OFR AM RKALTIMK See belov PM, See belov QAM Q PM'DRILLTIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAQKS INFORMATION APPLIKS TO Control Ce3.1 Telephone queries (Sheet 10cm real time of 1030 to 1100)~tessa e: This is an exercise.This is an exercise.I live across the river from the Hanford nuke plant where the accident happened this morning.I heard that radiation was released and I want to know if there'a chance that it will get to where I live.Should I do something to protect my familv and livestock?(Caller is Roherta Stafford, 2311 Auburn Road, Franklin County.)Antici ated Res onse: Determine where caller lives.I(aterial with radioactive contamination was released from this morning's accident, hut it has not spread far from the accident site.Teams are at work tracking the location of the material.Give PADs for Franklin County at this time, if any.Listen to KONA Radio.~Res ouse: Message To (Team)JIC Media Actual Response Called Time Cottectt Summar JTC Public X Info.B/F Countv DRII LNOc Exercise 90 SUPPI V SVSrm CONTROLLER INFORMATlON GENERAL DATA SHEET PACK SHEET NOc RESPONSIBLE CONTROLLER ILOCATIONI See below Control Cell Lead Controller VALIO FOR TIMES OFP QAM REAI TIME See below PM 0AM'0 RILL TIME TO HOURS HOURS ASSOCIATEO WITH MKSSAOKS INFORMATION APPI IKS TO Control Cell.Telephone Queries beet.10cn real time of 1030 to 1100)is is an exercise.This is an exercise.This is Susan Borino (who lives at 620 Casper Lane, Franklin County).recently moved into this house with this emergency radio in it.The radio has gone off this morning with some sort of message about an incident at the nuke plant.I don't know if I need to do something or not.8y children are in school.Should I go get them'1 1 u Ib Determine from caller's address which section she lives in.Provide brief status report on accident.'etermine if PADs, if any, apply to her area.Determine if she has an emergency calendar, and refer her to it if she has one.Keep tuned to KONA for updated information.

ssage To Actual Response Qa1Lak'Liam GurraaT'Hedia C Public Info.F County SPII ISR?S Rl I7&QI RILl Non Exerc'ise 90 SMKET NOo See below WABNIBOBO9 yt'BBIC yottBB kN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET REsPoNsIGLE coNTRoLLER (LocATIoNI Control Cell Lead Controller PAOK VAI IO POR TINES OPB AM RKAI TIME See below PM See below 0AM Q pM ORILL TIME To HOURS HOURS ASSOCIATED WITM NKSSAOKS INPORMATION APPLIES TO Control Cell Telephone queries (Sheet 10du real time of 1030 to 1100)This is an exercise.This is an exercise.(Caller is Franklin County Sheriff's Deputy Dillon)I'm on scene at an accident on Cedar and Dayton.I'e put out flares.He will need help directing traffic.9 Make the call after they call the control cell asking for a deputy to respond.Message To~0=Qul~Actual Response Gtu~~JIC Media JIC Public Info'/B County 944 IS?RE Rl[7&>I DRILL NOo Exercise 90 irk SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK SHEET NQo RESPONSIBLE CONTROLLER ILQCATIQN)

See below Control Cell Lead Controller QAM VALID I OR TIMES OPB REAL T,MK See below>>See below QPM D RILL TIME TO HOURS 1 HOURS j ASSOCIATKD WITH MKSSACIES INPORMATIQN APPLIES TO Control Ce3,1 Telephone Queries (Sheet 10dw real time of 1030 to 1100)This is an exercise.This is an exercise.(Caller is Nick Reynolds of Columbia Cable.He need an ambulance on the corder of Cedar and Dayton.Ne backed out of a driveway and ran into another vehicle.Two people are hurt, one pretty badly.Please hurry.They should ask you the following questions, however, if they don', offer the information anyway.0: Is it blocking traffic2 A: Yes, our cable truck is crosswise on the road and tv cable is spread on the roadway.Q: Extent of injuries: A: Cuts on their face.One person is, stuck under the truck.Q: Description of the victims.A: 2 males in late 20's.Response to this simulated accident shall also be simulated.

They should contact HSP and Fr.Co.Sheriff to provide traffic support.Message To Actual Response MLusL~m Qmxas'IC Media JIC Public Info.B/y County KR GXUJ'~944 I$222 RI IV%2)

ORILL NOo Exercise 90 KKT NQo See below Mal SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RKSPONSIBLK CQNTRQLLKR (LOCATION)

Control Cell Lead Controller PACK of VAI IO FOR TIMKS QFt AM RKALT>>K See below PM See below ASSQCIATKO WITH MKSSAOKS QAM TO HOURS Q PM O RILL TIMK INP'ORMATION APPLIKS TO HOURS Control Ce3.1 Telephone eries (Sheet 10dx real time of 1030 to 1100)This is an exercise.This is an exercise.(Caller is Mary at the Health Department.)

Hhat was the cause of this emergency.

I just heard that it was because of a truck accident on Cedar and Dayton.Give her appropriate accident information.

Message To.Actual Response QaaaL.RQL@k Birn@Razz,ass'IC Media JIC Public Info.B/y County 944 I4222 Rl I7&2I OR ILL NO+Exercise 90 HKKT NOo See below kN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTRQLLKR (LOCATION)

Control Cell Lead Controller PAOK ot ALIO I OR TIMKS QFC QAM TIMK See below PM See below@AM'OR ILL TIMK TO HOURS HOURS ASSQCIATKD WITH MKSSAGKS INFORMATION APPI IKS TO Control Cell Telephone eries (Sheet 10ec rea1 time of 1030 to 1100)This is an exercise.This is an exercise.(Cal1er is Michelle Carro1).I was at Leslie Groves Park and 1ooked upstream and it looks like the island across the river in Franklin County is on fire.They should call Franklin Co.Dispatch.Ifessage To Actual Response LXmQ=CalLai Diam Qaxx@S'IC Hedia JIC Public Info'B/F County SOII IS222 Rl (1~2)

ORILL NO.Exercise 90 kS SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACK ot HKET NO, RESPONSIBLE CONTROLLER ILOCATION)

See below Control Cell Lead Controller VAI IO FOR TIMES OFI QAM REAL TIME See below PM See below QAM~ORILI TIME TO HOURS HOURS ASSOCIATKO WITH MESSAGES INFORMATION APPI IKS TO (Sheet 10ed real time of 1030 to 1100)Control Cell Telephone eries This is an exercise.This is an exercise.(Caller is Larry Reigler, Bat Chief, Pasco Pire Dept.)Patient free from the truck accident." Ambulance enroute to Our Lady of Lourdes.Possible back injury.Is there a chance that the patient or we are contaminated' Yes.Possible contamination.

Should be monitored at Our Lady of Lourdes.Emeute Message To'mQ=Actual Response MML~m kuxmM JIC Media JIC Public Info.1/y County 90$o15222 Rl IT&2)

OR ILL NO Exercise 90 SHEET NOo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATION)

Control Cell Lead Controller PACK of VALIO FOR TIMES OFI QAM REAL TIME See below PM See below@AM Q PM ORILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAQKS INFORMATION APPLIES TO Control Cell Telephone queries (Sheet 10eg real time of 1030 to 1100)This is an exercise.This is an exercise.(Caller is Terry Smith.)There is a brush fire north of Ringold Rd to about Davis Lane.Have you been notified already?Kennewick-Richland Dispatch should have already notified them.Response to this message will be simulated.

Message To~sl=Actual Response~Lmi,'Ehm hula~JIC Media JIC Public Info.B/y County Rasa@, Qia~k 90Iol SCREE Rl (7~8)

ORII L NO Exercise 90 HKKT NOo See below 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROLLER ILOCATION)

Control, Cell Lead Controller PAOK or VALIO FOR TIMKS OFB RKAL>>MK See below AM See belo~0AM 0 PM'0 RILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAOKS INFORMATION APPLIES TO Control Cell Telephone gueries (Sheet 10eh real time of 1030 to 1100)l~~o This is an exercise.This is an exercise (Caller is Jim Allen)I'm at Fr.Co.Fire Dist.3, can you tell me where our emergency worker kit instructions are locatedf They should be inside your emergency worker kit or look in your FNF Plan.IP-19.May need to give exact location of emergency worker kit.MJUULQ4.Message To Qa+Q=Actual Response'LLm Qazr~JIC Media JIC Public info.B/B County 999 ISSZII Rl (7&9)

DRILL NO.Exercise 90 SHEET NOe See belo~4N SUPPLY SYSTEM CONTROLLER lNFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATION)

Control Cell Lead Controller PAGE VALID POR TIMES OP1 AM REALTIMK See below PM See below ASSOCIATED WITH MESSAGES 0AM TO HOURS@PM DRILI TIME INFORMATION APPLIES TO HOURS Control Cell Telephone Queries (Sheet 10ei zeal time of 1030 to 1100)This is an exercise.This is an exercise.This is Larry Reig1er, (Bat Chief Rich1and Pire Dept.)Ambulance from Dayton and Cedar enroute to Our Lady of Lourdes code 3.Hill the ambulance crew or the patients need to be checked for radiation2 Is the hospital prepared to handle this2 Yes.MiMJ~Message To LXaaaQ=Actual Response JIC Media JIC Public info.Si1 CaunCv ELK.~~S II~152?X Rl IT<S)

DRILI NOo Exercise 90 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of SHEET NOa 10ga RESPONSIBLE CONTROLLER (I OCATION)Control Cell VALIO FOR TIMES OF QAM REAL TIME 1030 QPM 1 100 QAM Q PM DRILLTIME TO HOURS HOURS ASSOCIATED WITH MESSACKS INFORMATION APPLIES TO Control Cell Telephonic queries To: Media (State)From: Reporter from the Missoula Bugle Message: I want to come over and see what is going on at the power plant.What is.the quickest route to the WNP-2 plant?Anticipated Response: Tell him how to get from Missoula to the JIC.Actual Response?L~1 I I 968 l 5222 Rl (7 63)

DRILL NOt Exercise 90 ll'AtlllOOTOO tl'tilt tOll Ct 43 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE OI SHEET NOo 10gb RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VAI ID FOR TIMES OF:@AM 1030~PM To 1100 ASSOCIATED WITH MESSAGES@AM Q PM TO HOURS DRILL TIME INFO R M AT I 0 N APPLIES TO Control Cell Telephonic gueries HOURS To: Media (State)From: Scientific American Message: What protective actions have been recommended by the utility for the accident?Does the NRC agree?Has the state made any decisions?

How do"they coordinate them with the power plant?What if one says one thing and one says another?Anticipated Response: Tell what has been recommended.

NRC is part of the decision process, tell what the state decisions have been and the coordination that takes place.Actual Response 96$IS222 Rl (7 89)

DRILL NOs Exercise 90'NAIIII'IC'IO!I

~I'CLIC'OIII1 4P SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE oI SHEET NO, 10gc RESPONSIBLE CONTRQLLKR (LOCATION)

Control Cell VALID FOR TIMES OF@AM 1030 CPM 1100 ASSOCIATED WITM MESSAGES 0AM TO HOURS 0 PM DRILL TIMK INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Media (State)From: CBS News, Paul Stets Message: Nhat protective actions are being taken for the emergency workers and are there any casualties so far?Anticipated Response: Tell what the protective actions have been and no there are no fatalities.

Actual Response')96$15222 Rl IT 55)

OR ILL NO.Exercise 90 WAINI CCTOX tCCLIC'OWCC 4P SUPPLY SYSTEIVI CONTROLLER INFORMATION GENERAL DATA SHEET PACK SHEET NO RESPONSIBLE CONTROLLER (LOCATION)

Control Cell 10gd VA LIO FOR TIMES OF:@AM 1030 g Po 1100 0AM'OR ILL TIMK TO HOURS HOURS ASSOCIATKO WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic Queries To: Rumor Control (State)From: Seattle News Reporter Message: Is it true that if you are exposed to radiation that you can take radiation pills and it wi 1 1 absorb it so you won'be effected?where do you get these pills and what are they really good for?Anticipated Response: Tell what KI does, but only emergency workers take them.Actual Response?968 15222 RI (7 82)

DRILL NO>>Exercise 90 I>>*~III!>>OTO%tCOIIC COWCR SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of HEKT NO>>10ge RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OFI QAM REAI TIME 1030 QPM 1100 ASSOCIATED WITH MESSAGES QAM Q PM TO HOURS D RILL TIME INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: EOC Operations (State)From: Private Citizen Message: I live in Yakima and I am on a kidney dialysis machine, will the Supply System be able to continue to supply my electricity even though they have shut down the WNP-2 plant?Anticipated Response: Yes, WNP-2 is only part of the Bonneville Grid.Actual Response?968 I$222 Rl (7 82)

DRILL NOo Exercise 90 N'ASIIIXCTOX tCCLIC toll tl 49 SUPPLY SYSTEM CONTROLLER tNFORMATION GENERAL DATA SHEET PAGK SHEET NO 10gf RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VAI ID POR TIMES OPt QAM REAL TIME 1030 Q PM 1100 ASSOCIATED WITH MESSAGES QAM Q PM DRILL TIME TO HOURS INPORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Media (State)From: Concerned Citizen Message: I live in Richland and I wan't to know if my electric rates are going to go up because of this accident at Nhoops.:Are you sure it is safe for me to stay in Richland?Anticipated Response: Don't know if the rates will go up.Yes, it is safe to stay in Richland.Actual Response 968 IS222 RI (7 82)

RILl NOo Exercise 90 IIAIIIIIIO' OII~\'SIIC tOIIlR 4W SUFFLY SYSTEIVI CONTROLLER INfORMATION GENERAL DATA SHEET PAGE oI SHEET NOo 10gg RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF: QAM REAL TIMK 1 030 Q To 1 1 00 QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic gueries To: Agriculture REP at State EOC From: Manager of Richland Safeway Store Message: What are the chances of the food stocks being contaminated?

The store is located right here on George Washington Way not too far from the ten mile EPZ.Is someone going to come out and check this food to see if it is all right?Anticipated Response: If the food was in'he store before the release, it cannot be contaminated.

Actual Response 968 1$222 RI (7 62)

DRILL NOr Exercise 90 W*INIXCIOX tt'LIC~0%tt 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of SHEET NOr 10gh RESPONSIBLE CONTROL I ER (LOCATION)

Control Ce 1 1 VALID FOR TIMES OF(QAM REAL TIME 1030 Q PM 1100 QAM QPM DRILL TIMK TO HOURS HOURS ASSOCIATED WITH MESSAGES r INFORMATION APPLIES TO Control Cell Telephonic Queries To: Agriculture Rep.(State)From: Private Citizen Message: Cou'Id you please tell me what measures are being taken for the affected vegetable gardens in the Pasco area?Anticipated Response: Give the info regarding washing leafy vegetables, scrubbing, removing outer leaves, etc.Actual Response?968 15222 Rl{7 88)

RILL NOs Exercise 90 la't~NICC108~\'CtIC'o&tt 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of SHEET NOe 10gi RESPONSIBLE CONTROLLER (LOCATIONI Control Cell VALID FOR TIMES OF1 QAM RKAL TIME 1 030 Q PM To 1 1 00 QAM QPM DRILI TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic gueries To: Fisheries Rep.(State)From: Bill Stacy, Nashington Rod and Gun Club Message: I am president of the Nashington Rod and Gun Club and I am calling to find out how much radiation is expected in the fish from the Columbia River and any surrounding lakes near the NNP-2 plant.Anticipated Response: Not speculating, fish will be monitored.

Actual Response Il 968 15288 Rl (7 83I ORIL L NOe Exercise 90 WAINIIIOCO!I

~COlIC COIICI 4P SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE of SHEET NOe 10 RESPONSISLE CONTROLLER

{LOCATION)

Control Cell VALIO FOR TIMES OFI QAM REALTIME 1030 QPM 1100 QAM Q I'M ORILL TIME TO HOURS HOURS ASSOC IATEO WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic Queries To: Health Officer (State)From: Administrator from St.Mary Medical Center in Halla Halla Message: I am calling to find out if we should be papering the emergency room in case we have a lot of contaminated people coming in.Are these people going to be screened at the assistance center before they get here?How many people should we really be expecting?

Anticipated Response: Yes, paper.It should be part'f their procedures if they are dealing with radiated patients.People would be screened at the assistance centers, Give number, if one is known, for the people going to the hospital.Actual Response'7 96$IS222 Rl (7'82)

RILL NOs Exercise 90 la'ASHIXOIOX

~VSLIC COlaCS 4N SUPPLY SYSTEIVI CONTROLLER INFORMATION GENERAL DATA SHEET FAG K oI HKKT NO.10gk RESPONSIBLE CONTROLLER (LOCATION)

ControI r;eII VAI IO FOR TIMES OF QAM 1030 To 1100 , REAL TIME QPM QAM QPM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPI IES TO Control Cell Telephonic Queries To: Agriculture (State)From: Dairy Farmer in Adams County Message: Is it safe.to send my milk to market?Hhen will someone be out to test it?Hhat do I do if it isn't safe?Anticipated Response: Someone from the Office of Radiation Protection or one of the Federal Agencies doing testing will be testing milk in the areas that were affected by the plume release from the plant.Actual Response r?968'l5222 Rl I7 65)

DRILL NOe Exercise 90 KKT NOe See.below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RKSPONSIBLK CONTROLLKR (LOCATION)

Control Cell Lead Controller PACK'" VAI ID FOR TIMKS OF AM RKAL TIMK See below FM o See below QAM DRILL TIMK To HOURS ASSOCIATKD WITH M OKS INFORMATION APPI IK5 TO Control Ce3,1 Telephone Queries (Sheet 10co real time of 1100 to 1130 Rumor No.4)This is an exercise.This is an exercise.John Splaine at KFAE Radio.There are reports circulating around that all the employees are leaving Plant 2 because of the danger of a meltdown.There seems to be a big increase in traffic on the Bypass Highway".Hhat's happening at the plant2 Explanation of plant status, including the need for a precautionary evacuation of non-essential personnel.

Plant is~being abandoned.

Ehauaxm.Message To Actual Response~uzi, t'~z Gaxr~JIC Media JIC Public Info.B/y county 9$8eISRR2 Rl I7<$)

DRILL NQ>>Exercise 90 NO>>See below w*INInctoc oa'Ilc ycwac bN SUPPLY SYSTEM.CONTROLLER INFORMATION GENERAL OATA SHEET RESPONSIBLE CONTROL LKR{LOCATION)

Control Cel'1 Lead Controller PAQK VALID FOR TIMKS QFI AM TIME See below PM See below 0AM'0 RILL TIME, To HOURS HOURS ASSOCIATED WITH MKSSAOKS INFORMATION APPLIES TQ'ontrol Cell Telephone eries (Sheet 10cp real time of 1100 to 1130)Rumor No.4)Mike~This is an exercise.This is an exercise.This is Carol Dumas again, Associated Press, Yakima.I'e, gotten a report that workers are'abandoning Plant 2 because there's danger of a fuel meltdown.I need to check on the accuracy of this report.What's is the situation at the plant nowt Provide a concise summary of the accident situation using the latest information on hand.Precautionary evacuation of employees has begun.Explain why.Message To Actual Response Quern~t'~i~a.GurX,~9~~JZC Madia JIC Public Info.B/B County 999>>ISSUES RI (7&9)

DRILL NQ.Exercise 90 4a sUpp7v svsYK CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of EKT NQo RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VAI ID POR TIMES OP1 QAM RKALTIMK See below PM See below QAM'DRILL TIME TO HOURS HOURS ASSOCIATED WITM MESSAOES INPQRMATIQN APPLIES TO Cont'x'ol Ce3,1 Telephone Queries (Sheet 10cq real time of 1100 to 1130 nlO~C This is an exercise.This is an exercise.Rumor No.ff)This is Willis Mitchell at KOTY Radio in Kennewick.

I'e heard that the work force at WNP-2 is evacuating because there's going to be a meltdown..

Is there any truth to that statement?

What is going on out there now?Explain plant status and the reason for the precautionary evacuation of non-essential Plant 2 personnel.

Message To Qa'~Actual Response GalLmi~+=QuxasM JIC Media JIC Public Info.B/y County 444o14222 R I{7<4)

DRILL NOe Exercise 90 NOe See below 4B SUPPLY SYSTEM CONTROLLER lNFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATION)

Control Cell Lead Controller PACK VALID FOR TIMES QF AM REAL T>>K See below PM See belo~@AM PM DRILL TIME TO HOURS HOURS ASSOCIATKD WITH MESSAQES INFORMATION APPI IKS TQ Control Ce3.1 Telephone Queries (Sheet 10cr real time of 1100 to 1130)~o.This is an exercise.This is an exercise.This is Tina A11away at KONA Radio, Pasco.I heard that you had to evacuate some RNP-2 workers because of radiation from this morning's accident.How many people were evacuated'P Where did they got Viere any of them contaminated by the radioactive materia1 re1eased during the accidents Respond with available information on the evacuation.

Eammm'essage To Actual Response Qa@M GalLak~w Quar~JIC Media JIC Pub1ia Info, B/F County 904 1522K Rl (7%9)

DRILl NOo Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL OATA SHEET.PAQE ot EKT NOo RESPONSIBLE CONTROLLER ILQCATION)

See below'Control Cell Lead Controller VALID FOR TINES OF1 QAM REAL TIME See belowM See below'AM PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAQKS INFORMATION APPLIES TO Control Cell Telephone queries (Sheet 10cs real time of 1100 to 1130)This is an exercise.This is an exercise.This is Nancy Mozley at KALE Radio.Has t'e employee evacuation at WNP-2 been completed vet?How many employees were involved?Did they go home?'s the plant still operating?

u Provide response based on latest available information.

Message To QaumL.Actual Response t'i JIC Media JIC Public Info.B/y County 90$o15225 Rl (7%5I ORILI NOc Exercise 90 4S SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGK ol SHEET NOc RESPONSIBLE CONTROLLER

{LOCATIONI See below Control Cell Lead Controller VAl IO FOR TIMES OFF QAM REAL TIME See below PM See below ASS CIATKD WITH MKSSACKS QAM Q PM DRILL TIME TO HOURS INFORMATION APPLIES TO Control-CellTelephone Queries HOURS I t (Sheet 10ct real time of 1100 to 1130)5QRRZX'his is an exercise.This is an exercise.(Caller is John Splaine, Radio KPAE)Are the emergency workers taking special precautions to protect themselves from radiation?

Shat are the precautions?

~[Deputy George Henryj Should we issue our emergency worker kits now?Are there any protective measures our deputies should take in the area near Hanford?Yes, give current PAD and then refer to County Rep.B/P County: Yes.Give current PADs.Message To Actual Response fMhuk~ma Carr~JIC Media JFC Pub1ic Info.B/F County 984oISZZZ Rl I7&Z)

RILL NOe Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOE of~HEET NOs RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VAl IO FOR TIMES OF)@AM AM REAL TIME See below PM See below@PM ORILI TIME TO HOURS HOURS ASSOCIATEO WITH MESSAOES INFORMATION APPLIES TO Control Ce3.1 Telephone eries (Sheet 10cu real time of 1100 to 1130)~Nessa e: This is an exercise.This is an exercise.This is Nadine Ostroski with Radio KZAN, Bellevue.I'm getting ready for our noon news broadcast and I'd like to get an update on the accident at the Whoops nuclear plant.What's the situation there now?Antici ated Res onse: Provide a concise report using latest available information.

R~es ease: Nessage To lTeam)Called Actual Response Time Correct?Summarv JIC iIIedia JIC Public Info.B/F County 904 15222 R'I f749)

ORILL NO.Exercise 90 SJI SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK oI a**I SHKKT NOe RKSPONSIBLK CONTROLLER (LOCATION)

See below Control Cell Lead Controller V LIO FOR TIMKS OFa QAM RKAL TIMK See bel ow PM See be 1 ow QAM Q PM ORILLTIMK TO HOURS HOURS OCIATKD WITH MKSSAQKS INFORMATION APPLIKS TO Control Ce3,1-Te1ephone Queries (Sheet 10cv real time of 1100 to 1130)~massa e: This is an exercise.This is an exercise.This is Robert Fordin from the Sall Street Journal in San Francisco.

t('e have technical information about the accident at your plant this morning.What I'd like to have is your assessment of the impact of this accident on vour upcoming sale of refunding bonds.Do you think you'l have to pay a higher interest rate because of the bad publicity?

Antici ated Res onse: Refer question and caller's name, affiliation, and telephone number to team supervisor for forwarding to Finance for response.~Res ease: Message To ITeam)Called Time Actual Response Correct?Summar JIC Media JIC Public Info.B/F County 444 14424 Rl (7&SI RILI NOo Exercise 90 HKKT NO.See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROLLKR ILOCATION)

Control Cell Lead Controller PAOK of CI AM VAL IO FOR TIMKS 0 f 1 AM RKALT<<K See below pM See below',@PM DRILL TIM K TO HOURS HOURS ASSOCIATKD WITH MKSSAOKS INfORMATION APPLIKS TO Control Cell Telephone Queries (Sheet 10cw real time of 1100 to 1130)Kaa,au@I This is an exercise.This is an exercise.(Caller is Noah.Jones, 725 Auburn Rd)I'm from-Pranklin County.My neighbor said the radiation is coming this way.What do I do with my farm animalsf I can't leave my home because I'm waiting for a very important phone call.Provide applicable PADs.Refer to emergency calendar and listen to KONA.Eamuuaa: Message To Actual Response Q~L~w JIC Media JZC Pub1ic Info.B/y County h~hu 90919222 Rl Il&2)

DRILL NOo Exercise 90 4S SUPPLY SYSTEM CONTROLLER INFORNIATlON GENERAL DATA SHEET PACK of SHKKT NOo RKSPONSISLK CONTROI LKR (LOCATION)

See below Control Cell Lead Controller VALIO FOR TIMKS OFt AM RKALT>>K See below PM See below ASSOCIATKO WITH MKSSAOKS C1 AM TO HOURS'DRILL TIMK INFORMATION APPLIKS TO HOURS Control Cell Te3.ephone Queries (Sheet 10cx real time of 1100 to 1130)5aaavw This is an exercise.This is an exercise.(Caller is John Trap to Selph Landing to to get out.He may cause he isn't from-local fisherman)

Say, I took my buddy down do some fishing.He doesn't have a car or a way hear a siren but wouldn't know what to do this area.Can you guys help him2 Hill send someone to helps Refer to Counties Rep.Message To Qmd=Actual Response t'~i~w JIC Media.JIC Public Info.B/F County H~~KEELS 90$o15222 Rl (7%2)

DRILL NO.Exercise 90 HKKT NOu See-belov WABNIWOBO!C yy~BIC tOW~~4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCAT ION)Control Cell Lead Controller PAOK ot VAI ID FOR TIMES OFB QAM REAL TIME See below PM'See below.QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephone queries{Sheet 10cy rea1 time of 1100 to 1130)This is an exercise.This is an exercise.This is Gary Thomas, Fr.Co.Resident.Hhat you doing about evacuating animals2 Do you have big buses, so I can evacuate my cattle2'f I lose them, I'e lost everything I own.I 1ive on Hest Fir.Te11 her about Price-Anderson Act.B/F County: Give current PAD and explain Price-Anderson Act.Message To ZhumL Actual Response Qaz.eau'IC Media JIC Pub1ic Info.B/y Cuuuuy Eau 95$l5522 RI (7&5I D ILL NOc Exercise 90 S KKT NOc See below SN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACK of V I IO FOR TIMES OF: QAM REAL TIME See below PM" lo 0AM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAO KS INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10cz real time of 1100 to 1130)This is an exercise.This is an exercise.This is Gladys Stinson, I live at 106 Elm S'treet.I broke my leg and am in a wheel chair.I don't drive anyway.I called a taxi but they won't come because of the emergency.

Is there someone with a wheel chair lift that can get me'?Rhat can I do to keep safe until you send someone to get me.Refer call to Counties'ep.

Should coordinate with Transp.Coordinator to get bus with chair lift.Stay indoors with windows closed until they arrive, Eamu~Message To QamQ=Qa,LLmk Actual Response Qurw~JIC Media JJC Pubiic Info.b/P County Lm~Dieu,~9$4oI SSSZ R1 I7%9)

DRILl Non Exercise 90 HEKT NOc See below w*BNI'.%4to'%ontlc powBB'4P SUPprr SVSTZM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROL,LER (LOCATION)

Control Cell Lead Controller PAOK of VALID FOR TllNKS OF1 REAL TIME See below AM C3AM See below@PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH IcIKSSAOKS INFORMATION APPLIES TO Control Ce3.1 Telephone+eries (Sheet 10da real time of 1100 to 1130)This is an exercise.This is an exercise.This is Janice Sumner.I left my son at Little Angels at 3605 H.'Ruby in Pasco and now when I call, no one answers.I'm really concerned!

I don't want him hurt by the radiation from the nuke plant accident.This is Marge Peterson, Red Cross Office.John Sumner's mother is trying to locate him.She left him at Little Angels in Pasco and now no one answers the phone.Has the daycare evacuated2 Where do you think they have gone2 What can I tell them is being done to locate their son?Refer call to Counties'eps.

B/P Countv: No, they haven't evacuated., Pasco area is not affected by the accident.Suggest they try calling the daycare again.They may be outside or you may have dialed incorrectly.

EQ'iRQLIIRP Message To Qa@M Actual Response JIC Media JIC Pub11c Inf o.B/P County hl~hu 90$152ss RI (7&sI DRILL NOc Exercise 90 4m&SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAD E of SHEET NO.RE5PONSI SLE CONTROI LER,(LOCATION)

See'below Control Cell Lead Controller VAI ID FOR TIME5 OPt QAM REAL TIME See below PM See below QAM DRILI TIME TO HOURS HOURS ASSOCIATED WITH MESSAQES INPORMATION APPLIES TO Control Cell Telephone fineries (Sheet 10db real time of 1100 to 1130)5aaaaaa This is an exercise.This is an exercise.This is Joe Garcia, Franklin County Resident.I heard on the radio that I have to evacuate.Hhere is the nearest shelter.I lost my calendar and don't know what to do or where to go.I live on Bellevue.Determine where exactly he lives.Provide opplicable PAD, if any.Tell him to listen to KONA.B/F County: May transfer to another extension.

Then he should be told current instructions on where to go etc.E~uu~: Message To MmaM Actual Response Car.xau'IC Media JFC Public Info.B/F County 989 19225 Rl (1%9)

DRILL NOc Exercise 90 HKET NOc See below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEETRESPONSIBLE CONTROLLER ILOCATION)

Control Cell Lead Controller PAaK oI VAI IO PQR TIMES OFB REAL>>ME See below PM See below@AM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAQKS INSQRMATION APPLIES TQ Control Cell Telephone gueries (Sheet 10dc real time of 1100 to 1130)This is an exercise.This is an exercise.(Caller is George Gensen of 11+1 Country Haven Loop.I'm a paraplegic and will need a stretcher.

Is someone going to come and help me.They should have this person listed in their procedure and be arranging for someone to help him.Raw~<Message To LX mal=QulMi Actual Response QuxaM JIC Media JIC Pub1ic Info.B/P County 95$15Z22 R\I745)

DRILL NOo Exercise 90 4N SUPPLY SYSTEM-CONTROLLER INFORMATlON GENERAL DATA SHEET PAOK ot SHEET NO RESPONSIBLE CONTROLLER ILOCATIONI See below Control Cell Lead Controller VALID FOR TIMES OF.AM AM ee belowM See below TO 0@PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAQES INFORMATION APPLIES TO Control Ce3.1 Telephone Queries (Sheet 10dd real time of 1100 to 1130)Mama This is an exercise.This is an exercise.This is Lisa Stratford calling from Spokane.I'm with HEAL (Hanford Education and Action League)and I'm interested in knowing what radioisotopes were released into the environment as a result of this morning's accident at HNP-2.What form are they in2 What is being done to control their spread2 Provide as complete an answer as possible, using the latest available information.

Refer questions for which there is not complete information to team supervisor for processing.

Message To V~M Actual Response Garxs~JIC Media JIG Pub1ic Info.B/P County 99$ISNESS Rl Il+SI

~~~~~~~a~a~'~'~~~~~~~~~~~~~-~~l.~I I~I~~~I'~~~~'I-'~~I~'l$~~~l~~~~~i~~~~~~~~~~~'~~~~l~~~I:~gt~tl~~I~Il II II~~~I l~I I~~

PRILI NOo Exercise 90 SN SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE ot SHEET NOo RESPONSIBLE CONTROLLER

{LOCATION)

See tbelow Control Cell Lead Controller VALID PQR TIMES OP AM REAL TIME See belowM See below ASSOCIATED WITN MKSSAOKS 0AM TO HOURS'DRILL TIME INPORMATION APPLIES TO HOURS Control Cell Telephone Queries (Sheet 10dy real time of 1100 to 1130)This is an exercise.This is an exercise.(Caller is Mike Cobb, Franklin Co.Police Officer).I'm out at a traffic jam near Eltopia Hest Road.There is a van here that must have overheated.

It has a bunch of kids from Love Me Daycare in it.He need a bus immediately.

It looks as if traffic is backed up for a long way.Refer to Transportation Coordinator to get transportation.)haumai.: Message To Q~al=Actual Response Cs~~m Gas~JIC Media JIC Public Info.B/F County DLRQihfsJL

$6$1$222 Rl (7<2)

DRILI Now Exercise 90 HKKT NOo See below QJI SUPPLY SYSTEM CONTROLLER lNFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LOCATIONI Control Cell Lead Controller PACK of VALID FOR TIMES OF1 AM REAL TIME See below PM See below CI AM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAOKS INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10dz real time of 1100 to 1130)This is an exercise.This is an exercise.(Caller is Sam Lorenz of Grant County EM Director.)

Have you received anything on the wind direction at Hanford yet?We need to stay in close contact through this thing.Please keep me updated on your opeations as much as possible.Probably say to coordinate with State.Message To Qa+M JIC Media Actual Response QaLLaC 2i'ma'I JEC,Ps'cbl ic'I'nf o.8/y County Qim~m 989 ISSUE RI I7<SI DRILL NOa fxercise 90 IIAINI'%C'IOC

~I'CLIO tCIICC 4tN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE 10ha RESPONSIBLE CONTROLLER

{LOCATION)

Control Cell VALID FOR TIMES OF: QAM RKAL TIME 1 100, QPM 1 1 30 ASSOCIATED WITH MESSAGES QAM Q PM DRILL TIME TO HOURS INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: Los Angeles Times Reporter Message: Nants to know what has happened at the NNP-2 plant.Nhat warnings were given to the public, what protective actions were taken, and how many casualties have there been so far?Anticipated Response: Tell what has gone on at the plant, what type of notification was given to the public, what the'protective actions have been, no fatalities.

Actual Response 7 96S ISSUER Rl (7 SS)

DRILL NOo Exercise 90 W*~NIXOtOX tl'Llt tOIItt 4N SUPPLY SYSTEiVI CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of SHEET NOe 10hb RESPONSIBLE CONTROLLER (LOCATION)

Control Cell I REAL TIME To 1130 Q PM DRILL TIME VALID fOR TIMES OF: AM CI AM TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic gueries To: Media (State)From: Seattle Times Message: Is the situation at the plant going to get any worse?Hill Richland or Pasco have to evacuate?If they do evacuate, where would the'eople have to go?Anticipated Response: Richland and Pasco will not have to be evacuated.

Tell him where the assistance centers're located and who would have to use them.Actual Response 96$l5222 Rl (7$2)

ORILL NOo Exercise 90 lI*llllCCTOC O'Slit~OWCC 49 SUPPLY SYSTEM CONTROLLER INfORMATION GENERAL DATA SHEET PAGE of SHEET NOe 10hc RESPONSIBLE CONTROLLER

{LOCATION)

Control Cell VALIO FOR TIMES OF: 0 REALTIME 1100~PM 1130 ASSOCIATED WITH MESSAGES~AM 0 PM OR)I L TIME TO HOURS INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Media (State)From: Nashington Post Reporter Message: Nhat is going on out there with the HPPSS plant?Are things at the plant getting better or worse?Does the HRC consider this a serious problem?Has anyone been injured?How does this compare to Chernobyl?

Anticipated Response: Give an update as to what is going on at the plant.Very different from Chernobyl, explain the difference if necessary.

Actual Response r?96$19222 RI (7 82)

DRILl NQo Exercise 90 Mal SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET FAG E ot HKET NOr lohd RESPONSIBLE CQNTROLI ER (LOCATION)

Control Cell VALID FOR TIMES OFl PAM REALTIMK 1100 PPM 1130 ASSOCIATED WITH MESSAGES PAM TO HOURS P PM DRILL TIME INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Media (State)From: CNN News in Atlanta Message: What is the status of the WNP-2 plant?Is there any radiation danger to residents outside the ten mile radius'?What is the dfiference between beta and gamma?Which is worse?Anticipated Response: Give status, explain ingestion problems outside of ten mile radius, different types of radiation gamma can be worse only because beta can be blocked with anti-c clothing but gamma can'.Get info from HPs if he doesn't know the answer.Actual Response?I I 968 ISZZZ Rl$7 83)I DRILL NOo Exercise 90 WAIHI'1C106 tOlllC to'41A 42I SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET PACK I or SHEET NO, 10he RESPONSI BL E CONTROLLER (LOCATION)

Control Cell VALID FOR, TIMES OF1 QAM REAL TIME 1 100+PM 1 1 30 ASSOCIATED WITH MKSSACES 0AM CI PM TO HOURS'DRILL TIME INFORMATION APPLIES TO HOURS Control Cell Telephonic Queries To: EOC Coordinator (State)From: Private Citizen Message: I can't find my tarmer's information booklet that I was sent!I know that there is an accident out there, now I don't know what to do!Hhere can I get one?Anticipated Response: Explain what has happened and,what they should do.1 Actual Response?968 I$222 R'I P BB) qsI t 2>pl LQP DRIL!NOa WA~III'AO'IO%

tI'LIC tOll I1 49 SUPPLY SYSTEIVI CONTROLLER INFORMATION GENERAL DATA SHEET PACK Exercise 90 SHEET NOo RESPONSI ELK CONTROLLER (LOCATION) of 10hf Control Cell ft'j lw~OI~I'5 t VALID POR TIMES QPL QAM REAL TIME 1 100 Q PM 1 1 30 ASSOCIATED WITH MESSAGES 0AM TO HOURS 0 PM DRILI TIME INFORMATION APPLIES TO ontrol Cell Telephonic Queries To: Media (State)From: Seattle PI Reporter Message: How long will this evacuation take?Nhat provisions are being taken to shelter the evacuees?Nhat Federal participation is involved'?

Nhen will the evacuees be allowed to return?Nhat provisions have been taken to.secure personal property.HOURS Anticipated Response: Tell where the shelters are located and how long the evacuation took.Nhat the FEDS are doing, don.'t know at this time when the evacuees will be going back, road blocks and sheriff patrol to prevent any looting.Actual Response?868 I$222 Rl{7 88)

ORILI NOo Exercise 90 IIA~IIII OCOI!~I'LIC tolstoy 49 SUPPLY SYSTEM CONTROLLER IN FORMATION GENERAL DATA SHEET FAG K oI SHEET NOe 10hg RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VAt IO FOR TIMES OFI AM Q g M REAI TIME 1100 CPM 1130@PM DRILL TIME TO HOURS HOURS AS5OCIATED WITH MESSAGES INFORMATION APPLIK5 TO Control Cell Telephonic Queries To: Media (State)From: Longview Daily News Message: How much radiation has been released, or do you expect to be released?Anticipated Response: Give ini'ormatfon.

Actual Response?968 IS222 RI I7 63)

DRII I NQo Exercise 90 WA~llltofOÃtt'flit fDWtt 49 SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET PACE of SHEET NQ lohh RESPONSIBLE CONTROI LKR{LOCATION)

Control Cell VALID FOR TIMES QFf QAM REAL TIME.1 100 Q PM I ASSOCIATED WITH MESSAGES QAM TO HOURS QPM DRILL TIME INFORMATION APPLIES TO Control Cel 1 Telephonic gueries HOURS To: Rumor Control (State)From: Private Citizen Message: I live in Boise and I was planning to visit my brother in Pasco tomorrow.Is it safe to go?How long should I wait?Anticipated Response: Safe to go as Pasco was not evacuated.

Actual Response 668 I$222 Rl I7 6$)

DRILL NO, Exercise 90 wA~NlbCTOW CCILIC COwCR 49 SUPPLY SYSTEiVlCONTROLLER IN FORMATION GENERAL DATA SHEET PAGE SHEET NO, lohi RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OFt QAM REAL TIME 1100 Q M To 1130 ASSOCIATED WITH MESSAGES QAM QPM DRILL TIME TO HOURS INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: Yakima Daily News Message: Would you please explain to me the radiation hazards associated with nuclear power.Hhat'is the difference between x-rays and gamma rays?Hhich is worse.Hill animals suffer the same effects as humans?Anticipated Response: Get information from DSHS and will return the call.Actual Response 968'IS222 Rl (7 82)

DRILL NOo WASllIXO10'X

~l'LIC iOWCI 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET FAG K Exercise 90 SHEET NO 10h]RESPONSIBLE CONTROLLER

{I OCATION)Control Cell of h h~VALID F OR TIMES OF: QAM RKALTIME 1 100+PM o 1 130 ASS OCIATKD WITH MKSSAGES 0AM CI PM TO HOURS'DRILL TIME INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: KING Radio Message: Does the state plan to take any legal action against the Hashington Public Power Supply System at this time?Oo you think they will in the future?Anticipated Response: Oo not know what the state will do in the future.Actual Response')968 15222 RI (7 BS)

)DRILL NO,'AAIIIICC'IOC

~\'CLIC t0%CC 49 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE Exercise 90 I SHEET NO RESPONSIBLE CONTROLLER

{LOCATION) ot lohk Control Cell VALID FOR TIMES OF.@*M REAL TIME 1 1 00" Q PM 1 1 30 ASSOCIATED WITH MESSAGES~AM Q PM TO HOURS DRILL TIME INFORMATION APPLIES TO Control Ce1 1 Tel ephoni c Queries HOURS To: Media (State)From: KOMO Radio Message: We understand that the Columbia River has been closed.Does this mean that it is closed all the way to the Pacific'?lf not, how far was it closed?How were the people on the river notified to get off the river?Anticipated Response: Closed to Leslie Groves Park, Sheriff evacuated the river using the bull horn and sirens going off.Actual Response Il 96$l5222 Rl (7 82)

DRILL NOo Exercise 90 WASIII$0'ION tI'tilt t0%K1 Mal SUPPLY SYSTE1%CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of EKT NO RESPONSIBl E CONTROL!KR (LOCATION) 10hl Control Cell VALID FOR TIMES OF'AM RKALTIMK 1 100 QPM T 1 130 ASSOCIATED WITH MESSAGKS QAM TO HOURS Q PM DRILI TIME INFORMATION APPI.IES TO Control Cell Telephonic gueries HOURS To: Agriculture Rep (State)From: Franklin Co.Farmer Message: Do you have any idea how much money it takes to put my dairy herd on stored feed?Much less where it is going to come from!Who is going to pay for all of this problem.I knew I should have moved to another state!Anticipated Response: Explain that under the Price Anderson 81 11 it wi 11 be covered.Actual Response 666 1$222 Rl (7$$)

DRILL NOo Exercise 90 IIAIIII1CTOC

~OClIC tOOI1 49 SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET PAGE SHEET NOe 10hm RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF I REAL TIME 1100~PM T 1130 ASSOCIATED WITH MESSAGES@AM TO HOURS 0 PM DRILI.TIME INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Hedia (State)From:.Hew York Review Message: How many people were evacuated and are there any plans to evacuate more?V Anticipated Response: Give the number that were evacuated, no others expected to be evacuated.

Actual Response 968 15222 RI Ij.62)

ORILI NQa Exercise 90 IIAIIII8CTOX tI'LIC tOWtt 49 SUPPLY SYSTEIIII CONTROLLER INFORMATION GENERAL DATA SHEET PAGE ot KKT NO 10hn RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VAI IO FOR TIMES QF.QAM RKALTIMK 1 100~PM 1 130 ASSOCIATEO WITH MESSAGES 0AM TO HOURS Q PM ORILI TIME INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Hedia (State)From: Hashington Post, reporter Bob Jackson Message: Has anyone at FEMA recommended the use of KI?Hhy does a state like Tennessee let the people take it, but not Hashington?

Anticipated Response: Hashington's health officer deemed it was not necessary for anyone except emergency workers and special populations.(people who could not leave)to use KI.FEMA has said nothing about it.Actual Response'7 968 IS222 Rl I7.82)

DRILI NOI Exercise 90 WAIIIICC'IO'%

I'IIC'C%~C 4r3I SUPPLY SYSTEM CONTROLLER JNFORMATtON GENERAL DATA SHEET PAGE KET NOI RESPONSIBLE CONTROLLKR (I OCATION)10ho , Control Cell VAl ID FOR TIMES OF: QAM 1 100 QPM 1 130 ASSOCIATED WITH MESSAGES QAM TO HOURS DRILL TIME INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: The Daily Olympian Reporter Message: How many cancer deaths do you expect as a result of the general public's exposure?Anticipated Response: Not willing to speculate.

Actual Response'6$1$222 RI (7 62)

DRILL NO+Exercise 90 49 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK ot HKKT NOs lohp RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALIO FOR TIMES OF: QAM RKALTIMK 1100 QPM 1130 XAAM CI PM DRILL TIME TO HOURS HOURS ASSOCIATKD WITH MESSACES INFORMATION APPI IES TO Control Cell Telephonic gueries To: Rumor Control (State)From: Kate Jones, Private Citizen Message: Is it safe to drink the water from my faucet?How will I know if it isn'safe?I live in Basin City,.Anticipated Response: Safe to drink the water because it comes from a covered source and she is out of the plume pathway.Actual Response Il 968~'ISZZZ Rl (7 62)

DRII I NOo Exercise 90 WAINICCIOC

~I'CIIC tO'aCC 4N SUPPLY SYSTEiM CONTROLLER INFORMATION GENERAL DATA SHEET PACK oI SHEET NOe 10hq RESPONSIBLE CONTROLLER Il OCATION)Control Cell VALID FOR TIMES OF: QAM RKAL TIME 1 100 QPM 1 1 30 ASSOCIATED WITH MESSAGES QAM QPM TO HOURS DRILI TIME INFORMATION APPLIES TO HOURS Control Cell Telephonic Queries To: EOC Coordinator (State)From: Sara Cole, Housewife Message: I just moved to the Richland area from Tennessee.

I have some KI that was distributed to us when we lived near the TVA plant in Tenn.Should I be taking the KI?I haven't heard anything on the radio about the citizens taking KI.Don't you people have the general population take it?(Answer is no)Hhy don't you have the people taking it?Anticipated Response: Should not take the KI, only the emergency workers are to take it.Actual Response?96$~15222 Rl IT 82I DRILI NOo Exercise 90 WA~H I 8 CtoÃtl'Llt tCW t C 4W SUPPLY SYSTEiVl CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of HKKT NOo 10hr RESPONSIBLE CONTROLI ER (LOCATION)

Control Cell VALID FOR TIMES OF: QAM RKALTIMK 1 100 QPM To 1 1 30 QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic Queries To: Agriculture Rep.(State)From: Carl Johnson, Farmer Message: What am I supposed to do?I had to evacuate my land and my crops are about ready to be harvested.

Hill they be safe?What if I can't get in to harvest the crops and even if I do will they be safe to eat?I have a'ield of broccoli.Anticipated Response: Security patrols are in affect, will be checked to determine if the broccoli is safe to eat.Actual Response Il 968'l5222 Rl{2 82)

DRILL NO+Exercise 90~1AAHICCTCC

~6~LIC 10'AAC 4N SUPPLY SYSTEIVI CONTROLLER INFORMATION GENERAL DATA SHEET PAGE o)S~EET NO.10hr RESPONSIBLE CONTROLLKR

{LOCATION)

Control Cell 1100 o 1130 ASSOCIATED WITH MESSAGES@AM@PM TO HOURS DRILL TIME INFORMATION APPLIES TO ontrol Cell Telephonic Queries HOURS To: Media (State)From: Senator Gorton's Office Message: This is Senator Gorton's Office.Has a boycott been initiated for interstate commerce of agriculture products from the affected counties in Hashington?

Anticipated Response: No boycott has been initiated at this time.Actual Response Il 968 1$222 Rl (7 82)

DRILL NO+Exercise 90 KKT NO+See below SP SUPPLY SYSTEM CONTROLLER INFORMAT!ON GENERAL DATA SHEET RESPONSIBLE CONTROLLER ILOCATIONI Control Cell Lead Controller PAOK of VALID FOR TIMES OPI QAM RKALTIMK See below PM To See below QAM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAQES INFORMATION APPLIES TO Control Cell Telephone eries (Sheet 10de real time of 1130 to 1200)This is an exercise.This is an exercise.(Caller is Bruce Jenkins, KALI TV)He would like'to arrange to take.pictures of your JIC(EOC)and interview the emergency chairman.Input after the JIC(EOC)is declared activated.

Refer to JIC or EOC Director..'message To L;Emd Actual Response~w JIC~fedia JIC Publ c 1 Info.B/P Count v V 944ii4222 RI I7&2I DRILL NOe Exercise 90 4tN SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACK o)SHKKT NOe RESPONSIBLE CONTROLLER ILOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OF: AM RKALTIMK See below PM See below TO 0@PM 0 RILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSAOKS INFORMATION APPLIES TO Control Cej.l Telephone Queries (Sheet 10df real time of 1130 to 1200)X"~4.This is an exercise.This is an exercise.(Caller is Charles Ryan at KIMA-TV, Yakima)Re would 1ike to have a camera team interview workers at one of the emergency centers.Would that be alrightf Where should he gof (Caller is Marge or Mark Peterson, Red Cross Office)A television station wants to come in and interview some of the shelter residents.

Would that be alrightf who should I refer him tof Refer to JIC Director or have them come to JIC.Give EHAC Coordinators name.L"'d?QJ~.Message To Actual Response LXaaml, L~~m Sax;~'IC SSedia JIC Public Info.B/I County hK EKP 9$9e1$22Z Rl I7%$)

DRILL NOe Exercise 90 KKT NOe See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LOCATIONI Control Cell Lead Controller PACK Ot VALID FOR TIMES OFt AM REAl TIME See below PM e below 0AM DRILI TIME TO HOURS HOURS ASSOCIATED WITM MESSAGES INFORMATION APPLIES TO Control Cell Te1ephone Queries (Sheet 10dg real time of 1130 to 1200)~lessa e: This is an ezercise.This is an exercise.P This is John lIcClelland Jr., publisher of the Saint Helens Chronicle in St.Helens, Oregon.I don't know if you'e familiar with St.Helens, but we are just down the hiqhway from the Trojan nuclear plant.We'e getting reports on the radio about the accident at your nuke there.Everyone in town is talking about it.I'd like to know first-hand what happened and what the situation is.Do you think an accident like that could happen at the Trojan plantP Antici ated Res onse: Provide a concise report on the accident and present status, using latest available information.

Do not speculate about the possibility of a similar accident happening at Trojan.Refer that question to PGE in Portland.R~es onse:.'Iessage To~Team Actual Response Called Time Correct?Summar'IC'acedia JIC Public Info'lF Connt?90$ISII22 Rl I7&9)

OR LI NQ, Exercise 90 aea~Nlmcrom, el'elle ross~m 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK SH KT NQe RKSPQN$I BLK CONTROLLKR

{LOCATION)

See belo~Control Cell Lead Controller VAI IO POR TIMES OPl QAM RKALTIMK See belo~PM See below QAM Q PM ORILL TIMK TO HOURS HOURS SSOCIATKO WITH MKSSAGKS INPQRMATIQN APPI IKS TO Control Cej.l Telephone Queries (Sheet 10dh real time of 1130 to 1"00)~lessa e: This is an exercise.This is an exercise.This is Ron Saito at the Yakima Herald-Re ublic.We'e getting close to deadline and I need an update on the accident situation there at Plant 2.Also, what happened to the protestors that were there earlier in the day?Antici ated Res onse: Provide an update using the most accurate information available.

R~es oase: lIessage To ITeam)Actual Response Called Time Correct?Summar JlC Nedia JIC Public Info.B/F County 444el5222 Rl{7 42)

DRILL NO Exercise 90 KKT NOe See below 4S'UPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET'ESPONSIBLE CONTROLLER ILOCATIONI Control Cell Lead Controller PACK of REAL T,MK See below PM See below@PM VALID FOR TIMES OFa AM 0AM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAOES INFORMATION APPLIES TO Control Cel,l Telephone Querf.es (Sheet 10 di real time of 1130 to 1200)~Massa e: This is an exercise.This is an exercise.This is Steve Quinn calling from KIRO Radio in Seattle.What's happening now with the nuclear accident at Plant 2?(Pause for report)That's interesting.

I'd like to get that on tape, if that's O.K.with you.(Pause)I have the tape rolling.Please identify yourself.What is Whoops doing about the radiation that was released this morning from the nuclear plant accident near Richland?Antici ated Res onse: Correct"Whoops" with Supply System.Then provide concise status report, using latest available information.

Field teams have been tracking the plume and the dose rates are being verified.Give latest PADs.R~es esse: message To~Team JIC)Iedia Called Time Actual Response Correct?Summar JIC Public Info.B/F County ooo 15222 Rl I7ws)

DRILL NOe Exercise 90 43l SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK SHKKT NOe RESPONSIBLE CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFt QAM AM RKAL TIME See below PM See below@PM DRILl TIME TO HOURS HOURS ASSOCIATED WITH MESSAQKS INFORMATION APPLIES TO (Sheet 10dj real time of 1130 to 1200)Control Cell Telephone eries n~essa e: This is an exercise.This is an exercise.'Ay name is Steve Barrenson and I'm with The Othello Outlook newspaper.

I want to know where the radiation that has been released is now.They say it's a cloud so what does it look like?How can you tell it from anv other cloud?Antici ated Res onse: Provide information from latest updates about distribution of external radiation.

Explain that the location of the material is being monitored by a trained team with special instruments.

It is not a visible cloud.R~es onse:.'Iessage To ITeam)Actual Response Called Time Correct?Summarv JIC 1Iedia JIC Public Info.B/T County DRILl NOe Exercise 90 HKKT NOa See belov 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROI LKR ILOCATION)

Control Cell Lead Controller PAGE of VALID POR TIMES OI'1 QAM REAL TIME See below PM See below CI AM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSACES INPORMATION APPL IES TO (Sheet 10dk real time of 1130 to 1200)Control Ce3,1, Telephone queries~sensa e: This is an exercise.This is an exercise.This is Ralph Solberger at Radio KRSC in Othello.I understand that you give out information at this number for the news media.I'm looking for a report on the status of the accident at the Hanford nuclear plant.Has the radiation.gotten across the Columbia River into Grant Countv?What should people watch out for?How far is this nuclear plant from the Othello,;.area?

Antici ated Res onse: Provide information from latest updates about distribution of external radiation.

Field teams have been tracking the plume and the dose rates are being verified.Give latest PADs.R~es ense: Message To~Team Actual Response Called Time Correct?Summar'IC acedia JIC Public Info.B/F County 555el5222 RI I7%5)

DRILl NO Exercise 90 bN SUPPLY SYSTEM CONTROLLER IN FORMATION GENERAL DATA SHEET PAGE ot SHEET NOs RESPONSIBLE CONTROl LER{LOCATION)

See below Control Cell Lead Controller VALID FOR TIMES OFT QAM REAL TIME See below PM See below QAM Q PM DRILL TIME TO HOURS HOURS ASSOCIATKD WITH MESSAGES INFORMATION APPt IES TO Control Cell Te1ephone Queries (Sheet 10dl real time of 1130 to 1".00)Ã~Iessa e: This is an exercise.This is an exercise.This is John Reynolds, from the Adams County Journal in Ritzville.

I'm interested in getti'ng more information about the radiation that has gotten out as a result of this morning's accident at the Hanford nuke plant.How.long will it stay on the ground?Will it get onto crops in that area?If so, is it dangerous?

Antici ated Res onse: Provide information from latest updates about distribution of external radiation.

Field teams have been tracking the plume and the dose rates are being verified.Give latest PADs.Refer crop questions to state Agriculture.

~aes esse:!Iessage To~Team Called Time Actual Response Correct?Summary JIC Media Y JIC Public info.B/F County ji s I t'i I s I 90$e15222 Rl I7&2)

DRILL NO.Exercise 90 EKT NO>>See below 4N SUPPLY SYSTEM CONTROLLER tNFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER

{LOCATION)

Control Cell Lead Controller PACE ol VALID FOR TIMES OFP QAM AM REAL TIME See below PM See below QPM DRILI TIME TO HOURS HOURS ASSOCIATED WITH MESSAOES INFORMATION APPI IES TO Control Cell Telephone Queries (Sheet 10dm real time of 1130 to 1200)This is a drill.This is a drill.This is PIO in Co.ENAC)There are some people concerned about what caused this emergency.

Can you fill me in'?Can you send someone over here with a description of where the plume is and the pattern it followed.Also send'omeone over with all the press releases up to this time.Can you find us a radiation expert to come and talk with these evacuees as soon as possible, I can't answer their questions on this.All of the procedures in our EHAC activation books including the EBS forms are for emergencies at nuclear plants.Do you think you'l be using this form and should we follow the same proceduresf Does the Price-Anderson Act still apply'efer call to Counties'ep.

B/P County: Answers all inquiries with available data..'!essage To o.gQ Actual Response~ra JIC Media JIG Public Info.b/P County F~E$04 1$222 Rl I7&$I DRII LNOu Exercise 90 SHEET NOc See below 4N SUPPLY SYSTEM CQNTRQLLER tNFQRMATlQN GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PACE of VAl ID FOR TIMES OFt QAM REAI TIME See below PM See below Q PM'DRILI TIME To HOURS HOURS ASSOCIATED WITH MESSAOES INFORMATION APPI IKS TO Control Cell Telephone Queries (Sheet 10dn real time of 1130 to 1200)X" el&'his is an exercise.This is an exercise.This is Al Haymaker)ttthat's going to happen to my cherry trees'ou know this is my livelihood here.Be a pa1 and tell me what I should do'?Give current PADs.Damage will be assessed after monitoring is complete.Tell him about Price-Anderson Act.4lessage To DTVmQ=Actual Response~hag~~a Cuzxa~JIG iledia JZC Pubtic Info.B/P County Mhu 444 14222 RI (7~2I DRII L NO, Exercise 90 HEET NO See below WABIIIIIOl49 BV~BIC yoWCB 4S SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAQE of VALIO FOR TIMES OFI 0AM AM REALT>>E See below PM See below@PM 0 RILL TIME TO HOURS HOURS ASSOCIATEO WITH MESSAOES INFORMATION APPt IES TO Control Cell Telephone queries (Sheet 10do real time of 1130 to 1200)This is an exercise.This is an exercise.This is Marge Chow, Richland School District.Should we be preparing for any special type of actions at our schools because of this emergency.

Provide answers using the latest available information.

Refer the call to Counties'ep.

No.The cloud is over Franklin County.EQliRQQRQ'essage To Actual Response~o JIC Media JIB yuB1ic Info.B/y County 988 19222 RI (7&ZI DRILI NO Exercise 90 SHEET NQo See belo~4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CQNTROI LKR ILQCATIONI Control Cell Lead Controller PACK of VALID FOR TIMES QFB QAM REAL TIME See below PM See below@AM Q PM'DRILL TIME TO HOURS HOURS ASSOCIATED WITH MKSSA4KS INFORMATION APPLIES TO Control Ce3.1.Telephone eries (Sheet 10dp zeal time of 1130 to 1200)This is an exercise.This is an exercise.This is Sarah lItewhart.

I 1ive near Eltopia Rd.Hhen the evacuation was ordered, my husband was already in town running errands.Now that I'm not at home and he can't go home, how can I get in touch with him'efer to County Rep.B/F County: Go to ERAC, if activated, and register with ARC..'tessage To Lou aL.Actual Response f~~~'IC ifedia JIC Public Info.B/F County 9$$IS@22 Rl (7&9)

DRILL Noo Exercise 90 KKT NQo See below 4N SUPPLY SYSTBiVI CONTROLLER INFORMATION GENERAL DATA SHEET RKSPQNSIBLK CQNTRQLLKR (LOCATION)

Control Cell Lead Controller PAOK ot VAI ID FQR TIMKS OF: QAM RKALTIMK See below PM See below QAM DRILL TIMK To HOURS HOURS ASSOCIATED WITH MKSSAQKS INFORMATION APPLIKS TO Control Cell Telephone queries (Sheet 10dq real time of 1130 to 1200)This is an exercise.This is an exercise.This is Margaret Downings, Franklin County.Apparently the plume has washed over my house and garage.What will happen to them now2 How can they be decontaminated2 Who will pay for it2 Tell them about Price-Anderson and refer them to the Counties Rep.B/E County: Explain Price-Anderson.

Message To aamL=Actual Response JIC Media JZC Pub1ic lnf o.B/P County gt 904 1522K Rl (7<3) 0 RILL NOc Exercise 90 WurotocrOW yrrllr rOWuuc 4Q SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAO E SHEET NOc RESPONSIBLE CONTROLLER)LOCATION)

See below Control Cell Lead Controller VAI IO POR TIMES OPr@AM AM REAL TIME See below PM See below@PM O RILL TIME TO HOURS HOURS ASSOCIATEO WITH MESSAOKS INPORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10dr real time of 1130 to 1200)This is an exercise.This is an exercise.(Caller is John Ramos.)Ny garden still has some pumpkins and Zucchini growing in it.I live in zone 2 on Cedar Street).Is my garden destroyed?

Refer to Counties Rep.II/F County: Cannot determine at this time.Contamination figures available at a later date.,"Iessage To Actual Response QurzaaE'IC lledia Jrc public 8/r county ka Eau 90$c15222 Rl I7&2)

ORILI NOc Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK ol HKKT NOc RKSPONSIBLK CONTROl LKR{LOCATION)

See below Control Cell Lead Controller VALIO POR TIMKS OPB AM RKALT>>K See belowM See below I QAM ORII L TIMK TO HOURS HOU S ASSOCIATKD WITH MKSSACKS INPORMATION APPLIES TO Control Ce3.1.Telephone eries (Sheet 10ds real time of 1130 to 1200)~c This is an exercise.This is an exercise..(Caller is Gayle Shook).I'm a wine salesman for a large California winery.Re buy wines from this area.Are the grape crop and vines in this area ruined because of the accident at the power plant.Refer to County Agriculture Rep.B/F County: Only areas affected by the plume.."Iessage To LX'mL Actual Response MMi~a JIG iiedia JIC Public Xnfo.B/P County hu, 9$4c1$222 Rl I7%2)

DRILL NOo Exercise 90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET FAG K of SHKKT NOo RK5PONSIBLK CONTROLLER (LOCATION)

See below Control Cell Lead Controller VALID FOR TIMKS OFB QAM RKAL>>MK See below PM See below QAM PM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MK55AOKS INFORMATION APPLIKS TO Control Cell Telephone Queries (Sheet 10dt real time of 1130 to 1200)This is an exercise.This is an exercise.Caller Gina Hutchins.I live on Dogwood and when I evacuated, I couldn't get my dog to get in the car and so I had to leave without him.Where can I take him to to find out if he's been contaminated after I go back home.Refer to County Rep.B/P County: ELiQQILTdhi.

lfessage To Actual Response JIC Iedia JIC Public Info.B/y County$44 15424 R1 (7&4)

RILL NOo Exercise 90 HKKT NO See below 4P SUPPIY SYSTEiVI CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSIBLK CONTROLLER ILOCATION)

Control Cell Lead Controller PAOK oI VALID FOR TIMKS OP1 AM 0AM RKALTIMK See below PM See below DRILI TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAOKS INFORMATION APPLIKS TO Contxol Cell Telephone Queries (Sheet 10ea real time of 1130 to 1200)This is an exercise.This is an exercise.(Caller is Lt.Panther, RPD)The traffic light.has gone out at the Nellsian Hay intersection.

Traffic has backed up and is very slow.There is an officer directing traffic there now but the situation is not improving very quickly.Host likely sends help.tfessage To EZmQ=Actual Response~au JIC Media JIC Public Info.B/F County 9$015255 RI I7&SI ORILI NOo Exercise 90 4rk SUPPLY SYSTEM CONTROLLER tNFORMATlON GENERAL DATA SHEET PACK of SHKKT NOo RKSPONSIBLK CQNTRQLLKR (LOCATION)

See below Control Cell Lead Controller VALIO PQR TIMES OPl QAM RKAL TIMK See below PM TQ See below QAM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAOKS INPORMATION APPLIKS TQ Control Cell Telephone Queries (Sheet 10eb real time of 1130 to 1200)~o This is an exercise.This is an exercise.(Ca11er is Mary at the Hea1th Department)

Take and Pay stores has offered to 1st evacuees charge the medicine they have left behind.O O Refer to KONA for announcement.

~hamuaa-'essage To QmM Actual Response~ra Gurr~JIC Media JIC Pub1ic Info.B/y County 90$ISRRC Rl I7&sI ORILI NOa Exercise 90 KET NOo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER tLOCATION)

Control Cell Lead Controller PAQ K ot VALID FQR TIMES OFt QAM REAL TIME See below>>See below CI AM Q>>0 RILL TIME To HOURS HOURS ASSOCIATED WITH MKSSAQKS INFQRMATION APPI IKS TO Control Cell Telephone+eries (Sheet 10ee real time of 1130 to 1200);This is an exercise.This is an exercise.(Caller is EHAC Coordinator at ERAC center).'here is a man and his wife here and they want to go into the N.Road 68 area to get their uncle out.He has refused to evacuate but they think they can talk him into it.Can you arrange for them to get past the road blocksf Has there been any conditions for reentry issued by the state yeti Give answers based on current conditions.

May refer to law enforcement for route alerting.Message To Actual Response Guxa~'IC Media;JIC Public Info.., B/P County DRILL NOo Exercise 90 SHEET NQo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTRQI LER (LOCATIONI Control Cell Lead Controller PAQ K of VALID POR TIMES Qtut QAM RKALTIMK See below PM See below@AM Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAQES INFORMATION APPLIES TO Control Cej,l Telephone Queries (Sheet 10ef real time of 1130 to 1200)This is an exercise.This is an exercise..(Caller is.'targe Peterson, local Red Cross Office)I have a man here in my office from the Selph Landing area.He refuses to go home and wants to be referred to a motel.He also says he left soup on the stove and his house will burn down if someone doesn't go turn it off.Refer to County Rep.B/E County: Refer to EMAC if evacuated and contact Pire Coordinator.

I.'fessage To LID Actual Response JIC'.'tedia t" JIC Public Info.B/F County 909oISSZS Rl (7%9)

RILL NOo Exercise 90 HKET NOo See below 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

Control Cell Lead Controller PAOK at VALID FOR TIMES OFB AM TIME See below PM See below QAII 0 RILL TIME TO HOURS HOURS ASSOCIATKO WITH MKSSAOES INFORMATION APPLIES TO Control Cell Telephone Queries (Sheet 10ej real time of 1130 to 1200)~o(~1o'his is an exercise.This is an exercise.This is the Spokane Chapter of the Red Cross.How long before Spokane has to evacuate.Ve need enough notice to get more volunteers to help out.Provide~~o'tatus that emergency is not severe enough for Spokane to evacuate.Message To Equal=Actual-Response JIC Media JIC Public Info.B/y County 8~@554 IS@SR Rl (7&5)

DRILL Nf~SHEET NOgi%A~III'%Ct0%tl'IlIC t011 l1 49 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RIQPO(SIBt.E(O)f ROLLER{LOCATION)

PAGE oI""""""'TM"'AM 1200 REAL TIME@PM ASSOCIATED WITH MESSAGES 0 PM DRILL TIME TO HOURS INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: Private Citizen Message: Philip James, from New York City, wants to know what major businesses and industries are located near the NNP-2 plant, and what effect the radiation will have on their activities

-including shut downs, loss of product.'nticipated Response: Major businesses that would be affected are those involving agriculture and dairy farms.Relate what the farmers would have to do.Actual Response?II 968 1588K RI (7 83I DRILL NOs Exercise 90 WASNI'AC'!09 tl'CLIC tOWlt 49 SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET.PACK SHEET NOa 1 oi b RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF)QAM REAL TIME 1 1 30 Q PM To 1 200 QAM Q PM DRILL TIME TO HOURS.HOURS ASSOCIATED WITH MKSSACKS INFORMATION APPLIES TO Control Cell Telephonic gueries To: EOC Coordinator (State)From: Concerned Citizen, Jane Andrews Message: I would like someone from the state to come out and take a water sample from my well.With all this problem at the nuclear plant I want to make sure that my water is safe to'drink.Anticipated Response: If the water is from a well, it is covered and there is no need to worry about it being contaminated.

If it is open, it wi 11 be tested.Actual Response Z 968 ISZ22 Rl (7 88)

ORII L NO Exercise 90 leASNI'lOTO'l

~'I'SlIC tO'ACI 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK SHKET NO, 10ic RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VAI IO FOR TIMES OF: QAM RKAI TIME 1 1 30~PM 1 200 0AM Q PM OR)I L TIME TO HOURS HOURS ASSOCIATEO WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic Queries To: Hedia (State)From: 8oston Globe Reporter Hessage: I would like to have complete details on what is going on at the power plant accident out there.How does it compare to THI and Chernobyl?

How many residents were evacuated?

Where were they sent?Are all emergency systems in the plant working?Has anyone been killed or injured?Anticipated Response: Explain what is going on, what areas are being evacuated if any, where the people are going and their numbers, what the plant is doing, explain the difference if they know regarding previous accidents, no one has been killed, tell of injuries if any.Actual Response?968 1$882 Rl{7 89)4 DRIL NO, Exercise 90 WA~IIICC'IOC~I'I.IC tOw C1 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE SHEET NO loid RESPONSIBLE CONTROLLKR (LOCATION)

Control Cell VALID FOR TIMES OF: QAM 1 1 30"+PM 1 200 ASSOCIATED WITH MESSAGES CI AM TO HOURS 0 PM DRILL TIME INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Hedia (State)From: Yakima Radio Reporter, Frank Palaski Message: Wants to know what the Federal role was in the decision to have the people evacuate?Hho made the decision anyway.Nhat if the people didn't want to go, were they forced to leave?Anticipated Response: FEDS had no role in telling the people to evacuate, State and County made the decision based on recommendations from-the plant, people not forced to leave.Actual Response'7 868~I5222 RI (7 85)

WA~HISOCO'%CtllC tOI1 CI 4N SUPPLY SYSTEM CONTROLLER INFORMAT1ON GENERAL DATA SHEET Vxercise 90 SHEET Nlf.R~QSIBI1E$0)TROLLER (LOCATION)

PAGE VALID FOR TIMKS OFl 1130~To 1200 REAL TIME PM QAM CJPM ORII LTIMK TO HOURS HOURS ASSOCIATKD WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic gueries To: Media (State)From: Senator Adams Office Message: Senator Adams office calling to determine what Federal assistance has been made available.

Anticipated Response: Explain the type of federal assistance available or find out and call back.Actual Response r?96$~ISZRZ Rl (7 89)

D R ILI NOo Exercise 90 IAA~CICCTOX~I'AIC tOWCC 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE I SHEET NOI 1 oi f RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF: QAM QAM 1130 QPM To 1200 QPM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPI IES TO Control Cell Telephonic gueries To: Media (State)From: KIRO News Radio Message: Ne understand that the poeple who live near the power plant were asked to evacuate their homes.How long did this take?How many people live in , that area?Anticipated Response: Give an estimated time that it took.Give the number of people in the area in quadrant evacuated.

Actual Response rr?96$IS222 RI (7&2) tIC I'xercise 90 WA~III IC'IOC~I'LIC'OW~C Mal SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET of SHEET Nfoi g R~tPIBLP P)TflOLI KR (LOCATION)

"""""""'1'M" QAM IZ00 REAL TIMK QPM ASSOCIATKD WITH MESSAGES QAM QPM DRILL TIME TO HOURS INFORMATION APPI IES TO Control Cell Telephonic queries HOURS To: State EOC Operations From: Congressman Morrison's Office Message: This fs the Congressman's aide.He intends to fly home as soon as possible.Is there any reason why not to go?Can your office provide those little gizmos that detect radiation for about three of us?Anticipated Response: No reason why not to if that is what he wants to do.He will not be allowed in the areas where people have been evacuated.

See if it is possible to get TLDs., Actual Response rr?IIC l 966 15222 Rl (7$3)

DRILL NOo Exercise 90 WAIHIIOIOX

~I'IIC IOWII 49 SUPPLY SYSTEM CONTROL I ER INFORMATION GENERAL DATA SHEET PAGE SHEET NOI 10ih RESPONSIBLE CONTROLI ER (LOCATION)

Control Cell VAI ID FOR TIMES OFI QAM REAL TIME 1 1 30 Q PM QAM@PM D RILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION'APPLIES TO Control Cell Telephonic Queries To: Media (State)From: Seattle Daily Star Message: Hhen do you think President Bush wi 11 fly out here to be at the site of the accident?Hho will be coming wi th him?Hill he be given those radioactive pi 1 1 s?Anticipated Response: Have not been told that the President is coming to the site.Actual Response?966 IS222 R'I (7 62)

DRILL Nf, WASHICCTOC

~8~LIC tOIICC 4N SUPPLY SYSTENl CONTROLLER INFORMATlON GENERAL DATA SHEET PAGK K TNO(RESPONSIBLE CONTROLLER (I OCATION)VALID FOR TltIQ)F1 PAM TO REAL TIME PPM ASSOCIATED WITH MESSAGES PAM 0 PM DRILL TIME TO HOURS INFORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: KJR News Message: Would like, some information regarding what security measures are being taken for personal property left behind during the evacuation.

Anticipated Response: Sheriff and State Patrol in charge of security,~jj Actual Response'7 t'l I,,68 I5222 RI P 83)

DRILL Nog i gp WAINI80tOX tCILIC POWII 4P SUPPLY SYSTEIVI CONTROLLER INFORMATION GENERAL DATA SHEET PACK ol HKKT NOo R~N/IBLf./NTPOLLKR (LOCATION)

VALID FOR Tlalp3ogl QAM 1 2pp REAL TIME QPM QAM Q PM DRILL TIME To HOURS HOURS ASSOCIATKD WITH MKSSACKS INFORMATION APPLIES To Control Cell Telephonic gueries To: Media (State)From: Spokesman Review Reporter Message: Please give me an update on the WNP-2 situation.

What is happening now?When can the people return home?Are they going to fi 11 up the reactor with concrete?Will there be any more releases?Have people started filing law suits yet?Anticipated Response: Give update, don't know when the people can return home, they aren't going to fi 11 the reactor with concrete, don'know if there will be any more releases and haven't heard of anyone fi ling law suits..Actual Response 7 968 15222 Rl (7 82)

DRILL NOe Exercise 90 WA~IIIWC10%~I'ClIC PCWCC 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAG K SHEET NO 10ik RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID POR TIMES OF PAM 1130 PPM 1200 ASSOCIATED WITH MESSAGES PAM P PM DRILL TIME TO HOURS INPORMATION APPLIES TO Control Cell Telephonic Queries HOURS To: Media (State)From: KING TV Reporter Message: Have Benton and Franklin Counties been declared a disaster area?Are there plans to request a federal declaration?

Anticipated Response: Explain declaration of emergency has been declared by county and state.Check to see if a federal declaration is to be requested.

Actual Response 1 988 IS288 Rl (7 88)

OR)I LNO.Exercise 90'WASHICCtOC tVCLIC tollCC 49 SUPPLY SYSTEM CONTROLLER 1NFORMATtON GENERAL DATA SHEET PAGE of HEKT NOr 1 oi 1 RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF: AM 0 TD 0AM 1130 g PM 1200 Q PM DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic gueries To: EOC Coordinator (State)From: Private Citizen Message: I want to get a medical examination to be certain that I did not get any radiation during the evacuation.

Hho should I send the bill to?A'nticipated Response: Ask if they were checked at an assistance center.If not, they can be monitored there.Actual Response')968 IS222 Rl (7 88)

ORII LNO, Exercise 90 l1'*~NNN'lOfO!I

~N'tllC tO'tl~Mal SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE SHEET NOo 10im RESPONSIBLE CONTROLLER (LOCATION)

Control Cell*VALIO FOR TIMES OF, QAM 1130 g PM 1200 ASSOCIATED WITH MESSAGES 0AM 0 PM DRILL TIME TO HOURS INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Hedia (State)From: KOHO Radio Hessage: Nhat impact did the weather have on the deposition of radiation?

Hhat do you expect today's forecast to do to this cloud of radiation?

Anticipated Response: Answer according to the weather given in the scenario.Actual Response?968 IS222 Rl (7 82)

DRILL NOs Exercise 90 IIA~IIICCTC%tt'ttlt tClttt 49 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE oI EKT NO>10in RESPONSIBI K CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF'AM REAL TIME 1 1 30~PM 1 200 ASSOCIATED WITH MESSAGES@AM TO HOURS 0 PM DRILL TIME INFORMATION APPLIES TO Control'ell Telephonic Queries HOURS To: Rumor Control (State)From: Private Citizen, Lola Brown Message: I was evacuated b'ecause of the radiation.

I am two months pregnant.What are the chances of my child being born deformed'?

Should I get an abortion?Who can give me the adequate answers?Anticipated Response: You were evacuated to prevent this type of thing happening, do not get an abortion.Actual Response?988 15222 R'I I7 82)

ORILL NO, Exercise 90 4A WS~WioafOW O'SOC'OWaa 49 SUPPLY SYSTEM.CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE of SHEET NO+10io RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VAI IO FOR TIMES OFi QAM REAL TIME 1 1 30 Q PM 1 200 QAM Q PM OR)I I TIME TO HOURS HOURS ASSOCIATKO WITH MESSAGES INFORMATION APPLIES TO.Contro.l Ce.l.l..Telephonic Queries To: Media (State)From: KURE Radio Message: This is lack Mason of KURE in Pasco., You'pe on the air.He want to ask a few questions about the HPPSS situation.

Hhat is your name?Can you tell us what happened?Is the problem over?Hhen can people go home?How can people tell if their pets or their'livestock are radioactive when they get home?Anticipated Response: Tell the Situation, don't know yet when the people can go home, can have their pets and livestock checked for radiation.

Actual Response I 968 15822 R'I (7'88)

DRILL NOt Exercise 90 lr Villi'i JOWL rh'.r F t rtrH Wei II+WL ll'lIIIIIICTO%

ttlllf toll ll 4P SUPPLY SYSTEIVI CONTROLLER iNFORMATiON GENERAL DATA SHEET PAGE of EET NO+loip!RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF: REAL TIME 1 1 30 0AM 0AM~PM 1200....'~PM DRILL TIME'" TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO r I Control Cel 1 Telephonic Queries To: County EOC (State)From: Charlie Foster, Local Farmer r 4 Hessage: Is my well water.safe to dr'ink?I am sure that it received some of that deadly radiation and.I want, someone to come out and check it to make sure.Hy farm is located.},n Kennewick.,'Anticipated Response: Hell water, is safe to drink becuase it is covered.Actual Response?966 15222 R1 I7 65)

DRILI NOa Exercise 90'+ASSSIXCSDC

~CsllC PD%~C*Mal SUPPLY SYSTEM ,<I CONTROLLER INFORMATtON GENERAL DATA SHEET PAGE SHEET NOe 10i q RESPONSIBLE CONTROL I~(LOCATION)

Control Cell E oI VALID FOR TIMES OFs 1130 AM Q"AM To 1.200.Q PM DRIL!TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Control.Gal.l Telephonic queries To: EOC Coordinator (State)From: HA Rep.Sid Morrison Message: Nhen will it be possible for.pregnant@omen.

to return to their homes without being affected by fallout?, Do you have any idea how many women who evacuated'are pregnaqtl?'hat sort, of"medi,cal effects could be expected to their unbor'n children.Anticipated Response: Get informatjon from the HPs.Actual Response 969~l5222 Rl (7 82I DRII L NOo Exercise 90 i/5 40W0~0w0W05 WC50100500

~0~5IC~0050 49 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET...PAGE of HEET NO, 10ir RESPONSIBLE CONTROLLER

{LOCATION)

Control Cell VALID FOR TIMES OF5.REAL TIME 1130 0AM 1Z00 ASSOCIATED WITH MESSAGES QAM.0 PM 5'O DRILL TIME~.HOURS INFORMATION APPLIES TO HOURS Control Cell Telephonic gueries To:., Media (State)From: Boston Globe Reporter Message: How long will it'ake',the.radioactive cloud ko disappear?

Nhat is in the fallout?How dangerous, i j,it?lf.people are e)Iposced what wi 11 happen to them'?How does it compare to the*bombs that were dropped on Japan?Hill the results to the people be the same?A'nticipated Response: Give the info from DSHS peopl'e.Actual Response 868 18222 RI{7.83)

DRILL NOo Exerci se 90 WA~Ill%4'l0%tl'Illt PO&lS 4N SUPPLY SYSTEM ,-, CONTROLLER INFORMAT1ON GENERAL DATA SHEET r<<N~<<5r*PAGE ot SHEET NO, 10is RKSPONSISLE CONTROLLER

{!OCATION)i Control Cel 1 VALID FOR TIMES OFlEAL TIME 1130 QAM QP To 1200---QAM" QPM DRII L TIME TO HOURS HOURS ASSOCIATKO WITH MESSAGES~'INFORIllATION APPI IKS TO.Contm3.CeLl Telephonic Queries 0~To: Media (State)From: Seattle Reporter Message: I have been told lthat thiS is the biggestnuclear disaster in the United States is that.-true?

lHow mljqh-radiation ptas released?Has the NRC notified any foreign government of the dangers?Hill the release be detected in any other countries and if so where?Anticipated Response:.Give)he amount of radi,ation released, NRC has notified other,,countries and at this time it is unknown where the release will be detected.Actual Response?<<'966 ISZZZ Rl (7 6>)J rr or DRILL NO Exercise 90~4+PV~APIO+f'l'A

~NISCTO'%oillc'0%~1 49 SUPPLY SYSTEM'ONTROLLERS INFORMATION GENERA,I bATA SHEFT I~PAGE of SHEET NO.1 pi t VALIO FOR TIMES OF>1130 REAL TIME RESPONSIBI E CONTROLLER (LOCATION)

Control Cell QAM 1 happ QAM Q PM..',"Q PJ4 TO~RILL TIME~>>-"~HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO"Control Cell Telephonic gueries To: Media (State)From: Los Angeles Times Message: Our Science Editor feels:tea't the greatest risk to the public is from internal exposure.-"Are the'evacuees being: monitored for internal exposure?a~1P Anticipated Response: All evacuees are being monitore'd and ir" they had internal radiation:it woul'd 6e detected.Actual Response?969 15222 R'I{7 82)

OR)I I..NO.Exercise 90 ,<Mr~XL~e~e%AIIII'iafoii

~\'I%le toN~i SUPPLY SYSTEM ,,C;CONTROLLER INFORViATtON GENERAL DATA SHEET PAGE SHEET NOo 10iu RESPONSIBI C COI4TROLCER'ILOCATION)

Control Cell VAI IO FOR TIMES OF1 AM A Cl Q 1130 g PM 1200 DRII I TIME TO HOURS HOURS ASSOCIATKO WITH MKSSAGKS j't t s i T~'1i i/A 4~INI'ORMATION APPI IES TO-Control-Ce 1 1-Tel ephoni c/veri e s~i W Ir)~1'4 e 0 H To: EOC Coordinator (State)From: John Williams 1 Message: Say, I keep hearingAabout this:.Price-Anderson, Act going to pay out money for those Iof us.who hag.to evacuate,--When,:.;is Ithisgoing to happen?I am staying with some.friends here.:.in-Connell apd:I want to know how long I have,to wait to, get some money so.that.I can go-stay at a motel and not put these friends out any longer.Where will the Federal Government.

be setting up their office?Who will be in charge?Anticipated Response: ':Federal Insurance Company;.should be setting up today or tomorrow.-.The media'.wi 11 issue a press release as to the location.They are in charge of distributing the money.Actual Response~, 666 15R22 Rl (7 SS)

DRILI NOo Exercise 90 WMNWMA 4lAA4WAII 49 SBPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE ot HEET NOo 10iv RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF(AM 0 QAaf REAL TIME Q PM"~.'"~PM TO DRILL TI)tE.~.HOURS HOURS ASSOCIATED WITH MESSACES~5~INFORMATION APPLIES TO Control'Cell Tel'ephonic queries To: EOC Coordinator (State)From: Concerned Citizen Message: Hill it help if we'.bOII1 llhd water befo)'e:we.drink it?*I mean if there is any radiation in theIWater'wiIll that take cire of the'radiation?

Hhat about drinking some"-sort of-alcoh'ol, will that" take"-care of any poisonous radiation I might haVe.gotten.in my..system when I was evacuating from my house.I.9~w~P I" c Anticipated Response: Whither b'oiling)the water or drinking alcohol wi 11 take care of any'poisonous radiation.

9'ctual Response 96$~IS222 R'I (1 63)

DRII L NO Exercise 90~~XX>>X~~"+Q<wAXÃl%DXOX XI'XXIC~CANC~~~~>>X 4N SQ'g IIY SYSTEM CONTROLLER INFORMATION GENERAL OATA SHEET PAG E oI SHEET NOo 10iw VALID FOR TIMES OF: REAL TIME 1 1 30 RESPONSIBLF CONTapLLEIL(LOCATACll4l

.Control Cel 1 0AM@PM To 1200 PM DRIL!TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES~,.;'~.,',...INSORMAV4ON APPLL S TO I....., ZQILtrol.SPUD]ephoni c Queri es To: Rumor Control (State)From: Hark Brown Hessage: What is,thy Governor doing.aboutthe...run.on..the banks that is occurring in ,'the Tri.Citi'es.'fso', I%card"that there wis,,a run on the grocery stores over.there" too.." nasl,the National;,Guard

'bqen called out yet?Don't you think that it would be a food idea Po do Chat?Anticipated Response: Check to see if there.really.i,s a run on the banks and grocery'stores', then'see,wight the Governor and National Guard are going to do.'ctual Response'7 964 l5222 RI (7 42)~'fXXXXI~IXI~X I A%1tgl~I>>X~*%P~X 1~>>NWW V>>>>O>>>>>>t.>>OO>>Ol" Ol>>leeanrl W>>>>,~e">>l>>OO>>O>>>>4.~O>>OO>>>>>>O>>OO>>>>>>ll DRILL NO>>WASHL>>lOTOX

~OOllC'O>>>>ll 4P SUP'Pri SVSTm" CONTROLLER INFORMATION

>>GEblER'AL QAYA SHEET--~-~PAGK Exercise 90>>ar~~of HEET NO>>10ix RESPONSIBLE CONTROLLER (LOCATION)

Control Cell VALID FOR TIMES OF)QAM QAM I REAL TIME 1 1 30 Q PM Q PM, O'RIDL TIME<<,~s HOURS ASSOCIATKD WITH MESSAGES INFORMATION APPLIES TO Control Cell Telephonic Queries To: EOC Coordinator (State)From: Walt Waiter>>Message: Say, I have a geiger'counter'.that l would be will.ing'.to use and help you people out with,'thi's', problem"you have't...Whoops.

'herewould you like me to go to monitor'eoople?,;I'hink yoIj wil;~find,'that my'.rates are very competitive.

Anticipated Response: Thank"h'im, but tell him, that DSHS is"handling the'onitoring.

">>Actual Response'...96615222 RI[7$3)~4Jpv"',W>>&*>>~'b>>'>>CO>>J 5V,%>>.>>lee>>>>l>>>>>>>>H'lO>>

l DRILL NO)Exercise 90)<<AJHHACTo'.%

~I'Llc to~e ,4N SUPPLY SYSTEM'CONTROLLER INFORMATION

  • GENERAL'DATA SHEET)'<<v)<<>>w'<<\~k PACK oI SHEET NO)10iy RESPONSIBLE CONTROLLER (LOCATION)

<<<<v<<)>>~v m<<>>VALID FOR TIMES OFI REAL TIME 1 1 30 0AM TO'Z00" I~ASSOCIATED WITH MESSAGES I'I I)TO DRILL TIME HOURS INFORMATION APPLIES TO Control Cell Telephonic gueries HOURS To: Rumor Control (State)From: Sue Green, Private Citizen Message: Is it true that it will be at least five years before anyone will be able to culti'Volte the'land around'tffe Tri'iti'e's area?'sn't this a situation just like Chernobyl'f

~~Anticipated Response: This reactor.is not like Chernobyl.

Right now it is diffictj1t t'o say how lo'ng land will not be able to be cuftivated:

It'wil'1 depend on"the soil sample tests that DSHS is doing.~~Actual Response?V'<<<<\.)4 668 15222 R1 (7 62)~I<<<<8~AV)I))hI))))<<)lh

'I<<~<<)<<>><<)~~)~~Vt<<<<C)))<<<<V It Wh<<)<<C<<<<I<<)I' v>>r>>>>I t>>>>t>>>>>>~>>>>>>>>ttr>>t>>

%t J>>v~>>>>, Irk SUF.-P.LY SYSTEM.CONTROLLER iNFORMATION GENERAL BATA SHEET DRILL NO>>Exercise 90 ,~~~>>A~r r>>'HEET NO>>RESPONSIBLE CONTROLLER (LOCATION) 10iz Control Cel 1'--'->>>>PAGE ot VALID FOR TIMES OFr QAM~-"""-.-~AM~~I,, LJ REAL TI<<1130 go 1200--.-'~-I ASSOCIATED WITH MESSAGES~>>v>>~~>>'TO DRILL TIME HOURS INFORMATION APPLIES TO I V H>>Control Cell Telephonic Queries HOURS To: Rumor Control (State)>>>>7'~~~~From: Concerned Citizen"~Message: I understand that all yen who.1iye, within 50 miles frog,this Hhoops plant are going to become sterile as a result of this bigaccident.

Hhat can I do to prevent this?>>Anticipated Response: "A This is riot true.The amountrof radiation released will not raffect the male population.

r>>>>Actual Response-', 96$~IS222 Rl P'82)~>>>>>>"~v%rv v>>tt~>>t'>>>>>>>>>>~~vv v>>v>>>>t>>>>>>>>>>v I'4">g~I , JJ,)I I.W f t'II t JI l H t I I f h k, t WASHINGTON PUBLIC POWER 4N SUPPLY SYSTEM STRICTLY PRIVATE LOCKED STORAGE REQUIRED UNTIL AFTER 9/ll/90 THE ATTACHED DOCUMENT MUST NOT BE LEFT UNATTENDED OR WHERE ANY UNAUTHORIZED PERSON MAY HAVE ACCESS TO IT.WHEN NOT IN USE, IT MUST BE STORED IN A LOCKED REPOSITORY.

WHILE IN YOUR POSSESSION IT IS YOUR RESPONSIBILITY TO PRO-TECT IT AND IT'S CONTENTS FROM ANY UNAUTHORIZED PERSON.AFTER PROCESSING, WHEN THE ATTACHED DOCUMENT IS READY TO BE FILED IN A LOCKED REPOSITORY, THIS COVER SHEET MAY BE DETACHED AND DESTROYED.

06000397 9OO9ii PDR ADOCK PDO F j~~p~INTENTIONALLY BLANK Jf)~H EXERCISE 90 Exercf se Ofrector: R.A.Cht trod Exercise Coordtnators:

V.E.Shock1ey 3.A.Landon R.D.Mogle 1>>\,.INTENTIONALLY BLANK L~)

A.B.C.D.E.~tU t 11 d Oi t Ib tl Ob)ectives and Limitations Schedule Players Positions Evaluators/Controllers

.Definitions/Acronyms Player/Observer Instructions I-A-1 I-B-1 I-C-1 I-D-1 I-E-1 I-F-1 5gm~(Controlled Distribution)

A.Introduction to Scenario (Story Line)-B.Scenario Sign Off C.Time-Line Summary D.Scenario Forms E.Messages and Anticipated Response Forms F.General Data Sheets G.Critical Points H.Maps and Equipment II-A-1 I I-8-1 I I-C-1 I I-D-1 I I-E-1 I I-F-1 I I-G-1 I I-H-1 A.B.C.D.E.(Controlled Distribution)

Predrill Checklist General Evaluator/Controller Instructions Special Evaluator/Controller Instructions Critique Worksheets Evaluator Logs I I I-A-1 II I-8-1 III-C-1 I I I-'D-1 I I I-E-1 (Uncontrolled Distribution)

A.List of Procedures to be Implemented B.Other Supporting Information IV-A-1 None Evaluation Report (Uncontrolled Distribution)

To Be Published INTENTIONALLY BLANK

~NT PARTS II AND III ARE CONTROLLED DISTRIBUTION rw f~~INTENTIONALLY BLANK PART I OBJECTIVES AND LIMITATIONS EXERCISE 90 NOTE UNCONTROLLED DISTRIBUTION Ob)ectives and Limitations Schedule Players Evaluators/Controllers Definitions Player/Observer Instructions I-A-1 I-B-1 I-C-1 I-D-1 I-E-1 I-F-]NOTE UNCONTROLLED DISTRIBUTION il j 0~rr tl P~~INTENTIONLLY BLANK ll iii t)~Ill I I' A.2;gPi SECTION IA OBJECTIVES AND LIMITATIONS EXERCISE 90 The primary purpose of this exercise, scheduled for September 11, 1990, is to demonstrate effective management of the emergency and plant recovery operations with efficient coordination and communications between the activated Supply System emergency centers;Control Room (simulator), Operations Support Center (OSC), Technical Support Center (TSC), the Emergency Operations Facility (EOF)and the Joint Information Center (JIC).The exercise wi 11 be characterized by required response'to an emergency situation that will involve classification, notification, center.activation, team deployment, accident prognosis and mitigation, and the preparation of plant recovery operations procedures.

Timely and proper response by the players will contribute to mitigation.

of the simulated accident consequences.

Participation by EOF.and JIC liason personnel, as well as offsite agencies such as the Benton/Franklin Counties EOC and Washington State DEN, will occur.B.QBB Numbered objectives reflect standardized federal agency objectives.

Subparagraph letter groups reflect specific objectives.

Some are keyed to findings from earlier exercises and drills as indicated by the document code numbers in parentheses.

Demonstrate the ability to monitor, understand and use emergency classification levels (ECLs)through the appropriate implementation of emergency functions and activities corresponding to ECLs as required by the scenario.The four ECLS are Notification of Unusual Event, Alert, Site Area Emergency and General Emergency.

a.Centers affected: Control Room, TSC, and Benton/Franklin County and State EOCs.b.Limitations:

None.c.Supporting objectives:

1)Demonstrate the ability to completely fi 1 1 out i nfor-mation on the FNF notification form.(Drill 89-2, CAR C-22-SS;E89, CAR 89-20)REVISED: 7/9/90

.,2,,.Demonstrate the ability to fully alert, mobilize and activate per-'"'.son'nel for both facility and field-based emergency functions.

a.Centers Affected: Al 1..":.b.Limitations:

1)~z~,g~f4(, I.41"2)3)Neither round-the-clock staffing nor will shift change be demonstrated.

Phones in the JIC may not be prestaged.

HA EOC and the State HEIC wi 1 1 be set up (phones, equipment, materials, etc.).~41'1>4y">>~<, 4-I 4)1 All State personnel who would respond to Richland wi 11 be.in Richland prior to the exercise.This,is due to the increased cost of chartering special planes to respond to the exercise at the time of the accident.However, no response team will arrive at their appointed exercise location until the realistic time for arrival after the specific event classification.

,0r~lsiq;".."c:~~Support)ng Ob]ectf ves: '1)Demonstrate the ability of the Technical Data Center to perform assigned tasks such as specific technical analyses (D89-2 CAR C-12).i 44=t lid'l~1 2)Demonstrate the capability of the Public Address system to notify personnel within the Protected Area and the Indus-trial Area of an emergency (Drill/Exercise).

Specifically, the PA system within buildings 56, 81 5 82.(D90-1, CAR 90-0003)1~rl,'1~4 C1';-3)4)(., Demonstrate the capabi'lity to provide adequate and timely announcements on the!'ACTIVATED" status for emergency centers.The assumption of procedural responsibilities by key emergency center decision makers is not always clearly made known to center staff or to other emergency centers.(E89, CAR 89-26)Demonstrate that pager carriers are acknowledging receipt of classification notifications by calling back to the EOFCC to state their intent to respond or to not respond.(D89-2, CAR B-6-CC)1-A-2 D r v 3.Demonstrate the ability to direct, coordinate and con'carol emergency activities for Supply System and off-site support agencies.a.Centers affected: All.b.Limitations:

None c~Supporting ob]ectives:

1)Demonstrate the ability of the OSC staff to correctly track and control all plant reentry teams, assume control of personnel already dispatched at the time of OSC acti-vation (to include security personnel), and to maintain effective communications with all dispatched teams (D89-2 CAR C-l).2)Demonstrate a smooth, coordinated assumption of PED duties from the initial PED/Shift Manager and effective activa-tion of the TSC (E88, CAR NRC 88-29-C6).

3)Demonstrate an orderly, mutually understood transfer of control for direction of the Plant Emergency Team (PET)from the Control Room (Simulator) to the OSC with cogni-zance on the part of the TSC.(D89-2, CAR C-1-OS;E89, CAR 89-11;D90-1, CAR 90-0002)4.Demonstrate the ability to communicate with all appropriate loca-tions, organizations and field personnel.

a.Center affected: All.C.Limitations:

HA EOC will not utilize the NAWAS system.HA EOC staff will prepare and read NAHAS message text as required by scenario.FEMA wi 11 provide tape recorder for recording NAHAS messages.Supporting ob]ectives:

1)Demonstrate proper functioning and set up of the communi-cations systems, e.g.the Crash phones, PA speakers clarity, TSC phone locations, distinguishable simulator phone ringers, ENS line, fax, and STA phones, CRS phone console layout, radio clarity in the CAS, and OSC phone cable routing (E88, CAR C-25;D89-2, CAR C-4).1-A-3 iggp)~1~I.f1/0($gpss g,4 2)4)i,g~~i IrlI'Demonstrate timely and accurate exchange of information on such things as plant and emergency status, including com-pletion of ma]or activities, between emergency centers such as the Control Room, TSC, OSC, EOF and DIC, and dispatched emergency teams.Include such items as: o Proper Control Room staff PA announcements, notifi-cations of emergency events and utilization of aug-menting staff when warranted; proper TSC inclusion of the TSC Director and notifications of significant updates to the NRC, OSC and others, and timely announcements of existing hazards accompanied by correct alerting tone (D89-2, CAR C-8).o Timely airspace closure by the OACC staff, proper information net control by the TSC Information Coordinator, and a displayed familiarity with plant systems by the TSC, SSDC and TDC information coordinators (E88, CAR C-7;D 89-2, CAR C-ll).o Realistic communications by deployed Supply System reentry teams when all members are simulated to be in SCBAs.,'j~ipse gi o Critical information on actions to mitigate plant problems, or operational status for plant emergency centers is not always transmitted by emergency centers that have a need to know.(E89, CARs 89-14 and 89-25;089-2, CAR B-5-TS)o Transmittal of ARM readings between the Control Room (Simulator), TSC and OSC have been less than adequate.(D89-2, CAR C-10-TS)o Adequate and timely announcements are not always made nor repeated to emergency personnel to keep them apprised of plant conditions and/or hazards to avoid.(NRC NOTICE OF VIOLATION; E89, CARs 89-13 and 89-35)o Postings of the plume EPZ PAR/PAD status boards in'the SSDC and in MUDAC have been less than adequate for timeliness and completeness.(D89-2, CAR C-22-SS;E89, CAR 89-20)o Supply System Field Teams do not always establish immediate contact with MUDAC by phone or radio to keep coordinators informed of their deployment status.(D89-2, CAR 8-7-MU)'-A-4 o Some Supply System Field Team members have demon-strated less than adequate familiarity with proper setup of portable radio communications enhancement equipment for use in vehicles.(E89, CAR 89-19)3)Demonstrate the ability to initiate notifications to the EOF Communications Center, state, counties, DOE-RL and NRC in a.proper and timely manner.5.Demonstrate the adequacy of facilities, equipment, displays and other materials to support emergency operations.

a.Centers affected: All.b.Limitations:

c~1)Phones in the JIC may not be prestaged.

2)State EOC will be prestaged.

Supporting objectives:

1)Demonstrate the presence or availability and functioning of required equipment, or utilization of effective compen-satory measures, in the OSC (E88, CAR C-26).2)Demonstrate the proper and timely maintenance of emergency center data displays, especially in the PAP lobby, SSDC, HUDAC and JIC (D89-2, CAR C-17).6.Demonstrate the ability to continuously monitor and control emergency worker exposure.a.Centers and agencies affected: OSC, CAS, MUDAC and Benton/Franklin County EOC.b.Limitations:

1)The PAP and AAP will remain functional for routine plant operations.

Actual security is not to be jeopardized.

2)Radioactive material will not be utilized to"spike" any sample nor for contamination props.3)Offsite field team members wi 11 not wear protective clothing in the field except those dispatched on the Hanford Reservation.

1-A-5 4)SCBAs may be worn by bearded personnel.

5)Protective clothing and SCBAs need only be utilized throughout the first deployment of each emergency worker if proficiency is demonstrated.

In the interest of safety, SCBAs may be removed from anyone stressed by its use.c~Supporting Objectives:

Demonstrate the ability to move badges and TLDs, or mock ups from the PAP/AAP.2)Demonstrate effective control of Security Force emergency workers (D89-2, C-12).3)Demonstrate that continuous radiation monitoring is being performed by Field Teams, even while proceeding to assigned locations.(E89, CAR 89-34)4)Demonstrate familiarity on the part of HP Center Staff and on the part of Supply System Field Teams with where to obtain HCA's and air cartridge purging equipment.(D89-3, CAR 89-07)Demonstrate the appropriate equipment and procedures for determining field radiation measurements.

a.Centers affected: MUDAC (and field teams)..b., Limitations:

1)Mutual aid response wi 11 not be demonstrated.

2)WA DOH will deploy two field teams to demonstrate the objectives 7, 8, and 9.c.Supporting Objective:

None.Demonstrate the appropriate equipment and procedures for the measure-, ment for airborne radioiodine concentrations as low as 10-7 micro-curies per cc in the presence of noble gases.a.Centers affected: HUDAC (and field teams).,.i b.Limitations:

WA DOH will deploy two field teams to demonstrate the objectives 7, 8, and 9.1-A-6 c.Supporting objectives:

None.9.Demonstrate the ability to obtain samples of particulate activity in the airborne plume and promptly perform laboratory analysis.a.Center affected: Field Teams.b.Limitations:

c~1)Laboratory analysis will not be performed, 2)'A DOH will deploy two field teams to demonstrate objec-tives 7, 8, and 9.HA DOH will be expected to demonstrate the mechanism of meeting with HSP and simulating the transfer of particulate filters and cartridges to HSP (for transport to the HA LAB).Supporting objectives:

None.10.Demonstrate the ability, within the plume exposure pathway, to pro-ject (including thyroid dosage)dosage to the public via plume exposure.a.Center affected: HUDAC.b.Limitations:

None.c.Supporting objectives:

1)Demonstrate that Control Room personnel are familiar with how to determine plume release rate utilizing the TRS-80 handheld microcomputer.(NRC Inspection Report, Item 50-397)11.Demonstrate the ability to make appropriate protective action decisions, based on projected or actual dosage, EPA PAG's, avai 1-ability of adequate shelter, evacuation time estimates and other relevant factors.a.Centers affected: Benton/Franklin County EOC.b.Limitations:

None.c.Supporting Objectives:

None.1-A-7

.il:2..-;Demonstrate the ability to initially alert the public within the 10-mile EPZ and begin dissemination of an instructional message within 15 minutes of a decision by appropriate state and/or local officials.

a.Centers affected: Benton/Franklin County EOC b.Limitations:

yl'L.>>i I>>1)Subsequent to the initial real KONA broadcasted EBS mes-sage (normal test message), the EBS broadcasts wi 11 be simulated on a special telephone speaker circuit.'>>j)" P J'~>>2)City of Richland will not be expected to perform route alerting of the Horn Rapids area.c.Supporting Ob)ectives:

WA Department of Wildlife will demonstrate alerting (IP-14 in the B/F Plan).J~>>J>>>>I I'>>,~~~.>>re ,Y>>..2)Benton and Franklin Counties will demonstrate route alerting along the Columbia River (at least 4 boats shall be targets for alerting, one to the north of the five mile zone, 2 within.the five mile zone, and one south of the five mile zone.],l I L'=>>>>)i'>>~A>>~~3)Benton and Franklin Counties will prepare appropriate EBS messages.FEMA wi 11 record EBS messages.Message broad-cast should be bilingual.

4)Benton and Franklin County will activate the 4 sirens (to be in sequence and within 15 minutes from receipt of SAE and EBS message broadcast) and prepare/broadcast the exercise EBS message for Columbia River evacuation.

5)Radio station KONA shall broadcast the initial EBS message (indicating that this is a test, that an exercise is being conducted and that sounding of the sirens is for the exer-cise)upon request of B/F EOC (in conjunction with SAE/River route alerting).

13.Demonstrate the ability to coordinate the formulation and dissemina-

,:r tion of accurate information and instructions to the public in a timely fashion after the initial alert and notification has occurred.:l I>>a.Centers affected: CR, TSC, EOF, JIC and offsite agencies.1-A-8 b.Limitations:

1)The EBS broadcasts will be simulated on a special tele-phone speaker circuit.c.Supporting ob)ectives:

1)Demonstrate proper completion of required notification forms (D89-2, CAR C-22-SS;E89, CAR 89-20).14.Demonstrate the ability to brief the media in an accurate, coordi-nated and timely manner.a.Centers affected: JIC and State HEIC.b.Limitations:

None.c~Supporting ob]ectives 1)Demonstrate correct, timely and courteous responses by JIC and State HEIC telephone teams to all calls from the simu-lated media and public (D90-1, CAR 90-0017).2)Demonstrate that at least one phone on each telephone team remains functional at all times after activation of the JIC (E88, CAR C-22).3)Demonstrate proper discharge of all JIC responsibilities, e.g., proper team supervision, equipment activation and checks, news release preparation and distribution, conduct of news conferences, notifications and documentation (D89-2 CAR B-9).o Initial coordinating duties of key JIC personnel has been less than adequate for: a)Outside telephone line forwarding capabilities are not always checked for operational readiness.

b)c)Team supervisors do not always assure all equip-ment is gathered and is operational.

I Company switchboard operators are not always informed when media and public infolmation teams are activated and where to forward incoming calls.P 1-A-9

~g)~l~~(.4)Demonstrate that the JIC includes information on confirmed plant radiological releases in news releases to the media.(E89, CAR 89-21)5)Demonstrate that elapsed time is minimized from when the JIC is activated and when a first news conference is'cheduled.(D89-4, CAR 90-0012)~i ,15.Demonstrate the ability to establish and operate rumor control in a coordinated and timely fashion.I , a,.Centers affected: JIC and State WEIC.b: Limitations:

None.c~Supporting ob)ectives:

None.16.Demonstrate the ability to make the decision to recommend the use of KI to emergency workers and institutionalized persons, based on pre-determinedd criteria, as well as to distribute and administer it once the decision is made.a t r'b.c~Centers affected: TSC, OSC, CAS, EOF, offsite agencies.Limitations:

There are no institutionalized persons in the plume EPZ.Supporting ob)ectives:

None.i 17.-Not applicable.

,.'..18.'emonstrate the ability and resources necessary to implement appro-;,,',priate protective actions for the impacted permanent and transient ,,plume EPZ population (including transit-dependent persons, special , needs populations, handicapped persons and institutionalized ppj sons).a.Centers affected: Benton/Franklin County EOC.b.Limitations:

1)Evacuations will be simulated; no personnel will actually be moved.1-A-10 2)Scenario shall call for two mobility impaired persons to request transportation assitance, B/F EOC shall dispatch resources to location and simulate the transport to EHAC (no persons will be moved, vehicle shall run route to EHAC).c.Supporting Ob]ectives:

1)Demonstrate the capability to evacuate school'hiller'en from the plume.19.Demonstrate the ability and resources necessary to implement appro-priate protective actions for school children within the plume EPZ.a.Centers affected: County EOC.b.Limitations:

B/F EOC shall dispatch resources to one school to demonstrate driver's knowledge of route, EHAC location EW kit, communication procedure, etc.Bus will wait at school 5, minutes to simulate loading time of children.c.Supporting Ob]ectives:

None.k 20.Demonstrate the organizational abi 1'ity and resources necessary to control evacuation traffic flow and to control access to evacuated and sheltered areas.a.Centers affected: Benton/Franklin County EOC.b.Limitations:

1)HSP will provide vehicles and staff in support of B/F plan.2)City of Richland will deploy resources for closure of river access;Franklin County will deploy resources for closure of river (Ringold and Selph Landing), the two Franklin County vehicles wi 11 be redeployed to two access control points;and the two Franklin County vehicles wi 11 demonstrate evacuation verification patrol.Note: an out of sequence message wi 11 be inserted at 8/F EOC", request-ing that this response function be demonstrated.

c.Supporting Objectives:

None 21.Not applicable.

22.Not applicable.

23.Not applicable.

24.Not applicable.

25.Not app1 i cab 1 e.26.Demonstrate the ability to identify the need for and call upon Federal and other outside support agencies'ssistance.

a.Centers affected: TSC, SSDC, Benton/Franklin County and State EOCs.b.Limitations:

None c.Supporting Ob]ectives:

None 27.Not applicable.

28.Not applicable.

29.Not applicable.

30.Not applicable.

v r 31.Not applicable.

32.Not app 1 i cab 1 e.33.Not applicable.

34.Not applicable.

35.Demonstrate the ability to coordinate the evacuation of onsite personnel.

a.Centers affected: CR (sim), TSC, OSC, SSDC, EOFCC, HPC, MUDAC.b.Limitations:

Only'players'111 be evacuees.c.Support)ng Objectives:

None 36.Not applicable.

1-A-12 SECTION IB SCHEDULE EXERCISE 90 o Player Orientations Sept 10 1200-1300 GSB Conf.Room J.A.Landon 1330-1430 PSF, Rm 141 V.E.Shockley 1430-1530 MPF Auditorium R.L.Romanellj Special Player Orientations:

-Operations Crew-Security Officers Exercise/Drill TBD TBD PSF Room 217 Sept 10 0600 Bldg 13 Sept 11 As Req'd.Various J.A.Landon R.D.Mogle Respective o Early select key controller issue Aug 28 1030-1130 PSF Room 141 V.E.Shockley o Training (for those Aug 30 0730-1200 PSF Rm 141 not certified) o Scenario Issue, Y.E.Derrer R.D.Mogle Orientation

&Break-Sept 4 0730-1130 PSF Rm 141 out Sessions o Casualty Scene Sept 4 1230-1530 GSB Lunchroom J.A.Landon Inspection (if needed).o-Final'upply System, i,iSept-10--0730-1130

~'F Rm 141 R.D.Mogle ,<FEMA-and NRC Controller/Evaluator Coordination Session o Exercise 90 Sept 11 As Req'd Various Respective INTENTIONALLY BLANK SECTION IC PLAYERS POSITIONS EXERCISE 90 (Simulator)(M.'g~(1)Shift Manager (2)Control Room Supervisor (3)Reactor Operators (4)Shift Technical Advisor (5)Operations Communicator (6)Information Coordinator (Harmon)(1)OSC Director (Harmon)(2)Plant Emergency Team Leader (McKay)(3)HP Personnel:

Plant Emergency Team (Graybeal)

(4)Equipment Operators:

a)Plant Emergency Team (McKay)b)Others (5)Maintenance Support Personnel a)Electricians (Harmon)b)Mechanics (Harmon)c)I&C Technicians (Harmon)d)Electrical Maintenance/(Harmon)IEC Technician e)Radwaste Operator (McKay)(6)HP OSC Support Personnel (Graybeal) a)Lead HP b)Other HP Support Pers (7)Chemistry Staff (Graybeal)

(8)Safety Support Individual (Harmon)(9)Administrative Support Staff (Harmon)a)Significant Event Logkeeper (Harmon)b)Phone Communicators (Harmon)(Harmon) c)Stenographer (Harmon)d)Records Coordinator (Peters)e)Radio Communicator (Harmon)(Harmon)f)Dosimetry Support (Graybeal)(Graybeal)(Graybeal)

(10)OSC Support Personnel (Harmon)a)Information Coordinator (Harmon)b)HP Log Keeper (Graybeal) c)Team Tracking Locator (Harmon)(Harmon)e)Accountability Person (Harmon)f)Team Briefer/Debriefer (Harmon)g)Warehouse Coordinator (TBD)(11)Security Operations Coordinator (Telander)

I-C-3 (Koenigs)(1)Plant Emergency Director (Powers)(2)Assistant Plant Emergency (Powers)Director (3)TSC Director (Koenigs)(4)Plant Technical Staff a)Thermal Hydraulics b)Mechanical c)Electrical d)Chemical e)Computer (Koenigs)(Koenigs)'Koenigs)(Koenigs)(Koenigs)(5)Operations Manager (McKay)(6)Radiation Protection Manager (Graybeal) a)HP Technician (Graybeal)

(7)Radiological Data Coordinator (Graybeal)

(8)Administrative Manager (Peters)(9)Administrative Support Staff (Peters)a)b)c)d)Status Board Keepers: Plant Significant Events FAX Operator Helper Operations Communicator I-C-4 e)f)g)h)Radio/Phone Communicator Records Coordinator Accountability Coordinator Stenographers (PED)(TSC-D)TSC/OSC Liaison (10)Information Coordinator (Koenigs)(11)Plant/NRC Liaison (Hosier)(Telander)

(1)Security Supervisor (2)Security Officers (1)Recovery Manager (2)Assistant Recovery Manager (3)Licensing Manager (4)Safety Manager (5)Site Support Manager (6)Administrative Support Manager I-C-5 (7)Administrative Support Staff a)Secretary b)Stenographer c)Helper d)Manpower Scheduler (8)Information Coordinator (Telander)

(1)Security Manager (2)Center Supervisor (3)LLEA Coordinator (4)Information Coordinator (5)Staff Posting (6)Staff Posting and Communications Runner (1)Center Coordinator (2)Duty Officer (3)Responder (4)Notification Support Person (5)Telefax Operator (6)Helper (7)Communications Manager (Telander)(Telander)(Telander)(Chitwood)(Voss)(Voss)(Voss)(8)Plant Communications Coordinator (9)Communications Technicians (10)Communications Runner (Voss)(Voss)(Voss)I-C-6 (Ki el)(1)Offsite Agency Coordinator (2)Assistant Offsite Agency Coordinator (3)Administrative Support Staff a)Stenographer b)Helper (4)EOF Informatioo Coordinator (Noyes)(1)Representatives to State EOC (2)Representatives to County EOC (Noyes)(1)Technical Manager (2)Technical Staff: a)Fuels Assessment b)Plant Systems Assessment c)Radiation Detection Systems amd Safety Assessment d)Electrical/I&C Systems e)State/County Technical Liaison f)GDS (3)TDC Support Personnel:

o TDC Information Coordinator (4)Administrative Support Staff: o Secretary I-C-7 (Larson)(1)Radiological Emergency Manager (2)MUDAC Coordinator (3)Meteorologist (4)Dose Pro)ection/HP (5)Field Team Coordinator (6)Field Team Dispatcher (7)Aircraft Ground Controller (8)Dose Pro)ection/Systems Analyst (9)Environmental Field Teams a)Team No.1 b)Team No.2 c)Team No.3 (10)Stenographers (11)Information Coordinator (1)Center Coordinator (2)HP/Chem Staff (3)HP Center Staff (Tupper)(1)EOF Public Information Officer (2)Techni cal Li ai son (3)Network Coordinator I-C-8 (1)grani tor (2)Nord Processor (3)Computer Systems Coordinator (4)Duplicating Coordinator (5)Dup1icating Personne1 (6)Facilities Support (CMC)(1)Managing Director's Representative (2)Administrative Support Supervisor (Mazur)(Harrington)(Tupper)(1)Director (2)Secretary (3)Spokesperson (4)Technica1 Spokesperson (5)News Coordinating Team (6)Assistant Director (7)Production Team Supervisor (8)JIC Production Team I-C-9 (9)Distribution Team Supervisor (10)Distribution Team (11)Information Manager (12)Media Telephone Team Supervisor (13)Media Telephone Team (14)Public Information Team Supervisor (15)Public Information Team (16)Media Manager (17)Support Manager (18)Audio Visual Team (19)Receptionist (20)Security Staff 4, A.(1)Decision Group a)Emergency Chairman b)Benton County Sheriff c)Franklin County Sheriff d)EH Director e)Health Officer BD f)Publ i c Information Officer (2)Implementation Group a)Implementation Coordinator b)Facility Representatives BD TBD TBD-To Be Determined c)d)e)g)State DEH Representative State Patrol Representative Benton County Sheriff's Representatives Franklin County Sheriff's Representative City Police Representatives h)i)))k)Fire Coordinators Health Department Representatives Agriculture Rep.Red Cross Representative Emergency Hanagement/

Transportation Coordinator Receptionist/Hessage Controllers Communications Director (3)Advice Group a)Benton County Commissioner b)Franklin County Commissioner (4)Support Group a)Radio Operators b)Hessengers c)Plotters d)PIO Support T D e)Dispatchers TBD (5)Field Teams a)Franklin County Sheriff Deputies b)Washington State Dept.of Game c)Pasco Bus Dr1vers (6)Liaison Group a)On-site 81-County Representatives at EOF b)Benton County Sher1ff's Representative at EOF c)Spokesperson at JIC d)Ass1stant Spokespersons at JIC (1)State DEN Representat1ve (2)State Patrol Representative (1)On-site Governor's Representative (2)Alt.On-site Governor's Rep.(3)Executive Secretary (4)DSHS Representatives to EOF (5)State Agriculture Representative to EOF TBD I-C-l 2 (6)Meteorology and Unified Dose Assessment Center Staff a)Protective Action Decision Group Member b)Field Team Coordination (7)Environmental Field Teams a)Team Captains b)Team Members C.(1)State Emergency Public Information Officer (2)State Alternate Emergency Public Information Officer (3)State EPIO Team Member D!iiah&K (1)DEM Director (2)EOC Supervisor (3)WEIC Manager (4)Health Officer (5)Health Physicist (6)EFSEC Rep.(7)Coordinator (8)PIO Technicians TBD TBD D H I-C-13 (9)EFSEC Tech.(10)Communications Officer (ll)Communications Supervisor (12)DEM Duty Officer Ham@T D (1)DOE Representative to EOF (2)Meteorology and Unified Dose Assessment-Center Staff a)Protective Action Decision Group Member b)Field Team Coordination c)Field Team Dispatcher (3)Environmental Field Team a)Team Captain b)Team Members (4)Security Decision Center a)DOE Representative b)DOE Assistant Representative (5)DOE-RL (1)DOE Spokesperson (2)DOE Assistant Spokesperson TBD BD 7.BP ggzg.BD BP 8.A.ARC Lead Representative to JIC B.ARC Representatives to-JIC Public Information Te1ephone Team D T D I-C-15 INTENTIONALLY BLANK SECTION ID EVALUATORS/CONTROLLERS EXERCISE 90 a~(Simulator)

(1)Scenario Controller (Lead)(2)Shift Manager Controller (Lead)'3)Crew Controllers TBD (4)Simulator Controller/Programmer (5)GDS Controller/Programmer (6)Radiological Data Controller (7)Real Control Room Controller BD b.(1)Emergency Center Controller (Lead)(2)Emergency Center Evaluator (3)Reentry Team Controllers (Lead)Mechanical Electrical I&C HP HP HP (4)PET Evaluator (5)Chemi s try Control 1 er~p C.r n (1)Emergency Center Control 1er/(Lead)Evaluator (2)Technical Controller TBD (3)Radiological Controller

  • TBD-To be determined d.(1)Emergency Center Control 1er (Lead)(2)Dispatached Team Controller a~(1)Drill/Exercise Director (2)Drill/Exercise Lead Controller (3)Drill/Exercise Control Assistant (1)Emergency Center Control 1 er/Evaluator c~Emergency Center Controller d.Emergency Center Controller e.Emergency Center Controller BD Emergency Center Controller f mm I-D-2 g.(1)Emergency Center Controller (Lead)V (2)Dose Projection Evaluator (3)Field Team Control Evaluator (4)Supply System Field Team¹1 Controllers

¹2¹3 (5)State Field Team Controller (6)DOE-RL Contractor Field Team Controller h.Emergency Center Controller a.n b.c~d.(1)Emergency Center Controller (Lead)(2)News Production Team Evaluator (3)Media Telephone Team Evaluator (4)Public Information Telephone Team Evaluator (5)News Briefing Evaluator BD TBD BD T D I-D-3 (6)Support Activist)es Evaluator (1)Lead Controller (2)Telephone Query Controllers (JIC)BD TBD (3)NRC Response Controller FC BC TD TBD BD I-D-4 SECTION IE DEFINITIONS/ACRONYMS EXERCISE 90 AFFF AG AAP ARC ARM ATWS B BOP BPA CAC CAS CCTV CEP Ci CN CR CRD CSP CVB DBA DEM DG DGB DOE DOT DSHS DW EBS ECCS EDPS EFPD EFSEC EO EOC EOF EOFCC EPIO'EPIP EPZ ERP EWAC FAX FEMA FN FRTS GPM Hp HCC HP HPCS Aqueous Film Forming Foam Agriculture, Department of Washington St Alternate Access Point.American Red Cross Area Radiation Monitor Anticipated Transient Without Scram Backup Balance of Plant Bonneville Power Administration Containment Atmosphere Control Central Alarm Station Closed Circuit Television Containment Exhaust, Purge Curie Containment Nitrogen (Inerting System)Control Room.Control Rod Drive Containment Supply, Purge Containment Vacuum Breaker Design Basis Accident Department of Emergency Management Diesel Generator Diesel Generator Building Department of Energy Department of Transportation, Washington Department of Social and Health Services Drywell Emergency Broadcast System Emergency Core Cooling System Emergency Dose Pro]ection System Effective Full Power Days Energy Facility Site Evaluation Council, Equipment Operator Emergency Operations Center Emergency Operations Facility Emergency Operations Facility Communicat Emergency Public Informati.on Officer Emergency Plan Implementing Procedure Emergency Planning Zone Elevated Release Point Emergency Worker/Assistance Center Facsimile Federal Emergency Management Agency Fan Fire Remote Transfer Switch Gallons Per Minute Hydrogen Headquarters Communication Center Health Physics High Pressure Core Spray ate State , Washington State Washington State ions Center HVAC I&C JIC KI KV LLEA LOCA LOOP L/0 LPCI LPCS MREH HPF MS HSIV HSS/RV MUDAC NRC N2 NS~02 OACC OCB OOS OSC.PAD PAG PAP PAR PASS PED PEO PI PIO PS PSIG PUD Quad RACES RB RCIC RCPB REA REH RFP RHR RL RM ROA RPM RPS RPV RRA RH Heating, Ventilation, and Air Conditioning Instrumentation and Control Joint Informat1on Center Potassium Iodide Thyroid Blocking Agent Ki lovol t Local Law Enforcement Agency Loss of Cooling Accident Loss of Offsite Power Lockout (Circu1t Breaker)Low Pressure Coolant In)ection Low Pressure Core Spray Mi llirem Multipurpose Fac111ty Main Steam (line)Hain Steam Line Isolation Valve Hain Steam Safety/Relief Valve Meteorology and Unified Dose Assessment Center Nuclear Regul atory Commi ss1on Nitrogen Nuclear Steam Supply Shutoff System Oxygen Offsite Agency Coordinat1on Center 011 Circu1t Breaker Out of Service Operations Support Center Protect1ve Action Decision Protective Action Gu1de Primary Access Point Protective Action Recommendation Post-Accident Sampling System Plant Emergency Director Patrol (Hanford)Emergency Operations Pressure Ind1cator Public Information Officer Pressure Switch Pounds Per Square Inch Public Ut111ty District Quadrant, evacuation Rad1o Amateur Civil Emergency Service Reactor Building Reactor Core Isolation Cooling Reactor Coolant Pressure Boundary Reactor Exhaust Atr Radiological Emergency Manager Reactor Feed Pump Residual Heat Removal Richland Operat1ons; Department of Energy Recovery Manager Reactor Outside Air Radiation Protection Manager Reactor Protection System RX Pressure Vessel Reactor Recirculating Air Rad Haste Building RX S SAS SC SDC SDV SECON SFP SGTS SLC SM SP SSDC SSW TDC TGB TK TR TSC USCG V VDC HC HEIC WNP-2 WO HSP HH Reactor Startup Secondary Alarm Station Suppression Chamber Security Decision Center Scram Discharge Volume Security Condition Spent Fuel Pit Standby Gas Treatment Standby Liquid Control Shift Manager Suppression Pool Supply System Decision Center Standby Service Water Technical Data Center Turbine Generator Building Tank Transformer Technical Support Center United States Coast Guard Valve Volts Direct Current Window Closed, Gamma, Radiation Detection Instrument Washington Emergency Information Center Washington Nuclear Pro)ect Number 2 Window Open, Beta and Gamma, Radiation Detection Instrument Washington State Patrol Wetwell I-E-3 INTENTIONALLY BLANK PART II SCENARIO zxzacxaz i eo CONTROLLED DISTRIBUTION A.Scenario Script B.Scenario Sign-Off C.Time-Line Summary D.Scenario Messages&Anticipated Responses E.General Data Sheets F.Critical Points II-A-1 II-B-1 II-C-1 II-D-1 II-E-1 II-F-1 CONTROLLED DISTRIBUTION INTENTIONALLY BLANK SECTION IIA SCENARIO SCRIPT EXERCISE'90 This Exercise scenario involves a nominal 1.8X fuel and clad damage caused by a control rod drop accident.The accident is described in chapter 15 of the Final Safety Analysis Report (FSAR).The scenario consists of several non-related events in order to sequentially drive the WNP-2 Operating Organization through ascending Emergency Action Levels (EAL's).The first event involves an emotional anti-nuclear demonstration outside the Protected Area fence, in the parking lot adjacent the Prima y Access Point (PAP).Ultimately, one of the demonstrators manages to gain access to the Plant Pr otected Area..An.ALERT classification is declared.After the Alert is declared, an electrical fire will occur in the TSC.The fire does not cause severe damage, but does force a TSC relocation.

Some time later, the control-rod-drop accident and fuel damage occur.A Main Steam Line (MSL)ruptures in the Turbine Building and the MSIV's on the"A" MSL fail to isolate.Steam escapes the tur bine building.The radioactive plume is driven towards zone 2, the farming area north of Pasco.An EAL of GENERAL EMERGENCY is declared based on an Exclusion Area Boundary (1.2 miles)projected thyroid dose in excess of 5 REM.-Evacuation of Zone 2 will commence and evacuation of the Edwin Markham Elementary School by bus will be demonstrated.

The following major aspects, or objectives, will be evaluated:

-Security Contingency

-TSC Relocation

-Offsite Release (State/County)

-Radiation Monitoring:

Collection/Analysis of Field Team Air Samples-School Evacuation (Bus Demonstration only)The scenario will open with the Plant in process of power ascension after having recently worked its way out of a Technical Specification Action Statement (TSAS)3.0.3 shutdown due to an Equipment (}ualification issue over electrical fusing.The fuses in question were proved to be qualified and the Plant restarted at 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> s.As we enter into the scenario, the plant is ascending through approximately 10%of rated thermal power (RTP)but with several other minor problems and/or short duration TSAS as listed below: 1)A minor steam leak on the high pressure throttle valve for the"A" Reactor Feed Water Drive Turbine, RFW-DT-IA.

2)The"C" Residual Heat Removal Pump, RHR-P-IC, is out of service for maintenance.

It will be returned to service by the mid-day meal break..3)The Electrical Department is finishing up on replacement of electric strip heaters on the"A" Standby Gas Tr eatment, SGT-FU-IA.

4)The Rod Worth Minimizer is inoperative.

In accordance with Technical Specifications, a second licensed.operator-is verifying<control rod movement.NOTE: This Scenario Script is not intended to be a Safeguards Document.In'order to preclude compromising Supply System Security Safeguar ds, many details regarding the Plant Security System and Security Organization responses are dealt with either lightly or not at all within this script.The first of the Exercise Scenario activities commence at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> the morning of Tuesday, September 11, 1990.An anti-nuclear-activist group,"Friends Of Bivalves" ("FOB"), has staged a protest in the upper parking lot o WNP-ocate on the east side of the plant.The protest is a'planned, legal'emonstration."FOB" applied for and received legal authorization from the County, after having located a'friendly'agistrate and r eceiving a court order from the magistrate forcing the county to issue the permit.They have established a rallying poi'nt in the open ar ea just to the north of the Visitor's Center.Attempts by Supply System management to obtain a restraining order preventing the demonstration on Supply System leased property have been of no avail, the property having been'freely open to the public'or over 20 years.The demonstrators are well-identified, wearing shirts with the"FOB" logo and, additionally, carrying signs and posters with various anti-nuclear slogans.They also have-a large, flatbed truck par ked at the site of their demonstration.

The truck has several signs on it but, more important to the Supply System management and to Supply System Security, has-a-reinforced-ramming device attached-to--the front-of the-truck.The truck is parked in such a manner as for it to be very easy for the"FOB" activists to attempt to ram the truck through gate Two-Five (25), the sliding gate on the Protected Ar ea (PA)fence immediately to the north of the Visitor's Center.As will be borne out by subsequent scenario development, the truck is nothing but a ploy upon which to focus the attention of the Plant Security Organization.

Refer to Situational Data Sheet 9a for additional description about the group, their signs and the truck with ramming device.Chanting and demonstrations in the part of the parking lot described above go on for some time.EXPECTED RESPONS The Plant Manager may or may not declare an EAL of UNUSUAL EVENT because of Situationally Based Initiating Conditions due to..."a securit condition that threatens the securit of the Plant an re uvres increase recautsonary measures to be im emente b-secure t.he dec aratson, or not, o t e Unusua vent wou d e a judgement call on the part of the Plant Manager.It is not relevant to this scenario and may be carried out as'free play'.

the RSCS is operating correctly up to the point that the operator selects the worst possible rods.The-RSCS-then-fails~-al-lowing-the-dri.ve to be fully withdrawn.

For the drive to be fully withdrawn from under such high worth rods, the-r od-block:function-of

-the-RSCS-would-have to'fail~Significant shifts in spatial power generation occur during the course of the excursion.

The positive reactivity added by the falling rods raises power to.several time rated power which scrams the plant.At-this-point~-the-energy-added-to-the-fuel:.heats:it=up-producing inegati ve-Doppl er-feedback, which reduces power:before rod:motion-begins.

gore succinctly, as is di scussed later, the fuel suf fers localized over-power

-and-over-heat-conditions before-the-reactor-has--a-chance to~automatica11y-shutdown".

NOTE: Refer to Situational Data Sheet 9x for a tabular ization or sequence of events listing dealing with this rod drop accident.c)ay t L/'esign criteria for GE Boiling Water Reactors (BWR's)is such that a rod drop will not produce a peak fuel enthalpy above 280 calories per gram.The 280 cal/gm level is the point at which fuel dispersal (shattering and blowup)and pressure rise rates of 30 psi/sec occur.Although these enthalpies are above the clad failure threshold of 170 cal/gm, less than one percent of the fuel would become hotter than 170 cal/gm.Based upon this,~an-assumed-fai-lure-of--770-fuel-rods-is-used-as-the-basis-for<radiological release in this=scenario.-

->NOTE: Refer to Situational Data Sheet 9z for a discussion on the unliklihood of this accident's occurrence during the life of the plant.The reactor protects itself as it scrams on high APRM flux (120K setpoint).

A subsequent increase in the Main Steam Line (MSL)Radmonitors and the In-Containment LOCA monitors (due to shine off the RRC loops), indicative of fuel failur e will soon follow.NOTE: Fuel failure will occur from initial onset of cladding damage, until the Reactor Coolant inventory.source term maximizes at slightly more than 2.2 E+3 uCi/cc.EXPECTED RESPONSE Upon the automatic scram, the CRO will verify scram and will insert a redundant manual scram per PPM 3.3.1.He will:-Move the Mode Switch to S/D-Depress the 4 scram pushbuttons

-Verify all APRM's downscale, and-Verify all Control Rods full in.Recognition on the part of the Operating Crew of rod drop should occur as they see the high flux scram and subsequent radmonitor increases.

Thi s should lead them to conclude that potential fuel damage has occurred.The damage will not be such that the NSL Radiation Monitors cause the Main Steam Isolation Valves (NSIV)to isolate immediately, although the Radmonitor s will be quickly moving upscale.The Steam Jet Air-Ejector radmonitor, OG-RE-2, high:radiation-alarm-wil.l come in.and.the Control Room-Operator

-(CRO):will respond to the alarm and reference PPM ANN P602.A5-4.3.

Shortly:thereafter, a:Main-Steam:Line:Rad

-.High.-Alarm:will.annunciate.>

The CRO will respond to the alarm, reference PPM ANN P602.A5-1.3 and inform the CRS.He will monitor the MSL Radmonitors to verify increases.

NOTE: Only NS-RIS-610 A 8 C are modeled in the simulator...the"B" X D" instruments must be covered by accessing the TDAS.The Shift Manager/Control Room Supervisor:

may direct-a manual isolation of the NSIV's upon recognition of the rapidly upscale trend of the NSL radmonitors.

It is irrelevant whether or not he takes a'nticipatory action as at 0958 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.64519e-4 months <br />, only thr ee minutes after the automatic scram, the MSL radmonitor setpoints will be reached and will actuate the=.1:=out of=2=taken=twice MSIV-isolation logic'.Due to multiple high radiation monitor alarms, the Shift Manager may declare an Unusual Event (UE)classification per PPM 13.1.1, Attachment"A",8~g A i I 1 d ling it di Hi-alarms.

This states in part that"An area radiation Hi-alarm and an actual increasin or sustained Hi-a arm va ue con irmed b direct measurement exce t or transient con itions consistent with ex ecte ant o erations...

s a be an nusua vent.t is oubt ul that this noti ication or classification will occur, however, as subsequent events will overshadow this EAL.In addition, the plant should still be in ALERT status from the earlier security event.SCENARIO CONTINUED Regardless of whether or not the crew attempts to isolate the MSIV's immediately post-scram, as stated above at 0958 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.64519e-4 months <br /> the isolation setpoint for the NSL Radmonitors will be reached and auto MSIV isolation will occur.A11-MSIV's will successfully isolate except-for-the Inboard and-Outboard--valves--on--the

-"A'-'SL, MS-V-22A and MS-V-28A.The Inboard valve will fail=to-.close:at:all (the red indicating light on P-602 will remain on and the green light off).The Outboard valve will show itself as partially closed~(both-.red:and:green:lights:on:-P=602:-illuminated).

EXPECTED RESPONSE Based upon the failure of the MSL to isolate, it is not anticipated the crew will attempt to, at this time, go to'emergency depressurization, nor to HPCS or RCIC.The operating crew will commence a controlled pressure reduction using the DEH Controller in conjunction with the Main Steam Bypass Valves to the Main Condenser.

Normal feed will be maintained from the Condensate.

and Feed Water systems.The Shift Manager will commence to Cdeclare-an EAL of ALERT.based on the

-All Supply System Emergency Centers, with the exce tion of the,~JIC, will be allowed to'stand down'uring t is period and the Simulator may be placed on'freeze'.'

'Additionally

-, the-OSC will:b'e-required-to-maintain-personnel'ccountability staff in place during the evacuation.

Lastly, each center will be requir ed to maintain at least one player and one Controller in place, however, to provide'control cell'ommunications functions, if needed, with offsite agencies.Refer to Situational Data Sheet 9d for more details on this recess.Transportation will be provided by Exercise Controller Management.

If the TSC Director does not take action to evacuate 8/or relocate the Technical Support Center by 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />, then the TSC Lead Controller is to give him a default evacuation message in accordance with message number 3.Thei-e-is-a step:in:PPM:13.-10.3=requiring:-the:TSC=Director:to:request the-Control:Room to--isolate

-between-TSC and:Control:Room=HVAC if airborne activity problems are identified in the TSC.~Although-the PPM-does:not:specifical-ly-require this step to be implemented-for-fires, the TSC-Director=wi-1:1=probably request-the Control Room staff to isolate the TSC-HVAC-from-the-Control=Room-as-a-precautionary.-move;-'he details for this ar e located in PPM 4.10.3.1, Abnormal Response Procedure for Control Room HVAC High Radiation or Chlorine Induction.

The PED will declare an EAL of UNUSUAL EVENT, although this will be'redundant's the Plant should still be continuing in an ALERT EAL due to the potential for an ongoing security compromise.

IF:the-TSC

-Director-decides to relocate non=key TSC:staff:to-the-Plant Wupport-Facility-(eg

--to-the-Technical Decision Center-[TDC])

-,then-it iwill be-h>s responsibility=to-obtain-transportation and to transpor't those-personnel-in-real-time--rather-than-during--the

--30-Minute Recess-".At the time of the fire, the on-duty Shift Support Supervisor (SSS)and Equipment Operators (EO),should-be

-in-the-OSC

-in-accordance with-PPM~13-.10;9,.

OSC Operations and Director Duties.The SSS and EO's', in their role as Plant Fire Brigade will be dispatched to the TSC.The Fire Brigade, upon arrival, will find that the fir e has expended'itself.

Any subsequent investigation by them will show damage was limited to the electrical panels earlier refer ed to.There will be little, if anything, for the Fire Brigade to perform.Refer to Situational Data Sheet 9e for Fire Brigade damage findings.It is expected that:the-Hanford-Fire-Department-wi-1-1-be contacted by the Shift:Manager/Control:Room:Supervisor upon:automatic

-fire-alarm actuation andlor-recognition:of:the:firew There is a possibility, depending upon interplay between the TSC and=the-CR=(Sim) that the call may not be placed.If the call is placed, HFD will respond automatically.

Actual response ty by HFD will be simulated (HFD will not participate).

CA=Control-Ce11'ill:provide verbal:response to the cal.l from:the Control-Room.

Refer to Situational Data Sheet 9f for this contingent response.'As the OSC is already manned,as-previously:stated,-a:call:should.go:out~from the-TSC/CR-(after r elocation)--for-the-OSC:-to-form up a Reeiitry Team to--evaluate--and-:-repair:-the

-damage--to-the---electrical:

-gear in--the-TSC..Refer to Situational Data Sheet 9 g for OSC Reentry Team details.NOTE: The decision made and subsequent steps tak6n to evacuate the TSC should-occur between 0920 and.0930.hours.In accordance with the'30 Minute Recess'ote on the previous page, the Time-Line for the Exercise will now (for descriptive purposes)jump to 0955 hours0.0111 days <br />0.265 hours <br />0.00158 weeks <br />3.633775e-4 months <br /> in this scenario script.SCENARIO CONTINUED Earlier, at approximately 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, the Plant Manager will have.been contacted=by=-the-Head:of-BPA-'and notified that.BPA must take most of its generating:capaci-ty at-the--Grand-Coulee-off-line--by-1600-hours in order to perform emergency washdown of the high voltage line insulators at the dam.They had been, a few days prior, subjected to a heavy coating of dirt in a dust storm.Long Range weather pr edictions are for severe rainstorms in the area of the dam and BPA is concerned that wetting of the dirt on the insulators will provide a ground path with subsequent damage to the transmission system and/or generators at the dam.The BPA head will recognize that the WNP-2 Plant is in-process of recovering from the TSAS 3.0.3 shutdown, but=wil=l=--insist=-that-the-WNP=2:-Plant Manager--ascend.--..in=power

=wi-th::-'-'all-haste".This=message-:wi-l-l-:be'elivered by a Control-Cell.Refer to Message Data Sheet 2 for details on this message.By 0955 hours0.0111 days <br />0.265 hours <br />0.00158 weeks <br />3.633775e-4 months <br />, the Plant will be at approximately 175 power and increasing.

The operating staff on duty in the Control Room will be in process of withdr awing rods.A Control Rod Dro Accident occurs.The control rod drop accident is the resu t o an event sn which a high.worth-control-rod---is--inserted-out=of=:sequence into.the--core.

Siibsequently, it.becomes.decoupled from its drive-mechanism, The mechanism is withdr awn, but the decoupled control rod remains stuck in place within the core.In the case we will use in this Scenario,~two'ontrol-rods-become-decoupled-and.-subsequently drop.It is necessary to"do this-in-order to effect a clad damage of-1.8X.At the optimum moment, 0955-hours, the.first control-rod suddenly falls free-and-drops out of the core.The blade falls at 3.11 ft/sec which is the measured speed with the velocity limiter.in place as opposed to a coupled withdraw speed of 3 in/sec.The-resultant-removal--of--large--negative reactivi-ty

-from:the-core-causes--a--locali-zed::-power

-excursion.

The excursion dislodges the second rod, causing yet another.power.excursion.

Due to the rapidity with which this occurs, the double excursion will appear as i,f it is one.Shutdown mechanisms operate and the plant is<scrammed.

The.initial-rod:pattern-assumes=-a--single operator--error=and<

Rod-Sequence--Control--System-(RSCS)-malfunction-which: al-lows the wor st~possible:rods to be fully-withdrawn

~This is equivalent to postulating SCENARIO CONTINUED At 0827 hours0.00957 days <br />0.23 hours <br />0.00137 weeks <br />3.146735e-4 months <br /> a group of three"FOB" activists, not previously at the demonstration, approach the parking lot from the Power Plant Loop Road.They cross the RxR crossing by the Water Filtration Building.They ar e driving a pickup truck with a ladder in the back.They waste no time crossing the tracks and drive towards the Primary Access Point (Guardhouse).

Just prior to r caching the Guardhouse, they stop their truck by gate Two-Nine (29).They lean the ladder against the Protected Area Fence near gate 29.One of their number climbs the ladder, crosses-the-fence-and-gains:access:to:-the-Protected:Area.

Actual ladder movement and climbing activities will be simulated.

The intrusion will be immediately detected by the Central Alarm Station (A Controller will provide input to'the CAS regar ding the alarm)and Security Force personnel will respond.It is, additionally, possible that the entry will be visually observed either by Security personnel or by Plant workers (If Controllers observe any personnel in the area during the simulated fence climbing, they will tell the personnel what they are'seeing')...free play in this will be allowed.Security Force responders, upon receiving direction from the CAS, will:find:the.

intruder-marching-around:inside=the:PA:carrying:a:si.gn:wi h:an>.anti=nucTear

-slogan~A pre-positioned Role-Player will actually be performing.these activities.

The intruder will not have caused any damage to Plant property.The intruder will freely state that his intent in entering the Protected Area is to"cause as much damage as possible." Refer to Situational Data Sheet 9b for more details on this activity.EXPECTED RESPONSE The Secur ity Force will immediately detain the intruder.Security will notify the Plant Manager and/or the Shift Manager of the intrusion and subsequent detention of the"FOB" person.The Plant Manager/Shift Manager upon reference to Plant Procedure PPN-13-.1-.1-,Classifying-the Esmrgency.-will:declare-an-EAL-of-ALERT-because-of-Situationally-Based fIni-tiating

-Condi-tions due-to"On oin.Security Com romise-re uirin additional

-su ort.-..Visual

-observation o uni enti-ied.unauthorize ersons in a vi.ta-or r otecte area wi-t-an-)ntent-to-commi-t-sabota e.SCENARIO CONTINUED In accordance with Emergency Plan Implementing Procedur es (commonly referred to as EPIP's or Volume 13 PPM's), upon declaration of an ALERT, all Plant Emergency Centers activate, including the Technical Support Center.The TSC will be allowed to activate normally in accordance with PPM 13.10.3,"TSC Operations and TSC Director Duties".Assuming that the ALERT is declared by no later than 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, the TSC should be in at least a par tial state of activation by 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />.Based-upon-this

-, at-0910-hours:an:electrical:fire:wil-1

-occur-in-the-TSC-~The-fire-will involve TSC:1;ighting and:electrical

-outlets.

.Speci fi cally---the-fire-will-af feet the fol 1 owing-el ectri cal-gear: o MC-7AB-located:in the Mechanical:Equipment:Room.=on=the=north'all, and (indirectl

)o TR=TSC-2-located--in-the.

Auxil.iaries Room:on-the-south-wal-l.

The transformer, which supplies power to the RamTek and other computers and monitors in the TSC, will fail concurrently with the fire in MC-7AB.This transformer tends to run hot during normal operation and it would not be considered unlikely to have it fail during a fire affecting adjacent cir cuits.The:transformer

--is-fed:directly:by:SL=71.

A few minutes prior to the fire and transformer failure, at 0908 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.45494e-4 months <br />, the:CR>will receive-a:ground-indication-from SL=71~When the fire occurs,.the Mechanical HVAC room at the south end of the TSC will fil'1 with smoke, with a small amount of smoke entering into the TSC itself as the Motor Control Center burns.More-importantly

-al-1 normal-1 ghting:and:110-VAC wall:outlet=power-will

-.be-.lost:in:the-.TSCm as:-well as:in the.adjacent-Alternate-Health

-Physics--Access

-Control.Ni-Cad battery backed emergency lighting will prevent the TSC from becoming totally plunged into darkness.The sole direct indication in the CR (Sim)will be a fire alarm received on FCP-l, drop 5-5 indicating a fire in the TSC.'When wall outlet power is lost, all computer monitor screens in the TSC will go dark.The monitors themselves will still be functional, as well as the computer main frames, but the TSC staff will be unable to use the monitors with the screens darkened.Additionally-all speaker phones, the-fax--machine

-and-the-two-way-radio in the TSC:--wi-l-l::become non-functional upon loss of wall outlet power.Refer to Situational

<Data-Sheet gc:for-more-details.

EXPECTED RESPONSE Due to the fire and subsequent loss of lighting, computer monitoring and communications in the TSC, it would be obvious that the TSC would be severely degas aded in its capability to support any plant emergency activity.The TSC Director will evacuate the TSC in accordance with PPM 13.10.3, TSC Operations.and Director Duties.;Key Technical-Staff:wi.ll='e evacuated--to-the-Control-Room and less-critical:personnel:-:to either='he-OSC or to the Plant-Support-Faci-lity-as-decided-by-the-TSC-Director; NOTE: As this is an Exercise, instead of a real event, the Operator Training Simulator is taking the place of the Control Room.The Simulator is physical-ly':-located:in-the.Plant Support:-Faci-1-i-ty-(PSF) building approximately k mile to the west of the Plant Protected Area.The key TSC staff will be evacuated to the Simulator at the PSF.In a real event, evacuation from the TSC to the Control Room wou d take appr oximately 3 minutes.,Due to the.distance involved and the complexity-in-moving-personnel-out-of-the-,TSC--out through the PAP on the east side of the Plant to the parking lot and then providing transportation to the PSF, a 30 minute recess from the Exercise will take lace at this oint in time.

elevations.

At the same time, the Fire protection pumps in the Circulating Water Pumphouse begin to sequence on.For the sake of Drill simplicity, the different Wet Pipe, Deluge and Preaction Systems as well as the Fire pumps initiate in two (2)separate groupings a few minutes apart.The sequence is listed below as alarms r eceived on the Fire Control Panels in the Control Room: FIRST SEQUENCE ("A" 8"C" On FCP-1 B dg, El.501, Col A-0&6-13, 0-5&7-13 On FCP-2-Preset>on System 67, TG Bldg El.501, TG Bearings On FCP-3~P-P-A Pump Running-FP-P-2B.Pump Running SECOND SEQUENCE ("B")On FCP"I-TC BBBg, El.471, Col A-H 8 6-13, E-H 5 4-6 On FCP-2~ge uge Spray Sys 56, TG Bldg El.471, Col 6-13&A-C-Wet Pipe Sys 8, TG Bldg El.471, Heater Area On FCP-3~tan ard Alarm Fire Cont Sys Trouble-Functional Alarm Fire Cont Sys Trouble NOTE: Refer to Situational Data Sheet 9h for limite, partial outlines of the Control Room Fire Contr 1 Alarm Panels showing which alarms activate.o TURBINE BUILDING LIGHTING is affected by the dense steam cloud.Most o the l)ghtzng astened to the 572'levation roof of the TG Building at the East end, illuminating the 501'levation, is extinguished.

The 572'levation lighting at the west end of the buiding is unaffected.

The 501'levation at the east end becomes quite dim.Lighting on the 471'levation at the East end of the TG Building is extinguished in the Heater Bay.Most lighting elsewhere within the TG Building is intact.The Turbine Building rapidly fills with a volume of steam.A"Mixing Volume" of 3.58 E+6 cubic feet is assumed for the TG Building.Initial steam flow into the TG Building for the first minute after the Main Steam Line rupture is 1.79 E+5 lb-m/hr, or 3,000 lb-m/min.One pound of steam at atmospheric pressure occupies a volume of 26.799 cubic feet.(3,000-)(26.799)b-)=50,397 cu ft/min stm flow into TG Bldg.Assuming an exhaust fl ow of 265,000 CFM from the Turbine Building Exhaust Duct, it is obvious the building would never'fill-up'ith steam.The above mathematical

'Model's somewhat loosely depicted as it does not allow for initial condensation of the escaping steam onto cooler Turbine Building and machinery surfaces, nor does it integrate II"A-11 the rapid drop in steam flow over.the next few minutes..Now, returning to the main storyline:

A substantial offsite dose is released almost immediately (The total steam transport time from the broken NSL to the TG Bldg Exhaust Plenum is estimated to bq 30 seconds).The wind is blowing steadily from the northwest at 3 NPH, with a Stability Class of"E".The Turbine Building Exhaust Radmonitors, TEA-RIS-13/13A will come upscale.The intermediate range monitor, TEA-RIS-13A, after a brief surge in excess of 25 PMU's will ultimately peak out at approximately 18 PNU's.EXPECTED RESPONS As the above radiation monitors go into an alarm state, the Shift Technical Advisor.(STA)should begin performing calculations on the EMERGENCY Dose Projection System (EDPS).NOTE: There are several possible potential responses at this point...The NUDAC should still be activated from the earlier Security incident, but may have been told to'stand down'.IF the MUDAC is still activated, they may or may not have control o7 the EDPS switched to NUDAC.If EDPS is in MUDAC control, it is likely the STA may have to perform his calculations using the'Predict'ethod vice actual data method.If NUDAC is fortunate enough to be monitoring Plant data at the precise moment of the nelease, they may cogence calculations and arrive at results prior to the STA doing so.In short, all radiation data controllers/evaluators should be prepared for.multiple activity paths during this iteration.

The results from EDPS should be available within 20 minutes (Say by 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br />)if using the main EDPS.If using the Backup EDPS/TRS-80 computer, then the results should be available within 5-7 minutes (Say by 1017 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.869685e-4 months <br />).Based upon EDPS results, the STA should recommend to the PED that an ECL of GENERAL EMERGENCY be declared due to an estimated dose of GT 5 rem to the thyroid at the Exclusion Area Boundary (1.2 miles).(Actual estimated thyroid dose will be in excess of 19 Rem at the Exclusion Area Boundany.Estimated Whole Body Dose will be 0.067 Rem.)The STA will arrive at this calculational estimate by using the intermediate range monitor for the Turbine Generator Building Exhaust (TEA-RIS-13A).

It will be reading in the order.of 16k PNU's for the first fifteen or so minutes after the rupture.Refer to General Data Sheets in Tab 3 for.details on radiation monitors.The SM/PED will declare an EAL of GENERAL EMERGENCY per PPN 13.1.1 in accordance with the criteria in Attachment"A" of the PPM regarding Exclusion Area Boundary dose rates and will commence making the required notifications per PPN 13.4.1 within 15 minutes of classification.

The SM/CRS will contact the Shift Support Supervisor, (SSS)to inform him of the indications of failed fuel, TGB radiation alar ms and TGB fire alarms.The SSS will be requested/directed to obtain HP assistance and to investigate the situation in the Turbine Building.Once the MSL rupture occurs, condenser vacuum (and thus, the heat sink)will quickly be lost.Consequently, the SM/CRS will direct the Operating Crew to coomence emergency depressur ization in accordance with PPM volume 5 Emergency Operating Procedures.

The SM/PED will direct all unnecessary personnel to leave the TGB and an immediate or controlled evacuation of the protected area per PPM 13.5.1 or PPM 13.5.2.NOTE: Actual evacuations will be simulated.

There is no objective nor requirement to perform real evacuations in this exercise.The SM/CRS should notify HP regarding fuel failure and increasing Turbine Building ARM and TGB Exhaust Vent Radiation readings.The SM/CRS should request HP survey the TGB and request grab samples of the TGB exhaust.Additionally, the SM/CRS should contact Plant Chemistry to request they sample reactor coolant, along with gaseous grab samples including charcoal and particulate samples for offsite dose calculation input.As the TSC staff becomes cognizant of the overall problems at hand, it will occur to them that PASS samples should be taken.Not only should a reactor coolant PASS sample be taken, but also, a containment air PASS sample.They will request this of the OSC.The Chemistry Reentry Team, described above, will divert from taking normal samples per their volume, 12 procedures to taking PASS samples in support of PPM 9.3.22,'valuating Core Damage.The containment air sample will show no',~increase in air activity.The reactor coolant sample will show an>approximate 1.8X clad damage as was discussed ear lier.NOTE: PASS sampling is not an objective in this Exercise and will~e simulated.

i.e.-Results will be given to the Chemistry Reentry Team after they have formed up, simulated taking and analyzing a PASS sample.Results data is not a part of this scenario package and will be developed separately prior to the date of the Exercise.The TSC will be expected to direct the OSC to form a Reentry Team to take action to stop the uncontrolled steam leak.Although the TSC could be expected to direct, the OSC to per form this as early as 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br />, It would not be reasonable to expect a Reentry Team to perform any meaningful work in the steam tunnel until about 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> due to radiation doses.Refer to General Data Sheet 4m, Steam Tunnel Radiation Data, for details about radiation levels there.The following actions might be expected to be performed by the Control Room and/or the OSC in an attempt to close the MSIV's: o Manually close the valves from the Remote Manual Switches (RMS)on P-602.o Isolate and bleed off the air supply to the outboard MSIV, MS-V-28A.

o Isolate and bleed off the nitrogen supply to the inboard MSIV, MS-V-22A.o Deenergize the electrical supply to the solenoid valves associated with the air/nitrogen supplies to each MSIV.o Form a Reentry Team to make a Mais Steam Tunnel entry to attempt to determine the reason why, at least, the Outboar d valve will not close.C'Form a Reentry Team to jack-closed the outboard MSIV using a strongback arrangement in conjunction with hydraulic'Power-Paks'.

Only the last activi ty jacking the stuck valve closed will be effective in isolating the Main Steam line and thus terminating the leak.Major onsite objectives should be complete by about 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, allowing termination of onsite play., Should the OSC not be effective in closing the.MSIV, it will be'Defaulted'losed at 1400 hour0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> s to force culmination of Exercise activities within the Plant.Offsite play will continue until approximately 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> as is discussed below.SCENARIO CONTINUED As earlier stated, the Wind will be blowing from the northwest at 300 degrees at a speed of 3 miles per hour and a stability class of"E".The plume will be blown across the Columbia River into Franklin County.No population will be exposed to the plume until it does cross into Franklin County.The nearest population, across the river on a compass heading of 120 degrees (the plume travel), is approximately 4k miles from WNP-2.The plume will continue on towards and past Edwin Markham Elementary School, located at the intersection of Taylor Flats and Elm Roads, about 6.3 miles from the plume release point.The estimated Thyroid Dose Rate for the plume will drop off relatively rapidly as reactor pressure drops, thus removing driving force for the steam leak.A brief tabularization of times vs estimated Thyr oid Dose , as well as Whole Body Dose, at the 1.2 Mile Site Boundary is provided below.Refer to General Data Sheets in tabs 5&7 for details.1.2 MILE SITE BOUNDARY DOSES TIME TOD:~025 hrs 1026-1040 hrs 1041-1055 hrs 1056-1110 hrs 1111-1140 hrs 1141-1210 hr s 1211-1310 hrs EST.THYROID DOSE em 5.0 Rem 2.3 Rem 1.1 Rem 0.7 Rem 0.1 Rem 0.03 Rem WHOLE BODY DOSE 0.019 Rem 0.007 Rem 0.004 Rem 0.002 Rem 0.0003 Rem 0 Rem The sum, or total dose at the 1.2 mile boundary will be in the order of 19.2 Rem (estimated)

Thyroid and 67 mR Whole Body for the duration of the Exercise accident.Co-incidentally, the total doses at the 5 mile boundary will be in the order of 8.4 Rem (estimated)

Thyroid and 33 mR J symptomatic initiating condition of, in accordance with attachment"B" of PPM 13.1.1 that states in part that an ALERT shall be declared for"...MSIV closur e lo ic met, but both inboard and outboard valves on one or more ines ai to c ose.SCENARIO CONTINUED Once the controlled depressurization via the MS Bypass is begun, another casualty will be placed in front of the crew.At 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> the"A" MSL will suffer a massive rupture underneath the High Pressure Turbine on the 471'levation.

The Control Room cr ew will recognize potential problems as the Reactor level surges upscale high.If the scram has not , been reset, they will get another, immediate, scram based on reactor high water level.Additionally, the steam flow thru the stuck open MSIV's will show high flow, in excess of 75$of rated.Lastly, the Turbine Bldg ARM's start to ramp up as steam begins to fill the Turbine Building.Operation's recognition of the problem will be reinforced by almost immediate Fire Protection alarms in the Turbine Building.NOTE: None of the Turbine Generator Building ARM's are displayed on the Gr aphic Display System (GDS).TGB ARM readings are available~onl in the Control Room (Simulator) to Control Room (Simulator) personnel.

    • ~***~**********************~****~*******************************~

At this time, we will temporarily depart from the scenario story line in order to discuss the bases of the effects of a large (Main Steam Line)steam leak into the Turbine Building: Results from MSL"A" rupturing and allowing Reactor steam to vent into the Turbine Bldg are twofold;The moisture and thermal content of the steam provide one set of conditions, while the source term provides another set of conditions.

Again, as earlier stated, the Reactor has experienced an approximate 1.8X Cladding failure.As primary steam escapes into the Turbine building, the following radiation monitors begin to respond o ARM-14 located on the 501'levation of the TG Bldg will immediately go off scale.o ARM-15 located in the SE 441'l.of the TG Bldg ARM-16 located in the"A" RFW pump room, ARM-17 located in the"B" RFW pump room, and ARM-18 located in the Cond.pump area, 441'l.will all begin to come upscale.NOTE: Refer to the Data sheets 3a 8 3b,"Fixed Radiation Monitor Tntroduction" and""Fixed Monitor Readin s-A arm i Start Sto T II P g these ARM's and other r admonitors.

o TEA-RIS-13, Turbine Bldg.Noble gas Effluent Monitor and T-~bi 1d i R g g TEA-RIS-13, a beta scintillator in a gas chamber located in sample r ack 38 analyzes the normal Turbine Bldg gaseous effluents.

A sample of the release duct is taken in an isokinetic condition.

Thy3)og scale on the front of the RIS unit is the RIS response to Xe relating CPM to uCi/cc in the stream.The sensitivity of the unit is 4.7 E+7 CPM/uCi/cc.

The RIS will immediately., upon sensing the noble gases contained in the escaping steam, will increase above the Hi-Hi Alarm setpoint of 3460 CPN.The Low Range Monitor will continue to monitor the Turbine Building air and will go off scale at 10E7 cpm.The Intermediate Range monitor, TEA-RIS-13A, operating in series with RIS-13, monitors the waste stream when RIS-13 goes off scale.The Hi-Hi alarm illuminates two red lights on the RIS readout on RAD BD 24 and initiates a"TURB BLDG EXH DUCT HI RAD" alarm on P602.TEA-RIS-13A, like RIS-13, is a Beta scinti 1 1 ator housed in a shielded gas chamber.The recorder, REA-RR-19A', records not only the TG building effluent, but also the effluent for the Reactor building and Radwaste building intermediate detectors.

NOTE: TEA-RIS-13A DOES NOT ALARM (has no alarm 1 i).lM i~g RIE p id indication onl...Refer to the Master Data Sheet on A-R-1 A.Additionally TEA-RIS-13 DOES NOT ISOLATE on a HI-HI RAD alarm.The intermediate range monitor will be reading 1.3 Panel Meter Units (PMU)until the MSL ruptures, due to a light emitting diode designed to keep it onscale.a minute after MSL rupture it will go upscale in excess of 25 PMU's and will then trend downwards over the next lk hours as steam pr essur e in the Reactor decreases leak dr iving force.o TRA-RE-I, the Turbine Bldg In-Plant Air Particulate Radiation Monster zs a Beta scintillator located in the Turbine Bldg.ventilation exhaust just before the ventilation exhaust plenum.The recorder for this RE is located on RAD BD 24 and has a full scale of 100,000 CPM.The RE will ramp upscale approximately 2 minutes after the NSL ruptur es and will remain upscale for about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or until the Drill Players manage to isolate the uncontrolled steam path, whichever comes first.The alarm from TRA-RE-1 will be redundant to other alarms emanating earlier from RAD BD 24.Returning to the discussion on results of Reactor steam leaking into the Turbine Bldg, the following equipment is affected by the thermal and moisture content of the steam cloud: o FIRE PROTECTION SYSTEMS in the Turbine Bldg begin to sequent>a y actuate, begsnnsng with those systems closest to the steam line rupture and on the higher elevations and ending with those systems further away from the leak or on the lower Whole Body.As can be seen from the preceeding, little meaningful exposure will be released from the plant after 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.Past noon, the release rate from the TG Building H8V Exhaust vent will, effectively,'flat-line't about 4 Curies/hour of iodine and 34 Curies/hour noble gases.Due to the low wind speed, and subsequent lag time for doses to reach populous ar eas, field team and off-site agency play will continue on into the mid-afternoon.

EXPECTED RESPONSE Centers in the Emergency Offsite Facility (EOF)will already be in an activated status from the first declaration of ALERT due to the Plant Security compromise.

The Meteorological Unified Dose Assessment Center (MUDAC)will be perfor ming dose estimates in parallel with the Shift Technical Advisor.Upon realization on the part of the MUDAC of the severity of the release, they will immediately dispatch field sampling teams to track the plume and to verify dose rate estimates.

The joint Benton-Franklin County DEM's will commence PAD's.A School Bus will be dispatched to Edwin Markham School to demonstrate the capability to evacuate that school.Evacuation of the school will be simulated rather than actually occurring.

Offsite objectives should be complete and play should be terminated by 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.Upon demonstration of or actual completion of major Exercise objectives, the Exercise will be terminated.

      • E N D***II-A-15 INTENTIONALLY BLANK SCENARIO SIGN OFF EXERCISE 1990.The scenario for this exercise is approved for conduct as written and scheduled.

HNP-2 Plant Manager Date Assistant Managing Director for Operations Date Manager, Support Services Date Assistant Director of Community Development, Department of Emergency Management.

State of Hashington Date Director, Benton County Emergency Management Date Director, Franklin County Department of Emergency Management Date Manager, Richland Operations Off i ce U.S.Department of Energy Date INTENTIONALLY BLANK SECTION IIC TINE-LINE

SUMMARY

EXERCISE'0 TIME ACTIVITY DESCRIPTION 0700-Start of Data Generation.

0730 0800 0815-Drill Start Announcement.

-Plant is at 105 power and is ascending after exiting TSAS 3.0.3 on fuses.-Friends Of Bivalves anti-nuclear group stages a legal demonstration in front of the Plant.-Plant Manager may, possibly, declare an EAL of Unusual Event due to the"FOB" demonstration.

0827 0830 0840-Three"FOB" activists approach plant in a pickup truck.-With assistance from his cohorts, one of the three activists gains access to the Protected Area by climbing the security fence.-The head of BPA calls the Plant Manager to inform him of pending shutdown of the Grand Coulee for emergency preventive maintenance.

BPA will insist that the Supply System bring WNP-2 to full power as quickly as possible.-Security Force detains the trespasser.

-The detained activist spouts anti-nuclear, propaganda to Security and vows to cause as much damage as possible via acts of trespass.-Security Force Lieutenant notifies Plant Manager of the trespass.-Plant Manager declares an EAL of ALERT because of the security compromise caused by the trespassing activist.0850 0855 0910-Emergency Center activation commences as responding personnel arrive.-DEFAULT MESSAGE to declare an ALERT due to the Security incident if Plant fails to do so earlier.-Electrical fire occur s in the electrical 8 HVAC Apparatus room at south end of Technical Support Center.-All 110 VAC power to the TSC is lost with subsequent loss of lighting, computer monitors, fax, two-way radio, etc.

0910 (cont'd)0920-Plant Fire Brigade notified to respond.-Hanford Fire Department notification made.-Fire Brigade should have arrived on scene.They will find substantial damage to lighting panels, but will find no active fire.-TSC Director should make the decision to relocate TSC staff.0940-DEFAULT MESSAGE to relocate the TSC if TSC Director fails to do so earlier.A 30 MINUTE RECESS MILL OCCUR MHILE KEY TSC STAFF ARE A D pQb 0955 0958 1000 1010 1012-The plant is at, nominally, 17K power and control rods are being pulled to increase power level.-A Control Rod Drop Accident occurs.-The plant automatically scrams on 120K APRN hi-flux.-The Operating Crew in the Control Room (Simulator) implements Reactor Scram and Scram Recovery procedures.

-MSL, in-containment LOCA and SJAE radmonitors subsequently commence a rise, indicative of potential fuel damage.-The SN/CRS may decide to isolate the MSIV's in anticipation of the upward MSL radmonitor trend.-The SN may decide to declare an EAL of Unusual Event due to radiation monitors alarming.-MSL Radmonitors, MS-RIS-610A thru D, high setpoint logic for MSIV isolation is satisfied.

-The Inboard/Outboard MSIV's on the"A" NSL, MS-V-22A 5 28A, do not fully isolate.-The SM will declare an EAL of ALERT due to failure of the"A" NSL NSIV's to close.-The SM/CRS will direct a controlled depressurization of the r eactor via the MS bypass valves.-The"A" MSL ruptures in the Turbine Building on the 471'levation under the HP Turbine.-Turbine Building ARM's and Building H8V Exhaust Vent radmonitor alarm.-Turbine Building Fire Protection alar ms and deluge systems actuate due to the heat from the steam cloud.-The SN/Operating Crew evaluate control room (simulator) data and: 1)The STA will commence EDPS calculations and, 2)The SM/CRS will notify HP regar ding fuel failure, TG radmonitor readings and will request HP survey of the TGB and TGB H8V Exhaust grab samples.

1012 (cont'd)1020 1017-1030 3)The SM/CRS will contact Chemistry requesting reactor coolant and gaseous grab samples.-TSC, upon evaluation, will request PASS samples.be taken by the OSC (PASS sampling is not an Exercise Objective).

-The STA (or, MUDAC)will report the results of EDPS calculations to the SM/PED and will recommend an EAL of General Emergency be declared based on an estimated dose rate in excess of 5 Rem to the Thyroid at the 1.2 mile Exclusion Area Boundary.-The PED will declare an EAL of GENERAL EMERGENCY.

1030 1040 1045 1115 1120-TSC will direct OSC to form up a Reentry Team to attempt MSIV closure.-The leading edge of the radioactive plume escaping from the TG Building crosses over the 1.2 mile Exclusion Area Boundary.County DEM's should be activated and commence making public announcements and PAD's.-DEFAULT MESSAGE to declare a GENERAL EMERGENCY if the PED fails to do so earlier.-A Chemistry Reentry Team will commence PASS sampling Reactor coolant and containment atmosphere.

-OSC will commence locating tools and drawings to attempt to close the outboard MSIY.-A Maintenance Reentry Team will muster at the entrance to the steam tunnel to attempt MSIY entry.-A school bus should be dispatched (to demonstrate the capability) to evacuate Edwin Markham Elementary School.1150 1215 1400-The leading edge of the radioactive plume crosses over the 5 mile EPZ boundary.-The leading edge of the radioactive plume arrives at Edwin Markham Elementary School.-Default message to close the MSIV's if the Reentry Team has not been effective.

1430 1600 1630-In-Plant Exercise activities terminated.

Players to fill out After-Action Reports.-Ex-Plant Exercise activities terminated.

-Exercise Terminated.

INENTIONALLY BLANK SECTION IIE MESSAGE INDEX EXERCISE e90 MESSAGE NUMBER ITEM Exercise Start Announcement Mead of BPA to Plant Manager DEFAULT to declare an ALERT because~o the Security Incident DEFAULT to relocate the.TSC due to the fir e DEFAULT to declare a GENERAL 7%~RG NCY due to high offsite radiological releases DEFAULT on MSIV's drifting closed Exercise Termination INTENTIONALLY BLANK INTENTIONALLY BLANK ORAL NO WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION SCENARIO MESSAGES M~AQK NOo EXERCISE'0 TIMCs REAL Qasc pQ ORILL OP HouRs CONTROLLER LOCATION Simulator CON RO ROA ZAT ON MEssAGE FQR Control Room Super vi sor MEssAGE FRoM Lead Simulator Control 1er MESSAGE: The Exercise start conditions are as per the General Data sheets which I have recently given you and which we have gone over.Please make the following announcement on the Plant PA: "THIS IS AN EXERCISE.THIS IS AN EXERCISE.Exercise'90 is now in progress.Personnel not identified as participants in the Exercise should continue with their normal work schedule.THIS IS AN EXERCISE.THIS IS AN EXERCISE." I EPERENCE GENITAL DATA SHEETS FOR CQNTROLLER'SEONI;Y,:

Simulator Controller:

o Assure the CR comunication master switch has given the simulator contr ol.o You may give this entire sheet to the Control Room Supervisor.

o Have this PA announcement repeated approximately every hour.

ORILL NO EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION ANTICIPATED RESPONSE PAGE of TES TO MESSAGE NO.RESPONDING PERSON TIME i REAL LOCATION 0AM PM DRILL FOLLOWING ACTIONS SHOULD OCCUR HOURS CRS Simul ator makes an announcement on the Plant PA as per the message on the preceeding page.955 15515 R1 (1 55)

ORILL NO+EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION SCENARIO MESSAGES MhsSAOE NO CONTROLLER LOCATION TSC C N ROL A TIMEs REAL ROA ZAjf ON Qww ORtLL 0130 MEssAGE FoR Pl anŽanager MESSAGE FROM Lead TSC Control 1 er MESSAGE: "This is Jon Jones, the new head of Bonneville Power.'am calling to notify you that only WNP-2 is standing between us and a blackout of the entire Northwest grid.Unfortunately, we must take the entire Grand Coulee off-line by 1600 hour0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> s this afternoon.

This is necessary in order to perform an emergency washdown of the high voltage line insulators at the dam.Day-before-yesterday a severe dust storm came out of the wheat fields to the south and all the insulators are heavily coated with dirt.Meteorological predictions are for severe rainstorms in the area of the dam.We are concerned that the dirt on the insulators, once wetted, will allow electrical tracking and form a ground path.It is highly likely that severe damage will result to the grid if we do not take immediate action.Unfortunately, the tie-line to Canada is presently out of service for much the same reason.WNP-2 must make all efforts to base load immediately

.We recognize that you are just now re-ascending from a shutdown and would like to increase in power slowly.We also recognize that you have several technical specification limitations placed on you at present.We have contacted the Head of Region 5 NRC and have received his assurance that the Commission is supportive of preventing this blackout." REFERENCE GENERAL DATA SHEETS'";;,,.:,',, FOR'CONTROL'ER'USKONI'.",'",,,".',.;".., The only intent of this message is to'scene-set'he need for haste in raising power while in several TSAS...e.g.

-RHR-P-1C and SGT-FU-1A out of service.Both these TSAS are'red herrings'nd have no bearing on the scenario.9%8HBR9.1 RR{7&3)

ORILI IIO EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION ANTICIPATED RESPONSE PAG TaS TO MaSSAGa IIO.RESPONDING PERSON'I TIME I REAL LOCATION 0AM DRILL FOLLOWING ACTIONS SHOULD OCCUR HOURS Plant Manager General Serv.81d.Directs the Control Room to ascend in power.as expeditiously as practicable.

May direct the Plant Maintenance Organization to hurry with the work on RHR and SGT.$0515215 R2 I7.$2)

Rat~NO, EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION SCENARIO MESSAGES Qe ESSAQK NO+OLLRR LQCATlQN TSC TIMCi Rear.0855 ROA l2AT QN Qaw PM 0 RILL't HOU MESSAGE FOR Pl ant Manager Lead TSC Controller MESBAGE: "This is a DEFAULT MESSAGE: At approximately 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> an anti-nuclear activist was apprehended by PlaN Security inside the Protected Area after having illegally gained access.The person apprehended stated that he intended to do damage to the PLant.This necessitates the declaration of an EAL of ALERT due to'vi'sual observation of an unauthorized person in a protected area with the intent to commit sabotage.'ou:

are directed to declare an ALERT because of the preceeding reason." REPHRENCE GENEI4Q.DATA SHEETS The intent of this message is to maintain the chronology of the time line for the Exercise if, for some reason, the Plant Manager failed to declare an ALERT for the reasons stated.944I9241 R2 (7%2)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION ANTICIPATED RESPONSE ORILI NO.EXERCISE'90 MTKS TO MKSSACK NO.TIMKc RKAI.0855 QAM PM oRILL 0155>PACK oC HOURS RESPONOING PERSON LOCATION FOLLOWING ACTIONS SHOULO OCCUR Plant Manager GSB Makes a'declar ation of ALERT.Supply Sys Personnel Activate Centers in accordance with appropriate procedures.

Make notifications in accordance with appropriate procedures.

98~ISZIS R2 I7 9$)

O+',~L NOe WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION SCENARIO MESSAGES IbjIKSSAOC NO EXERCISE'90 REAL 0940 OAIN PM 0 RILL 0240 os HOURS CONTROLLER LOCATION TSG CO RO ROA ZAZ ON MEssAGE FQR TSC Director Lead TSC Controller MESSAGE"This is a DEFAULT MESSAGE:>~<At approximately 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> a fire occurred in the Technical Support Q'<~Center.

All normal lighting was lost, HVAC was lost and, more 0"~~importantly, all Plant monitoring capabilities were lost.It is not possible for the TSC staff to perform their emergency functions while working under these conditions.

Consequently, you ar e directed to relocate the TSC in accordance with the appropriate Plant procedure.

REFERENCE GENERAL DATA SHEETS'.;;"':,",'.,"'"-',',",",';",',;"'.""..";

..'.;;"'...;.,"'","".","..;,.;.';."...;.;.:-., FORCQhffROU."ER'USEONLY-'.""'~i,',,'..',;

','-',:;;;;::;.," One of the prime objectives of this Exercise is to relocate the TSC.

ORILI NO.EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION ANTICIPATED RESPONSE PAGE ot MESSAGE NO+RESPONDING PERSON TI MEc REAL 0940 LOCATION CIAM PM oRILL 0~40 FOLLOWING ACTIONS SHOULD OCCUR HOURS TSC Director TSC Evacuates and relocates the TSC in accordance with the direction contained in PPM 13.10.3$66 15215 R2 I7 65)

P RILL NO+EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INfORMATION SCENARIO MESSAGES M~QE NO CONTROLLER LOCATION CR (Simulator)

C N R TIMEI Real 1045 ROA IZA ON CIAM PM DRILL 0345 HOU MEssAGE FQR Plant Emer gency Director Lead TSC Controller MESSAGE: "This is a DEFAULT MESSAGE: At approximately 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> a large amount of radioacti ve steam commenced escaping from the Turbine Building to the outer environment.

The source term in this steam is enough to cause an estimated thyroid dose in excess of 5 Rem per'our at the 1.2 mile boundary.You are dir ected to declare a GENERAL EMERGENCY for the preceeding reason.REFERENCE GENERAL DATA SHEETS FOR CONTROL.E'ER'USEOIIIt'V The intent of this message is to maintain the chronology of the time line for the Exercise and to drive play by offsite agencies.955 I5201 R2 (7&QI ORILL NO EXERCISE'0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION ANTICIPATED RESPONSE PAGE ot O M AGE NOo RESPONOING PERSON TIME<REAL 1045.LOCATION@AM PM 0 RILL 0345 FOLLOWING ACTIONS SHOULO OCCUR HOURS Plant Emergency Directo CR (Sim)Declares a GE in accordance with PPN 13.1.1$05 I5215 R2 I7 55I ORILI NOe EXERCISE'90 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION SCENARIO MESSAGES Or~WOE NOe CONTROLLER LOCATION CR (Simulator)

CON RO R A TIMEc ReA<1400 ROANIZA ON Qua PM ORILL HOU MEssAGE FpR Control Room Super vi sor Lead Simulator Controller MESSAGE: "This is a DEfAULT h)ESSAGE: The NSIV's on the"A" MSL have been stuck open since prior to 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.They have just'drifted closed', effectively terminating the release of steam to the outer environment.

REFERENCE GENERAL DATA.SHEETS ,',;;,'"-".

';;:;;;;":;@FOR',COMTRO This will obviate the necessity to continue at an EAL of.GE.The Simulator Controller will, concurrent with this message,'close'he NSIV's on P-602.SCS'ISO I RR (7WS) nR11~1.ffo.EXERCISE'0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION ANTICIPATED RESPONSE PAG K of TKS TO MKSSAGK ffO RESPONDING PERSON TIMKg RKAL 1400 I.OCATI ON 0AM PM ORIu.07QQ FOLLOWING ACTIONS SHOULD OCCUR HOURS Control Room Supervisor CR (Sim)Plant Emergency Directo CR (Sim)Notifies the Shift Manager and the PED.Downgrades the Emergency Classification, preparatory to terminating the Exercise.96$.15215 R2 (7$5)

QR/LI NQo I EXERCI)E'0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION SCENARIO MESSAGES 0IP M~AOC NO.CONTROLLER LOCATION ALL C N 0 R A TIMKs ReA<1415 RQA IZA 0 Qau PQ ORILL MESSAGEFpR All'lant Players MESSAGE FRpM Al 1 P 1 ant Lead Control 1 ers MESSAGE: THE PLANT PORTION OF THE EXERCISE IS TERMINATED.

REFERENCE GENERAL DATA SHEETS Have all Players prepare After Action Reports.Collect the reports and pertinent Center data.

LL NOo ET NO+11A~HI'AOIOW~6~LIC'OWLS%4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET Exercise'90 RESPONSIBLE CONTROLLER

{LOCATION)

PACE of VAI IO FOR TIMES OF i QAM TO REAL TIME 0 PM 0AM 0 PM 0 RILL TIME TO HQURS 0900 HOURS ASSOCIATKO WITH MESSACKS INFORMATION APPLIES TO SECTION CONTENTS DATA SHEET SECTION ITEM 10 Initial Plant Conditions Reactor and Plant Data Fixed Monitor Readings In-Plant Area Dose Rates.Dose Rates in Plant Yicinity Meteorological Data Field Team Data-None Plant Lab&HP Center Data Situational Event Data Control Cell Telephonic gueries-Not Issued to Controllers at Plant or at PSF 666 IS222 R'I f7&2)

INTENTIONALLY BLANK NO, EXERCISE'0'NA~NI'%0100~00LIC'OWI1 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE ot SHEET NO RESPONSIBLE CONTROLLER (LOCATION) 1 ALL VALID FOR TIMES OFs QAM REAL TIME Q PM 1600 ASSOC IATEO WITH MESSACES QAM QIM DRILL TIME HDURS INFORMATION APPLIES TO INITIAL PLANT CONDITIONS HOURS DATA SHEET ITEN Ia 1b 1cHistorical Data for All Players-Plant Conditions Historical Data for All Players-Power Level History Exercise Star t Conditions for Operational (Sim&RW-CR)Staff CONTROLLER NOTE: dd d 1 11d the day prior to the Exercise.The Exercise Start Conditions Data will not be handed out until the Operating Crew is receiving their"Shift Turnover Briefing" just a few minutes prior to starting the Exercise.$68'IS222 Rl (7 8$)

DRILL NOs SHKKT NOo 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET EXERCISE'0 RESPONSIIILE CONTROLLER ILOCATION)

PACK oI la ALL VALID FOR TIMES OFt@AM REAL TIME ALL DAY 0 PM ASSOCIATED WITH MESSAGES 0AM 0 PM DRILL TIME ALL DAY HOURs INFORMATION APPLIES TO INITIAL PLANT CONDITIONS Historical Data for All Players-Plant Conditions HOURS 1.Time of Year: Tuesday, September 11, 1990 (Real Time).2.Emer enc Situation:

As of 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />, this-date, none.3.The Plant has been experiencing a fairly successful operating cycle after having finally come back up to power after the R-5 Outage.The outage itself was successful, yet difficult when Emergency Diesel Generator 81 failed just a few days before the outage's scheduled completion.

The repairs to the DG delayed the Plant's restart for over a month.At present, the Plant is in Mid Fuel Cycle and has been operating essentially at 100K base load.Equipment problems have been virtually nil.A few days earlier, the Plant entered a"Technical Specification 3.0.3 Shutdown" due to a potential electrical fusing problem discovered dur ing an Equipment t)ualification Engineering (EOE)review.The Plant restarted after continued evaluation by E(}E was able to prove the problem to be of no safety consequence.

4.As the morning begins, the Plant is at 10%power and is in process of pulling rods for even higher power levels.Marching orders are to ascend to 100K power in a timely fashion.At the moment, the only items of note are:-A minor steam leak on the high pressure throttle valve for the"A" Reactor Feed Water Drive Turbine, RFW-DT-1A.

-The"C" Residual Heat Removal Pump, RHR-P-1C, is out of service for maintenance (taking oil samples).It will be returned to service by the mid-day meal break.The"A" Standby Gas Treatment, SGT-FU-1A, has some bad electrical strip heaters.Plant Electricians are in process of replacing them.The Rod Worth Minimizer (RWM)is inoperative.

In accordance with Technical Specifications, a second licensed operator is verifying rod movement as the rods are withdrawn to increase reactor power.5.The Plant is manned for a normal weekday-shift operation.

In addition to a full complement of Plant Management, the Operations staff is at full strength in the Control Room and Radwaste Control Room.Chemistry and Health Physics is fully manned and on duty at their respective locations.

The Maintenance Organization is manned with its normal compliment of Mechanics, IEC Techs, Clectricians, Laborers and Tool Crib Attendant.

6.Heather conditions for the last few days have been very typical for the season...warm, balmy with light winds.$66 ISZZZ R'I I7 6>)

EXERCISE'0%A~HIWCTO'0~6~LIC f0%~C 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE ot 1 2 SHEET NO+RESPONSIBLE CONTROLLER

{LOCATION) 1b ALL VAI IO FOR TIMES OF: QAM REAL TIME AL L DAY Q PM ASSOCIATED WITH MESSAGES QAM QPM DRILL TIME ALL DAY HOURs INFORMATION APPLIES TO INITIAL PLANT CONDITIONS Historical Data for All Players-Power Level History HOURS REACTOR POMER X CALENDAR YEAR 1988 100-REACTOR PONER X 0 100-J F M A M J J A S 0 N D CALENDAR.YEAR 1989 50-REACTOR POWER CALENDAR YEAR 1990 0 100-0 J-F M A M J J A S 0 N D 5 weir g~(s~~J m~S~~~)ps~P gdl g<~gC<+J F M A M J J A S 0 N D 66$.15222 Rl I7$3)

DRILL NOa EXERCISE'0 llASIIIXCTO%

tl'tlIC tOIICI~4W SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PACE 2 2 0 RESPONSIBLE CONTROLLER (LOCATION) 1b ALL VAI ID FOR TIMES OF I QAM, ALL DAY CPM ASSOCIATED WITH MESSACES 0AM 0 PM ALL DAY To DRILL TIME HOURS INNAL PlXNY CONDITIONS Historical Data for All Players-Power Level History HOURS POWER LEVEL HISTORY DETAILS FROM AUGUST'89 to PRESENT 8-6"89 8"8"89 8-11"89 8"15-89 8-17" 89 8-18"89 8"19"89 9-5"89 9" 12-89 9"21" 89 9-29-89 10-4-89 10"29-89 4"21-90 7-15-90 Scram from 100K power Recover from Scram, Return to 76K power Forced Outage due to electrical fuse coordination Recover to 70%power Reactor Scram Recover to 71%power Power limited to 71K due to Feed Pump problems Power dropped to 31K due to APRM prob's, then recovered to 71K Feed pump problems resolved, power increased to 100%Forced Outage due to Condenser tube leak Recover from Forced Outage, gradual ramp to 80K power Hold at 80K power due to air inleakage problems Achieved a nominal 100K power, but actual power varies depending on temp, barometric press and wind conditions Refueling Outage R-5 commenced Reascended to power after DG r airs complete.666~16222 R1 I7.62)

%A~Nl'XCCOS~COLIC Cold~0 4i SUPPLV SVSTEM CONTROLLER INFORMATION GENERAL DATA SHEET SHEET NOC EXERCISE'90 RESPONSIBLE CONTROLLER ILOCATION) lc CR (Simulator) of VALID FOR TIMES OFl REAL TIME 0700 Q PM 1600 ASSOCIATED WITH MKSSACES 0AM DRILL TIME HOURS INFORMATION APPLIES TO HOURS DRILL START CONDITIONS For Operational Staff (Sim 8 RM-CR)1.Refer to attached Shift Mana er Shift Turnover Checklist.(later)2.Refer to attached Control Room Su ervisor Shift Tur nover Checklist.(later)p 3.Refer to attached Control Room 0 erator Shift Turnover Checklist.(later)4.Refer to attached Shift Su ort Su ervisor Shift Turnover Checklist.(later)P.f P C~C>>I f ff, f/ff/6.Refer to attached Shift Mana er's Lo for Grave Shift, 9/ll/90 (later).CONTROLLER NOTES: p p P f~fd>>p Operations Personnel.

It is acceptable for Operations Personnel to share'hese checklists with whomever they please after having received them.2.TSC Controller...Provide a cc of sheets 5 8 6 to the Individual who will be playing the Operations Manager in the Exercise.These sheets can be provided to him at any time after 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on 9/ll/90.968 I SZ2/I R 1 I7$$)

INTENTIONALLY BLANK O L NO+EXERCISE'90 4W SUPPLY SYSTEM CONTROLLER tNFORMATION GENERAL DATA SHEET PACE af S'T NO+RESPONSIBLE CONTROLLER ILOCATION) 2 CR (Simulator)

VALIO FOR TIMES OF<QAM REAL TIMe 0700 P PM 1600 ASSOCIATKO WITH MESSACES QAM DRILL TIME HOURS INFORMATION APPLIES TO REACTOR AND PLANT DATA HOURS DATA SHEET 2a 2b 2c'2d 2e 2f 2h ITEM Reactor Power (X)vs Time Reactor Pressure (psig)vs Time Reactor l<ater Level (inches)vs Time Suppression Pool Temperature

('F)vs Time Suppression Pool Level (inches)vs Time RRC Loop"A"&"B" Flow (gpm)vs Time Generator Output (MWe)vs Time TG Building Ventilation Exh.FLow (cfm)vs Time NOTE TO ALL CONTROLLERS:

DO'OT UTILIZE THIS SECTION (REACTOR AND PLANT DATA)EXCEPT IN CASE OF SIMULATOR FAILURE...AS LONG AS THE SIMULATOR IS IN OPERATION, ALL PLANT DATA IS TO BE OBTAINED FROM THE SIMULATOR&/OR EMULATOR VIA THE GDS.$6$1S222 RI IV~2)

ORILL NQo EXERCISE'0 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK ot SHEET NO RESPONSIBLE CONTROLLER (LOCATION) 2a CR (Simu1ator)

VALIQ PQR TIMES OP1 QAM REAL TIME 0700 Q PM 1600 ASSOCIATKQ WITH MKSSACKS QAM QPM HOURS INPORMATION APPI IKS TO REACTOR POWER (5)vs Time HOURS 100 90 70 60 50 Fl 40 8 30 20 10 5 0 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600-Increase from 10 to 17 X Power between 070(M955-SCRAN due to 120K APRN trip setpoint 9 0955-Zero X power after 0955 968 1$222 RI{9 89) n im NO.EXERCISE'90 4P SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE of ET NO+2b RESPONSIBLE CONTROLLER (LOCATION)

CR (Simu1ator)

VALIO POR TIMES Opt QAM 0700 Q PM 1600 ASSOCIATKO WITH MESSAGES QAM Q PM D RILL TIMK HOURS~~HQ Ups INPORMATION APPLIES TO REACTOR PRESSURE (psig)vs Time 1250 1125 1000 875 750 625 500 375 25P UJ g 125 CE P 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600-0955 SClUN-1010 MSL Break-Appr.1020-30 coun.nce Emerg.Depressurization 66$ISZZ2 RI I7<>)

DRILl NOs EXERCISE'90 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK SHEET NOe RESPONSIBLE CONTROLLER (LOCATION) 2c CR (Simulator)

VALID SOR TIMES Oltc QAM 0700~o 1600 ASSOCIATKD WITH MKSSACKS 0000 0900 DRILL TIME HOURS (inches)vs Time+100'50-Turnaround

(+54")M 50-150 OC-250 I"TAF ("161")-BAF (-294")-350 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 TIME)(XX SCRAM-1010 MSL Break-Appr.1020-30 coaxnence Emerg.Depressurization

-No other transients anticipated on water level 555 15222 RI P<5)

ID RILL NQ EXERCISE'0 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAC E ot!S NQ, RESPONSIBLE CONTROLLER (LOCATION) 2d CR (Simulator)

~VALID FOR TIMES OF: QAM I REAL TIME 0700 Q PM.1600 IASSQCIATED WITH MESSAGES I QAM'DRILL TIME HOURS INFORMATION APPLIES TO SUPPRESSION POOL TEMPERATURE

('f)vs Time HOURS 100.IJJ C3 80 70 I 60 CS 50 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 TINE 4-Coamence Emerg.Depressurization to Suppression Pool 9 1020-30 hrs;SP will increase in temperature to about 75-$7 f.$64 IS222 Rl I7%3)

D R ILI NOo EXERCISE'90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of SHEET NO RESPONSIBLE CONTROLLER (LOCATION) 2e CR (Simulator)

VALID P'OR TIMES OFc QAM REAL.TIME 0700 Q PM 1600 ASSOC IATKD WITH MKSSACKS QAM DRILL TIMK 0000 HOURS 0900 INFORMATION APPLIES TO HOURS SUPPRESSION POOL LEYEL (inches)vs Time+2 Vl+1 tH 0 w-1 UJ-2 8 3-5 CL 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600-Coamence Emerg.Depressurization to SP 9 1020-30 hrs.SP will increase slightly in level to about+1(plus one)inches.$64 ISZZZ R'I I7%3)

DRILL NO.EXERCISE'0 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE of r NO.RESPONSIBLE CONTROLLER II OCATION)2f CR (Simulator)

VALID POR TIMES OPs QAM REAL TIMK 0700 g PM 1600 ASSOCIATED WITH MESSACKS@AM Q PM DRILL TIME 0000 HOURS 900.-HOURS INPORMATIQN APPI.IES TO RRC LOOP"A" 8."8" FLOW (gpm)vs Time 100 60 40 20 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600-Both pumps will operate 9 15 Hz with FCV's full open for the duration of the Exercise.464 ISZZ2 RI Ii 44)

ORILI NO+SHKKT NO+4N SUPPLY SYSTEM CONTROLLER tNFORMATlON GENERAL DATA SHEET RKSPONSIBLK CONTROLLER (LOCATION)

PACK oI VALIO FOR TIM OFc QAM RKAI TIMK QPM 1600 ASSOCIATKO WITH MKSSAQKS QAM TO Q>>DRILLTIMK 0000 HOURS 0900~~HOURS INFORMATION APPL IKS TO GENERATOR OUTPUT (MWe)vs Time 1250--Rated Generator Ouput 1153 NW(e)1000 750 500 CI 250 4l 0 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 TINE-Ramp up in power from a nominal 10K of rated 9.0700 to 15K 8 0955.-Trip 9 0955 to zero 5 power$64 IS222 Rl I7%2)

ORILL NO+EXERCISE'0 WCICIlcCTOII tl'CLIC tCWCC 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of NOe 2h RESPONSIBLE CONTROLLER (LOCATION)

CR (Simulator)

VALIO FOR TIMES OF.QAM l REAL TIME 0700 Q PM 1600 QAM Q PM DRILL TIME HOURS HOURS ASSOCIATEO WITH MKSSACKS INFORMATION APPLIES TO S TG BUILDING VENT.EXH.FLOM (cfm)vs Time 300 270 240 210 180 M 3 150 C)QO 903 603 303 0 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 TINE-Flow will remain constant at 265,000 CFIII for the duration of the Exercise 66$'IS222 RI I7$2)

INTENTIONALLY BLANK DRILL NOo EXERCISE 90 WAIWIWCTOW

~VClIC iOWCC 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE 61 S NOe RESPONSIBLE CONTROLLER (LOCATION) 3 ALL VALIO FOR TIMES OF1 QAM REAL TIMK PM To 1600 ASSOCIATED WITH MESSAGES 0AM DR)I.L TIMK HOURS INFORMATION APPLIES TO FIXED NONTOR READINGS INDEX HOURS DATA SHEET 3a 3b 3c 3d 3e 3f 3g 3h 3h" 1 31 3i-1 3J 3k 31 3m 3n 30 3p 3g 3r 3s 3t ITEM Intr oducti on Alarm Hi Start/Stop Time ARN 1-5 ARM 6-ll ARM 12, 13, 23, 24&32-34 ARM 14-18 AR"RIS-21 TEA" RIS-13 Graph of TEA-RIS-13 (CPM)TEA-RIS-13A Graph of TEA-RIS-13A (PMU's)NS-RIS-610A, B, Z&D CAM's, Tubine Generator Building El.441', 501'GSB El.441'NS"RIS-27A

&8, 27C&D, 27E&F CMS-SW and RCC Series REA RIS-19&19A OG-RIS-601A 8 8 (Off Gas Post-Treatment)

ARN 19-21&ARM 25-30 OG-RIS-612 (Off Gas Pre-Treatment)

WEA 8 WOA Series REA-RIS-609A, B, C&D TRA-RI S-1 968 16222 Rl I7%2)

INTENTIONALLY BLANK DRILL NOs Exercise-90 WAIIIIIIOTOO

~I'Slit tOWER 4W SUPPLY SYSTEM CONTROLLER IN FORMAT tON GENERAL DATA SHEET PACK KT NOo 3a RESPONSIBLE CONTROLLER (LOCATION)

CR (Simulator)

VALID FOR TIMES OFI P*M REAI TIME 0700 pPM ASSOCIATKD WITH MESSACES PAM Q PM DRILL TIME 0000 HPURS 0900 TO INFORMATION APPI IES TO Fixed Monitor Readings-Introduction HOURS The plant is in the process of power ascension recovering from a Technical Specifications Action Statement (TSAS)3.0.3 shutdown due to equipment qualification problems.The plant is at 17K power pulling r ods to ascend in power.At 0955 hours0.0111 days <br />0.265 hours <br />0.00158 weeks <br />3.633775e-4 months <br /> while withdrawing control rods, a Control Rod Drop Accident occur s.The result of the Rod Drop Accident is a hot spot in the core ultimately causing 1.8X fuel cladding failure over a period of 15 minutes.At 0956 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.63758e-4 months <br /> the off gas pretreatment monitor OG-RIS-612 reachs the alarm setpoint of 1800 mr/hr.At 0958 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.64519e-4 months <br /> the Main Steam Line Monitor NS-RIS-610 A, B, C, and D all alarm.These alar ms cause for NSIV's to close with the exception the inboard and outboard MSIV's on Main Steam Line"A".At 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br /> Main Steam Line"A" ruptures at an elbow under the High Pressure Turbine in the Turbine Generator Building Elev.471'verhead.

The steam is released ladened with Noble gases and radioiodines from the failed fuel.This release of activity causes the area, process and effluent monitor in the Turbine Generator Building to all alarm.This release causes the Turbine Generator Building effluent monitor TEA-RIS-13 to go offscale immediately.

The intermediate range monitor TEA-RIS-13A increases to in excess of 25 PNUs, drops briefly and then peaks out at 18 PMU's by 1018 hour0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br /> s.The steam released to the Turbine Generator Building contains 100%of the Noble gases and 10K of the radioiodines released to the core liquid inventory from the Rod Drop Accident.The normal Turbine Generator Building exhaust flow of 265,000 CFM sweeps the activity from the building precluding a build up of both heat and radioactivity.

This exhaust flow results in offsite doses of 19.2 Rem to the Thyroid and 67 mrem to the whole body at the 1.2 mile exclusion area boundary.The flow rate from the reactor to the Turbine Generator Building is based on the" pressure and temperature due to the latent heat in the core from power operation..The major portion of the release occurs during the first 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period.The flow rapidly decrease to about lk to 2X of flow for one steam line and remains fairly constant throughout the exercise as the.NSIV NS-V-28A is partially closed and acts as a throttle valve.If the OSC repair team is successful in closing the MSIV the release will be terminated at that time.The release rates and the doses in the Turbine Generator Building are reflected on the data sheets following in this section.One additional assumption used is 205 of the radioiodine available in the Turbine Generator Building at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> is plated out on the building surfaces.The iodine is plated out over a period of approximately one half hour.Additional plate out is not assumed as the major portion of the activity has been released by 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> as the building exhaust system has swept the activity out decreasing the iodine available for plate out.666 16222 R1 I7 62)

DRILL, NOa Exercise-90 WAIOIIIOIOÃ

~I'IIC tOWER 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of SHEET NOt RESPONSIBLE CONTROLLER ILOCATION)

C Sim 1 ator VALID POR TIMES OPI QAM RKAI TIME 0700 P,M" 1600 ASSOCIATED WITH MESSACES QAM QPM DRILL TIME 0000 HDURs 0900 INPORMATION APPI IES TO Fixed Monitor Readings-Hi Start/Stop Time HOURS Data is provided for the Radiation Monitoring systems for 0200 to 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.The first monitor alarm occurs at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on the off gas pretreatment monitor.The Turbine Generator Building area, process and effluent monitors then alarm at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.Alarms are due to the detector response to Noble gas and Radioiodine in the Turbine Generator Building air from the MS-line A break.See,below for details: ARM Alarm Hi (Time)1-13 No alarm actuated throughout Exercise 14 1010 to end of Exercise 15 1010 to end of Exercise 16 1010 to end of Exercise 17 1010 to end of Exercise 18 1010 to end of Exercise 19-23 No alarm actuated throughout Exercise.-

24 1400 to end of Exercise due to PASS sampling 25-34 No alarm actuated throughout Exercise AR-RIS-21 1015 to end of Exercise CMS-RIS-27A and 27B-No alarm actuated throughout Exercise CMS-RIS-27E and 27F-No alarm actuated throughout Exercise CMS-RIS-12/1A 8 121B-No alarm actuated throughout Exercise CMS-RIS-12/3A

&123B-No alarm actuated throughout Exercise MS-RIS-610A

-0958 to end of Exercise MS-RIS-610B

-0958 to end of Exercise MS-RIS-610C

-0958 to end of Exercise MS-RIS-610D

-0958 to end of Exercise OG-RIS-612

-No alarm actuated throughout Exercise OG-RIS-612

-1000 to 1012 hour0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.85066e-4 months <br /> s OG-RIS-601A

&B-No alarm actuated throughout Exercise TEA-RIS-1-1010 to 1144 hours0.0132 days <br />0.318 hours <br />0.00189 weeks <br />4.35292e-4 months <br /> TEA-RIS-13A

-No alarm actuated (no alarm function)No other monitoring system affected as they are not associated with this Exercise Data Sheets for the Plant Area, Process and Effluent monitoring system follow: 966 IS2ZZ Rl f7%9)

DRILL NOo Exercise-90 WA~II IIIOOOIo~I'OIC tOWOI kN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET IIAOK ot KKT NOo 3c RK5PON515LK CONTROLLKR (LOCATION) cR (siIIIIlator)

'VALID POR TIMKS OPI RKAL TIMK 7)00 AM TO PM 16500 QAM Q PM DRILL TIMK 00 HOURS 9)00 HOURS ASSOCIATKD WITH MKSSAO INPORMATION APPLIK5 TO Fixed Nonitor Readings-ARH 1-5 ARN-Readings 0ue to Normal Plant Operation and PASS Sea@ling.All Readings in mr/hr (la)less noted otherNise)

Time ARN-1 ARH 2 ARH-3 ARH-3a ARN-4 ARH 5 7)00 7)15 7:30 7)45 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 10 8I00 8)15 8:30 8I45 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 10 9)00 9:15 9:30 9)45 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 10 10:00 10)05 10)10 10:15 10:20 10:25 10:30 10)45 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 10 10 10 10 10 11:00~11:15 11)30 11)45 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 10 12:00 12:15 12:30 12:45 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 10 13IOO 13:15 13I30 13I45 200 200 200 200 200 200 200 200 200 200 200 200 10 10 10 12 14)00 14:15 14)30 14)45 15)00 16)00 ass Issss Rl{7&5)200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200~oOO age 1 22 50 65 DRILL Now Exercise-90 WA~Hl'ACTOR~I'LIC tOWtI 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOE o2 SHEET Now RCSPONSICLE CONTROLLER (LOCATION)

CR (Siss)later)

VALID FOR TIMCS OP$REAL TIME 7 00 ASSOCIATED WITH MCSSAO AM TO PM 16200 CIAM Q PM DRILL TIME HOURS INFORMATION APPLICS To Fixed Honitor Readings-AN 6-11 9200 HOURS ARH-Readings Oue to Normal Plant Operation and PASS Sea@ling.All Readings in mr/hr (ISIless noted otherIIise)

Time 7200 7215 7230 7245 ARH-6 ARH-7 ARH-8 AN-9 RHR 8 15 15 15 15 ARH-10 RHR A 10 10 10 10 8!00 8215 8230 8245 15 15 15 15 10 10 10 10 9 00 9215 9230 9245 15 15 15 15 10 10 10 10 10200 10205 10210 10215 10220 10225 10230 10245 15 15 15 15 15 15 15 10 10 10 10 10 10 10 11200 11215 11230 11245 15 15 15 15 10 10 10 10 12200 12215 12230 12245 15 15 15 15 10 10 10 10 13200 13215 13230 13245 15 15 15 15 10'10 10 10 SOS IS111 Rl{741)14200 14215 14230 14245 15200 16200 15 15 15 15~is~i5 1 10 10 10 10 10 10 DRILL NO>>Exercise-90 w*~0424402024 tttllt towto 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK 2IKKT NO>>3e ItKSPONSIKLC CONTROLLKR (LOCATION)

CR (SiIIILator)

VALID FOR TIMKS OFI RCAL TIMC 7>>00 ASSOC IATKD WITH MKSSAa AM TO IIM 16:OO 0AM DRILL TIMC INFORMATION APPI IKS TO HOURS Fixed Honitor Readings-ARH 12, 13, 23, 24,32-34 9:00 HOURS ARH-Readings Oue to Normal Plant Operation and PASS Sampling.All Readings in mr/hr (wILess noted otherwise)

Time 7:00 7 I5 7:30 7:45 ARH-12 RCLC ARH-13 CRD P ARH 24 ARH-32 (R/hr)Downscale Downscale Downscale Downscale (R/hr)Dowlca le Downscale Downscale Downscale ARH-34 (R/hr)Downscale Downscale Downscale Downscale efoo ef15 8I30 8:45 Downsca Le Downscale Downscale Downscale Downscale Oowlcale Downscale Downscale Downscale Downscale Downscale Downscale 9:00 9:15 9:30 9:45 10IOO 10I05 10:10 10I15 10 f20 10:25 10I30 10I45 11IOO 11:15 11I30 11:45 12IOO 12:15 12:30 12:45 Downscale Downscale Downscale Oowlcsle Downscale Oownsca le Downscale Downscale Downscale 0 owlsca l e Downscale Downscale Downsca l e Downscale Downscale Oownsca le Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downsca l e Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale Oowlscsle Downscale Downscale Downscale Downscale Downscale Downscale Downscale Downscale 13:00 13I15 13:30 13I45 16 Downscale Downscale Downscale 0.11 Downscale Downscale Downscale 0.10 Downscale Downscale Downscale Downscale 14:00 14I15 14:30 14:45 15:00 16:00$55 Issss RI PQSI 45 45~40~W>>0>>0.11 0.12 0.,11 0.12 0.12~0.'ll 1 0.10 0.11 0.10 0.11 0.11 0.11 Downscale Downscale Downscale Downscale Downscale Downscs l e DRILL NO, Exercise-90 WAINIICOTOS tV~LIC JOWEI 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of SHEET NOr 3f RCSPONSlbLE CONTROLLER (LOCATION)

CR (SiIKI later)VALID fOR TIMCS OP!RKAL TIMC ASSOCIATED WITH MCSSAO AM TO PM 16200 0AM 0 00 TO 9'00 HOURS D RILL TIME INPORMATION APPI ICS TO Fixed Honftor Readings-ARH 14-18 HOURS All Readf s in mr/hr (unless noted otheruIse)

Tfme 7 00 7230 8200 8230 9200 9230 9255 ARH-14 130 130 130 130 130 130 130 ARH-15 ARH 16 ARH 17 20 20 20 20 20 20 20 ARH-18 scRAH Q 9255 A.H.and Fue r 8 ins l Failue 10200 10205 10210 10211 10212 10213 10214 10215 10216 10217 10218 10219 10220 10225 10!30 10235 10240 10245 10250 10255 11200 11215 11230 11245 3500 7850 5917 3350 3945 4359 4427 4589 2756 2126 1586 1030 476 394 4760 2650 2916 3140 3537 3716 3781 3671 2165 1203 745 576 289 221 4763 2653 2919 3143 3540 3719 2891 2168 1650 1206 20 20 20 3156 3496 3553 3732 3857 3797 2181 1219 761 494 305 219 6356 3538 4192 4961 5127 5047 4900 3853 2196 1603 1271 767 269 Steam Lfne Break at 10210 A.H.12200 12215 12230 12245 374 357 350 197 207 200 193 213 206 201 271 261 252 13200 13215 13230 13245 332 327 174 169 182 225 220 14200 14215 14230 14245 318 314 311 159 155 152 165 158 155 171 215 210 201 15200 307 150 153 198 16200 140 143 156 SOS IS222 R'I PAQ)

DRILL NDo i 90 WA~HINOTOS~rHIC POWII 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET IPAOK et SHKKT ND 3h VALID FOR TIMKS DPI R KAL 7IMK RKSPONSISLK CDNTRDLLKR (LOCATION) cR (s(ImI(ator)

Ale~M 16:00 0AM QPM Dhit LTIMK MOURS ASSOC!ATKD WITH M AO INSDRMATIDN APPLIKS TO Fixed Honitor Readings-TEA-RIS-13 8 13A Turbine Generator Building Release CPH isCoISIt Rate in f or TEA.RlS.13.

Ave.is average coat CPH or PrevIous mIn.CPH Time Time CPH Time CPH CPH 7(00 7:15 7:30 7:45 8(00 8:15 8130 8(45 9)00 9:15 9:30 9(40 9(45 9(50 9(55 80 9)56 9)57 9(58 9:59 10(00 10(01 10 02 10(03 10(04 10(05 10(06 10(07 10:08 10I09 10910 80 10:11 Offscale 10:12 S.BSE+06 10913 9.48E+06 10(14 9.93E+06 10(15 Offscale 10(16 Of fscale 10(17 Of f sea le 10)18 Of f scale 10(19 Of fscale 10:20 Offscale 10921 9.80E+06 10:22 9.25E+06 10(23 8.79E+06 10:24 8.30E+06 10I25 7.79E+06 Ave.1.02E+07 Ave.4.71E+06 10(41 2.99E+06 10)42 2.85E+06 10(43 2.72E+06 10(44 2.60E+06 10(45 2 48E+06 10(46 2.36E+06 10(47 2.25E+06 10(48 2.14E+06 10:49 2.04E+06 10(50 1.94E+06 10:51 1.84E+06 10:52 1.75E+06 10:53 1.66E+06 10:54 1.5SE+06 10:55 1.50E+06 Ave.2.18E+06 10(56 1.43E+06 10)57 1.35E+06 10:58 1.28E+06 10(59 1.22E+06 11(00 1.16E+06 11(01 1.10E+06 10(02 1.04E+06 11:03 9.85E+05 11:04 9.33E+05 11:05 8.84E+05 11:06 8.38E+05 11:07 7.93E+05 11:08 7.51E+05 11(09 7.11E+05 11910 6.73E+05 1.01E+06 Ave.10:26 7.28E+06 10(27 6.78E+06 10-28 6.28E+06 10:29 5.94E+06 10:30 5.60E+06 10:31 5.27E+06 10932 4.94E+06 10:33 4.63E+06 10:34 4.33E+06 10:35 4.10E+06 10:36 3.88E+06 10:37 3.66E+06 10)38 3.46E+06 10:39 3.27E+06 10I40 3.12E+06 11:12 11:13 11:14 11:15 11:16 11:17 11:18 11:19 11:20 11:21 11:22 11:23 11:24 11(25 Ave.11:26 11?27 11:28 11(29 11(30 11:31 11:32 11:33 11:34 11:35 11:36 11:37 11938 11:39 11:40 Ave.11(41 11(42'l1:43 11:44 11:45 11:46 11(47 11:48 11(49 11(50 11(51 11)52 11:53 11:54 11 I 55 Ave.6.37E+05 6.03E+05 5.71E+05 5.40E+05 5.11E+05 4.83E+05 4.57E+05 4.32E+05 4.08E+05 3.86E+05 3.65E+05 3 45E+05 3.26E+05 3.OSE+05 2.91E+05 4.44E+05 2.75E+05 2.60E+05 2.45E+05 2.32E+05 2.19E+05 2.07E+05 1.95E+05 1.84E+05 1.74E+05 1.64E+05 1.55E+05 1.46E+05 1.38E+05 1.30E+05 1.23E+05 1.90E+05 1.16E+05 1.09E+05 1.03E+05 9.73E+04 9.17E+04 8.65E+04 8.16E+04 7.69E+04 7.26E+04 6.84E+04 6.45E+04 6.08E+04 5.73E+04 5.41E+04 5.10E+04 7.94E+04 Ave.3.28E+04 12:11 1.97E+04 12:12 1.85E+04 12(13 1.75E+04 12(14 1.64E+04 12915 1.55E+04 12:16 1.46E+04 12:17 1.37E+04 12:18 1.29E+04 12:19 1.22E+04 12:20 1.15E+04 12:21 1.08E+04 12:22 1.02E+04 12(23 9.57E+03 12:24 9.01E+03 12:25 8.48E+N Ave.1.34E+04 12:26 7.99E+03 12(27 7.52E+03 12(28 7.08E+03 12:29 6.66E+03 12:30 6.27E+03 12:31 5.90E+03 12)32 5~56E+03 12:33 5.23E+03 12:34 4.92E+03 12(35 4.63E+03 12(36 4.36E+03 12)37 4.11E+03 12(38 3.86E+03 12(39 3.64E+03 12:40 3.42E+03 5.41E+03 Ave.11:56 4.ME+04 11:57 4.53E+04 11:58 4.27E+04 11759 4.02E+04 12900 3.79E+04 12:01 3.57E+04 12:02 3.37E+04 12)03 3.17E+04 12:04 2.99E+04 12:05 2.82E+04 12:06 2.65E+04 12(07 2.50E+04 12(08 2.35E+04 12)09 2.22E+04 12(10 2.09E+04 Ave.2.18E+03 12:56 1.29E+03 12-57 1.22E+03 12(58 1~14E+03 12(59 1.ME+03 13(00 1.01E+03 13:01 9.52E+02 13(02 8.95E+02 13:03 8.42E+02 13:04 7.92E+02 13:05 7.45E+02 13:06 7.01E+02 13:07 6.59E+02 13:08 6.20E+02 13909 5.83E+02 13(10 5.49E+02 8.72E+02 Ave.12:41 3.22E+03 12:42 3.03E+03 12:43 2.85E+03 12:44 2.68E+03 12:45 2.53E+03 12:46 2.38E+03 12:47 2.24E+03 12(48 2.10E+03 12I49 1.98E+03 12(50 1.S6E+03 12:51 1.75E+03 12:52 1.65E+03 12:53 1.55E+03 12(54 1.46E+03 12(55 1.37E+03 9SS 1591S Rl (7WQ)Page 1 O D 0 x z 0-I-I IU.=w oc fA g I~Q O C7 0 C L CI Cl Cl LV 0 z C 0 Z 0 I 5 3 Lt O 0 C g I 2 Cn 0 g 5 Z R l3 0 Z~M L 0 I lL 0 0 C O~~I 0 Ch CC O Xo l O Q C Z jI 0 X l C I 2 0 C gz+o OC O I 0 a 0 C O~o z l0 C I 0 g 0 un Vl M M~CO EO CI gg~O CL'p D 0 0 gg Cf X g X C l4 l CPH 18000000 16000000 14000000 12000000 10000000 8000000 6000000 4000000 2000000 789991 1 1 1 1 1 1 1 1 1 1 1 1::::: 0000000000000 0 0 0 4 5~~~~~~~~~0005 70001 122233444 TEA-RISo13 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'I 1 1 1 1 00 111111111111111222222222222222333

~~~~~~~~~~~~55000112223344455000112223344455000 C lC IC N'A DR<<L No.Exercise-90 WAIHI7IOTO$

~I'LIC POWCI 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAQK of SHKKT NOe 3i RKSPONSIKLK CONTROLLKR (LOCATION)

CR (Sisi)later)VALID FOR TIMKS OFc 7)00 REAL TIMK ASSOCIATKD WITH MKSSAO AM TO PM 16)00 0AM 0)00 TO HOURS DRILl TIMK INFORMATION APPLIKS TO 9)00 HOURS fixed)Ionitor Readings-TEA.RIS-13 8 13A Turbine Generator Building Release PHU is Response Rate for TEA.RIS-13A.

Ave.is average P)RJ for previous 15 minutes.Time 7)00 7!15 7)30 7)45 8)00 8!15 8)30 8!45 9)00 9!15 9)30 9)40 9)45 9)50 9)55 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 10!26 10)27 10)28 10)29 10)30 10)31 10)32 10)33 10)34 10!35 10)36 10)37 10)38 10)39 10)40 Ave.12.56 11.85 11.13 10.64 10.15 9.67 9.19 8.27 7.93 7.60 7.28 6.96 6.68 6.45 9.01 Time 11!12 11!13 11!14 11!15 11!16 11!17 11!18 11!19 11)20 11221 11!22 11)23 11!24 11)25 Ave.2.44 2.38 2.32 2.27 2.22 2.17 2.12 2.08 2.04 2.00 1.96 1.93 1.89 1.86 1.83 2.10 Time 11)56 11)57 11!58 11)59 12)00 12)01 12!02 12!03 12!04 12)05 12)06 12)07 12)08 12)09 12)10 Ave 1.39 1.39 1.38 1.38 1.37 1.37 1.36 1.36 1.36 1.35 1.35 1.35 1.34 1.34 1.34 1.36 Time 12)41 12)42 12!43 12)44 12)45 12)46 12%7 12!48 12)49 12)50 12!51 12)52 12)53 12)54 12!55 Ave.P)IU 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1~30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 9)56 1.30 9)57 1.30 9)58 9!59 1.30 1.30 10)04 1.30 10!05 1.30 10!06 1.30 10)07.1.30 10!08 1.30 10!09 1.30 10!10 1.30 10)00 1.30 10!01 1.30 10)02 1.30 10)03 1.30 10!41 10)42 10)43 10)44 10)45 10!46 10!47 10!48 10)49 10!50 10251 10)52 10)53 10)54 10)55 6.24 6.04 5.84 5.64 5.45 5.27 5.09 4.92 4.76 4.60 4.45 4.30 4.16 4.02 3.89 11226 11)27 11!28 11!29 11230 11)31 11)32 11)33 11)34'11)35 11)36 11!37 11238 11)39 11!40 1.80 1.77 1.75 1.72 1.70 1.68 1.66 1.64 1.62 1.60 1.59 1.57 1.56 1.54 1.53 12211 12!12 12!13 12!14 12!15 12!16 12!17 12!18 12!19 12)20 12)21 12!22 12)23 12)24 12)25 1.34 1.34 1.33 1.33 1.33 1.33 1.33 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 12)56 12)57 12)58 12)59 13)00 13!01 13!02 13)03 13)04 13)05 13!06 13!07 13!08 13)09 13!10 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 10)11 25.09 10)12 14.17 10!13 15.11 10!14 15.84 10!15 17.11 10!16 17.10 10)17 17.66 10!18 18.00 10!19 17.56 10)20 16.95 10)21 16.15 10)22 15.36 10!23 14.71 10)24 14'2 10)25 13.28 Ave+10)56 10!57 10!58 10!59 11!00 11)01 10!02 11!03 11!04 11)05 11)06 11!07 11!08 11)09 11!10 4.98 3.77 3.65 3.53 3.42 3.32 3.22 3.12 3.03 2.94 2.86 2.78 2.70 2.63 2.56 2.50 Ave.11!41 11!42 11)43 11)44 11)45 11)46 11)47 11)48 11)49 11!50 11)51 11!52 11!53 11)54 11!55 1.65 1'2 1.50 1.49 1.48 1.47 1.46 1.45 1.44 1.44 1.43 1.42 1.41 1.41 1.40 1.40 Ave.12)26 12!27 12)28 12)29 12)30 12)31 12)32 12)33 12)34 12)35 12)36 12)37'2!38 12)39 12)40 1.33 1.32'1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 Ave.1.30 Ave.$$$I$222 Rl f7<2)16.54 Ave.3.07 Ave.1.45 Page 1 Ave.1.31 z 0<<g+QJ 4 us oA u~+~Clj.=w oc"cA 4 1;>Rg z OC zP QJ ,~cn Cg+~>~U 0 CP 4 4 C 0!4 Z C 4 4 Z I 4 al Z 0 I C 3"o" 4 rn I Z 4 V 4 Q a 0 L CI CI~i Oi 4 I-CZ D O X CI~i 4 I C 4~i 0 I 1 g C a ID L g 4 I g 4 4 IL I 4 C 4 g 3 4 C Z 0 C I C 4 L Z Z I 4 4 I C 4 M eN Nl CC p 0 Fg Z IL I 30.00 25.00 20.00 15.00 10.00 5.00 0.00 TEA-RIS-13A 7 8 9 9 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1:::::000000000000000001111111111111112222222222222222333 0 0 0 I 5~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0 0 0 5 7 0 0 0 1 1 2 2 2 3 3 II 4 4 5 5 5 0 0 1 1 1 2 2 2 3 3 4 4 4 5 5 5 0 0 1 1 1 2 2 2 3 3 4 4 II 5 5 5 0 0 1 Time ORILL NO+Exercise-90 wAINI'%0$0'5~oiuc tow~I 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of SHKKT NO.3J ItKSPONSIKLK CONTROLLKR (LOCATION)

CR (Sitmzlator)

VAI IO FOR TIMKS OPz RKAL TIME AM TO~M 16100 0AM 0 RILL TIMK 0100 TO 9100 HOURS HOURS ASSOCIATKO WITH MKSSAO INPORMATIQN APPLIKS TO Fixed Honitor Readings-HS RIS-610 At Bg Ct 8 0 HS.RIS 610A HS-RIS-610B HS-RIS-610C HS-RIS-6100 SSS 15222 RI P<2)Time 7100 7130 8100 8130 9100 9130 9155 9156 9157 9158 9159 10100 10105 10110 10111 10112 10113 10114 10115 10116 10117 10118 10119 10120 10125 10130 10135 10140 10145 10150 10155 11 100 11 115 11 130 11145 12100 12115 12130 12145 13100 13115 13130 13145 14100 14115 14130 14145 15100 16100 1~OOE+03 1.00E+03 1.00E+03 1.00E+03 1.00E+03 1.00E+03 2.00E+02 2.70E+03 3.20E+03 3.71E+03 4.21E+03 4.72E+03 5.22E+03 6.12E+04 Offscale Of fscale 9.13E+05 8.92E+05 8.72E+05 8.52E+05 8.32E+05 8.11E+05 7.91E+05 7.70E+05 7.50E+05 6.22E+05 4.94E+05 3.67E+05 2.39E+05 1.97E+05 1.54E+05 1.12E+05 6.65E+04 2.10E+04 8.83E+03 7.08E+N 5.34E+03 3.59E+03 1.84E+N 9.77E+01 9.50E+01 9.50E+01 9.50E+01 9.50E+01 9.50E+01 9.50E+01 9.00E+01 9.00E+01 9.00E+01 7'00 1.10E+03 1.10E+03 1.10E+03 1.10E+N 1.10E+03 1~10E+03 2.20E+02 2.88E+03 3.46E+03 5.50E+02 4.75E+02 4.50E+02 4.50E+02 4.50E+02 4.50E+02 4.50E+01 4.50E+01 4.50E+01 4.50E+01 4.50E+01 4.00E+01 4.00E+01 4.00E+01 4.00E+01 4.00E+01 4.00E+01 4.00E+01 4.00E+01 4.OOE+01 4.00E+01 4.00E+01 4.00E+01 4.00E+01 3.90E+01 3.90E+01 3.90E+01 3.00E+00 3.90E+01 3.50E+01 3.50E+01 3.50E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.00E+01 3.00E+01 7130 8100 8130 9100 9130 9155 9156 9 57 9158 9159 10100 10105 10110 10111 10112 10113 10114 10115 10116 10117 10118 10119 10120 10125 10130 10135 10140 10145 10150 10155 11100 11 115 11 130 11145 12100 12115 12130 12145 13100 13115 13130 13145 14100 14115 14130 14145 15100 16!00 mR/hr Time mR/hour 7100 7130 8100 8130 9100 9130 9155 9156 9157 9158 9159 10100 10105 10110 10111 10112 10113 10114 10115 10116 10117 10118 10119 10120 10125 10130 10135 10140 10145 10150 10155 11100 11115 11 130 11 145 12100 12115 12130 12145 13100 13115 13130 13145 14100 14115 14130 14145 15100 16100 1.20E+03 1.20E+N 1.20E+03 1.20E+03 1.20E+03 1.20E+N 2.40E+02 3.06E+N 3.71E+03 4.36E+03 5.00E+03 5.65E+03 6.30E+03 7.20E+04 8.68E+05 9.73E+05 8.67E+05 8.47E+05 8.28E+05 8.09E+05 7.90E+05 7.70E+05 7.51E+05 7.32E+05 7.13E+05 5.91E+05 4.69E+05 3.49E+05 2.27E+05 1.87E+05 1.46E+05 1.06E+05 6.32E+04 1.99E+04 8.39E+03 6.73E+03 5.07E+03 3.41E+03 1.75E+03 9.28E+01 9.03E+01 9.03E+01 9.03E+01 9.03E+01 9.03E+01 9.NE+01 8.55E+01 8.55E+01 8.55E+01 Page 1 7100 7130 8100 8130 9100 9130 9155 9156 9157 9158 9159 10100 10105 10110 10$11 10112 10113 10114 10115 10116 10117 10118 10119 10120 10125 10130 10135 10140 10145 10150 10155 11100 11115 1'I$30 11 145 12100 12115 12130 12145 13100 13115 13130 13145 14100 14115 14130 14145 15100 16100 8.50E+02 8.50E+02 8.50E+02 8.50E+02 8.50E+02 8.50E+02 1.70E+02 1.62E+03 2.20E+03 4.50E+02 3.85E+02 3.50E+02 3.50E+02 3.50E+02 3.50E+02 3.50E+01 3.50E+01 3.50E+01 3.50E+01 3.50E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.20E+01 3.0oE+01 3.00E+01 3.00E+01 3.00E+01 3.00E+01 3.00E+01 3.00E+01 3.00E+01 2.ME+01 2.ME+01 2.ME+01 2.80E+01 2.60E+01 2.60E+01 2.60E+01 2.60E+01 2.40E+01 2.40E+01 2.40E+01 IIR/hour Time aR/hour SCRAM/FF HSIV high flat close RILI NO+Exercise-90 40 SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET PAGE KKT NOo 3k RESPONSIBLE CONTROLLER LLOCATIONI CR (Sisatator)

VALIO FOR TIMES OF<<PAM REAL TIME To 16400<<i<<~g.~0AM 0 PM DRILL TIME 0400~TO HOURS 0 900 HOURS ASSOCIATED WITH MESSAGES CNI Reading FuLlscnle 100k cps INFORMATION APPLIES TO Fixed Honitor Readings-CNi's TG Building 441'.471', 501'l.8 OSC 441'A<<I Readi s (c TB1A ldf 8 OS or Bui TB3A C BGSB 441'B2A Service Bl)Turbine Generat GSB HP Time 7400 7<<30 8<<00 8430 9<<00 9430 9<<55 TGB441'l ev.2200 2200 2200 2200 2200 2200 2250 TGB471'lev.1500 1500 1500 1500 1600 TG8501'l ev.1300 1275 1250 1350 1300 1370 1350 by OSC Elev.441<<1800 1800 1800 1MO 1800 1800 1800 Access Elev.441'700 1700 1700 1700 1700 1700 1700 SCRNI a 9455 A.H.and F l Fniluer Begins 10<<00 10<<05 10<<10 10411 10<<12 10<<13 10414 10:15 10416 10<<17 10418 10<<19 10<<20 10<<25 10430 10435 10440 10<<45 10450 10$55 11400 11415 11<<30 11445 12400 12415 12<<30 12<<45 13<<00 13415 13430 13445 14<<00 14<<15 14<<30 14445 2300 2250 2300 Offscale Offscale Offscale Offscale Offscale Offscale Offscale Offscale Of fscale Offscale Of fscale Offscale Of fscale Offscale Of fscale Offscale Of fscale Offscale Of fscale Of fscale Offscale Offscale Offscale Of fscale Of fscale Of fscale Offscate Offscale Offscale Of fscale Offscale Offscale Offscale 1730 1730 1735 Offscnle Offscale Offscale Offscale Offscale Offscale Offscale Offscale Offscate Offscale Of fscale Of fscale Of fscale Of fscale Of fscale Offscale Offscale Offscnle Of fscale Offscale Offscnle Offscale Of fscale Offscale Of fscale Offscale Of fscale Of fscnle Offscnle Of fscale Offscale Offscale Offscale 1350 1340 1350 Offscale Offscale Offscale Of fscale Offscale Offscale Offscale Offscnle Offscale Offscnle Offscnle Offscale Offscale Offscnle Offscale Offscale Offscale Offscale Offscnle Offscnle Of fscale Offscale Offscale Offscale Offscale Offscale Offscale Offscale Offscale Offscnle Offscnle Offscate 0'f f sea le 1800 1800 1800 2915 4351 5285 6001 8858 3705 3313 2220 1984 1879 1814 1802 1800 1800 1800 1MO 1800 1MO 1800 1MO 1700 1700 1700 11945 7276 7720 8671 8701 8985 9169 8671 8758 7196 5760 4741 3213 2625 2120 1733 1714 1702 1701 1700 1700 1700 1800 1800 1800 1800 15400 Offscale 16<<00 Offscale Offscale Offscale Of fscale Offscale 1800 1800 1800 1800 444 I5222 R'I ts 44I DRILL NO+Exercise-90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE SHEET NO, 3l RESPONSIBLE CONTROLLER (LOCATION)

CR (SIII5Ilator)

'VALID POR TIMES OPt QAM REAL TIME Q PM TO 16900 QAM 0'00 DRILL TIME.TO 9.00 HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Fixed Honitor Readings-LOCA Honitors NS-RIS-27 JC 8, C 8 D and ELF LOCA HOnitarS NS-RIS-27CED Read DOMnSCale fOr ntIre Vent.S.o eSS t an-/r NS-RIS-27A 8 278 (R/hr)Time'7A 278 NS-RIS-27E 8 27F (R/hr)Time 27E'7F 7 00 7:30 8:00 8.30 9:00 9:30 9I55 9I56 9957 9:58 0.30 0.30 0.30 0.30 0.30 0.30 0.91 1.85 2.78 3.72 0.30 0.30 0.30 0.30 0.30 0.30 0.86 1.75 2.64 3.54 SCRAH/FF 7:00 7:30 8:00 8:30 9900 9:30 9I55 9956 9:57 9:58 1.20 1.20 1.20 1.20 1.20 1.20 2.88 4.57 6.25 7.93 D.S.O.S D.S.D.S.O.S.O.S.4.05 10.31 16.56 9959 10IOO 10905 10:10 10:11 10:12 10:13 10 14 10:15 10:16 10917 10I18 10:19 10920 10925 10930 10:35 10 40 10945 10:50 10955 11900 11:15 11:30 11945 12 00 12:15 12930 12:45 13:00 13:15 13930 13:45 14:00 14!15 14930'l4 45 15I00 16IOO 17IOO 4.66 5.60 6.44 6.57 6.71 6.84 6.98 7.11 7.25 7.37 7.48 7.60 7.71 7.83 7.95 8.06 8.16 8.25 8.33 8.35 8.38 8.49 8.71 8.81 e.77 8.73 8.68 8.64 8.60 8.49 8.38 8.27 8.16 8.08 8.00 7.92 7.84 7.76 7.46 4.43 5.32 6.12 6.25 6.37 6.50 6.63 6.76 6.89 7.00 7.11 7.22 7.33 7.44 7.55 7.65 7.76 7.83 7.91 7.93 7.96 8.07 e.17 8.27 8.37 8.33 8.29 8.25 8.21 8.17 8.06 7.96 7.86 7.75 7.67 7.60 7.52 7.45 7.37 7.09 HSIV close except A Line Failure 9959 9.61 10911 13.94 10:12 14.42 10:13 14.90 10:14 15.38 10:15 15.86 10:16 16.10 10:17 16.33 10:18 16.57 10:19 16.81 10:20 17.04 10:25 17.28 10930 17.49 10I35 17.70 10I40 17.87 10945 18.03 10:50 18.19 10955 18.35 11900 18.51 11:15 18.68 11:30 18.84 11:45 19.01 12:00 19.16 12:15'19.32 12:30 19.39 12:45 19.22 13 ISO 19.06 13I15 18.84 13I30 18.62 13:45 18.46 14:00 18.30 14:15 18.22 14930 18.15 14I45 18.07 15:00 18.00 16IOO 17.86 17900 17.71 10IOO 11.29 10I05 12.98 10910 13.46 29.07 35.33'40.94 41.83 42.73 43.63 44.53 45.43 46.32 47.1'1 47.8S 48.65 49.43 50.20 50.99 51.71 52.43 52.97 53.51 53.68 53.87 54.61 55.32 56.04 56.74 56.46 56.17 55.8S 55.59 55.30 54.59 53.87 53.14 52.38 51.85 51.33 50.80 50.27 49.73 47.76 966 I522X RI{7 69)

DRILL NOs Exercise-90 WA~HINOTOo to~LIC rOWSA 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET I'AOK of KKT NOo RKSPONSISLK CONTROLLER (LOCATION)

CR (S(92I(ator)

VALID POR TIMKS OP)R KAL TIMK 7100 ASSOCIATKD WITH MKSSAOKS AM TO PM (p 16:00 PAM TO HOURS 0 00 DRILL TIMK INPORMATION APPLIKS TO 9100 HOURS (Honftor R adi Ffxed Honitor Readings-CHS, SM, 8 RCC Series s)T iIae CHS.R l S-12/1JC1B PrfIoary Contafr99ent Partfculate Honitors RB 548'levation (cpm)12/18 CHS-Rl S-12/3AQB Pr f921ry Contaimant Noble Oas Honitors RB 548'levatfon (cf29)12/38 12/3A Qf RlS-604 RNR A RAD Honitor RB 501'l (cps)QI-RlS-605 RNR-8 RAD Honitor RB 522El (cps)RCC RIS 607 Closed CM RAD Honitor RB 548'l (cps)7'00 7130 8100 8130 9100 9130 9155 9156 9157 9158 9159 10100 10:05 10110 10111 10112 10113 10:14 10115 10120 10125 10130 10145 11100 11115 11:30 11145 12100 12:15 12:30 12:45 13100 13:15 13:30 13145 14100 14115 14130 14145 15100 16100 17100 SCRAH 3400 3400 3400 3400 3400 3400 Q 9155 A.H.3400 3300 3200 3100 3150 3200 3400 3200 3100 2900 2800 2200 1800 1200 1100 1000 600 600 600 550 520 500 3800 3800 3800 3800 3800 3700 3600 3500 3550 3600 3800 4200 3600 3500 3300 3200 2600 2200 1600 1500 1400 800 800 800 800 740 740 740 740 740 680 670 670 650 610 590 2200 2200 2200 2200 2200 2200 2200 2100 2000 1900 1950 2000 2200 2600 2000 1900 1700 1600 1450 1250 1150 1100 1050 1020 1015 1010 1000 950 900 900 900 900 900 900 900 900 900 1900 1900 1900 1900 1900 1900 1900 1800 1700 1600 1650 1700 1900 2300 1700 1600 1400 1300 1150 950 850 800 750 720 715 710 700 690 685 680 650 625 600 600 600 600 600 600 600 600 600 600 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 999 19222 R1 (7<2)

Exercise-90 WAIiiI IiCIOA~I~LIC JOW~I 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET I'AOK of SHKKT NOe 3n VALIO FOR TIMKS OP!RKAL TIME RKSPONSIIILK CONTROLLKR ILOCATION)

CR (SiImIIator)

AM TO 16!00 PM 0AM 0!00 ORILI TIMK TO HOURS 9!00 1 I HOURS ASSOC IATKO WITH MKSSAO INPORMATION APPLIKS TO Fixed Honitor Readfngs-REA-RIS-19 S 19A Reactor Building Release Calibration Factor~4.284 E+7 CPH/uCI/cc Noble Gas Beta Emitters only.Calfbration Factor 100 PNJ/uCI/cc for Xe-133 Robie Gas Beta Emitters only.REA-R IS-19 Tfme CoISIts r minute REA-R IS-19A Time Panel Heter Units 7100 7!30 8!00 8!30 9!00 9!30 9!55 9!56 9!57 9!58 9!59 10!00 10!05 10!10 10511 10!12 10513 10!14 10!15 10!20 10!25 10!30 10!45 11!00 11915 11!30 11!45 12!00 12!15 12!30 12!45 13!00 13!15 13!30 13!45 14!00 14!15 14!30 14!45 15!00 16!00 17!00 250 250 250 250 250 250 0 9!55 250 260 260 265 290 290 290 285 285 285 285 285 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 CPH CPH CPH CPH CPH CPH A.H.CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH CPH 7!00 7!30 8!00 8!30 9!00 9!30 9!55 9!56 9'57 9!58 9!59 10!00 10!05 10510 10!11 10!12 10!13 10!14 10!15 10!20 10!25 10!30 10!45 11!00 11!15 11!30 11!45 12!00 12!15 12!30 12!45 13!00 13!15 13!30 13!45 14!00 14!15 14!30 14!45 15!00 16!00 17!00 1.8 1;8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 PHU PNJ PNJ PNJ PNJ PNJ PNJ PHU PHU PNJ PHU PHU PNJ PNJ PNJ PHU PNJ PNJ PNJ PNJ PNJ PNJ PNJ PNJ PNJ PNJ 999 15222 Rl f7%5!

DRILL NO+Exercise-90 WAIIIIIIOTOÃ

~I'$IC POW~i 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOC of KT NQo 3o IICSPONSIBLK CONTIIOLLCR (LOCATION)

CR (SiIKIlator)

VALID POR TIMKS OPI RGL TIMK AM TO PM 16:00 C3AM D II ILL TI M K 0200 TO HOURS HOURS ASSOCIATCD WITH MCSSAO INI'ORMATION APPLIKS TO Fixed)lonitor Readings-OG RIS 601 JCS OG-R IS-601A Time 7200 7230 8200 8230 9200 9230 SCRA)I 9255 9256 9$5 9258 9259 10200 10205 10210 10211 10212 10213 10214 10215 10220 10225 10230 10245 11200 11 215 11 230 11245 12200 12215 12230 12245 13200 13215 13230 13245 14200 14215 14230 14245 15200 16200 350 350 350 350 350 350 Q9$55A.)i.350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 OG-R IS-601$Time 7200 7230 8200 8230 9200 9230 9255 9256 9257 9258 9259 10200 10205 10210 10211 10212 10213 10214 10215 10220 10225 10230 10245 11200 11 215 11230 11 245 12200 12215 12230 12245 13200 13215 13230 13245 14200 14215 14230 14245 15200 16200 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 17200 350 17200 250 SSS 151SS RI PCS)

ORILL NO9 Exercise.90 WAINIWOZOW

~C~ZIC 9OW~I 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET IIAO K ot SHKKT NO RKSPONSIKLK CONTROLLKR (LOCATION) 3p CR (SiIKIlator)

VALIO FOR TIMKS OF I R KAL TIMK 7200 ASSOCIATKD WITH MKSSAO AM TO~M 16200 CI AM 0 00 TO DRILL TIMK HOURS INI ORMATION APPLIKS TO Fixed Honitor Readings-ARH 19-22, 8 AN 25-30 9200 HOURS ARH-Readings Oue to Normal Plant Operation and PASS Sampling.All Readings in mr/hr (ISIless noted otherIIise)

Time 7200 7215 7230 7245 8200 8215 8230 8245'~zzN 19 ARH 20L21 Hain CR 2 As Read 2 As Rend 2 As Read 2 As Read RM Bldg 2 As Read 2 As Read 2 As Read 2 As Read ARH 22 Chem I.ab RM Bl As Read As Read As Rend As Read As Read As Rend As Rend As Rend ARH 30 RM CR 9200 9215 9230 9245 2 As Read 2 As Read 2 As Read 2 As Read As Read As Read As Read As Read 10200 10205 10210 10215 10220 10225 10230 10245 2 As Read 2 As Read 2 As Read 2 As Read 2 As Rend 2 As Read 2 As Rend 2 As Read 135 1675 1505 910 As Read As Read As Read As Read As Read As Read As Rend As Read 11200 11215 11230 11245 As Read As Read As Read As Read 765 As Reed 750 As Rend 740 As Rend 720 As Reed 12200 12215 12230 12245 As Read As Read As Read As Read 710 695 As Read As Rend As Read As Read 13200 13215 13230 13245 As Read As Rend As Read As Read 650 630 610 As Rend As Reed As Read As Read 14200 14215 14230 14245 As Rend As Read As Read As Read 550 530 As Read As Rend As Read As Read 15200 As Read As Read 999 ln222 RI (7&2)16200 As Read age As Read DRILL NOI Exercise-90 NA~IIINOIOX~I'IIO JOWCI 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of KT NOe RESPONSIELK CONTROLLER (LOCATION)

CR (Sia22(ator)

VAt ID POR TIMES OPI RKAL TIME 7200 ASSOCIATEO WITH MESSAO AM TO PM 16200 0AM TO DRILI TIMK HOURS INPORMATION APPLIES TO Fixed Non(ter Readings-OG.RlS.612 9200 HOURS OG RIS-61 2 nf)/hr Time 7'00 200 7230 200 8200 200 8230 200 9200 200 9230 200 SCRAH Q9255A.II.

9255 350 9256 705 9257 1065 9258 1420 9259 1780 10200 2135 10201 2495 10202 2850 10203 3210 10204 3565 10205 3925 10210 4280 1021'i 1800 10212 1100 10213 650 10214 550 10215 500 10220 490 10225 485 10230 485 10245 485 11200 480 11215 480 11230 480 1'1 245 480 12200 480 12215 475 12230 475 12245 475 13200 470 13215 470 13230 465 13245 465 14200 460'14215 460 14230 450 14245 450 15200 440 16200 400 17200 350 Hl Alarm 0 1800 ER/hr Ri Ri Alarm 0 2300 ER/hr Steam(inc Break 999 1$aas Rl (7%9)

DRILI NOe Exercise-90 WAllllttoTOX tt'ILIC tOW~R 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of SHKKT NOe 3r RKSPONSIKLK CONTROLLER (LOCATION)

CR (Silm)later)

VALID FOR TIMES Of'l AM REAL TIME'M 16)00 PAM DRILL TIME 0 00 TO HOURS 9:00 HOURS ASSOCIATED WITH MKSSAO INFORMATION APPLIES TO Fixed Honitor Readings-MEA, MOA, Series Readings are constant for the entire exercise time.neniter MEA RIS 14 MEA-R IS-14A T ILocat(on RM Vent Exhaust, RM 487'lev.Normal Range RM Vent Exhaust, RM 407'lev.Extended Range Re~ine 45cpm 1.4PHU NA-RIB-31A NA-R IS-318 NA RIS 32A NA RIS-32B CR Remote Air Intake¹1 CR Remote Air Intake¹1 CR Remote Air Intake¹2 CR Remote Atr Intake¹2 20 cpm 23cpll 19cpm 40cpm SOS IS222 R'I P<2)

ORILI NO@Exercise-90 WAIIIINOTOW III'IIC POW~O 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAO E ET NOo 3s RESPONSISLE CONTROLLER (LOCATION)

CR (SIImIlator)

VALIO POR TIMES O&I REAL TIME 7I00 ASSOC IATEO WITH MESSAO AM TO PM 16(00 0AM DRILL TIME TO HOURS 0I00 Fixed Konitor Readings-REA-RIS-609A,B,C,and 0 INPORMATION APPLIES TO HOURS REA-RIS-609A,B,C,and 0 Oectector Range 10-2 to 10 2 Time Readi mr/hr Readi mr/hr Readi mr/hr Readi mr/hr 7I00 7I30 8I00 8 f30 9:00 9:30 9:55 9I56 9(57 9I58 9I59 10IOO 10I05 10I10 10I11 10I12 10:13 10I14 10:15 10:20 10I25 10I30 10I45 11:00 11I15 11I30 11I45 12IOO 12(15 12I30 12I45 13IOO 13 f15 13:30 13I45 14:00 14:15 14I30 14:45 15IOO 16IOO 17:00 1.20E-01 1.20E 01 1.20E.01 1.20E-01 1.20E.01 1.20E.01 SCRAK Q 9I55 A.K 1.20E 01 1.20E.01 1.20E-01 1.20E.01 1.20E.01 1.20E-01 1.20E-01 1.20E-01 1.20E 01 1.20E-01 1.20E 0'I 1.20E.01 1.20E 01 1.20E 01 1.20E-01 1.20E-01 1.20E-01 1.20E.01 1.20E-01 1.20E-01 1.20E.01 1.20E 01 1.20E.01 1.20E-01 1.20E.01 1'0E-01 1.20E.01 1.20E 01 1.20E.01 1'0E-01 1.20E 01 1.20E-01 1.20E-01 1.20E-01 1.20E-01 1.20E-01 2.50E-01 2.50E-01 2.50E-01 2.50E-01 2.50E.01 2.50E-01 2.50E-01 2.50E-01 2.50E&1 2.50E.01 2.50E.01 2.50E-01 2.50E-01 2.50E-01 2.50E 01 2.50E-01 2.50E-01 2.50E 01 2.50E.01 2.50E-01 2.50E-01 2.50E-01 2.50E-01 2.50E.01 2.50E 01 2.50E-01 2.50E 01 2.50E 01 2.50E-01 2.50E 01 2.50E 01 2.50E.01 2'0E-01 2.50E-01 2.50E-01 2.50E-01 2.50E 01 2.50E.01 2.50E-01 2.50E-01 2.50E-01 2.50E.01 7.00E 02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E 02 7.00E-02 7.00E-02 7.00E-02 7.00E 02 7.00E-02 7.00E-02 7.00E.02 7.00E-02 7.00E-02 7.00E-02 7.00E.02 7.00E-02 7.00E.02 7.00E-02 7.00E-02 7.00E 02 7.00E-02 7.00E-02 7.00E-02 7.00E 02 7.00E.02 7.00E-02 7.00E 02 7.00E 02 7.00E-02 7.00E-02 7.00E-02 7.00E-02 7.00E 02 7.00E-02 7.00E.02 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3'0E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 3.20E-01 SSS 15212 R'I P<5)

DRILL NO, Exercise 90 WAIIIIIIIOTOW

~r~LIC POWCI 4N SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAOC of SHKKT NOe 3t RKSPONSIKLC CONTROLLCR (LOCATION)

CR (Siaalator)

VALID SOR TIMKS OP?RCAL TIMC 7?00 AM TO PM ASSOCIATCD WITH M KSSAOKS 16?00 0AM INPORMATION APPLIKS TO DRILLTIMC?00 HDURS 9 00 Fixed Honitor Readings-TRA-RIS-1 Turbine Bldg Air Particulate Honitor HOURS Turbine Building Air Particulate Honi ter TRA-RE-1 (TRA-R IS-1 Range 0-50,000CPH (Ass??nes 10K effici for noble ases ssi thr s le chamber and 1X for Radioiodine on the filter)7?00 7?30 B?00 8?30 9?00 9?30 9?55 SCRAH Q 9 10!00 10?05 55 TRA RIS 1 11000 11000 11000 11000 11000 11000 11000 A.H.and 11000 11000 Readi (CPH)F uel Failuer Begins 10!10 10!11 11000 HS Line Fails 11000 10!12 10513 10!14 10!15 10!16 10!17 10!18 10!19 10?20 10?25 10?30 10?35 10?40 10?45 10?50 10?55 11!00 11?15 11?30 11?45 Offscale Of fscale Of fscale Offscale Offscale Offscale Offscale Offscale Of fscale Offscale Of fscale Offscale Offscale Offscale Offscale Of fscale Offscale Offscale Offscale Offscale CAH Offscale Oue to Radioiodine 12!00 12!15 12?30 12!45 Of fscale Offscale Offscale Of fscale 13!00 13!15 13?30 13?45 Offscale Of fscale Offscale Offscale 14?00 14!15 14?30 14!45 Offscale Offscale Offscale Offscale 15!00 16!00 Of fscale Of fscale Sss Issss Rl pcs)

~~~~~~~~4~'~'~~~'~~I II g e II I I I I~-I'I I~i I I 0~~~~~~~g~~~~~~g~'.I I~~~I~~~~~1 TURSINt LURK t OR.STORAOK TARN TURSAlt LUIS OIL CONINIIOlltR O~o=~OAS Q HI%.HNIR ORTSRSQ INK 0 0 5b5o SISTRUHKNT AIR COIIRRKSTORS AIR RtCtlttR TANASINLKT~I A IN COHOKNSKRD RKACTOR f KKOSUHR OD Iliol COHO KNSKRgg HKCN jQ A AIR KACTOR b AIR KJKCTOR SKAL OIL COOLKR OUTLKT PIT O~CONOSHSKR g IA CONOKH/RKCOUSHIKRS SAKS RUNAS+Q Q~c Il Q RRKHKATKR'5 OO o CONOKN SKR ANO WATKR SKRARATOR O~OS CKNOIATOR STA'IOR COOLHIO UIRT TA CONOt N5ATK.Oo.O~0 0 0~INN'IH~IKKI~Kl OIK*~I~MI K TURBINE GENERATOR BLDG.ELEV.441'g~~HNTSSI Exercise-90

>>A~>>I'>Ctt>'>

~>Iut to>>t1 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGK ot KT NO.4a RESPONSIBLE CONTROLLKR (LOCATION) cR (slIm)later)

VALID FOR TIMES OPt QAM 7100 TO REAL TIME PM16100 0AM 0100 CI PM DRILL TIMK TO HOURS 9:00 HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Direct Readings Turbine Generator Building 441'lev.Turbine Generator Building Dose Rates 6 Dose Rate (mr/hr)Area on sm ns on eve Contamination Level (cpm/mrad/hr)

Area Time A (mr/hr)B mr/hr C 0 (mr/hr)mr/hr)mrsd/hr mrsd/hr mrsd/hr c mrsd/hr 7 00 7:30 8100 8130 9:00 9:30 9:55 SCRA)I Q 10:00 0.1 0.1 0'0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1)I.snd 9155 A.0.1 0.1 25 18 25 18 25 18 25 18 25 18 25 18 25 18 Fuel Failuer Begins 25 18 100 100 100 100 100 100 100 100 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 250 0.05 525.250 0.05 525 250 0.05 525 250 0.05 525 250 0.05 525 250 0.05 525 250 0.05 525 250 0.05 525 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 10:05 10110 10111 10:12 10113 10:14 10:15 10120 10125 10130 10145 11100 11:15 11130 11:45 0'0.1 26 29 35 38 42 44 35 26 0.1 0.1 2850 3893 4'192 4900 3853 1271 269 25 18 25 18 2875 3143 3263 3550 3918 4237 4217 4551 4671 5028 4925 5295 3878 4196 2913 3183 1296 1484 661 818 408 552 318 458 294 432 100 100 100 120 140 145 155 165 185 195 210 339 333 327 0.02 285 0.06 0.02 470 0.09 0.03 655 0.13 0.03 840 0.17 0.03 1025 0.21 0.03 1210 0.24 0.04 1395 0.28 0.04 1580 0.32 0.04 1765 0.35 0.05 2267 0.45 0.07 2770 0.55 0.07 2719 0.54 0.07 2675 0.53 0.001 10 0.001 0.001 100 0.001 250 0.05 525 250 0.05 525 485 0.10 825 725 0.15 1130 965 0.19 1435 1200 0.24 1735 1440 0.29 2040 1675 0.34 2345 1915 0.38 2645 2150 0.43 2950 2390 0.48 3250 3036 0.61 4039 3682 0.74 4829 3616 0.72 4749 3560 0.71 4679 0.11 0.11 0.17 0'3 0~29 0.35 0.41 0 F 47 0.53 0.59 0.65 0.81 0.97 0.95 0.94 iodine Plate out B,C,D, CPH Rs1 435<Z1 299 12:00 12:15 12:30 12:35 271 261 248 296 434 286 424 277 415 273 411 322 318 314 312 0.06 0.06 0.06 0.06 2636 0.53 3510 0.70 2601 0.52 3465 0.69 2571 0.51 3426 0.69 2557 0.51 3409 0.68 4618 4564 4517 4495 0.92 5%1244 0.91~N:.'1195 0.90<<N!1299 0.90 ti'.'%1206 12145 244 269 407 310 0.06 2544 0.51 3391 0.68 4474 0.89 I",<:.1 112 13100 13:15 13:30 13:45 14100 14:15 14:30 237 262 399 231 256 392 225 250 386 220 2C5 381 215 240 375 210 235 370 206 231 366 307 302 293 0.06 0.06 0.06 0.06 0.06 0.06 0.06 2519 0.50 3360 0.67 2497 0.50 3331 0.67 2477 0.50 3305 0.66 2C58 0.49 3282 0.66 1765 2442 0.49 3260 0.65 2426 0.49 3240 0.65 2411 0.48 3221 0.64 4435 4400 4369 4340 4313 4289 4266 0.89.'<~>>10?7 0 88'4i1046 0.87 t':;4101 0.87'N!:991 0.86 I>%967 0.86 N>i944 0 85~>""i>923 14:45 201 226 362 0.06 2398 0.48 3204 0.64 42CS 0.85 ih'>904 15:00 198 358 290 0.06 2385 D.CB 3187 0.64 4225 0.84 RM886 16100 343 284 0.06 2341 0.47 3131 0.63 4156 0.83 ri"'%823 966 I5222 R1 (7.62)

Oo CVAfOAAIOA IA Qa IVAOwE AA AISIAVOA TMC STEA ll CVAfOAATOA I~IIS SVPASS VALVCSNP f/W NTA SA I I Nf f/W HTA 54LP fEEOwATCA HCATCA I*LP f/W HTA EA RAS tt/Sl IP f/W NTA SA LP fE'EOWATC/I NCATEA 14 tP f/WHT/124fCCOWATCA HCATE/I IC IP f/W HTA SS O C IP f/W NTA TC HAIN 445 COOLIHO II Al N 44555 RAS tblr'il~I~I~115 W W HATCH~W W H hssssssIC Ofs CA5 UffEA LCVCL AOOM 4/AI 5WITCNCTAA 4 AACA'QS='AS I46/1*TURBlNE GENERATOR BLDG.ELEV.471'(')~4/SSTASS Exercise-90

'AAIIIIWCIO'I tl IIII'0%I1 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE ET NO.4b RESPONSIBLE CONTROLLER (LOCATION)

CR (SiImIlator)

VALIO POR TIMES OPI PAM 7 00 To REAL TIME QPM ASSOCIATEO WITH MESSAGES 16:00@AM 0 00 0 RILL TIME TO HOURS INPORMATION APPLIES TO 9I00 HOURS Direct Readings Turbine Generator Building 471'lev.Turbine Generator Building Dose Rates MB Dose Rate (mr/hr)Area Contamination Level (cpm/mr ad/hr)Area 7 00 7930 BI00 8I30 9I00 9I30 A 8 (mr/hr)mr/hr 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 C 0 (mr/hr)mr/hr)25 0.1 25 0.1 25 0.1 25 0.1 25 0.1 25 0.1 mrad/hr 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 c mrad/hr 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 350 350 350 350 350 350 mr ad/hr 0.07 450 0.07 450 0.07 450 0.07 450 0.07 450 0.07 450 0.09 0.09 0.09 0.09 0.09 0.09 c mrad/hr 9I55 0.1 0.1 25 0.1 100 0.001 100 0.001 350 0.07 450 0.09 SCRAM Q 9I55 A.M.and Fuel Fa iluer 8 egins 10IDD 10I05 10:10 10:11 10I12 10913 10I14 10:15 10I20 10I25 10I30 10IC5 11IOO 11915 11:30 11I45 0.1 0.1 0~1 0.1 29 2850 32 3238 39 3893 42 4192 46 4646 49 4900 39 3853 29 2888 13 1271 6 636 4 383 3 293 3 269 0.1 0.1 2875 3263 3918 4217 4671 4925 2913 1296 318 294 0.1 0.1 0.1 2850 3238 4087 4192 4900 3853 1271 293 269 100 0.001 100 0.001 100 0.001 100 0.02 120 0.02 140 0.03 145 0.03 155 0.03 165 0.03 185 0.04 195 0.04 230 0.05 302 0.06 374 0.07 366 0.07 360 0.07 100 100 100 300 505 705 1105 1305 1510 1710 1910 2484 3058 3000 2950 0.001 0.001 0.001 0.06 0.10 0.14 0.18 0.22 0.26 0.30 0.34 0.38 0.50 0.61 0.60 0.59 350 350 350 690 1035 1380 1725 2065 2410 2755 3440 4373 5306 5212 5129 0.07 450 0.07 450 0.14 680 0.21 925 0.28 1165 0.35 1400 0.41 1640 0.48 1875 0.55 2115 0.62 2350 0.69 2590 0.87 3236 1.06 3882 1.04 3816 1.03 3760 0.07 450 0.09 0.09 0.09 0.14 0.19 0.23 0.28 0.33 0.38 0.42 0.47 0.52 0.65 0.78 0.76 0.75 iodine Plate out B,C,D, CPM 717~>5 1299';5 12IOO 12915 12I30 12I35 12I45 3 271 3 261 3 252 2 248 2 244 269 271 261 252 248 244 354 0.07 2905 349 0.07 2866 360 0.07 2950 351 0.07 2875 341 0.07 2800 0.58 0;57 0.59 0.57 0.56 5057 4993 5129 5008 1.01 3710 1.00 3665 1.03 3760 1.00 3675 0.98 3591 0.74 0.73 0.75 0.74 0.72 1299'."5 CT244 T194'I9 13IOO 13I15 13 I30 13:45 14IOO 1CI15 14:30 14I45 2 237 262 2 231 256 2 225 250 2 220 245 2 215 240 2 210 235 2 206 231 2 201 226 225 220 215 210 206 201 338 0.07 2772 335 0.07 2747 332 0.07 2724 329 0.07 2703 327 0.07 2683 324 0.06 2665 322 0.06 2649 320 0.06 2633 0.55 4841 0.55 4800 0.54 4762 0.54 4728 0'4 4696 0.53 4667 0.53 4640 0.53 4615 0.97 0.96 0.95 0.95 0.94 0.93 0.93 0.92 3560 3531 3505 3482 3460 3440 3421 3404 0.7'I 0.71 0.70 1077, 5 i'990';7 966"51 0.70 0.69 0.69 0.68 0.68 944"1 923"'43 15IOO 2 198 198 319 0.06 2619 0.52 4592 0.92 3387 0.68%Ã%886 16IOO 2 184 312 0.06 2569 0~51 4510 0.90 3331 0.67 823A2 999 ISZSZ R'I IS.SSI AIOI5TVAK 5EAAAATOA IA Qn Zl I 2'.m C)m m X 0 XI lD!O p m!m CI WC X 0!I~I'nE IS II n X 4 ASSN N<<NN~~CX C X Cf At AATOA 6p Iy Ts IS Ts X n j!X X~I I i X a AIOITTVAC 5CAAAATOA Ie Qn i X C 0 0 Xn Is II C p Qm II.;g IQ 0 D:"*0 I n n nnn g IS ATCAII I II II Il I L DRILL NO<Exercise-90

<<ASH<'KCTOi

~I'I.IC'OAC1 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET~PAGE.KT No.RKSPDNSIKLK coNTRoLLKR ll.ocATIoN) 4c VALID FOR TIMES OF: QAM REAL TIME 700 PM To ASSOCIATED WITH MKSSAGKS CR (81Im)later) 16:00 0AM To HOURS DRILL TIME 0 00 INFORMATION APPLIKS To 9:00 HOURS Direct Readfngs Turbine Generator Building 501'lev.Turbine Generator Buildfng Dose Rates and Contamination Levels MB Dose Rate Contamination Level (mr/hr)(cPII/mrad/hr)

Area Area Time-~A<~-8"~C D (mr/hr)mr/hr (mr/hr)mr/hr)7 00 0.1 2 25 150 100 mrad/hr 0.001'100 8 mrad/hr 0.001 350 mrad/hr 0.07 c mrad/hr 0.09 650 7:30 8)00 8:30 9:00 9)30 9:55 0.1 0.1 0.1 0.1 0.1 0.1 2 25 150 2 25 150 2 25 150 2 25 150 2 25 150 2 25 195 100 100 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0.001 0.001 0.001 350 350 350 350 350 350 0.07 0.07 0.07 0.07 0.07 0.07 650 650 650 650 650 650 0.09 0.09 0.09 0.09 0.09 0.09 SCRAH Q 9:55 A.H.and Fuel Failuer Begins 10)00 10)05 10)10 10:11 10)12 10)13 10)14 10)15 10:20 10:25 10:30 10:45 11)00 11:15 11:30 11:45 0.1 0.1 0.1 29 2850 32 39 3893 42 4192 46 4646 49 4900 39 3853 29 2888 13 1271 6 636 4 383 3 293 3 269 25 25 2875 3263 3918 4217 4671 4925 3878 2913 1296 408 318 2145 4250 6350 5595 4840 4237 4551 5028 4196 3183 818 552 458 432 100 0.001 100 0.001 350 100 0.001 100 0.001 350 100 0.001 100 0.001 350 100 0.02 310 0.06 590 120 0.02 520 0.10 825 140 0.03 735 0.15 1065 145 0.03 945 0.19 1300 155 0.03 1155 0'3 1540 165 0.03 1370 0.27 1775 185 0.04 1580 0.32 2015 195 0.04 1790 0.36 2250 230 0.05 2000 0.40 2490 267 0.05 2574 0.51 3136 339 0.07 3148 0.63 3782 331 0.07 3090 0.62 3716 325 0.06 3040 0.61 3660 0.07 0.07 0.07 0.12 0.17 0.21 0.26 0.31 0.36 0.40 0.45 0.50 0.63 0.76 0.74 0.73 650 650 650 940 1230 1520 1810 2100 2390 2685 2975 3265 4054 4764 4694 0.09 0.09 0.09 0.19 0.25 0.30 0.36 0.42 0.48 0.54 0.60 0.65 iodine Plate out B,C,D, CPH 0.81 Nh~718 0.97<MT435 0.95@!1363 0.9C NST299 12:00 12:15 12)30 12:35 12:45 3 271 3 261 3 252 2 248 2 244 269 424 415 411 407 319 0.06 2995 0.60 3610 314 0.06 2956 0.59 3565 310 0.06 2921 0.58 3526 308 0.06 2906 0.58 3509 306 0.06 2890 0.58 3491 0.72 4633 0~71 C579 0.71 4532 0.70 4510 0.70 4489 0.93'1244 0 92 fs;1195 0.91!~%299 0.90<N$206 0.90 N~T 112 13:00 13:15 13)30 13:45 231 225 220 262 256 250 245 392 381 303 0.06 300 0.06 297 0.06 294 0.06 2862 0.57 3460 0.69 4450 2837 0.57 3431 0.69 4415 2814 0.56 3405 0.68 4384 2793 0.56'382 0.68 4355 0.89 e)'(10: 0.88'~'.F04'6 0.88 4@101 0.87<Mi991 14:00 14:15 14:30 14:45 215 210 201 240 226 370 362 292 0.06 289 0.06 287 0.06 285 0.06 2773 0.55 3360 0.67 4328 2755 0.55 3340 0.67 4304 2739 0'5 3321 0.66 4281 2723 0.54 3304 0.66 4260 0.87Ã41967 0.86 SS,944 0.86 N~~0923 0.85 4%904 15:00 2 198 358 284 0.06 2709 0.54 3287 0.66 4240 0.85 O'N886 16:00 2 18C 209 277 0.06 2659 0.53 3231 0.65 4171 0.83 iI@823 sss 15222 Rl (7%2)

OFfTCS AREA llWOI NOCW ETTCNIN EONNNENT Jc LOOSE (cdSLE CTRTCAL SNOP COEtREO O~COIPINEO MT CN MEN'4 OCKSA ROOM NONE ICE LOCa I I NOON L i ACCtSS CONTROL~Na EMIE Off MAINTENANCS OFFCt Qs W RtSTROOM~IONPII.IINI NEPIPCE I PLL OTNE N CNIINNCI NLNTECS ILEP SEA TCW SERVICE BLDG.ELEV.a41'a w al 4 4 N Ab bb b A orrca tRTNTENOENTS Off TCt CORRIOOA MAIN I EN ANCE A OFF ICE b b orrca orrca (sS"'awra NI Ica NXW<<rca W RESTROOM OPEN TO oaovIO r l Coo<<rca or>ca M ATSTITOOM~LANT AOMONSTRATION (p~LCETPII.WII NIPLICII PIL OTNEN ooaaNNCE SMA FL 51 M RtSTROOM SMLFN 51 SNAKC (si 4MLF IO I P.a SML AW I ELEVATOR SERVICE BLDG.ELEV.456, PI~aF Tl' DRILL NO'Exercise-90

%ASHIiOTOi H~LIC POI1EO 4k SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE ot KT NO.RESPONSIBLE CONTROLLER (LOCATION)

CR (Sfmulator) 0AM 7.00 gP REAL TIMK VALID FOR TIMES OF1 16100 0AM DRILL TIME 0 00 TO HOURS 9100 HOURS ASSOCIATED WITH MKSSACES INFORMATION APPI IES TO Ofrect Readings--

General Service Building 441'456'lev.General Service Buildfng Bose Rates and Contamination Levels MB Dose Ra'te Contamination Level (mr/hr)(cPII/mrad/hr)

Area Area Tfme A..mr/hr 8 (mr/hr).C mr/hr mr/hr A mr ad/hr mrad/hr mrad/hr~0 c mrad/hr 7 00 0.1 0.1 0.1 0.1 100 0.02 100 0.02 100 0.02 100 0.02 7130 0.1 0.1 0.1 0.1 100 0.02 100 0.02 100 0.02 100 0.02 8100 8130 9100 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 100 0.1 0~1 100 0.1 0~1 100 0.02 100 0.02 100 0.02 100 0.02 0.02 0.02 100 0.02 100 100 0.02 100 100 0.02 100 0.02 0.02 0.02 9130 0.1 0.1 0.1 0.1 100 0.02 100 0.02 100 0.02 100 0.02 9155 0.1 0.1 0.1 0.1 100 i 0.02 100 0.02 100 0.02 100 0.02 SCRA)i 9 9'155 A.)f.and Fuel Fafluer B 10100 10105 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1'100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 100 0.02 0.02 10110 10111 10112 10113 10114 10115 10120 10125 10130 10145 11100 11115 0.1 0.1 0.1 0.6 0.5 0.1 0.54 0.1 0.45 2.5 0.25 2.25 2.8 0.28 2.52 3.5 0.35 3.15 3.8 0.38 3.42 4.2 0.42 3.78 4.4 0.44 3.96 3.5 0.35 3.15 2.6 0.26 2.34 1.1 0.11 0.99 0.1 26 35 38 42 35 26 100 0.02 100 0.02 100 0.02 100 0.02 100 0'2 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 124 0.02 145 0.03 100.0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 159 0.03'29 0.03 211 0.04 154 0.03 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 100 120 140 145 155 165 185 195 210 446 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.09 11130 11145 0.3 0.2 0.1 0.27 0.1 0.18 162 0.03 177 0.04 256 0.05 175 0.03 293 0.06 193 0.04 624 0.12 0.15 12:00 12115 12130 12:35 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 189 0.04 186 0.04 183 0.04 182 0.04 323 0.06 207 0.04 315 0.06 203 0.04 307 0.06 200 0.04 304 0.06 198 0.04 891 858 829 816 0~18 0.17 0.17 0.16 12145 0.1 0.1 0.1 180 0.04 301 0.06 196 0.04 803 0.16 13100 0.1 0.1 0.1 178 0.04 295 0.06 194 0.04 0.16 13115 13130 13145 0~1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 176 0.04 174 0.03 172 0.03 290 0.06 285 0.06 280 0.06 191 189 0.04 0.04 0.04 720 0.15 0.15 0.14 14100 0.1 0.1 0.1 170 0.03 276 0~06 0.04 0.14 14115 14130 14145 0.1 0.1 0.1 0.1 0.1 0.1 0'0.1 0.1 169 0.03 167 0.03 166 0.03 272 0.05 268 0.05 265 0.05 181 0.04 0.04 0.04 674 0.14 0.13 0.13 15100 16100 0.1 0.1 0.1 0.1 2 0.1 0.1 2 165 0.03 0.03 262 0.05 178 251 0.05 172 0.04 648 0.13 0.03 604 0.12 ses 15222 RI{7 sQ)

~~i I Qi~g~

Exercise.90

'a*~NliCTO%tl~LIC~OIICC 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET'AGE ot ET NO.4e RESPONSIBLE CONTROLLER (LOCATION) cR (silmIlator)

VALID FOR TIMES OI: 7700~TO REAL TIME CI PM 16IOO 0AM 0IOO DRILL TIME TO HOURS 9I00 HOURS ASSOCIATED WITH MESSAGES INI'ORMATION APPLIES TO Direct Readings--

OSC and PAP MS Oose Rate (mr/hr)Area OSC and PAP Oose Rates and Contamination Levels Contamination Level (cpm/mrad/hr)

Area Time 7 00 7I30 8700 8730 9700 9730 9755 A mr/hr 0.1 0.1 0.1 0.1 0.1 0.1 0.1 8 C (mr/hr)mr/hr)0.1 0.1 0.1 0.1 0.1 0~1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 A'rad/hr 100 0.02 100 0.02 100'0.02 100 0.02 100 0.02 100 0.02 100 0.02 mrad/hr c mrad/hr 100 0.02 100 0.02 100 0.02 100 100 0.02 100 0.02 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 100 0.02 SCRAN cI 9755 A.II.and liver 8 i l F Ue a eg ns 10I00 10I05 0.1 0.1 0.1 0.1 0.1 0.1 100 100 0.02 0.02 100 100 0.02 0.02 100 100 0.02 0.02 10I10 0.1 0.1 0.1 100 0.02 100 0.02 100 0.02 10:11 2.5 0.25 10712 2.8 0.28 0.23 0.25 100 100 0.02 0.02 100 100 0.02 0.02 100 100 0.02 0.02 10:13 3.5 0.35 0.32 100 0.02 100 0.02 100 0.02 10I14 3.8 0.38 0.34 100 0.02 100 0.02 100 0.02 10715 4.2 0.42 0.38 100 0.02 100 0.02 100 0.02 10720 4.4 0.44 10725 3.5 0.35 10I30 2.6 0.26 0.40 0.32 0.23 100 100 100 0.02 0.02 0.02 100 100 100 0.02 0.02 0.02 100 100 100 0.02 0.02 0.02 10I45 11700 1.1 0.11 0.6 0.1 0.1 0.1 100 124 0.02 0.02 100 159 0.02 0.03 100 121 0.02 0.02 11I15 11I30 11:45 0.5 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 145 162 0.03 0.03 0~04 211 256 0.04 0.05 0.06 140 156 170 0.03 0.03 0.03 12700 12I15 12I30 12I35 0.1 0.1 0.1 0~1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 189 182 0.04 0.04 0.04 0.04 315 307 0.06 0.06 0.06 0.06 180 0.04 0.03 0.03 12I45 0.1 0.1 0.1 0~04 301 0.06 0.03 13IOO 13715 13I30 13I45 14IOO 14 I 15 14I30 14I45 0.1 0.1 0.1 0~1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0~1 0.1 0.1 0.1 0~1 0~1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.04 176 0.04 174 0.03 172 0.03 170 0.03 169 0'3 167 0'3 166 0.03 285 276 265 0.06 0.06 0.06 0.06 0.06 0.05 0.05 0.05 170 165 162 161 159 0'3 0.03 0.03 0.03 0.03 0.03 0.03 0.03 15IOO 16IOO 0.1 0.1 0.1 0~1 0~1 0.1 165 0.03 262 160 0.03 251 0.05 0 F 05 158 0.03 154 0.03 96a ISZZZ Rl (7 sZI ao Cl IS 9)NX..4I%0~Lo 9 M-e IE 8I~11400 0 n,"iLL No'xercfse-90 i%A~HI'iCTO%ti~lli'ONCE 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE ot ET NO RESPONSIBLE CONTROLLER (LOCATION)

CR (SiIm)later)

VALID FOR TIMES Of: QAM 7:00 TO REAL TIME<PM ASSOCIATED WITH MESSAGES 16)00 CI AM 0:00 TO DRILL TIME HOURS INFORMATION APPI IES TO~Direct Readings Reactor Building 471'lev.9)00 HOURS Reactor Building Dose Rates and Contamination Levels MB Dose Rate Contamination Level (mr/hr)(cPII/mr/hr)

Area Area Time 7 00 A 8 C D (mr/hr)mr/hr (mr/hr)mr/hr 2 1 0.1 40 mr/hr c mrad/br c mr ad/hr c mr ad/hr 2 100 0.001 100 0.001 100 0.001 c mrad/hr c mrad/hr 0.001 0.001 100 100 7)30 8)00 8)30 9)00 9)30 9 55 0.1 0.1 0~1 0~1 0.1 0.1 10 40 10 40 10 40 10 40 10 40 10 40 2.100 0.001 100 0.001 100 0.001 2 100 0.001 100 0.001 100 0.001 2 100 0.001 100 0~001 100 0.001 2 100 0.001 100 0'01 100 0.001 2 100 0.001 100 0.001 100 0.001 2 100 0.001 100 0.001 100 0.001 100 100 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0.001 0.001 0.001 SCRAH Q 9)55 A.)I~snd Fuel Failuer Begins 10)00 0.1 10 40 2 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 10)15 10:30 10)45 11:00 0.1 0.1 0.1 0.1 10 10 10 10 40 40 40 2 100 2 100 2 100 2 100 0.001 100 0.001 0.001 100 0.001 0.001 100 0.001 0.001 100 0~001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 100 100 100 0.001 0.001 0.001 0.001 11:15 11:30 11)45 0.1 0.1 0.1 10 10 10 40 40 40 2 100 2 100 2 100 0.001 100 0.001 100 0.001 100 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 100 0.001 100 100 100 0.001 0.001 0.001 IF PASS S ling do es not start 12)35 hrs use 12:30 hrs readings 12)00 12)15 0~1 0.1 10 10 40 40 2 100 2 100 0.001 100 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 100 0.001 0.001 12)30 12:35 12)45 0.1 0.1 0.1 10 850 812 40 2 100~1020 60 100 975 55 100 0.001 100 0.001 100 0.001 100 0.001 0.001 100 0.001 100 0.001 100 0 F 001 100 0.001 100'.001 0.001 100 0.001 100 100 100 0.001 0.001 0.001 13)00 13)15 13)30 13)45 14)00 0.1 0.1 0.1 0.1 0.1 700 625 930 50 885 45 840 40 795 35 750 30 100 100 100 100 100 0.001 0.001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 100 100 100 100 0.001 0.001 0.001 0.001 0.001 14)15 14)30 14)45 0.1 0.1 0.1 550 513 705 30 660 30 615 30 100 100 100 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 100 100 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 100 100 0.001 0.001 0.001 15:00 0.1 2 475 570 30 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 16)00 0.1 2 324 395 30 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 9ss 1$222 Rl (7$2)

A I ELEV rI 1IP 7'evES ARM'7 2d LPCS vaLV~ROOM A lS'BOVE FLOOR EOR BO CRP REPAIR ROO OI tlPCS 0 SUMP VENT 0 TIP ROOt4 HS,V UNIT RECIRC pUMP 1A PERSQQHCL ACCESS HATCH ACCESS HATCH~l~i~~~~r+RCIC OTSW 40 RECIRC puMP, IB~ii~i~lii~~~Ii ii ii rr~~ii Hgv UNIT F d RETURN LINE OECON aREA CRP HATCH 0 0 HLV UNIT',I g'r\HATCH csp Maltt CONTAINMENT VF.NT gp 5C f2 vaLvE ROOM B ELEV 42 scaLE 7"'E~<mi~~~~~~N REACTOR BLDG.ELEV.501' Exercise-90

'I~A~HIWOTO%~l~LIC'O%1 ER 4S SUPPLY SYSTEM!CONTROLLER INFORMATlON GENERAL DATA SHEET FAG K.c',KT NO.94g RESPONSIBLE CONTROLLER (LOCATION)

CR (SiImiiator)

VALIO FOR TIMES OFl 7)00 Q TO REAL TIME'M ASSOC IATKD WITH MKSSAGKS'16)00 QAM 0 00 TO DRILL TIME HOURS INFORMATION APPI IKS TO Direct Readings Reactor Building 501'lev.9900 HOURS Reactor Building Dose Rates and Contamination Levels IIB Dose Rate Contamination Level (mr/hr)(cpm/mr/hr)

Area Ares'Time A (mr/hr)B mr/hr C D (mr/hr)mr/hr)mrad/hr c mrad/hr c mr ad/hr c mrad/hr 7'00 7I30 8 00 BI30 9:00 9I30 9:55 0.1 0.1 0.1 0.1 0'0.1 0.1 10 40 10 40 10 40 10 40 10 40 10 40 10 40 100 100 100 100 100 100 100 0.001 0.001 0.001 0.001 0.001 0.001 0.001 100 100 100 100 100 100 100 0.001 100 0.001 0.001 0.001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0~001 100 0~001 0.001~100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 SCRAII B 10IOO 10I15 10I30 R.and Fuel Fa 9I55 A.iluer Begins 0.1 10 4 0.1 10 40 0.1 10 40 100 100 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 10I45 11IOO 11I15 11I30 0.1 0.1 0.1 0.1 10 40 10 40 10 40 10 40 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 11I45 0.1 10 40*ROTEI If PAS 100 S Sampling do 0.001 100 es not start 100 0.001 0.001 12:35 h rs use 1 2I30 hrs 100 0.001 I'eadlngs 12IDO 12I15 12I30 12I35 12:45 0.1 0.1 0~1 0.1 0.1 10 40 10 40 10 40 9700*175 670 165 100 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0~001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 13I00 13915 13I30 13I45 0'0.1 0.1 0.1 640 160 610 150 580 145 550 135 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 100 100 100 0.001 0.001 0.001 0.001 14IOO 14I15 14I30 14945 0.1 0.1 0.1 0.1 620 130 490 120 460 115 430 110 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 100 100 100 0.001 0.001 0.001 0.001 15900 0.1 2 400 100 100 0.001 100 0.001 100 0.001 100 0.001 16IDO 0.1 2 285 65 100 0.001 100 0.001 100 0.001 100 0.001 909 1 sass Rl (7 9$)

A n ELEV 01 FOR-O lo'~EOA.S MASTER CONTROL AREA PIPING MCC ROOM C LADDER O FOAM CEP'SOVE F OOll PASS 11 A~~,>M>>'?w h'r CRD MODULES RWCU PUMP 1A~'A RWCU PUMP 18 REACTOR PRESSURE VESSEL 0 SU>>(>VENT REACTOR l>~l PIPE SPACE 20'SOVE FLOOIT f (0 ((1 SAC.SHIELD O'SOVE FLOO t~F'C~re~Py PASSUNE'l(8 0'OVE fLOOA H PCS 10'aOVE FLOOR MCC ROOM LADDER CAO O (>O OEa~>20'SOVE FLOOll CRD MODULES g AAII.S/LAOOf R ELECT.ROCu FOll 0 lo'hl FFC~r F(>C FOR A SW SR+3 ELEV 82 02~(4)4>2 1042 ((t>'(ACES A(L OI>>20 Aa>ve>CS REACTOR BLDG.ELEV.522'CALE g>>gg>02rro)4 (I 861025.18 DRILL NOa Exercise-90 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAD E oI EKT NO RKSPONSIBt K CONTROLLER (LOCATION) 4h CR (Simulator) 7iPP+TO RKAL TIME VALID FOR TIMES OP: PAM 16I00 0AM DRILL TIMK~TO HOURS 9I00 HOURS ASSOCIATKD WITH MESSAGES INFORMATION APPLIES TO Direct Readings Reactor Building 522'lev.Reactor Building Dose Rates and Contamination Levels MB Dose Rate Contamination Level (mr/hr)(cpII/mrghr)

AI'ea Area A 8 (mr/hr)mr/hr C (mr/hr)0 mr/hr mr/hr mrad/hr c mrad/hr c mrad/hr c mrad/hr c mrad/hr 7900 7930 8900 8930 9)00 9I30 9'55 SCRAH oI 10)00 0.1 0.1 0.1 0.1 0.1 0.1 0.1 9955 A.II~and 0.1 10 10 10 10 10 10 10 Fuel Fa 10 40 40 40 40 40 40 2 40 I iver Begins 40 2 100 100 100 100 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0~001 100 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 100 100 100 100 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0~001 0.001 0.001 0.001 0.001 10915 10930 10945 11IOO 0.1 0.1 0.1 0.1 10 10 10 10 40 40 40 40 100 100 100 100 0.001 0.001 0.001 0.001 100 0~001 100 100 0.001 100 100 0.001 100 100 100 0.001 0.001 0.001 0.001 0.001 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0 F 001 0.001 0.001 0.001 11915 0.1 10 40 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 11930 0.1 10 40 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 11I45 12900 01.2 0.1 10 40 9 ROTE!If PAS 10 40 100 0.001 S S li does not s 100 0.001 100 0.001 100 0.001 tart 12935 h rs use 1 2930 hrs 100 0.001 100 0.001 100 reading 100 0.001 100 0.001 100 0.001 0.001 12915 12930 12935 12945 0.1 0.1 0.1 0.1 10 10 1000 40 40 250 1250 240 1195 100 100 100 100 0.001 0.001 0.001 0.001 100 0.001 100 100 0.001 100 100 0.001 100 100 0~001 100 0.001 0.001 0.001 0.001 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0.001 13IOO 13915 13I30 0.1 0.1 0.1 915 870 825 230 1140 215 1085 205 1030 100 100 100 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 100 100 0.001 0.001 0'01 100 100 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 13I45 0.1 790 195 985 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 14IOO 14I15 14I30 14I45 0.1 0.1 0.1 0.1 745 710 630 185 930 175 885 165 830 155 785 100 100 100 100 0.001 0.001 0.001 0.001 100 0.001 100 0.001 100 0.001 100 0.001 100 100 100 100 0.001 0.001 0.001 0.001 100 100 100 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 0.001 0.001 0'01 15900 0.1 2 585 145 730 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 16 IOO 0.1 2 435 105 540 100 0.001 100 0.001 100 0.001 100 0.001 100 0.001 99$19222 R'I (7'92)

DRILL No>Exercise 90'>>ASNF>>0t0<<

<>l'Out t0%00 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE SHEET NO>RESPONSIBLE CONTROLLER (LOCATION) 4i CR (SiImIlator), OSC IIith Field Teams VALID FOR TIMES OFt 710 TO REAL TIME PM 16100 0AM 0 PM DRILL TIME 0 00'TD HOURS 9100 HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO In-Plant Area Dose Rates-Air Sacpie Results-TGBuilding in DPH 0 on mR/hr mR/hr mR/hr D on 0 on D on IIR/hr on mR/hr on mR/hr on Time Filter fo 100 ft 3 Sa le Filter fo 50 ft 3 S le Filter fo 25ft 3 S le Filter f 100 ft S le Filter f 50 ft 3 S le Filter fo 25ft 3 S le Cartridge Cartridge 100 ft 3 50<t 3 S le S le Cartridge Cartridge Cartridge Cartridge 25ft 3 100 ft 3 50 ft 3 25ft 3 S le S le S le S le 7 00 7:30 8100 8:30 tN>"~,:Sk<<'P>><%8k" l@¹Sk'c<<<m Sk rem>>t?Bk"dNN N8k'.'<<<<6>0>>gk'ent?5".N A8'NSk'dN Pv'tgk>4~a.NSk'dN<<sgk di>';<:;Bk>>Sk d'>'>><<>Sk d>>INBk'N NSR dkg I.-:Sk dN<8."::.NNSk d;~>>?>t<<6<8 N:Z MN'<<>>::, 8""?.'".Bk¹NENSk'~Nc..".::IN

'4.Nckgk":.e>..:<<>>NSk":;:N

~:;.Sk>!<<5 R~'Sk'" 4".,¹BR':!8'i<<;>>.Bk RN"N6$k"'"-'.?'Sk"<<i<"':~<8k"~""':>>tgk'"-'.:>88k:i>>'c'>>t

<C~Sk'<<'>>>

M::Bk'N!8 rcc<<rlgk 9100<><<,'jgk'>>1>N'Yi>><<>>SkBk N cr>>'.Bk'<<i 45&k dN:<<0?IN<8k MSk mar%.<A.N't>>>.,'..NSk"'::

<¹Sk"'".>!

9130 9155 10:00"<<>>>N":-<Sk'N".'Sk'dhsÃSk diP</>>BkNN'.Sk'c,'Sk

'id:><~c, NBk'$%<<<>>Sk'pi NBk>!.'Sgk N<<a NNSk'iN 8~~>.Bk>¹N V@8k d>~N ta<:<i-Sk"<<0: 8<MBk" K.NI<N'~Y<<0'¹<Sk"'-::

$@1N"':8>>>.'"<<<Bk'

>4'-: ': l-Bk">:".'S>>';-:..:<<NSk"'!~".':>>SNSk"'B.i'".'::Sk N'>:>>c.."'."Skgdi:;;!:

i<<'".Sk NX):".ilk<<cc::: Sk M'.<>.N M'0105 10110>X<1<8k c<<ic'<<??NN s+~48k'%<<I":.NNSk<<N Sk<c<P?<>Bk'<<s QSk'd<<.<Ttgk f>>e>Sk'dI!r.".Sk dN lBSk'"d 8 I@iSk"d>'<<<<" Yj>Sk'>>8>4>><<NBk'h>>NKBk"'r>SMBk"'~/>>?<<.'Sk

>C:":::<<8k"'::.':":.":Sk"'<<>>

j%?Ski:.:I¹Sk"':".':,"::;.Bk'" 5<<>>>>iirtBk"&N 10:11 10:15 7.51E+08 6.DOE+08 3.75E+08 3.DOE+08 1.88E+08 1.50E+M 15013 12007 6003 3753 3002 1.43E+10 1.14E+10 7.13E+09 5.70E+09 3.57E+09 285239 142619 71310 2.85E+09 228127 114063 57032 10120 10125 10130 6.89E+08 5.78E+08 4 47E+08 3.45E+08 2.89E+08 2.24E+08 1.72E+08 13781 1.45E+08 11561 1.12E+08 8945 6891 3445 2890 1.31E+10 1.10E+10 8.50E+09 6.55E+09 5.49E+09 4;25E+09 3.27E+09 261840 130920 65C60 2.75E+09 219657 109828 54914 2.12E+09 169960 84980 42490 10:35 3.45E+08 1.73E+08 8.63E+07 6905 3452 1726 6.56E+09 3.28E+09 1.64E+09 131188 6559C 3279 10140 10145 10150 10155 11100 2.74E+08 2.24E+08 1.79E+08 1'2E+08 9.94E+07 1.37E+08 1.12E+08 8.96E+07 7.08E+07 4.97E+07 6.85E+07 5477 5.59E+07 4475 4.48E+07 3585 3.54E+07 2831 1988 2.49E+07 2739 1793 1415 1369 1119 896 497 5.20E+09 4.25E+09 3.41E+09 2.69E+09 1.89E+09 2.60E+09 2.13E+09 1.70E+09 1.34E+09 9 CCE+08 1 06E+09 85027 4251C 8.52E+08 68122 34061 6.72E+08 53780 26890 4.72E+08 37777 18888 1.30E+09 104068 52034 26017 21257 17031 134C5 9444 11:15 11:30 11145 12100 C~OOE+07 1.73E+07 7.28E+06 3.01E+06 2.DOE+07 8.66E+06 3.64E+06 1.50E+06 1.DOE+07 4.33E+06 1.82E+06 7.52E+05 1C6 400 30 200 87 15 7.61E+M 3.29E+M 1.38E+08 5;71E+07 3.80E+08 1.65E+08 6.92E+07 2.86E+07 1.90E+08 8.23E+07 3.46E+07 1.43E+07 15217 6582 2767 1143 7608 3291 1384 571 3804 1645 692 12:15 12130 12145 13100 1.23E+06 4.96E+05 1.99E+05 7.97E+04 6.13E+05 2.48E+05 9.96E+04 3.98E+04 3.07E+05 1.24E+05 4.98E+04 1.99E+04 10 12 0.40 2.33E+07 1.16E+07 9.42E+06 4.71E+06~3.79E+06 1.89E+06 1.51E+06 7.57E+05 5.82E+06 2.36E+06 9.46E+05 3.79E+05 76~30 94 38 15 116 47 19 13:15 13:30 13145 6.03E+04 4.08E+04 2.14E+04 3.01E+04 2.04E+04 1~07E+04 1.51E+04 1.02E+04 0.82 5.35E+03 0.43 0.30 0.60 0.20 0.41 0.21 NNSk du~'.15E+06 5.73E+05 7.76E+05 3.88E+05 4.07E+05 2.03E+05 2.86E+05 1.94E+05 1.02E+05 16 14100 1C 1 15 1.98E+03 1.50E+03 9.92E+02 7.CBE+02 C.96E+02 NNSk dNT 3.74E+02 IBk N>ENSk dN?Mgk trB SSk d,??<>3.77E+04 1.89E+04 2.84E+04 1.42E+04 9.43E+03 7.11E+03 0.75 0.57 0.38 0.28 0.19 0.14 14130 1.01E+03 5.04E+02 2.52E+02 NNSk dN@Sk'(S'<Sk'N 1.92E+04 9.58E+03 4.79E+03 0.38 0.19 0.10 14145 5'0E+02 2.60E+02 1.30E+02 M'.Sk dh<<ITNBk'".EBk'd>B 9.88E+03 4.94E+03 2.C7E+03 0.20 0.10 tNSk'<<<15100 3.18E+01 1.59E+01 7.96E+00@%8k dSI'<<lgk'd!8 Nlgk d<<><<Bk"'>'>>I'i%8k'<>-:.K~8k 5>>Concentrations as found from actual air saaples in the Turbine Generator Building~16:00 from 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> until Exercise90 is terminated.

Page 1 96019222 R1{7 63)

ORILI NO>Exercise-90 WA>><lxC10>>

~I'LIC tO>>I~4P SUPPLY SYSTEM', CONTROLLER INFORMATION GENERAL DATA SHEET PAGE ot EET NO 4J RESPONSIBLE CONTROLLER (LOCATION)

CR (SIImIlator), OSC Mith Field Teams VALID FOR TIMES OF)QAM 7'00 TO REAL TIME OOQPM ASSOCIATED WITH MESSAGES 16900 Ily" P QAM 0900 DRILL TIME HOURS INFORMATION APPLIES TO 9IOO HOURS In-Plant Area Dose Rates-Air Sample Results-TGBuilding Concentration(uCI/c)

Time Filter fo 10ft3 S le DPjj S mR/hr on Cartridge fram Iodines DPjj on Cartpjdge Due to M.G.mR/hr on Filter f 10 ft3 S le Cartridge 10 ft3 S le mR/hr on 0 on mR/hr on Cartridg Filter fo Filter for 10 ft 3 10 ft 3 10 ft 3 S le 8 le S le Total R.G.Beta Emitters Turbine Generator Building Radioiadines Concentration Actual at TimesGiven Reflecting Pl ateout I-131 I-132 I-133 1-134 I-135 uCi/cc uCi/cc.uCI/cc uCi/cc uCi/cc uCi/cc 7 00 7:30 8IOD WBk"@a>>NSk">>"<NSk'N<Fxlgk'":N K"'Sk dÃI M<8k'>jg k~~8k" KM o>>>>Bk'RN XBR" k%'NBk'4%58k S$HRSk Nr@Ix>sgk<~'>x'p'.Sk

'g~Bk>':~>>jOEBkSk'@.

NNSk':Wx'.

N>':Sk NN N>gk":I'k!

>%8k'de 4>>.'Sk'h~hÃSk<i.';ÃSk>%terSk'55 Br~8k"'dNrN Prus'.:,>>'8 k Mr.>>>88 k d@8+igk'"".::=:.""Sk'l:.';

<$.8k"';~2<8I30 9:00 9I30 9955 Ragk kK4 N:;:Sk'5R N@Bk'.~~>gk

'::P NNSk'N@~~8k X@:"'.",Bk de NC~S M~CSSk'e@NSSk'48 NIBk S5~I.IBk NISk'~~x Itr>gk" NN@'.Sk Nk'>.NSk'j4.Bk

'M 9NSk>k8 Sklgk')N'S'ISk~x>><4@8k'>y<<'g N<>>gk'!x.>IB"dk)h'>>Sk'd~P:

SNSk"dNI!Ngk.IS k<8k" NS W>'Sk'dM NNSk'MS 5>'Bk MBk"':.:"3'.:.8k'">%MSk'd::i::-.

':-.":.':Sk

':..".:".":::.

/<?Sk'd!.;"g

'::":Sk'".":""'Bk'"%8k f<-..i$::Bk dM>>b.: Sk'!I,'~Sk'd~%@~8k"d>>N 10:00 10I05 10:10<<x<V<88k'vx>>G>>>gk d.F-'r<SSk'ew Fr'x Bk>':N C>%8k SNBk'dX6I Lxk>gk d&$+N~Sk" N>" WSk 88 I!INBk?<N'.N RNBkÃ2 MBk K4 Qigk'@ii!Sk":~

<~>>Bk" I.'>>>Ngk M%~~8k" Pr'I NSk'i':>.k d3.'r~8k".!<N>>i:.8 drr.'.'.~8':>8k R.'NBk.-'::Bk"':"..::8 5!Sk"'d'-."""-~l>Sk'gdNN

':"';Bk'"~4 SSk"dent 5%8k'd'W'Sk" k4 8>><8k"di'.'8 Mir'..:Sk>>:8 10:11 10915 10:20 10:25 10I30 10I35 10:40 10I45 10950 10I55 11IOO 11I15 11I30 11I45 12900 12I15 12930 12I45 7.51E+07 6.DOE+07 6.89E+07 5.78E+07 4.47E+07 3.45E+07 2.74E+07 2.24E+07 1.79E+07 1.42E+07 9.94E+06 4.DOE+06 1.73E+06 7.28E+05 3.01E+05 1~23E+05 4.96E+04 1.99E+04 1501 1201 1378 1156 690 359 80 35 15 6.01 2.45 0.99 0.40 1.43E+09 1~14E+09 1.31E+09 1.10E+09 8.50E+08 6.56E+08 5.20E+08 4.25E+08 3.41E+08 2.69E+08 1.89E+08 7.61E+07 3.29E+07 1.38E+07 5.71E+06 2.33E+06 9.42E+05 3.79E+05 28524 8.12E+08 22813 5.53E+08 26184 5.60E+08 21966 4.36E+08 16996 3.22E+08 13119 2.41E+08 10407 1.87E+08 8503 1.51E+08 6812 1.20E+08 5378 9.42E+07 3778 7.33E+07 1522 3.33E+07 658 1.46E+07 277 6.23E+06 114 2.61E+06 47 1.08E+06 19 4.45E+05 8 1.81E+05 812 553 322 241 187 151 120 94 33 15 0.44 0.18 1.85E-01 2.71E 03 1.26E-01 2.21E-03 1.27E-01 2.59E-03 9.90E-02 2.22E-03 7.32E-02 1.76E-03 5.48E.02 1.39E 03 4.26E-02 1.12E-03 3.43E-02 9.35E-04 2.73E.02 7.63E-04 2.14E.02 6.'14E.04 1.67E-02 4.39E-04 7.57E-03 1.86E-04 3.32E-03 8.43E.05 1.42E-03 3.70E-05 5.94E-04 1.59E-05 2.46E-04 6.72E-06 1.01E-04 2.81E-06 4.12E-05 1.16E-06 3.94E-03 3.14E-03 3.60E-03 3.01E-03 2.32E-03 1.79E-03 1.41E-03 1.15E-03 9.12E-04 7.15E-04 4.99E-04 1.96E-04 8.25E-05 3.36E-05 1.34E-05 5.25E-06 2.04E-06 7.S3E-07 5.70E-03 6.18E-03 5.35E-03 4.63E-03 4.78E-03 4.33E-03 5.43E-03 5.25E-03 5.04E-03 4.64E-03 4.22E-03 4.29E-03 3.66E-03 3.12E-03 3.36E-03 2.88E-03 2.31E-03 2.63E-03 2.33E-03 1.75E-03 2.11E-03 1.93E-03 1.36E-03 1.74E-03 1.57E-03 1.04E-03 1.41E.03 1.26E-03 7.85E-04 1.12E-03 9.01E-04 5.26E-04 7.98E-04 3.79E-04 1.83E-04 3.30E-04 1.70E-04 6.81E-05 1.46E-04 7.43E-05 2.45E-05 6.23E-05 3.17E-05 8.65E-06 2.61E.05 1.33E-05 3.00E-06 1.08E 05 5.51E-06 1.03E-06 4.38E-06 2.27E-06 3.51E-07 1.77E-06 13IOO 13915 13I30 13I45 7.97E+03 6.03E+03 4 AD OBE+03 2~14E+03 0.16'.'".B>gk d:4's:::;:;Sk'::>x

<iikgk"dN';1.51E+05 1~15E+05 7.76E+04 4.07E+04 3 7 34Eq04 xNN>>Bk';.;<)-., 2 5.55E+04<>4<.xgk" NS 2 3.77E+04 5K~8k":i'::.

1 1.98E+04 C":Sk"'<s@1.67E-05 4.80E.OT 1.26E.05 3.63E.07 8.56E-06 2.46E-07 4.50E-06 1.30E-07 2.99E.OT 2.26E-07 1.52E-07 7.93E-OB 9.27E-07 1~19E-07 7.11E-07 7.02E-07 8.94E-08 5.38E-07 4.76E-07 6.01E-OB 3.64E-OT 2.50E-07 3.08E-08 1.91E-07 14IOO 14915 14I30 14:45 1.98E+02 1'0E+02 1.01E+02 5.20E+01>Slgk d%%Nr".Bk d xN i."!88k"':3 NNBk de 3.77E+03 2.84E+03 1.92E+03 9.88E+02ÃI Sk'~<1.91E+03 ex%BI N:".N":.Bk'kB 1.44E+03>>'SBk N':Sk'kGI 9.72E+02 S!:Sk":@-";N Bk'?'4 5~02E+02 5:>>Bk'>>>>i 4.35E-OT 1.32E-08 3.2SE-07 9.94E-09 2.21E-07 6.70E-09 1.14E-07 3.47E-09 6.08E-09 4.58E-09 3.08E-09 1'8E-09 2.47E-OB 1.48E-09 1.76E-OB 1.87E-OB 1.11E-09 1.33E-OB 1.26E 08 7.47E-10 8.96E-09 6.50E-09 3.79E-10 4.62E-09 15900 3.18E+00>>NSk dYP 6.05E+01~~NBk'M 3.19E+01:!NBk 5!7.24E-09 2.29E-10 7.83E-11 4.17E-10 1.17E-11 2.77E-10 Concentrations as found from actual air samples in the Turbine Generator Building~16900 from 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> until Exercise 90 is terminated.

Page 1 966 I 9222 R I{1&2)

DRILI.NO.Exercise-90

%A~IIIWCTO%trill(t011~I 4N SUPPLY SYSTEM CONTROLLER tNFORMATlON GENERAL DATA SHEET PACK SHEET NOs 4k VALID FOR TIMES OF: QAM REAL TIME CI PM 7500 TO 16500 RKsPDNslaLK coNTRQLLER ILocATIDN)

OSC uith RentryTeams, Plant Lab 0AM 0500 DRILI TIMK~TO HOURS 9:00)I I HOURS ASSOCIATKD WITH MKSSAQKS INFORMATION APPLIES TO In Plant Ares Dose Rates-Turbine Gen.Bldg Air Sample Concentrations-SR-38 Ra(h(aste Building-525'lev.

Reactor Building Radioiodine Concentration Actual at Times S le F loM Cartridge Filter Time Sin.I131 uCI/cc I132 uCi/cc I133 uCi/cc Given Ref lecti Pl ateout I134 uCI/cc REA I 135 SR-38 uC I/cc CF)1 Curies Iodine on Filter Curles(C)Iodine on Cartri e DPH on R/hr S Filter 1 ft R/hr at 1 inch Rad/hr S 1 inch 7 00 7(30 8)00 8:30 9(00 9(30 9(55 10 00 10(05 10(10 10(11 10:15 10(20 10)25 10(30 10(35 10(40 10)45 10:50 10:55 11500-175-180-120-90.60-30-15-10-5 0 1 5 10 15 20 25 30 35 40 45 50 Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bk d Bkgd Bkgd Bkgd 2.71E-03 2.21E-03 2.59E-03 2.22E-03 1.76E-03 1.39E-03 1.12E-03 9.35E.04 7.63E-04 6.14E.04 4.39E-04 Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd BL d Skgd Bkgd Bkgd 3.94E.03 3.14E.03 3.60E.03 3.01E.03 2.32E.03 1.79E-03 1.41E.03 1'5E-03 9.12E.04 7.15E.04 4.998-04 Skgd Bkgd Skgd Skgd Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd 5.70E-03 4.63E-03 5.43E-03 4.64E-03 3.66E.03 2.88E.03 2.33E-03 1.93E-03 1.57E-03 1.26E-03 9.01E-04 Bkgd Bkgd Skgd Bkgd Bkgd Skgd Bk d Bkgd Bkgd Bkgd 6.18E-03 4.78E.03 5.25E-03 4.22E.03 3.12E-03 2.31E-03 1.75E-03 1.36E-03 1.04E-03 7.85E-04 5.26E-04 Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bk d Bkgd Bkgd Bkgd 5.35E-03 4.33E-03 5.04E-03 4.29E-03 3.36E-03 2.63E-03 2.11E-03 1.74E-03 1.41E-03 1.12E-03 7.98E-04 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bk d Bkgd Bkgd Bkgd 1.40E-04 7.00E.04 1.98E-03 3.60E-03 5.27E.03 6.88E.03 8.41E.03 9.S7E-03 1.12E-02 1.24E-02 1.33E-02 Bkgd Bkgd Skgd Skgd Bkgd Bkgd Bk d Bkgd Skgd Bkgd 1.40E 03 7.00E-03 1.98E-02 3.60E.02 5.27E.02 6.88E.02 8.41E-02 9.87E.02 1.12E-01 1.24E-01 1.33E-DI Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd 3.11E+08 1'5E+09 4.41E+09 BE+09 1.17E+10 1.53E+10 1.87E+10 2.19E+10 2.49E+10 2.75E+10 2.96E+10 Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd Bkgd BL@ci Bkgd Bkg(j 5.59E-03 2.79E-02 7.92E-02 1.44E-01 2.10E-01 2.74E-01 3.36E-01 3.94E-01 4.47E-01 4.95E-01 5.32E-01 Bkgd Bkgci Bkgd Bkgd Skgd Bkgd Bkgd Skgd Bkgd Bkgd 1 4 11 21 30 40 48 57 64 71 77 Skgd Bkgd Bkgd Bkgd Bkgd Bkgd Bk d Bkgd Bk@ci Bkgd 6 31 160 234 305 373 438 498 550 592 11:15 11:30 11(45 12)00 12(15 12)30 12(45 13)00 65 1.86E-04 80 8.43E-05 95 3.70E-05 110 1.59E-05 125 6.72E-06 140 2.81E-06 155 1.16E-06 170 4.80E-07 1.96E.04 3.79E-04 8.25E-05 1.70E-04 3.36E.05 7.43E-05 1.34E-05 3.17E-05 5.25E-06 1.33E-05 2.04E-06 5.51E-06 7.83E-07 2.27E-06 2.99E-07 9.27E-07 1.83E-04 3.30E-04 6.81E-05 1.46E-04 2.45E-05 6.238.05 8.65E.06 2.61E-05 3.00E-06 1.08E-05 1.03E-06 4.38E-06 3.51E-07 1.77E 06 1.19E-07 7.11E-07 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 1.38E.02 1.41E-02 1.42E.02 1.43E-02 1.43E-02 1.43E.02 1.43E 02 1.43E-02 1.38E-01'1.41E-01 1.42E-01 1.43E-01 1.43E-01 1.43E-01 1.43E-01 1.43E-01 3.07E+10 5.51E-01 3.12E+10 5.61E-01 3.15E+10 5.66E-01 3.17E+10 5.69E-01 79 81 82 82 3.17E+10 5.70E.01 82 3.17E+10 5.71E.01 82 3.18E+10 5.71E-01 82 3.18E+10 5.71E-01 S2 613 625 630 633 635 635 635 13(15 185 3.63E-07 13(30 200 2.46E-07 13(45 215 1.30E-07 2.26E-07 7.02E 07 1.52E-07 4.76E-07 7.93E.DB 2.50E-07 8.94E-OS 5.38E-07 2.3 6.01E.08 3.64E-07 2.3 3.08E-08 1.91E-07 2.3 1.43E-02 1.43E-02 1.43E.02 1.43E-Dl 1.43E-01 1.43E-01 3.18E+10 5.71E-01 3.18E+10 5.71E-01 3.18E+10 5.71E-01 82 82 82 635 635 635 14)00 14:15 14(30 14:45 230 1.32E-DS 245 9.94E-09 260 6.7DE 09 275 3.47E-09 6.08E-09 2.47E-DS 4.58E.09.1.87E-08 3..0SE.09 1.26E-DB 1.58E-09 6.50E-09 1.48E-09 1.76E.DS 2.3 1.11E-09 1.33E-08 2.3 7.47E-10 8.96E-09 2.3 3.79E-10 4.62E-09 2.3 1.43E.02 1.43E-02 1.43E-02 1.43E-02 1.43E-01 Y.43E-DI 1.43E-01 1.43E-01 3.18E+10 5.71E-01 3.18E+10 5.71E-DI 3.18E+10 5.71E-01 3.18E+10 5.71E-01 82 82 82 82 635 635 635 635 15:00 290 2.29E-10 7.83E-11 4.17E-10 1.17E-11 2.77E-10 2.3 1.43E-02 1.43E-01 3.18E+10 5.71E-01 82 635 16(00 Concentrations as found free actual air saai)les in the Turbine Generator Building 305 free 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> until Exercise 90 is terminated.

t 4 Page 1 966 I 5222 Rl ls$5) 1.DRILL No<Exercise 9Q'I<*$><I'<osob tl~LIC'o>>CR 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of KT NO<4l RESPONSIBLE CONTROLI KR ILOCATION)

CR (Siaxf later), QSC uith Field Teams VALIO FOR TIMES OF: 7:0 TO REAL TIME PM 16100, I<f'I 0AM CI PM DRILL TIME 0:00 TO HOURS 9100 HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO in-Plant Ares Dose Rates-Air Sample Results-QSC

&PAP Reading on cartrid e 81 in.D on D on mR/hr mR/hr mR/hr D on 0 on mR/hr on IIII/hr on mR/hr on Time Filter fo 100 ft 3 S le Filter fo Filter fo 50 ft 3 25ft 3 S le" S le Filter 100 ft 8 le Filter f 50 ft 3 8 le" Filter fo 25ft 3 S le Cartridge Cartridge 100 ft3 50 ft3 8'le8 le Cartridge 25ft 3 8 le'artridge Cartridge 100 ft 3 50 ft 3 S le S le Cartridge 25ft 3 S le 7100'8418k'B 7:30<".3."Sk M 8100 (RBk M(f<<Bk S4 N48k<~N<<<NSk<<>>jss'>ABBR Kas>~'N"<Bk@Sk'dN ETSk d.>'>s RSk N<sgk"O'Ts,".',Sk dr<SSk'Al@Sk dN s>sgk'd18s<<.",.8 N.Sk IIP><<x.>Bk NYIS'"-ss'>8k IS kSk" dN;.'<'-NBk%N M.Bk'~X>>%38k'N NBBk'C N':i:IBk'ÃBk ri.': 8>s>Sk N4!::Es'<Bk".<<N!.:<i~%$%s>'8k':4<g.gk."~~K.>:wj;N>"'>N>'""'NBk',"8::Bk N4<i:i<<<Sk'8:30 k@Sk 9100 NNSk'R%9:30 NAIA RN 9.55"'"-Sk'"'N IS IN?Bk<iK'9 10:00<~~8k'0105':~%>Bk~N.Sk: "":::"Bk NBk'!8i";:<<:"-""<N"'V 1Q'1Q~tgk NSk'Ni NSk du~@Sk'MSk R)Sk Fii P<'Sk'<<9 O'Sk ds).'ig8<i<<Sk'd..":..".

@RSks N!Sk'((1 CS'X'<<Sk dfs~>~Sk dÃN(Sk d!S-!BSke s"".igk dIB!IISk'd

<<ISSkN STSk"'dh~fr!Sk'dL g>NNS"4M<!':e>Bk'a>

I.Xf-".!Sk'N55

>ABk"!sk 8!:CSk'.4,".srsSk" N<<l 5 4RSk'dNA@m Bk'iS:"..Bk NB s~<<;Sk s'f<<<Sk'"d>>~~<."sgk'Q 4<l:;:i.">8k"dw<<<<'.<<%8k"" i%!N"'Bk~9<>

'NSN>!8 5~SSk'k 1>:Bk'e Mss Sk'ia%'!Bk'" IS<--."38k't K':.!!Bk"'N)Is'.<<.'<Bk

'@4~48k'P.5:!IBk'%8k" RN<-..'RBk" 3>B sos:.":::Bk" i::8 ess Bk s4s W48kgd~i s"a'Bk::M s<<><<1<'Bk"'"-.

4%Bk"@<i~X!!Sk'if 10111 7.51E+02 10115 6.DOE+02 10120 6.89E+02 10125 5.78E+02 3.75E+02 1.8BE+02 3.DOE+02 1.50E+02 3.45E+02 1.72E+02 2.89E+02~1.45E+02 0.02 0.01 0.01 0.01 0.01<.':<fgk d~r'.01!NSk'dl";"':

<88k dN fQSkS<<'.K<8k di'." Sk" d<:.'.43E+04 7.13E+03 1.'14E+04 5.70E+03 1.31E+04 6.55E+03 1.10E+04 5.49E+03 3'7E+03 2.85E+03 3.27E+03 2.75E+03 0.29 0.23 0.26 0.22 0.14 0~11 0.13 0.11 0.07 0.06 0.07 0 F 05 10130 4.47E+02 10135 3.45E+02 10140 2.74E+02 10145 2.24E+02 10:50 1.79E+02 2.24E+02 1.12E+02 1.73E+02 8.63E+01 1.37E+02 6.85E+01 1.12E+02 5.59E+01 8.96E+01 4.48E+01 0.01>@8k d,"8 Slgk'"di>s'4'Sk'@%18k'dN NSk d'."8%8k'dLI%8k dsis<f<<Sk dS)>%8k N R>Sk':>;s-"::,'>Sk'dN ISSk'::>a%8k%Ngk 8.50E+03 4.25E+03 6.56E+03 3.28E+03 5.20E+03 2.60E+03 4.25E+03 2.13E+03 3.41E+03 1.70E+03 2.12E+03 1.64E+03 1.30E+03 1.06E+03 8.52E+02 0.17 0.13 0.10 0.09 0.07 0.08 0.07 0.05 0.04 0.03 0.04 0.03 0.03 0.02 0.02 10:55 1.42E+02 7.0BE+01 3.54E+01 SSk d>1<(SSk dN NSk dN 2.69E+03 1.34E+03 6.72E+02 0.05 0.03 0.01 11100 11115 11:30 11145 12100 12:15 12130 12145 13100 13115 13130 13145 The air sample concentrations for the QSC&PAP vilL be as found from 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> until the exercise is terminated, as no activity is added by the accident.14100 14:15 14:30 14145 15100 16100 Page 1 9ss Iszzz RI If%9)

PIP E CHASE%P A,'M'bing, W FEEDEVAT~R~C AHA+~gag:.P.Ill 2 e co UJ XX~A~~~STEAM AC kk jc'~kk TUNNEL':P~r STEAM TUNNEL DRILl NOI Exercise-90

'aASIII9CTOX

~PILIC'OW~9 4N SUPPLY SYSTEM CONTROLLER tNFORMATION GENERAL DATA SHEET PAQ E ot.ET NOe RESPONSIBLE CONTROLLER (LOCATION)

CR (Simulator)

VALID FOR TIMES OF1 QAM REAL TIME 7IOO CPM TO ,16100 0AM D R ILL TIME TO HOURS 9100 HOURS ASSOCIATED WITH MESSACES INFORMATION APPLIES TO Direct Readings--Reactor Building Steam TINnel'01'lev.

Reactor Building Steam TISInel Dose Rates and Contamination Levels IIB Dose Rate Contamination Level (mr/hr)(cpII/mrad/hr)

Area AI'ea Time 7100 7130 A (mr/hr)750 750 8 (mr/hr)1000 1000 C (mr/hr)1.DOE+03 1.DOE+03 c mrad/hr 8500 1.70 9500 8500 1.70 9500 mrad/hr.1.90 1.90 10800 10800 2.16 2.16 c mrad/hr 8 00 8130 9)00 9130 9)55 SCRAM a 750 750 750 9155 A.)1.1000 1000 1000 1000 1000 and Fuel 1.DOE+03 1.00E+03 1.DOE+03 1.DOE+03 1.DOE+03 Fai lueI'eg 8500 1.70 9500 8500 1.70 9500 8500 JI.70 9500 8500 1.70 9500 8500 1.70 9500 1.90 1.90 1.90 1.90 10800 1OBOO 10800 10800 10800 2.16 2.16 2.16 2.16 2.16 9156 9157 9158 9159 10100 10105 4.05E+02 4.81E+02 4.73E+02 5.37E+02 6.01E+02 6.66E+02 2.57E+03 3.04E+03 2.99E+03 1.25E+03 1 40E+03 1.55E+03 2.70E+03 3.20E+03 3~15E+03 3.58E+03 4.01E+03 4.44E+03 8500 1.70 9500 8500 1.70 9500 8500 1.70 9500 8500 1.70 9500 8500 1.70 9500 8500 1.70 9500 1.90 1.90 1.90 1.90 1.90 1.90 10800 10800 10800 10800 10800 10800 2.16 2.16 2.16 2.16 2.16 2.16 10110 10:11 10:12 10113 10114 10915 10120 10125 10:30 10145 7.80E+03 9.36E+03 1.24E+05 1.16E+05 1.14E+05 1~11E+05 9.82E+04 9.57E+04 7.93E+04 3.05E+04 1.82E+04 2.18E+04 2.89E+05 2.72E+05 2.65E+05 2.59E+05 2.29E+05 2.23E+05 1.85E+05 7.11E+04 5.20E+04 6.24E+04 8.26E+05 7.76E+05 7.58E+05 7.41E+05 6.55E+05 6.38E+05 5.29E+05 2.03E+05 8500 1.70 9500 8500 1.70 9500 8700 1.74 9700 9200 1.84 10200 1.90 1.90 1.94 2.04 9250 1.85 10250 2.05 9700 1.94 10700 9800 1.96 10800 9850 1.97 10850 2~14 2.16 2.17 10000 2.00 11000 2.20 10050 2.01 11050 2.21 10800 10800 11000 11500 11550 12000 12100 12150 12300 12350 2.16 2.16 2.20 2.30 2.31 2.40 2.42 2.43 2.46 2.47 11:00 11:15 1.C2E+04 8.48E+03 3.32E+04 1.98E+04 9.50E+04 5.65E+04 10950 2.19 11950 11200 2.24 12200 2.39 2.44 13250 13500 2.65 2.70 11130 11145 2.68E+03 1.13E+03 6.25E+03 2.63E+03 1~78E+04 7.50E+03 11250 2.25 12250 2.45 11200 2.24 12200 2.44 13550 13500 2.71 2.70 12100 12115 12130 12145 9.03E+02 6.80E+02 4.58E+02 2.35E+02 2.11E+03 1.59E+03 1.07E+03 5.49E+02 6.02E+03 4.54E+03 3.05E+03 1.57E+03 11200 2.24 12200 11200 2.24 12200 11200 2.24 12200 11050 2.21 12050 2.44 2.44 2.44 2.41 13500 13500 13500 13350 2.70 2.70 2.70 2.67 13100 1~25E+01 13115 1~21E+01 13130 1.21E+01 13:C5 1.21E+01 14100 1.21E+o1 14)15 1.21E+o1 14130 1.21E+01 14145 1.15E+01 2.91E+01 2.83E+01 2.83E+01 2.83E+01 2.83E+01 2.83E+01 2.83E+01 2.68E+01 8.30E+01 8.08E+01 8.08E+01 8.08E+01 8.08E+01 8.08E+01 8.08E+01 7.65E+01 11000 2.20 12000 10950 2.19 11950 10700 2.1C 11700 10700 2.14 11700 10700 2.14 11700 10700 2.14 11700 10700 2.14 11700 10700 2.14 11700 2.40 2.39 2.34 2.34 2.34 2.34 2.34 2.34 13300 13250 13000 13000 13000 13000 13000 13000 2.66 2.65 2.60 2.60 2.60 2.60 2.60 2.60 15)00 1 15E+01 2.68E+01 7.65E+01 10200 2.04 11200 2.24 12500 2.50 16100 1.15E+01 2.68E+01 7.65E+01 8700 1.74 9700'1.94 11000 2.20 966'16222 RI (7 6$)

DRILL NOo Exercise-90 WkllllCC'lO'0

~l'CllC tOCl1 43 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE NQ RESPONSIBLE CONTROLLER (LOCATION)

CR (Simulator)

VALID FOR TIMES QFl QAM 7 00 TO REAL TIME@PM ASSOCIATED WITH MESSAGES 16100 0AM Q PM 0100~TO DRILL TIME HOURS INFORMATION APPI IES TO 9100 HOURS Direct Readings--

All Areas of RB Not Previously Covered Reactor Building Dose Rates and Contamination Levels IN Dose Rate Contamination Level (mr/hr)(cpm/mr ad/hr)AI'ea Ares A B C All Radiation Levels Are AS Found All Comtamination Levels Are As Found NOZEI This data is for all areas of the Reactor Building not covered by SPECIFlC data sheetsil 66$1S222 Rl (7 62)

DRILL NOt'AASHI'%OTOW till.ll'0%

~A 4W SUPPLY SYSTEM CONTROLLER INFORMATlON GENERAL DATA SHEET PAGE of'T NO.RKSPONSIBLK CONTROI LKR ILOCATION)

VALID I'R TIMKS OPl QAM TO REAL TIMK QPM QAM Q PM DRILL TIMK TO HOURS HOURS ASSOCIATKD WITH MKSSAGKS INI'ORMATION APPLIKS TO INTENTIONALLY BLANK 90$15222 Rl I7%2I AAOIIASTC AIIO COIITIIOL ALTAL tL, Ill'tCOAOS CA ASCII~ILTTAT AVTAIAIttS

~I t CN A IAC J L l 0 vIr v t II I AOCAITATAOtllCT OIAt CTOA ANI LOCA lIYAC VII I.h~~~V~ATTCIltN I 919TSC, 441$EL.

o" ILL No Exercise-90 IVAVHI IGV0%~I~I I('OI~VG 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE KT NOo 4o RESPONSIBLE CONTROLI ER{LOCATION)

CR (SiImIlator)

VALIO FOR TIMES OFI QAM 7100 REAL TIMK Q PM ASSOCIATKO WITH MESSAGES 16100 QAM 0100'O oRILL TIMK HOURS INFORMATION APPLIES TO 9100 HOURS Direct Readings--Technical Support Center (TSC)4 Air Sample Results Tecnical Support Center Dose Rates and Contamination Levels Mg Dose Rate Contamination Level (mr/hr)(cpm/mrad/hr)

Area Area A,~8 C 0 V All Radiation Levels Are AS Found for All Times All Comtamination Levels Are As Found for All Times Air S le Results The air sample concentrations for the TSC Mill be as found as no activity fs addedby the accident.ROTE: This data is for all areas of the Technical Support Center.464 I5244 RI I7 43I INTENTIONALLY BLANK DRILL NOo SHE~NOe'A SUPPLY SYSTEM CONTROLLER tNFORMATION GENERAL DATA SHEET RESPONSISLE CONTROLLER (LOCATION)

PAGE of VAL FOR TIMES OF: QAM TO REAL TIME OPM 0AM 0 PM DRILL TIME~TO HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO IHTENTIONALLY BLANK 968 I 5222 R1<7 83)

DRILL NO+Exercise-90

<<ir<<inoro<<rciuc ro<<ra 4N SUPPLY SYSTEM CONTROLLER IN FORMATION GENERAL DATA SHEET PAGE SHEET NO+RESPONSIBLE CONTROLLER ILOCATIONI OSC with Field Teams, Field Teams VALID FOR TIMES OF'AM REAL TIME Q PM TO 16:00@AM 0'00 DRILL TIME~TO HOURS 9(00 HOURS ASSOC IATKD WITH MKSSA(KS INI ORMATION APPLIES TO Dose Rates in Plant Vfcinjty-Sky Shine A.Instructions:

1.Oose ratesin the Plune: Use the table reading for the time and centerline point.Interpolate proximity to centerline.

2.Oose rates due to Sky Shine: Use the table for the time and area outside of P luna.the 8 Oose Rate Table: Plune Dose Rate (njj/hr)Centerline Point Time 1 2 3 4 5 Sky Shine Oose Rate (njI/hr)Area 2A 3A 4A 5A 6A 7A 7:00 7:30 8:00 8:30 9(00 9:30 Bkd Bkd Bkd Bkd Bkcl Bkd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bj(d Skd Bkd Bkd Skd Sj(d Bkci Bk(I Bkd Bkd Bk(I Bkd Bkd Skcj Bkcj Bkd Bkd Skd Bkd Bkd Bkd Bkd Bk(I Bj(d Bk(I Bkci Bj(d Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bj(d Bkd Bkd Bkd Bkd Bkd Bkd Skd Bkcl Bkd Bkd Bkd Bkcj Bkcj Bkd Bk(j Bkd Bkd 10:00 10:10 10:15 10:25 10:30 10:40 10:45 10:55 11:00 11:15 11:25 11(30 Bkd Bkd Bk(I Bkd Bkd Bkd Bkd 226 84.6 27.1 32 38.2 46.4 56.4 162 60.7 19.4 22.76 27.4 33.3 40.5 98.1 36.8 11.8 13.8 16.6 20.2 24.5 69.1 25.9 8.3 9.72 11.7 14.2 17.3 40.2 15.1 4.84 5.64 6.8 8.28 10 29 10.9 3.5 4,084 4.92 5.99 7.26 17.9 6.72 2.16 2.528 3.04 3.7 4.48 13.2 4.97 1.59 1.867 2.25 2.73 3.31 11.7 4.38 1.41 1.646 1.98 2.41 2.92 10.9 4.09 1.31 1.536 1.85 2.25 2.73 4.86 1.82 0.58 0.685 0.83 1 1.22 Bkd Bkd 15.04 0.21 10.79~0.15 6.54 0.09 4.61 0.07 2.68 0.04 1.94 0.03 1.19 Bk(I O.M3 Bkd 0.779 Bkd 0.727 Bkd 0.324 Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkcj Bkd Bkd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd 11:45 11:55 12:00 12:15 12:30 12:45 12:55 13:00 13:15 13:30 2.SS 1.07 0.34 0.401 0.48 0.59 0.71 1.84 0.69 0.22 0.259 0.31 0.38 0.46 1.54 0.58 0.18 0.22 0.26 0.32 0.38 1.24 0.46 0.15 0.17 0.21 0.26 0.31 0.94 0.35 0.11 0.13 0.16 0.19 0.23 0.64 0.24 O.OS 0.09 0.11 0.13 0.16 0.34 0.13 0.04 0.05 0.06 0.07 0.08 Bk(I Bkd Bkd Skd Bk(I Bkci Bkcj Bk(I Bkci Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bk(I Bkd 0.19.Bkd Bkd Bkd Bkd Bkd'kd Bkd BkcI Bkd Skd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Skd Bj(d Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkci Bkd Bkd BR(i BkcI Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkcj Bkd Bj(d Bkd Bk(I Bkd Bkd Bkd Bkd 13:45 14:00 14:15 14:30 14:45 15:00 16:00 Bkd Bkd Bk(I Bkd Bkd Bkd Bkcj Bkd Bkd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Sk(I Bkd Bkd Bk(I Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Sk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bj(ci Bk(I Bkd Bkd Bk(I Bkd Bk(I Bkd Bk(I Bkd Bk(I Bkd Bkd Bkd Bkd Bkd BkcI Bkd Bkd Bkcl Bkd Skd Bkd Bkd Bk(I Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd Bkd BkcI 7A 6A 5A iA OO t~o~4>e Oy 1 Rx Bkt SIIggi 4'ie Oy+1y O~1~+e+0 Op 6 ie 7.05 mile Increments (250 ft)8805XL1 March 1990 INTENTIONALLY BLANK DRILL NO+WAIIIISO'IO9

~I'IIC POWI1 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET rAGE EXERCISE'90 SH~O.RESPONSIBLE CONTROLLER (LOCATION) 6 ALL VALID FOR TIMES OFI QAM REA!TIMEO7OO P PM ASSOCIATED WITH MESSAGES PAM DRILLTIMK HOURS INFORMATION APPLIES TO oC HOURS METEOROLOGICAL DATA INDEX DATA SHEET ITEN 6a Heather Forecast 6b Stability Classification Table 6c Met Tower Data (Primary 8 Backup)9CO 19222 Rl I1$2)

~~~~~s Q s~~~~'~~~0~I~0~~~'~~~: I~~I II II I I~~~~I I~'I I I~t~~~I~~I~1~~'~'~~$'~I~~~~~~~'~~~~'

DRILL NO,..Exercise-90 WAIIIIrIIII0%

IrC~IIC POWIR kN SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RKSPONSISLE CONTROLLER (LOCATION) 6b Control Room (SiIIII(ator),HUDAC 8 TSC I'AOK of VALI D PO R T I MES O P I 7(00 REAL TIME AM TO PM 17(00 0AM DRILL TIMK 0(00 TO HOURS 7(00 HOURS ASSOCIATED WITH MKSSAOKS INPORMATION APPLIES TO Heteorological Data-Stability Classification Table A.Stability Class vs'/4 z signal Stability'lassification Pasquil l csteeerles TemPerature Change Mith Nei ht (Degrees C/100m Extremely Unstable Hoderately unstable Slightly unstable Neutral Slightly stable Hoderately stable Extremely stable 6, T/E z-1.9-1s9b, T/5 z-1.7-1.76T/b, z-1.5-1.5b.T/5 z-0.5-0.SAT/4 z 1.5 1s54.T/6 z 4 425.T/+z 8.Stability Class vs.Sigma Theta Signal Stability Classif ication Pasquil l Categories (De rees)Extremely Unstable Hoderately unstable Slightly unstable Neutral Slightly stable Hoderately stable Extremely stable sigma theta w 22.5 22.5>sigma theta>>17.5 17.5>sigma theta>>12.5 12.5>>sigma theta 2.7.5 7.5>sigma theta>3.8 3.8>sigma theta>2.1 2.1>sigma theta Page 1 944.IS222 Rl (7 42)

DRILL NO+Exercise-90 wA~HlscT0%~rillc tow~I 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE SHEET NOo RESPONSIBLE CONTROLLER (LOCATION) 6c ControL Room (SiImI tater),NjDAC 8 TSC VALID FOR TIMES OP<7:00 REAL TIME ASSOCIATED WITH MESSAOES AM TO PM 17:00 CIAM 0 00 TO HOURS DRILL TIME INPORMATIQN APPLIES TO 7 00 HOURS ileteorotogicat Data-Tower Readings (Primary 8 Backup)Prima liat Tower Readi s Time liind Speed (lip H)Ilind Delta T Direction hT/h 2 From Pasqui l l Degrees Degrees Catego C/100m Sigma Temp.Theta Degrees Stability (Degrees).C CLassification 0700-0800 0800-0900 0900-1000 1000-1100 1'100-1200 1200-1300 1300-1400 1400-1500 1500-1600 1600-1700 4 4 3 3 3 3 3 3 3 3 296.303 296-303 296.302 297-303 297-302 296-302 296-301 297.302 298-303 297.303 0.7 0.7 0.8 0.8 0.9 0.8 0.9 0.9 0.9 0.8 18.33 20 21.11 22.22 23.89 25.56 26.67 26.67 25.56 21.11 Slightly Stable Slightly Stable Slightly Stable Sl'ightly Stable Slightly Stable Slightly Stable Slightly Stable Slightly Stable Slightly Stable Slightly Stable Beck Het Tower Readings Time ulnd Speed (IIPH)llind Delta T Direction hT/A, 2 From Pasqui l L Degrees Degrees Cate or C/100m Sigma Theta (Degrees)Terp.Degrees Stabi L i ty C Classification 0700.0800 0800-0900 0900-1000 1000-1100 1100.1200" 1200-1300 1300-1400 1400.1500 1500-1600 1600-1700 297-304 296.302 297-302 297-303 297-302 296-303 297-302 298-304 298-303 297-303 E E E E E E E E E E.0.7 0.8 0.7 0.8 0.9 0.8 0.8 0.9 0.9 0:8 18.33 20 21.11 22.22 23.89 25.56 26.67 26.67 25.56 21.11 Slightly Stable Slightly StabLe Slightly Stable Slightly Stable Slightly Stable Slightly Stable SLightly Stable SLightly StabLe Slightly Stable SlightLy Stable Page 1 sss I5222 RI (7%2)

DRILL NO+EXERCISE'90 llAIIIIRCTOW tl'LIC'0%~L 43 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of RESPONSIBLE CONTROLLER

{LOCATION) 7 ALL VAI ID FOR TIMES OF:.Q REAL TIME 0700 Q PM 1600 ASSOCIATED WITH MESSAGES 0AM QPM DRILL TIME 0000 HOURs INFORMATION APPLIES TO HOURS FIELD TEAN DATA INDEX DATA SHEET ITEN 7a Direct Readings 7b Detailed Direct Readings (Full Set to be issued to Field Team Controllers only)7c.Air Sample Results (field Teams)7d Plume Dose and Dose Rates 7e Vehicle and Personnel Contamination DRILL NO+EXERCISE'0 WAIN1%05nl

~I sill'nW~s 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE SHEET NOc RESPONSIBLE CONTROLLER (LOCATION) 7a ALL VALID FOR TIMES OF:@AM REAL TIME o7oo~PM ASSOCIATED WITH MESSAGES 0AM 0 PM DRIL.L TIME HOURS INFORMATION APPLIES TO HOURS FIELD TEAM DATA DIRECT READINGS~i'ccSsqts (cs4lW+pv 5'iQ)gw>>I>>s~ct CCI/pc I>>'.)I,".Iza5~ls,",;...:

J ls C I?Hanford:".,jj'Site,," l 03 j<gP', CZ'ZccCI'C~cs s~a s~s 8&~as&<ZC C C I Ac I'I;120 Hill 8'nssz" 5:~i" S TCSO ills.I Ics~c'.I Lc,'Xgcccl tL (1)I."C',,~CKcc wll t580llln.'+210 II In,>>t 2 4>>>>>>C?'Wl IS)C d I ITnlaw5 sn I~c,,'O'LoiLtcICIt'1 wwwlc Igx'.Pyld@j cs cllctw w.nl>>>>>>>>>>>>>>>>i<y<%lxt4 1 S.I;$L$<%5m%'".::;:-""6

: 4'>>sNI5 S.ldsz Ines:"iN'4 342 LEOEND~tttcc nets>>l>>WIC Iw N still nnts>>ww tOUhQl nntnnt~~1~Cccllcw ccwcwnt g mscczunsams

~ccn~wcnn w>>nncws cl&343 emlwstwas nwI cwstwst~cnc PLANT 2 PLUII E EXPOSURE PATHWAY EQENOENCY s, PLANNPIO ZONE'%WWW'h%%%%"tBenton';;.,',",,'...',:,,'I

~t"W4%@II&'%Yes zn~lt'8>>>>>>>>W.CWWSCCtl WL 5t...,iC stCI A~cttI lO~~x.>>>>>>>>>>>>>>>>>>>>

>>>>EtII>>SI I I L E 8'%6"'I I'"'s&IT,",s'?.;.;~:;I

'...,...,...,,,,Frankli 8QC SN>>>>>p<<1 K~,',*'.:-'i C,c.3gg ggxc>C M'st?"""I Time (7+Min)Leading Edge (Miles)Distance (Miles)Reading mR/hr WG 1.2 3.0 31 116 120 4 6.37 67 180 240 10 5 9 7 10.11 49 ,'i 868 15222 RI I7.82I I I D ILL NOa EXERCISE'90%ASHI'lotos

~I'tilt POlltt 4W SUPPLY SYSTEM CONTROLLER 1NFORMAT1ON GENERAL DATA SHEET PAGE oI 5'40, RESPONSIBLE CONTROLLER (LOCATION) 7b ALL 0AM VALID FO R TIMES 0 F 1 AM EAL TIME O7OO ASSOCIATED WITH MESSAGES CPM 1600 q, OPM 0 To DRILL TIME HOURS INFORMATION APPLIES TO HOURS FIELD TEN DATA DETAILED DIRECT READINGS TO BE ISSUED TO FIELD TEAN CONTROLLERS ONLY 96$~'I5222 RI (7$3)

INTENTIONALLY BLANK PLUME EXPOSURE PATHWAY 0-1 mi T+20min (all readings in mR/hr)'a I'~~V p I~~g 1.~J'I~I.~~, I I'Tvrpl~'+8'~I 4~~I~I Field Tean Dace.Dsok+I Daan~~anetete atnntntt kl cnteafne CONTRQUED O~18'RI1%.BR L I t~I ea I e l'nanarM.ra Vy vW V~(4C I~~r~a Tv t'4W'an'~~I~I'KI V)I , riW ra I>g/I i V j~I LI 26 rn'4~I'.'I~e ae'tal.'I'PV~~Jf~~jrt en-'7 I II W II%~,/4

-PLUME EXPOSURE PATHWAY 0-2mi T+40min (all readings in mR/hr)t~r 1!z~5~tp a at>D~1'>>1>~1~Aggjj~>.I I~>>>.tt>f V 1~1 A e>>4i>g~,'~'~>1'&wc'as Nt flettt Teat>Dale, Detalett Otter A>ca>oe Ctpttte>ted>calle c~Ie>tete COttIIIOtlED DOTRttIIOM

't8't9>>'~~1~VI al>f 1~~>>1%1~'ILD litt t D)'>~~~~~Cl IP>\1 pa/~~~~5 V tt>le'Dms~e I>t/e 26 e>>>tt.t>'e'~Vtim'\,'t>c aW:9'27 ll (

~r PLUME EXPOSURE PATHVJAY 0-3mi (all readings in IR/hr)\>I r~T+60min f'Wr tff'I~~Jib l~L-S(l.tf~I i Q~N'~.5 t~~t I t e r~-8f, g~.of>g,~'I'f l f~I~fffIR'>CONf ROUED DSTRSIJIIQN MJRIIII 18!BBIIfKI KE~~t~~~I~ff'I 4Q w e rlI fi~'t.lD'ttttj.ii'""~iZ.I~1 M'~~~I~~ff9$AA D!4~I i<ttttfVJt~.g~w I,tf r'f YPrfi erat>>i 26

-PLUME EXPOSURE PATHWAY 0-4mi T+80min (all readings in IR/hr)'t Cft'r't"~r i~~etclf+Q-i g4~CT~l cTC C r~i'~5 l e'~rp>>t~gg C@ised f<<g~C l\s c f5>'f TtT t't., te.v~e'i~Tcrpocee cececcTT le ceectece CONTAOUXD DSTlTTltTTtON

~T~~WY~iM pp.~MJMESI Eeecciee Nt TTetct Teste DCCe.Deceeccl Dttece~"~CCC i~i, i 18 I I I'Ll i'r~~.55H5 19 ce c CN~~C 1 i<<)gf)~i~i~4~~e tel'ttlt<<~./ve+tc ee i'i mmZDD~~~f fat@'ecce'e~tlTTOOc'.9 u 26"j'Tee T~i<<'~~;Q%1'.,~.~'~8: '""27

~'

PLUME EXPOSURE PATHWAY 0-5mi T+1 (all readings in mR/hr)'r, g 00min'eak tf+4~.'P+c.~~tl"t t l 5 t 2L r 4 t,"":t'>y l~ty~~sept..'@3~<<<"'~l eP m.A<<L<<tt I Jl'L I , 18'~I BEE~1~J I Qf l~~a.8'./1.~jl~~~~~~TLO AN 5 Xf!~~~L n<<L<<LX>26~tf, ttt Q<<e fl~l: t"tt c8<<L ttrt tt+pip~r',NIN'~,,p

~l L'"" 27

-PLUME EXPOSURE PATHWAY 0-Gmi (all readings in mR/hr)w.'lPQRf.h)i 1 T+120min~D~1 I~tr tL t\D if.I~1 it'1 I I.Red tom Dsa.Decked Diea Aaa5nps 9@91 ECS"%IS 19 1 r 1, 17$)L I~~r\~Elhi 1~4'.', r., i~Ctl~rg W'~~'t@I rCLIt I'L~~p+/L So.ttr 1~~~k~F 1 1 L r C CmmD/~t t~rr'S(8'tI m~.~1'!1 I Lg'p'1'26 Ltf'r"".'t-L iIZrI'~',,PFAI v'~tkg 27 PLUME EXPOSURE PATHWAY 0-7mi T+140min (all readings in mR/hr)l Io'I ig Ol.~I P r~I 1 1 vovt)PI'f-,g'<<.-->

r~t'l p r h)kl lf 3~~I 7*fxotcfoo 00 Tfo)t Tooo Doto.Docofoof D)5OI foot/of)~ftftt)O PtOO)loft IO CO/CO))~~D DffmfBVINN 19 i~K~M.Ii8fim 33*r I PI h~~CSW~~IKSRIKii".~~pl oT)f.Tr>t ot r//5 7/C r ir.22 2 Af/fll (7/(//V;I II~I~\'TLDhfDID 4>>"," CTftffSD I 5~~~3.I D'OI~I'ftD;.);~'Io, ult/./I I~~(r I~I ttf/C f II(-~l rp'I~V!Jo-ur (7/f 7'~'g/I:8 26'" 27 li I, I h , II

.l'T"i~~//'LUME EXPOSURE PATHWAY 0-Smi T+160min (all readings in mR/hr)(Unless othenvise noted)v~~,~Q g q.'~r TI~II', s I I I g r p'ONMllEO DSIRSUAON 19~%8W~~8awRR~~%I r~~A I Il gyPII'1~~I CV V r I'III El VI 1@<~TLD llf 9 l~I rl I~~r r'1~~~~tlTlrlrl~26 I:l4 I I'~VIE TI K I.~gdx~g.9)f'r(~~sew*+8.jg4S"'7 0 0~'

P LUME EXPOSURE PATHWAY 0-9mi (all readings in mR/hr)..ee~o>~ed'.gg I l T+180min b33 ig ff I l I 5~'1'el c TI~Kxeecaco QO fceac Tooo Deca, Decoceec Daeec eecothcpt ertpecleco feodmly ao eeeetfeet CDcmKUED D3533333UT3533 I';y II/j js%I@I r P ttlee 1 gaffer I t I I~I~ec 35'j cavl f/'3acf e tc~W!tc'I~e ffpfa'-eO3.3 J")2"'i'TTTc anDr I~1~~'td~'P>f1'*I~l,/~~Dner55.,f~~\~'I+5 t I~.'I 3 We5Tt 1~Jle, 26

+Ie!1 a Ak>>t i IgrL cd.I-Cke,~" PLUME EXPOSURE PATHWAY 0-30mi T+200min (all readings in IR/hr)(Unless otherwise noted)tii v'+.1~C ti g I','>>'I Niff'AP~SKR8~~f!D.!~DIID.I'f!~.t i i i f~'Aal Tean Dan.Dec>>fed Gina feafttfn~fttnntnc nt~COtABOtKD DnfffnBVDON 18 19 1 ttf>>lpga J'wt" HKKH aÃeezemm~'ccal t ffnfl a IDOL Jtc'I Tg'@Q~~~M'k~t IC<~~'9 it'T'IT>>4~~I~i~'fffc Q'"t<<~pg-/wr..t~'~4~~t tt c:P,l fekte4ki tt t j3 n!'~'~.a.Pi>>Gl'f g~~gQ 27 28 I!!!~I

%4~HIWCTOK tl Cl IC" POIINC kP SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET EXERCISE'90 ET NO.7c RESPONSIBLE CONTROLLER ILOCATION)

TSC, NUDAC with Field Teams, HP Center FAG K of VALID FOR TIMES OF: QAM 0700 0 o 1600 ASSOCIATKD WITH MESSAGES 0AM QPM To 0900 DRILL TIME HOURS INFORMATION APPLIES TO FIELD TEN DATA AIR SAMPLE RESULTS HOURS A.Background-1.Air sampl e data re f1 ects centerline concentrati ons for a cl oud containing noble gases and r adionucl ides.The sour ce term cal culated (Ci/sec)for the Turbine Building point of release was used to determine airborne activity concento ations on the centerline.

Particulates and noble gases were released.Silver Zeolite cartridges should be used.2.Calculation Specifics-a.Sample volume-10 ft (per PPM 13.9.3).3 b.Chi/()was determined by-Time Stability frame Class (minutes)llindspeed (mph)Sigma Theta (')0-300 B.Use Instructions-1.Field Team Controllers-a.Use the nearest upstream values.b.Interpolate for centerline proximity.

c.Provide charcoal cartridge and filter direct readings.d.If a galena analyzer is used, also provide the I-131 readings (only).2.HP Center Contr oller-a.From the Sample Identification Form entries on sample location, time and direct readings, determine the appropriate nuclide loca-tionss.b.Provide the same direct readings.c.After analysis on the multi-channel analyzer, provide the nuclide concentrations.

Include that only traces of noble gas are present.99!15222 Rl I7%5)

INTENTIONALLY BLANK DRILL NO, Exercise-90 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of-T NOe 7c RESPONSIBLE CONTROLLER ILOCATION)

TSC, MUDAC, and HP Center VAl ID FOR TIMES OF: REAL TIME t 0AM TO 16:00 PAM D RILL TIME 0:00 HOURS 9:00 HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Field Team Data-Air Saapie Results Cloud Arrive Time Miles T+min Cloud Filter Arrive iodine Time Cartridge Before After Purge Purge c c Cartridge Filter mRad/hr mRad/hr at 1 in.at 1 in.M.G.Beta Emitters uCi/cc I-131 uCi/cc Center Line Concentrations I-132 I-133 I-134 I.135 uCi/cc uCi/cc uCi/cc uCI/cc 1 20 35 50 65 80 110 140 1.2 24 39 54 69 84 114 144 1.4 28 43 58 73 88 118 148 10:30 10 45 11100 11:15 11130 12100 12:30'10 34 10149 11104 11119 1'l 134 12:04 12:34 10138 10153 11108 11123 11:38 12108 12:38 318299 153731 67046 31762 9820 1727 167 323351 156172 68110 32266 9976 1754 170 318299 153731 67046 31762 9820 1727 167 3653582 1751011 764955 361676 111525 19804 1922 3711576 1778S05 777097 367417 113295 20119 1953 3653582 1751011 764955 361676 111525 19804 1922 3182986 1537315 670459 317621 98199'7269 1673 3233510 1561716 681101 322663 99r5r 17544 1699 31829S6 1537315 670459 317621 98199 17269 1673 636.60 307.46 134.09 63.52 19.64 3.45 0.33 646.70 312.34 136.22 64.53'l9.95 3.51 0.34 636.60 307.46 134.09 63.52 19.64 3.45 0.33 63.66 30.75 13.41 6.35 1.96 0.35 0.03 64.67 31.23 13.62 6.45 2.00 0.35 0.03 63.66 30.75 13.41 6.35 1.96 0.35 0.03 2.14E-04 9.71E-05 4.29E-05 2.00E-05 6.06E-06 1.15E.06 1~13E-07 2.17E-04 9.87E.05 4.36E-05 2.03E-05 6.15E-06 1.17E.06 1.15E.07 2.14E-04 9.71E-05 4.29E-05 2.00E-05 6.06E-06 1.15E-06 1.13E-07 6.80E-06 3.53E.06 1.64E-06 8.06E-07 2.65E.07 5.04E-OS 5.29E-09 6.91E-06 3.58E.06 1.66E-06 8.19E-07 2.69E-07 5'2E-08 5.38E-09 6.80E-06 3.53E.06 1.64E.06 8.06E-07 2.65E-07 5.04E-OB 5.29E-09 9.58E-06 4.54E-06 2.02E-06 8.95E-07 2.77E.07 4.54E.OS 4.03E-S 9.73E-06 4.61E.06 2.05E-06 9.SE-07 2.82E.07 4.61E-OS 4.10E-S 9.58E-06 4.54E.06 2.02E.06 8.95E-07 2.77E207 4.54E-OS 4.03E-S 1.51E-05 7.81E-06 3.53E-06 1.76E-06 5.67E-07 1.07E-07 1.11E-OS 1.54E-OS 7.94E-06 3.58E-06 1.79E-06 5.76E-07 1.SE-07 1.13E-OS 1.51E-05 7.81E.06 3.53E.06 1.76E-06 5.67E-07 1.07E-07 1.11E-OS 1.39E-05 1:39E-05 6.05E-06 6.68E-06 2.27E-06 3.02E-06 9.32E-07 1.51E-06 2.52E-07 4.66E-07 3.28E-OS 8.57E-08 2.27E-09 8.44E-09 1.41E-OS 1.41E 05 6.14E-06 6.78E-06 2.30E-06 3.07E.06 9.47E-07 1.54E 06 2.56E-07 4.74E-07 3.33E-OS 8.70E-08 2.30E-09 8.58E.09 1.39E-05 1.39E-05 6.05E-06 6.68E-06 2.27E-06 3.02E-06 9.32E-07 1.51E.06 2.52E-07 4.66E-07 3.28E-OS 8.57E-OS 2.27E-S 8.44E-S 1.5 30 45 60 75 90 120~150 2 40 55 70 85 100 130 160 10140 10155 11:10 11:25 11:40 12:10 12140 10150 11105 11120 11:35 11150 12120 12150 313246 151291 65982 31258 9664 1700 165 277880 134210 58532 27729 8573 1508 146 3595589 1723217 752813 355935 109755 19490 1892 3189635 1528660 667S18 315749 97363 17290 1678 3132462 1512913 659817 312580 96640 16995 1646 2778797'l342100 585321 2772SS 85729 15076 1460 626.49 302.58 131.96 62.52 19.33 3.40 0.33 555.76 268.42 117.06 55.46 17.15 3.02 0.29 62.65 30.26 13.20 6.25 1.93 0.34 0.03 55.58 26.84 11.71 5.55 1.71 0.30 0.03 2.10E-04 9.56E-05 4.23E-05 1.97E.05 5.96E-06 1.1)E.06 1.11E-07 1.87E-04 S.48E-05 3.75E-05 1.75E-05 5.29E-06 1.01E-06 9.89E-08 6.70E-06 3.47E-06 1.61E-06 7.94E.07 2.60E-07 4.96E.OS 5.21E.S 5.94E-06 3.08E-06 1.43E.06 7.04E-07 2.31E-07 4.40E-08 4.62E-09 9.42E-06 4.46E-06 1.98E-06 S.SOE.07 2.73E-07 4.46E 08 3.97E-S 8.36E-06 3.96E-06 1.76E-06 7.81E-07 2.42E-07 3'.96E-08 3.52E-S 1.49E-05 7.69E-06 3.47E-06 1.74E.06 5.58E-07 1.05E.07 1.09E-OS 1.36E-05 1.36E-05 5.95E-06 6.57E-06 2.23E-06 2.98E-06 9.1SE-07 1.49E-06 2.48E-07 4'9E.07 3.22E-OS 8.43E-'08 2.23E-09 8.31E-S 1.32E-05 6.82E-06 3.08E-06 1.54E-06 4.95E-07 9.35E-OB 9.68E-S 1.21E-05 1.21E.05 5.28E-06 5.83E-06 1.98E-06 2.64E-06 8.14E-07 1.32E-06 2.20E-07 4.07E-07 2.86E-DS 7.48E-OS 1.98E-09 7.37E-09 2.5 50 65 80 95 110 140 170 11:00 11:15 11:30 11145 12100 12:30 13100 241755 116763 50923 24124 7458 1312 127 2774983 1329935 581001 274702 84706 15042 1460 2417554 1167627 509229 241241 74584 13117 1271 483.51 233.53 101.85 48.25 14.92 2.62 0.25 48.35 23.35 10.18 4.82 1.49 0.26 0.03 1.62E-04 7.38E-05 3.26E-05 1.52E-05 4.60E-06 8.75E-07 8.60E-08 5.17E-06 2.68E-06 1.24E-06 6.12E-07 2.01E-07 3.83E-OS 4.02E-09 7.27E-06 3.45E-06 1'3E-06 6.79E-07 2.11E 07 3.45E-08 3.06E-09 1.15E-05 5.93E 06 2.68E.06 1.34E-06 4.31E-07 8.13E-OS 8.42E-S 1.05E-05 1.05E-05 4.59E-06 5.07E-06 1.72E-06 2.30E-06 7.08E-07 1.15E-06 1.91E-07 3.54E-07 2.49E-OS 6.51E.08 1.72E-09 6.41E-09 2.6 52 67 82 97 112 142 172 11:02 11:17 11:32 11:47 12102 12:32 13102 235440 113712 49593 23494 7264 1277 124 2702491 1295192 565824 267525 82493 14649 1422 2354399 1137125 495927 234939 72636 12774 1237 470.88 227.42 99.19 46.99 14.53 2.55 0.25 47.09 22.74 9.92 4.70 1.45 0.26 0.02 age 1.58E-04 7.18E-05 3.18E-05 1.48E-05 4.48E-06 8.52E-07 8.38E.OS 5.03E-06 2.61E-06 1.21E-06 5.96E-07 1.96E-07 3.73E-08 3.91E-09 7.08E-06 1.12E-05 3.36E-06 5.78E-06 1.49E-06 2.61E-06 6.62E-07 1.30E.-06 2.05E-07 4.19E-07 3.36E-OS 7.92E-08 2.98E-09 8.20E-09 1".03E-05 1.03E-05 4.47E-06 4.94E-06 1.68E-06 2.24E-06 6.90E-07 1.12E-06 1.86E-07 3.45E.07 2.42E-08 6.34E-08 1.68E-09 6.24E.09 964 15222 Rl P 42)

DRILL NO,'xercise-90 llklOIOOTOO H'LIP POloCO 43 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK OI SHEET NO+7c.cont RESPONSIBLE CONTROLLER (LOCATION)

TSC, HUDAC, and HP Center VALID FOR TIMES OF: 7 00 REAL TIME 0AM TO 16700 0AM DRILL TIME 0400~TO HOURS 9700 HOURS ASSOCIATED WITH MESSACKS INFORMATION APPLIES TO Field Team Data-Air San@le Results Cloud Arrive Time Hi les T+min 3 60 75 90 105 120 150 180 Cloud Arrive Time 11:10 11:25 11:40 11:55 12710 12740 13710 Filter iodine 212704 102732 44804 21225 6562 1154 112 Cartridge Before After Purge Purge c c 2441521 1170120 511184 241691 74527 13234 1284 2127043 1027317 448037 212252 65622 115CO 1118 425.41 205.46 89.61 42.45 13.12 2.31 0.22 42.54 20.55 8.96 4 25 1.31 0.23 0.02 Cartridge Filter nNad/hr mRad/hr at 1 in.at 1 in.H.G.Beta Emitters uCi/cc 1.43E-04 6.49E-05 2.87E-05 1.34E-05 4.05E-06 7.70E-07 7.57E.08 Center Line Concentrations I-133 uCi/cc 1.01E-05 5.22E-06 2.36E-06 1.18E-06 3.79E.07 7.16E-OS 7A1E-09 I-131 I-132 uCi/cc uci/cc I-134 uCi/cc 9.26E-06 4.04E.06 1.52E-06 6.23E-OT 1.68E-07 2.19E-08 1.52E-09 4.55E-06 2.36E-06 1.SE-06 5.39E-OT 1.77E 07 3.37E.OS 3.54E-S 6.40E.06 3.03E-06 1.35E-06 5.98E-07 1.85E.OT 3.03E-OS 2.69E-09 I-135 uCi/cc 9.26E-06 C.46E-06 2.02E-06 I.OIE-06 3.12E-OT 5.73E-08 5.64E-09 3.5 70 85 100 115 130 160 190 11720 11:35 11750 12705 12720 12750 13720 189463 9150'7 39908 18906 5845 1028 100 2174751 1042268 455330 215283 66384 11788 1144 1894635 915068 399083 189060 58451 10279 996 378.93 183.01 79.82 37.81 11.69 2.06 0.20 37.89 18.30 7.98 3.78 1.17 0.21 0.02 1.27E-04 5.78E-05 2.56E-05 1.19E-05 3.61E-06 6.86E 07 6.74E-OS 4.05E.06 2.10E-06 9.75E.OT 4.80E.OT 1.58E 07 3.00E-OS 3.15E-09 5.70E.06 2.70E-06 1.20E-06 5.33E-07 1.65E-07 2.70E-OS 2.40E-09 9.00E-06 4.65E-06 2.10E-06 1.05E.06 3.38E.07 6.38E.DS 6.60E-09 8.25E-06 3.60E-06 1.35E-06 5.55E-OT 1.50E-OT 1.95E.OS 1.35E-S S.25E-06 3.98E-06 1.80E-06 9.00E-07 2.78E-07 5.10E-OS 5.03E-09 4 80 95 110 125 140 170 200 11730 11:45 12700 12 15 12730 13700 13730 170517 82356 35917 17015 5261 925 90 1957276 938042 409797 193755 59745 10609 1030 1705171 823561 359174 170154 52606 9251 896 341.03 164.71 71.83 34.03 10.52 1.85 0.18 34.10 16.47 7.18 3.40 1.05 0.19 0.02 1.15E.04 5.20E-05 2.30E.05 1.07E.05 3.24E.06 6.17E-07 6.07E-OB 3.65E-06 1.89E.06 8.78E-OT 4.32E-07 1.42E.07 2.70E.OS 2.84E-09 5.13E-06 2.43E-06 1.08E-06 4.79E-OT 1.49E-07 2.43E.08 2.16E-09 8.10E-06 4'9E-06 1.89E.06 9.45E 07 7.43E-06 3.2CE-06 1.22E-06 5.00E-07 3.04E-07, 1.35E-07 5.74E-08 1.76E-OS 5.94E.09 1.22E-S 7.43E-06 3.58E-(1.62E-8.10E-07 2.50E-07 4.59E-OS 4.52E-09 4.5 90 105 120 135 150 180~210 5 100 115 130 145 160 190 220 5.5 110 125 140 155 170 200 230 6 120 135 150 165 180 210 240 11:40 11755 12710 12725 12I40 13 I 10 13I40 11750 12705 12720 12:35 12750 13720 13750 12700 12715 12230 12745 13700 13:30 14:00 12:10 12 25 12I40 12:55 13I10 13740 14I10 155360 75036 32725 15503 4793 843 e2 142982 69057 30117 14268 4411 776 75 132372 63933 27883 13209 4084 718 70 123530 59662 26020 12327 3811 670 65 1783296 854660 373371 176532 54435 9666 938 1641212 786565 343622 162467 50S8 8896 863 1519426 728198 318124 150411 46380 8236 799 1417938 679559 296875 140365 43282 7686 746 1553600 750356 327248 155029 47930 8429 816 1429818 690571 301174 142678 44111 7758 751 1323718 639328 278826 132090 40838 7182 696 1235302 596624 260202 123267 38110 6702 649 310.72 150.07 65.45 31.01 9.59 1.69 0.16 285.96 138.11 60.23 28.54 8.82 1.55 0.15 264.74 127.87 55.77 26.42 8.17 1.44 0.14 247.06 119.32 52.04 24.65 7.62 1.34 0.13 31.07 15.01 6.54 3.10 0.96 0.17 0.02 28.60 13.81 6.02 2.85 0.88 0.16 0.02 26.47 12.79 5.58 2.64 0.82 0.14 0.01 24.71 11.93 5.20 2.47 0.76 0.13 0.01 age 1.04E.04 4.74E.05 2.10E-05 9.77E-06 2.96E-06 5.62E-07 5.53E.OB 9.61E-05 4.36E-05 1.93E.05 8.99E-06 2.72E-06 5.18E-OT 5.SE.08 S.S9E.05 4.04E-05 1.79E-05 8.33E-06 2.52E-R 4.79E-07 4.71E-DB 8.30E-05 3.77E-05 1.67E-05 7.77E-06 2.35E-06 4.47E-07 4.40E.OS 3.32E-06 1.72E-06 S.OOE-07 3.94E-07 1.29E.07 2.46E-OS 2.58E-09 3.06E-06 1.5SE.06 7.36E-07 3.62E.07 1.19E-07 2.26E-OS 2.38E-09 2.83E-06 1.47E-06 6.81E.07 3.35E.07 1.10E-07 2.10E-OB 2.20E-09 2.64E-06'1.37E.06 6.36E-07 3.13E-07 1.03E.07 1.96E-OS 2.05E-S 4.67E-06 2.21E.06 9.84E-07 4.37E-07 1.35E-07 2.21E-OS 1.97E-09 4.30E.06 2.04E-06 9.06E-07 4.02E-07 1.25E-OT 2.04E-08 1.81E-09 3.98E-06 1.89E.06 8.38E-OT 3.72E-OT 1.15E-07 1.89E-OS 1.68E-09 3.72E-06 1.76E-06 7.82E 07 3.47E-07 1.08E-07 1.76E-OS 1.56E-09 7.38E-06 3.81E-06 1.72E.06 8.61E-OT 2.77E-07 5.23E-OS 5.41E-09 6.79E-06 3.5$E-06 1.58E-06 7.92E.07 2.55E-07 4.81E.OS 4.98E-09 6.29E-06 3.25E-06 1.47E-06 7.34E-07 2.36E.OT 4.45E-OS 4.61E-S 5.87E-06 3.03E-06 1.37E-06 6.85E.07 2.20E-OT 4.16E-OS 4.30E.S 6.77E-06 2.95E-06 1.11E.06 4.55E-07 1.23E-07 1.60E-OS 1.11E-09 6.23E-06 2.72E.06 1.02E-06 4.19E-OT 1.13E-07 1.C7E-08 1.02E-09 5.76E-06 2.52E-06 9.43E-07 3.88E-OT 1.0$E-OT 1.36E-OS 9.43E-10 5.3SE-06 2.35E-06 S.SOE-07 3.62E.07 9.78E-08 1.27E-OS 8.80E.10 6.77E-06 3.26E.06 1.48E-06 7.38E-07 2.28E-OT 4.18E.OS 4.12E-09 6.23E-06 3.00E-06 1.36E-06 6.79E-07 2.SE-OT 3.85E-08 3.79E-S 5.76E-06 2.78E-06 1.26E-06 6.29E-OT 1.94E-OT 3.56E-OB 3.51E-09 5.38E-06 2.59E-1.17E-O 5.87E-07 1.81E-07 3.33E-OS 3.28E-09 464'IS222 Rl 17.4SI RILL NO<<Exercise-90

%@I<<<<IXC70%

tl'ILIC iO<<<<CR 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE oI NO<<7c-cont.RESPONSIBLE CONTROLLER iLOCATION)

TSC NSAC and HP Center VALID FOR TIMES OFt REAL TIME, PAM p TO 16100 0AM DRILL TIME HOURS~TO 9:00 HOURS ASSOCIATED WITH MESSACES INFORMATION APPI IES TO Field Team Oata-Air Ssnple Results Cloud Arriva Time Miles 7+min Cloud Filter Arriva iodine Time Cartridge Before After Purge Purge c c Cartridge mRad/hr at 1 in.Filter mRad/hr at 1 in.H.G.Beta Emitters I-131 uCi/cc uCi/cc Center Line Concentrations I-132 I-133 I-134 uCi/cc uCi/cc uCi/cc I-135 uCi/cc 6.5 130 145 160 175 190 220 250 7 140 155 170 185 200 230 260 7.5 150 165 180 195 210 240 270 8 160 175 190 205 220 250 280 8.5 170 185 200 215 230 260 290 8.6 172 187 202 217 232 262 292 9 180 195 210 225 240 270 300 12:20 12:35 12150 13105 13:20 13:50 14:20 12:30 12145 13100 13:15 13130 14100 14:30 12:40 12155 13110 13:25 13140 14110 14140 12:50 13:05 13120 13:35 13:50 14:20 14150 13100 13115 13130 13:45 14 00 14130 15100 13:02 13125 13132 13:47 14102 14132 15:02 13:10 13135 13140 13155 14110 14:40 15"lo 116204 56124 24477 11596 3585 630 61 109636 52952 23094 10940 3382 595 58 103826 50146 21870 10361 3203 563 55 98774 47706 20806 9856 3047 536 52 94226 45509 19S48 9403 2907 511 50 93469 45143 19688 9327 2S84 507 49 90185 43557 18996 8999 2782 489 47 1333848 639258 279269 132040 40715 7230 702 1258456 603'l26 263484 124577 38414 6822 662 1191764 571163 249521 117975 36378 6460 627 1133770 543369 237379 112234 34608 6146 596 1081576 518355 226451 107068 33015 5863 569 1o72e77 514186 224630 106206 32749 5816 564 1035182 496120 216737 102475 31599 5611 545 1162043 561242 244771 115957 35850 6305 611 1096362 529519 230936 109403 33824 5948 576 1038260 501457 218697 103605 32031 5633 546 987736 477056 208055 98563 30473 5359 519 942265 455094 198477 94026 29070 5112 495 934686 451434 196881 93270 28836 5071 491 901846 435572 189963 89993 27823 4893 474 232.41 112.25 48.95 23.19 7.17 1.26 0.12 219.27 105.90 46.19 21.88 6.76 1.19 0.12 207.65 100.29 43.74 20.72 6.41 1.13 0.11 197.55 95.41 41.61 19.71 6.09 1.07 0.10 188.45 91~02 39.70 18.81 5.81 1.02 0.10 186.94 90.29 39.38 18.65 5.77 1.01 0.10 180.37 87.11 37.99 18.00 5.56 0.98 0.09 23.24 11.22 4.90 2.32 0.72 0.13 0.01 21.93 10.59 4.62 2.19 0.68 0.12 0.01 20.77'l0.03 4.37 2.07 0.64 0.11 0.01 19.75 9.54 4.16 1.97 0.61 0.11 0.01 18.85'.10 3.97 1.88 0.58 0.10 0.01 18.69 9.03 3.94 1.87 0.58 0.10 0.01 18.04 8.71 3.80 1.80 0.56 0.10 0.01 age 7.81E-05 3.55E-05 1.57E-05 7.31E-06 2.21E-06 4.21E-07 4.14E-OS 7.37E.05 3.35E-05 1.48E-05 6.90E.06 2.09E-06 3.97E.07 3.90E-OS 6.98E-05 3.17E-05 1.40E.05 6.53E-06 1.98E-06 3.76E-07 3.70E-OB 6.64E-05 3.01E.05 1.33E-05 6.21E-06 1.88E.06 3.58E-07 3'2E-08 6.33E-05 2.88E-05 1.27E.05 5.93E-06 1.79E-06 3 41E.07 3.35E.OS 6.28E-05 2.85E-05 1.26E-05 5.88E-06 1.78E-06 3.38E-07 3.33E-OS 6.06E-05 2.75E-05 1.22E-05 5.67E-06 1.72E-06 3.26E-07 3.21E-OB 2.48E-06 1.29E.06 5.98E.07 2.94E-07 9.66E-08 1.S4E.08 1.93E-09 2.34E-06 1.22E-06 5.64E-07 2.78E-07 9.11E.OS'l.74E-08 1.82E.09 2.22E.06 1.15E-06 534E-07 2.63E-07 8.63E-OS 1.64E-OS 1.73E-09 2.11E-06 1.09E-06 5.08E-07 2.50E-07 8.21E-OS 1.56E-08 1.64E-09 2.01E.06 1.04E.06 4.85E-07 2.39E.07 7.&3E-08 1.49E-OS 1.57E-09 2.00E-06 1.04E-06 4.81E.07 2.37E-07 7.77E-OS 1.4&E-08 1.55E-09 1.93E-06 1.00E.06 4.64E-07 2.28E-07 7.50E-OS 1.43E-OS 1.50E-09 3.50E-06 5.52E-06 5.06E-06 1.66E-06 2.85E-06 2.21E-06 7.36E-07 1.29E-06 8.2SE.07 3.27E-07 6.44E-07 3.40E-07 1.01E-07 2.07E-07 9.20E-OS 1.66E-OS 3.91E-08 1.20E-OS 1.47E-09 4.05E-09 8.28E-10 3.30E-06 5.21E-06 4.77E-06 1~56E-06 2.69E-06 2.08E-06 6.94E-07 1.22E-06 7.81E-07 3.08E-07 6.08E-07 3.21E-07 9.55E 08 1.95E-07 8.68E-OB 1.56E-08 3.69E-08 1.13E-OS 1.39E.09 3.82E-09 7.81E-10 3.12E-06 4.93E-06 4.52E-06 1.4&E-06 2.55E-06 1.97E 06 6.58E-07 1.15E-06 7.40E 07 2.92E-07 5.75E-07 3.04E 07 9.04E 08 1.85E-07 8.22E-OS'l.48E-OS 3.49E-OS 1.07E-08 1.32E-09 3.62E-09 7.40E-10 2.97E-06 4.69E-06 4.30E-06 1.41E-06 2.42E-06 1.8&E-06 6.26E.07 1.09E-06 7.04E-07 2.78E-07 5.47E-07 2.89E.07 8.60E-OS 1.76E-07 7.82E-08 1.41E-OS 3.32E-OS 1.02E-OS 1.25E-09 3.44E-09 7.04E-10 2.83E-06 4.48E-06 4.10E-06 1.34E-06 2.33E-06 1.79E-06 5.97E-07 1~04E-06 6.71E-07 2.65E.07 5.22E-07 2.76E-07 8.21E-OS 1.68E-07 7.46E-OS 1.34E-OS 3.17E-OS 9.70E 09 1.19E-09 3.28E-09 6.71E-lo 2.81E-06 4.44E-06 4.07E-06 1.33E-06 2.29E-06 1.78E-06 5.92E-07 1.04E-06 6.66E-07 2.63E-07 5.18E-07 2.74E-07 8.14E-08 1.67E-07 7.40E-OS 1.33E-OS 3.15E-08 9.62E-09 1.18E-09 3.26E-09 6.66E-10 2.71E-06 4.2&E-06 3.93E-06 1.29E 06 2.21E-06 1.71E.06 5.71E-07 1.00E-06 6.43E-07 2.53E-07 5.008-07 2.64E-07 7.85E.08 1.61E-07 7.14E-OS 1.29E-OB 3.03E-08 9.28E-09 1.14E-09 3~14E-09 6.43E-10 5.06E-06 2.44E-06 1.10E.06 5.52E-07 1.70E-07 3.13E.OS 3.08E-09 4.77E.06 2.30E.06 1.04E-06 5.21E-07 1.61E-07 2.95E-OB 2.91E-09 4.52E-06 2.18E.06 9.86E-07 4.93E-07 1.52E-07 2.79E-08 2.75E.09 4.30E-06 2.07E-06 9.38E.07 4.69E-07 1.45E-07 2.66E.OS 2.62E.09 4.10E-06'1.98E-06 8.95E-07 4.48E-07 1.38E-07 2.54E-OS 2.50E-09 4.07E.06 1.96E-06&.ME-07 4.44E-07 1.37E.07 2.52E.08 2.48E.09 3.93E-06 1.89E-06 8.57E-07 4.28E-.07 1.32E-07 2.43E-OB 2.39E-09 SssilS222 Rl I7 62)

DRILL N 0, Fxerc isa 90 0A~HI00t00 tt'tnt t0%tt 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAG E VALID FOR TIMES OFt 7 00 REAL TIME TO 16:00 QAM OPM ASSOCIATED WITH MESSAGES SHEET NO+RESPONSIBLE CONTROLLER ILOCATION) 7c-cont.TSC, N)OAC, and HP Center 0AM DRILL TIME 0 00.TD HOURS INFORMATION APPLIES TO Field Team Oats-Air Sample Results 9)00 HOURS)Ii les Cloud Arrive Time T+min Cloud Filter Arrive iodine Time~C Cartridge Before After Purge Purge c c Cartridge mRad/hr at 1 in.Filter mRad/hr at 1 in.H.G.Beta Emitters I-131 uCi/cc uOI/cc Center Line Concentrations I-132 I-'133 I-134 I 135 uCi/cc uci/cc uCi/cc uci/cc 9.5 190 205 220 235 250 280 310 13:20 13)45 13:50 14)05 14:20 14:50 15)20 86648 41849 18251 8646 2673 470 46 994586 476664 208238 98456 30360 5391 523 866480 418491 182514 86464 26732 4701 455 173.30 83.70 36.50 17.29 5.35 0.94 0.09 17.33 8.37 3.65 1.73 0.53 0.09 0.01 5.82E-05 2.64E-05 1.17E-05 5.45E-06 1.65E-06 3.14E-07 3.08E-08 1.85E-06 9.60E-07 4.46E-07 2.20E-07-7.20E-OS 1.37E-OS 1.44E-09 2.61E-06 4.12E-06 3.77E.06 3.77E-06 1.23E 06 2.13E-06 1.65E.06 1.82E-06 5.49E-07 9.60E-07 6.17E.07 S.23E.07 2.44E-07 4.80E-07 2.54E.OT 4.12E-07 7.55E-OS 1.54E-07 6.86E.OS 1.27E-07 1.23E-OS 2.92E-OS 8.92E.09 2.33E-OB 1.10E-09 3.02E-09 6.17E-10 2.30E-09 10 200 215 230 245 260 290 320 10.5 210 225 240 255 270 300 330 13:30 13:45 14:00 14:15 14:30 15:00 15:30 13)40 13:55 14:10 14)25 14)40 15)10 15:40 83364 40263 17560 8319 2572 452 44 80585 38921 16974 8041 2486 437 42 956891 458598 200345 94725 29209 5187 503 924994 443312 193667 91567 28235 5014 487 833639 402630 175596 83187 25719 4523 438 805851 389209 169743 80414 24861 4372 424 166.73 80.53 35.12 16.64 5.14 0.90 0.09 161.17 77.84 33.95 16.08 4.97 0.87 0.08 16.67 8.05 3.51 1.66 0.51 0.09 0.01 16.'l2 7.78 3.39 1.61 0.50 0.09 0.01 5.60E-05 2.54E-05 1.12E-05 5.24E-06 1.59E-06 3.02E-07 2.97E.OB 5.42E-05 2.46E-05 1.09E-05 5.07E-06 1.53E-06 2.92E-07 2.87E-OS 1.78E-06 2.51E-06 3.96E-06 3.63E-06 3.63E-06 9.24E-OT 1 19E-06 2.05E-06 1.58E.06 1 75E-06 4.29E-07 5.28E-07 9024E.OT 5.94E-07 7.92E-07 2.'11E.07 2.34E-OT 4.62E-07 2.44E-07 3.96E-07 6.93E-OS 7.26E.OS 1.49E.07 6.60E-OS 1.22E-07 1.32E-08 1.19E.08 2.81E.OS 8.58E.09 2.24E-OB 1.39E-09 1.06E-09 2.90E-09 5.94E-10 2.21E-09 1.72E-06 2.42E-06 3.83E.06 3.51E-06 3.51E 06 8.93E-OT 1.15E-06 1.98E-06 1.53E.06 1.69E.4 15E-07 5.10E-07 8.93E-OT 5.74E-OT 7 66E-0 2.04E-07 2.26E 07 4.47E-OT 2.36E-07 3.83E-OT 6.70E-OS 7.02E-08 1.44E-07 6.38E.OS 1.18E-07 1.28E-OS 1.15E 08 2.71E.08 8.29E 09 2.17E-OS 1.34E-09 1.02E.09 2.81E-09 5.74E-10 2.14E-09 11 220 235 250 265 280 310 340'l3:50 14)05 14)20 14:35 14:50 15)20 15)50 77806 37579 16389 7764 2400 422 41 893098 428025 186989 88410 27262 4841 470 778063 375788 163890 77641 24004 422'I 409 155.61 75.16 32.78 15.53 4.80 0.84 0.08 15.56 742 3.28 1.55 0.48 0.08 0.01 5.23E-05 2.37E-05 1.05E-05 4.89E-06 1.48E-06 2.82E-07 2.77E-OS 1.66E-06 2.34E.06 8.62E-07 1.11E-06~4.00E-07 4.93E-07 1.97E-07 2.19E.07 6.47E-OS 6.78E.OS 1.23E-OS 1.11E.OS 1.29E-09 9.86E-10 3.70E-06 3.39E.06 3.39E-06 1.91E-06 1.48E.06 1.63E-06 8.62E.07 5.54E.OT 7.39E-07 4.31E-07 2.28E-07 3.70E-07 1.39E.07 6.16E.OS 1.14E-OT 2.62E-OS 8.01E.09 2.09E.OB 2.71E-09 5.54E-10 2.06E-09 Page 4 969 19222 Rl (2$2)

DRILL NO+E 1 90 ll1~NIXCTOX~l'Illt tOll'CE 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACE'ET NO+7d RESPONSIBLE CONTROLLER (LOCATION)

TSC, HUOAC, and HP Center VALID FOR TIMES OF1 7'00 REAL TIME 0AM TO 16100 QPM 0AM 0 PM 0 00 DRILL TIME 9100 HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Field Team Data-Pl1ane Dose e Dose Rates Field Data for 10:30 to 15150 Pl1ane Dose Rates Plune At Maist Level At Ground Level Dose Rates in uR/hr Distance Hi les Cloud Cloud Arrive Arrive Time Time T+min Dose Rem (MB)Dose Rem (THY)Center line Center Half Edge Dose Dose Dose mR/hr aR/hr mR/hr (MC)(MC)(MC)Center Half Dose Dose mR/hr mR/hr (MO)(MO)Edge Dose mR/hr (MO).Center Half Edge Dose Dose Dose uR/hr uR/hr uR/hr (MC)(MC)(MC)1.2 1.4 1.5 2.5 20 35 50 65 eo 110 140 24 39 54 69 84 114 144 2e 43 58 73 88 118 148 30 45 60 75 90 120 150 40 55 70 85 100 130 160 50 65 95 1'10 140 170 10130 10:45 11100 11115 11130 12100 12130 10134 10:49 11104 11119 11:34 12104 12134 10138 10153 11:08 11123 11138 12108 12138 10140 10155 11110 11:25 11:40 12:10 12:40 10:50 11:05 1'1:20 11:35 11:50 12:20 12:50 11100 11115 11130 11:45 12100 12:30 13 00 4.32E-02 1.91E-02 7.84E-03 3.44E-03 2.09E-03 3.49E-04 6.44E-05 4.41E-02 1.88E 02 7.84E-03 3.51E-03 2.13E.03 3'6E-04 6.57E.05 4.33E-02 1.88E-02 0.007695 3.44E-03 2.09E.03 3.49E-04 6.45E 05 4.25E-02 1.85E-02 7.56E.03 3.39E-03 2.06E.03 3.43E-04 6.34E-05 3.76E-02 1.64E-02 6.70E-03 3'OE-03 1.82E-03 3.04E-04 5.61E-OS 3.29E-02 1.43E-02 5.85E-03 2.62E-03 1.59E-03 2.65E-04 4 90E-05 9.587 4.931 2.3104 1.1109 0.7291 0.1386 0.0287 9.777 5.028 2.3104 1.1329 0.7435 0.1413 0.0293 9.6 4.937 2.2687 1.1124 0.7301 0.1388 0.0287 9.436 4.853 2.2297 1.0933 0.7176 0.1364 0.0282 8.353 4'96 1.9739 0.9679 0.6353 0.1207 0.025 7.292 3.75 1.7233 0.845 0.5546 0.1054 0 0218 172.80 76.56 31.35 13.76 4.18 0.70 0.06 176.22 75.07 31.35 14.03 4.26 0.71 0.07 173.03 75.17 30.781 13.78 4.19 0.70 0.06 170.06 73.88 30.25 13.54 4.11 0.69 0.06 150.55 65.40 26.78 11.99 3.64 0.61 0.06 131.43 57.10 23.38 10.47 3.18 0.53 0 05 86.40 38.28 15.67 6.88 2.09 0.35 0.03 88.11 37.53 15.67 7.02 2.13 0.36 0.03 86.52 37.59 15.39 6.89 2.09 0.35 0.03 85.03 36.94 15.13 6.77 2.06 0.34 0.03 75.28 32.70 13.39 5.99 1.82 0.30 0.03 65.72 28.55 11.69 5.23 1.59 0.27 0.02 34.56 15.31 6.27 2.75 0.84 0.14 0.01 35.24 15.01 6.27 2.81 0.85 0.14 0.01 34.61 15.03 6.16 2.76 0.84 0.14 0.01 34.01 14.78 6.05 2.71 0.82 0.14 0.01 30.11 13.08 5.36 2.40 0.73 0.12 0.01 26.29 11.42 4.68 2.09 0.64 0.11 0.01 691.18 306.22 125.39 55.03 16.72 2.79 0.26 704.86 300.27 125.39 56.12 17.05 2.84 0.26 692.13 300.69 123.12 55'1 16.74 2.79 0.26 680.24 295.53 121.01 54.16 16.46 2.74 0.25 602.21 261.62 107.13 47.95 14.57 2.43 0.22 525.73 228.40 93.52 41.86 12.72 2.12 0.20 345.59 153.11 62.70 27.52 8.36 1.39 0.13 352.43 150.14 62.70 2S.06 8.53 1.42 0.13 346.06 150.34 61.5616 27.55 8.37 1.40 0.13 340.12 147.76 60.51 27.08 S.23 1.37 0.13 301.10 130.81 53.56 23.97 7.28 1.21 0~11 262.86'114.20 46.76 20.93 6.36 1.06 0.10 138.24 61.24 25.08 11.01 3.34 0.56 0.05 140.97 60.05 25.08 11.22 3.41 0.57 0.05 138.43 60.14 24.62 11.02 3.35 0.56 0.05 136.05 59.11 24.20 10.83 3.29 0.55 0.05 120.44 52.32 21.43 9.59 2.91 0.49 0.04 105.15 45.68 18.70 8.37 2.54 0.42 0.04 4263 711 66 2132 356 33 4186 2093 698 349 65 32 4114 2132 686 343 63 32 3642 1821 607 304 56 28 3180 530 49 1590 265 25 4180 2090 697 349 64 32 1045 174 16 1066 178 16 1047 175 16 1066 172 16 911 152 14 795 133 12 Page 1 966 ISa22 Rl{7 da)

DRILL NO, Exercise-90 W*~IIInotoII tl'OLIC tOWCS 4J SUPPLY SYSTEM CONTROLLER tNFORMATION GENERAL DATA SHEET FAG E of SHEET NOe 7d-cont.RESPONSIBLE CONTROLLER (LOCATION)

TSC, NSAC, and HP Center QAM TO VALID FOR TIMES OFI REAL TIME ASSOCIATED WITH MESSAGES 16:00 QPM 0 00 TO 9 00 DRILl.TIME HOURS INFORMATION APPLIES TO Field Team Data-PLInne Dose 8 Dose Rates HOURS Field Data for 10130 to 15:50 Plune Dose Rates Cloud Arrive Distance Time Hiles 7+min Cloud Arrive Time Dose Rem (MB)Dose Rem (THY)P lInne Centerline At lfaist Level Center Half Edge Dose Dose Dose mR/hr nR/hr mR/hr (lC)(lC)(lC)Center Hal f Dose Dose II@/hr mR/br (li0)(lID)Edge Dose mR/hr (MO)At Ground Level Dose Rates in uR/hr Center Half Edge Dose Dose Dose uR/hr uR/hr uR/hr (IC)(lC)(IIC)2.6 3.5 4.5 52 67$2 97 112 142'172 60 75 90 105'120 150 180 70 85 100 115 130 160 190 80 95 110 125 140 170 200 90 105 120 135 150 180 210 100 115 130 145 160 190 220 11102 11:17 11:32 11147 12102 12:32 13:02 11:10 11125 11140 11:55 12:10 12140 13110 11120 11:35 11150 12:05 12120 12:50 13120 11130 11:45 12100 12115 12130 13:00 13:30 11:40 11:55 12:10 12125 12:40 13:10 13140 11150 12105 12120 12:35 12:50 13:20 13:50 3.20E-02 1.39E.02 5.69E.03 2.55E-03 1.55E-03 2.58E.04 4.77E-05 2.89E-02 1.26E-02 5.14E-03 2.30E-03 1.40E.03 2.33E-04 4.31E-05 2.57E 02 1.12E-02 4.5SE.03 2.05E-03 1.25E.03 2.08E-04 3.94E-05 2.32E.02 1.01E.02 4.13E-03 1.85E.03'1.12E-03 1.87E-04 3.46E-05 2.11E-02 9.18E.03 3.76E-03 1.68E.03 1.02E-03 1.71E.04 3.15E-05 1.94E-02 8.44E-03 3.46E.03 1.55E-03 9.40E-04 1.57E.04 2.90E-05 7.102 3.652 1.6782 0.8229 0.5401 0.1026 0.0213 6.415 3.299 1.5159 0.7433 0.4879 0.0927 0.0192 5.712 2.938 1.3499 0.6619 0.4344 0.0826 0.0175 5.14S 2.648 1.2165 0.5965 0.3915 0.0744 0.0154 4.69 2.412 1.10S3 0.5434 0.3567 0.0678 0.014 4.313 2.218 1.0191 0.4997 0.328 0.0623 0.0129 128.00 55.61 22.77 10.19 3.10 0.52 0.05 115.62 50.23 20.57 9.21 2.80 0.47 0.04 102.95 44.73 18.31 8.20 2.49 0.42 0.04 92.79 40.31 16.51 7.39 2.24 0.37 0.03 84.53 36.72 15.04 6.73 2.04 0.34 0.03 77.73 33.77 13.83 6.19 1.88 0.31 0.03 64.00 27.80 11.38 5.10 1.55 0.26 0.02 57.81 25.12 10.28 4.60 1.40 0.23 0.02 51.48 22.36 9.16 4.10 1.25 0.21 0.02 46.39 20.15 8.25 3.69 1.12 0.19 0.02 42.26 18.36 7.52 3.37 1.02 0.17 0.02 38.86 16.88 6.91 3.09 0.94 0.16 0.01 25.60 11.12 4.55 2.04 0.62 0.10 0.01 23.12 10.05 4.11 1.84 0.56 0.09 0.01 20.59 8.95 3.66 1.64 0.50 0.08 0.01 18.56 8.06 3.30 1.48 0.45 0.07 0.01 16.91 7.34 3.01.1.35 0.41 0.07 0.01 15.55 6.75 2.77'1.24 0.38 0.06 0.01 511.98 222.43 91.08 40.76 12.39 2.07 0.19 462.48 200.92 82.27 36.82 11.19 1.87 0.17 411.82 178.91 73.26 32.79 9.96 1.66 0.16 371.14 161.23 66.02 29.55 8.98 1.50 0.14 338.11 146.89 60.15 26.92 8.18 1.36 0.13 310.90 135.07 55.31 24.75 7.52 1.25 0.12 255.99 111.21 45.54 20.38 6.19 1.03 0.10 231.24 100.46 41.14 18.41 5.59 0.93 0.09 205.91 89.46 36.63 16.39 4.98 0.83 0.08 185.57 80.62 33.01 14.78 4.49 0.75 0.07 169.06 73.44 30.07 13.46 4.09 0.68 0.06 155.45 67.54 27.65 12.38 3.76 0.63 0.06 102.40 44.49 18.22 8.15 2.48 0.41 0.04 92.50 40~18 16.45 7.36 2.24 0.37 0.03 82.36 35.78 14.65 6.56 1.99 0.33 0.03 74.23 32.25 13.20 5.91 1.80 0.30 0.03 67.62 29.38 12.03 5.38 1.64 0.27 0.03 62.18 27.01 11.06 4.95 1.50 0.25 0;02 2797 467 43 1399 233 22 2491 415 39 1245 208 20 2245 374 35 1122 187 17 2045 1022 341 171 32 16 1880 314 29 940 157 14 3097 1548 516 258 48 24 774 129 12 699 117 11 561 94 9 511 85 6 376 63 6 Page 2 464.IS222 R1{7%4)

DRILL NOo E i 90 llAlHI'ECTO%

~6~LIC tollII 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of ET NOe 7d-cont.RESPONSIBLE CONTROLLER (LOCATION)

TSC,)IUDAC, and HP Center VALID FO R TIMES 0 F 1 7 00 REAL TIME, 0AM TO 16:00Lj PM 0AM Q PM DRILL TIME 0:00 TO 9:00 HOURS HOUR ASSOCIATED WITH MESSACES INFORMATION APPLIES TO Field Team Data-Pltsne Dose 8 Dose Rates Field Data for 10:30 to 15:50 PlInne Dose Rates Cloud Arrive Distance Time Hi les 7+min Cloud Arrive Time Dose Rem (Ifg)Dose Rem (THY)PlIIne Centerline At Maist Level At Ground Level Center Dose mR/hr (MC)Half Dose mR/hr (IIC)Edge.Center Dose Dose nil/hr mR/hr (MC)(lJD)Half Dose mR/hr (IID)Edge Center Dose Dose mR/hr uR/hr (IID)(IIC)Half Dose uR/hr (IIC)Edge Dose uR/hr (MC)Dose Rates in uR/hr 5.5 5.6 6.5 7.5 1TQ 125 140 155 170 200 230 112 127 142 157 172 202 232 120 135 150 165 180 210 240 130 145 , 160 175 190 220 250 140 155 170 185 200 230 260 150 165 180 195 210 240 2 12100 12:15 12:30 12:45 13100 13130 14:00 12:02 12:17 12:32 12:47 13:02 13:32 14102 12:10 12:25 12140 12155 13110 13:40 14:10 12:20 12:35 12:50 13:05 13120 13150 14120 12130 12145 13100 13115 13:30 14100 14:30 12140 12:55 13:10 13125 13140 14:10 0 1.80E.02 7.82E-03 3.20E-03 1.43E-03 8.71E-04 1.45E-04 2.69E-05 1.78E-02 7.71E-03 3.16E-03 1.41E-03 8.59E-04 1.43E-04 2.65E-05 1.68E-02 7.30E-03 2.99E-03 1.34E-03 8.13E-04 1.36E-04 2.51E-05 1.5SE-02 6.86E.03 2.81E-03 1.26E-03 7.64E-04 1.27E-04 2.35E-05 1.49E-02 6.47E-03 2.65E-03 1.19E-03 7.20E-04 1.20E-04 2.22E-05 1.41E-02 6.13E 03 2.51E-03 1~12E-03 6.83E-04 1.14E-04 2 0 05 3.997 2.056 0.9446 0.4621 0.304 0.0578 0.012 3.94 2.027 0.9312 0.4566 0.2997 0.057 0.0118 3.731 1.919 0.8816 0.4323 0.2837 0.0539 0.0112 3.502 1.801 0.8276 0.4058 0.2663 0.0506 0.0105 3.305 1.7 0.7809 0.3829 0.2513 0.0478 0.0099 3.132 1.611 0.7401 0.3629 0.2382 0.0453 0 0094 72.04 31.30 12.82 5.72 1.74 0.29 0.03 71.02 30.85 12.63 5.65 1.72 0.29 0.03 67.24 29.21 11.96 5.35 1.63 0.27 0.03 63.12 27.42 11.23 5.03 1'3 0.25 0.02 59.56 25.87 10.60 4.74 1.44 0.24 0.02 56.45 24.52 10.04 4.49 1.37 0.23 0 02 36.02 15.65&.41 2.86 0.87 0.15 0.01 35.51 15.43 6.32 2.83 0.86 0.14 0.01 33.62 14.61 5.98 2.68 0.81 0.14 0.01 31.56 13.71 5.61 2.51 0.76 0.13 0.01 29.78 12.94 5.30 2.37 0.72 0.12 0.01 28.23 12.26 5.02 2.25 0.68 0.11 0 01 14.41 6.26 2.56 1.14 0.35 0.06 0.01 14.20 6.17 2.53 1.13 0.34 0.06 0.01 13.45 5.84 2.39 1.07 0.33 0.05 0.01 12.62 5.48 2.25 1.01 0.31 0.05 0.00 11.91 5.17 2.12 0.95 0.29 0.05 0.00 11.29 4.90 2.01 0.90 0.27 0.05 0 00 288.18 125.20 51.26 22.89 6.97 1.16 0.11 284.08 123.42 50.54 22.62 6.87 1.15 0.11 268.94 116.84 47.84 21.41 6.51 1.09 0.10 252.49 109.69 44.92 20.10 6.11 1.02 0.09 238.24 103.49 42.38 18.97 5.76 0.96 0.09 225.80 98.10 40.17 17.98 5.46 0.91 0.08 144.09 62.60 25.63 11.45 3.49 0.58 0.05 142.04 61.71 25.27 11.31 3.44 0.57 0.05 134.47 58.42 23.92 10.71 3.25 0.54 0.05 126.24 54.85 22.46 10.05 3.05 0.51 0.05 119.12 51.74 21.19 9.48 2.88 0.48 0.04 112.90 49.05 20.08 8.99 2.73 0.46 0.04 57.64 25.04 10;25 4.58 1.39 0.23 0.02 56.82 24.68 10.11 4.52 1.37 0.23 0.02 53.79 23.37 9.57 4.28 1.30 0.22 0.02 50.50 21.94 8.98 4.02 1.22 0.20 0.02 47.65 20.70 8.48 3.79 1.15 0.19 0.02 45.16 19.62 8.03 3.60 1.09 0.18 0.02 1743 291 27 1718 287 26 1627 271 25 1527 255 24 1441 240 22 1366 228 21 871 145 13 859 143 13 813 136 13 764 127 12 720 120 11 683 114 11 349 58 5 344 57 5 325 54 5 305 51 5 288 48 4 273 46 4 Page 3$6$15222 R1 I7$3I ORILL NO.Exercise-90 OASOIOOTOX tl'LIO POlltO 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of SHEET NO+7d cont RESPONSIBI E CONTROLLER (LOCATION)

TSC,)RSAC, and HP Center VALIP FOR TIMES OFf REAL TIME 0AM TO 16)00 0AM PPM DRILL TIME HOURS HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO Field Team Data-PlIane Dose)I Dose Rates Field Data for 10)30 to 15)50 PlIane Dose Rates Cloud Arrive Distance Time Hi les T+min Cloud Arrive Time Dose Rem (Mg)PLIane Center line Dose Rem (THY)Center Half Dose Dose mR/hr mR/hr (MC)(MC)Edge Dose afl/hr (MC)At Moist Level Center Hal f Dose Dose mR/hr mR/hr (MO)(MD)Edge Dose mR/hr (MD)At Ground'Level Dose Rates in uR/hr Center Half Edge Dose Dose Dose uR/hr uR/hr uR/hr (MC)(MC)(MC)8.5 8.6 9.5 10 160 175 190 205 220 250 280 170 185 200 215 230'60 290 172 187 202 217 232 262 292 180 195 210 225 240 270 300 190 205 220 235 250 280 310 200 215?30 245 260 290 320 12)50 13)05 13720 13)35 13750 14:20 14)50 13)00 13)15 13730 13)45 14)00 14730 15)00 13)02 13)17 13)32 13)47 14)02 14)32 15)02 13710 13)25 13740 13)55 14)10 14)40 15:10 13)20 13)35 13)50 14 05 14)20 14 50 15)20 13)30 13)45 14)00 14)15 14)30 15)00 15730 1.34E-02 5.83E-03 2.39E-03 1.07E-03 6.50E-04 1.09E-04 2.00E-OS 1.28E-02 5.57E-03 2.28E-03 1.02E.03 6.20E-04 1.03E-04 1.91E-OS 1.27E-02 5.52E-03 2.26E-03 1.01E-03 6.15E.04 1.03E.04 1.90E-05 1.23E-02 5.33E-03 2.18E-03 9.77E-04 S.94E-04 9.91E-OS 1.83E-OS 1.18E-02 5.12E-03 2.10E.03 9.39E-04 5.70E-04 9.51E 05 1.76E-OS 1.13E-02 4.93E-03 2.02E-03 9.03E-04 5.49E-04 9.16E-05 1.69E-05 2.98 1.533 0.7042 0.3453 0.2266 0.0435 0.0089 2.845 1.463 0.6726 0.3297 0.2164 0.0411 0~0085 2.82 1.45 0.6663 0.3267 0.2144 0.0408 0.0084 2.724 1.401 0.6438 0.3157 0.2072 0.0394 0.0082 2.616 1.345 0.6182 0.3031 0.1989 0.0378 0.0078 2.518 1.295 0.595 0.2917 0.1915 0.0364 0.0075 53.71 23.33 9.55 4.28 1.30 0.22 0.02 51.28 22.28 9.13 4.08 1.24 0.21 0.02 50.82 22.08 9.04 4.05 1.23 0.21 0.02 49.10 21.33 8.74 3.91 1.19 0.20 0.02 47.15 20.48 8.39 3.75 1~14 0.19 0.02 45.38 19.72 8.07 3.61 1.10 0.18 0.02 26.85 11.67 4.78 2.14 0.65 0.11 0.01 25.64 11.14 4.56 2.04 0.62 0.10 0.01 25.41 11.04 4.52 2.02 0.61 0.10 0.01 24.55 10.67 4.37 1.95 0.59 0.10 0.01 23.57 10.24 4.19 1.88 0.57 0.10 0.01 22.69 9.86 4.04 1.81 0.55 0.09 0.01 10.74 4.67 1.91 0.86 0.26 0.04 0.00 10.26 4.46 1.83 0.82 0.25 0.04 0.00 10.16 4.42 1.81 0.81 0.25 0.04 0.00 9.82 4.27 1.75 0.78 0.24 0.04 0.00 9.43 4.10 1.68 0.75 0.23 0.04 0;00 9.08 3.94 1.61 0.72 0.22 0.04 0.00 214.84 93.34 38.22 17.11 5.20 0.87 0.08 205.11 89.11 36.50 16.33 4.96 0.83 0.08 203.30 88.32 36.16 16.19 4.92 0.82 0.08 196.41 85.33 34.94 15.64 4.75 0.79 0.07 188.59 81.93 33.55 15.02 4.56 0.76 0.07 181.52 78.86 32.29 14.45 4.39 0.73 0.07 107.42 46.67 19.11 8.55 2.60 0.44 0.04 102.55 44.55 18.25 8.17 2.48 0.41 0.04 101.65 44.16 1S.OS 8.09 2A6 0.41 0.04 98.21 42.66 17.47 7.82 2.38 0.40 0.04 94.30 40.97 16.77 7.51 2.28 0.38 0.04 90.76 39A3 16.14 7.23 2.20 0.37 0.03 42.97 18.6 7.64 3.42 1.04 0.17 0.02 41.02 17.82 7.30 3.27 0.99 0.17 0.02 40.66 17.66 7.23 3.24 0.98 0.16 0.02 39.28 17.07 6.99 3.13 0.95 0.16 0.01 37.72'16.39 6.71 3.00 0.91 0.15 0.01 36.30 15.77 6.46 2.89 0.88 0.15 0.01 1299 219 20 1241 207 19 1?30 205 19 1188 198 18 1141 190 18 1098 183 17 650 109 10 620 103 10 615 103 9 594 99 9 570 9 549 92 8 260 44 4 248 41 4 246 41 4 238 40 4 228 38 4 220 37 3 Page 4 Ssa.IS222 Rl (7&2)

ILL NOo Exercise-90

%A~HIXOTOW fl'Ollc'OW

~R 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOE of ET NOe 7d-cont.RESPONSIBLE CONTROLLER (LOCATION)

TSC, HUOAC, and HP Center VAl IQ FOR TIMES OFc REAL TIME ASSOCIATKD WITH MESSAGES AM TO PM 16IOD, CI AM 0IOO TO 9IOD DRILL TIME HOURS INFORMATION APPLIES TO Field Team Data-Plune Dose 8 Dose Rates HOURS Field Data for 10I30 to 15I50 Pluae Dose Rates Distance Hi les Cloud Cloud Arrive Arrive Time Time T+min Dose Rem (IIB)Dose Rem (THY)Plwe Centerline At Ifaist Level At Ground Level Center Dose mR/hr (IIC)Half Dose mR/hr (IIC)Edge Center Dose Dose mR/hr mR/hr (IIC)(lm)Half Dose mR/hr (IJO)Edge Center Dose Dose mR/hr uR/hr (IIO)(IIC)Half Dose uR/hr (IIC)Edge Dose uR/hr (MC)Dose Rates in uR/hr 10.5 210 225 240 255 270 300 330 220 235 250 265 280 310 340 13:40 13I55 14:10 14I25 14I40 15I10 15I40 13:50 14:05 14I20 14 f35 14:50 15:20 15:50 1.09E-02 4.75E.03 1.95E-03 S.71E-04 5.29E-04 8.83E.05 1.63E-05 1.06E-02 4.58E-03 1.89E-03 8.43E-04 5.12E-04 8.55E-05 1.58E-05 2.429 1.249 0.5?39 0.2814 0.1847 0.0351 0.00?3 2.347 1.211 0.5557 0.2724 0.1788 0.034 0.007 43.77 19.02 7.79 3.49 1.06 0.18 0.02 42.30 18.32 7.54 3.37 1.02 0.17 0.02 21.89 9.51 3.89 1.74 0.53 0.09 0.01 21.15 9.16 3.77 1.69 0.51 0.09 0.01 8.75 3.80 1.56 0.70 0.21 0.04 0.00 8.46 3.66 1.51 0.67 0.20 0.03 0.00 175.09 76.07 31.15 13.94 4.24 0.71 0.07 169.22 73.26 30.16 13.49 4.10 0.68 0.06 87.55 3S.03 15.57 6.97 2.12 0.35 0.03 84.61 36.63 15.08 6.75 2.05 0.34 0.03 35.02 15.21 6.23 2.79 0.85 0.14 0.01 33.84 14.65 6.03 2.70 0.82 0.14 0.01 1059 177 16 1025 171 16 529 88 8 512 85 8 212 35 3 205 34 3 999 Isssz Rf (7%3)Page 5 DRILI NOt WA~lllÃOCOli tCSLIC tOWCR 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK SHKKT NOe RESPONSIBLE CONTROLLER

{LOCATION)

VALID FOR TIMES OFl REAL TIME ASSOC IATKD WITH MKSSAOKS AM TO PM 0AM TO HOURS DRILL TIME INFORMATION APPLIES TO HOURS INTENTIONALLY BLANK SOS IS222 Rl P<Q)

ORILL NOs E'90 ms~Nlecsoe~I'eIII'ouse 4P SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET FAG E ot S'e RESPONSIBLE CONTROLLER (LOCATION)

MUDAC Field Teams VALIO FOR TIMES OF: QAM REAL TIME P7PP Q PM 16PP ASSOCIATED WITH MESSAGES 0AM 0 PM TO DRILL TIME 0000 HQURS 0900 INFORMATION APPLIES TO Field Team Data-Vehicle and Personnel Contamination HOURS A.Instr uctions-1.Determine team exposure proximity (in miles)and time (in minutes)to the passing plume from team travel and the direct reading map at Data Sheet 7b.Distinguish periods when the personnel exposure is lessened by a protection factor of 3 for the vehicle with windows and vents closed.2.Compute the contamination readings for team vehicle and personnel utilizing the table and formula below.3.Provide pancake GM readings above background in cpm/probe area.NOTE: The effective T k is approximately 9 days.Values Off Centerline 1 Sigma (c m)B..Table-Plume Pathway Distance Va1ue from Centerline Plant (miles)Values Off Centerline 25K (c m)Va1id for Times After (Time).1.0 1.2 2.0 3.0 4.0 5.0 6.0 7.0 C.50,000 33,300 50,800 33,850 43,600 29,100 33,400 22,200 26,800 17,850 22,500 15,000 19,400 12,900 17,200 11,500 Formula-1.Vehicle Contamination Reading: Value Exposure Reading~(c m)x Time (minutes)/150=~(c m)12,500 12,700 10,900 8,350 6,700 5,600 4,850 4,300/150=/150=/150=Total Vehicle Contamination Reading=2.Personnel Contamination Reading: Exposure reduced by vehicle protection factor...1100 1104 1120 1140 1200 1220 1240 1300 Vehicle Exposure/3=Total Personnel Contamination Reading: 968 19222 RI (2 82)

INTENTIONALLY BLANK OR ILL NOo EXERCI SE'0 IIA~III'lOTOX tl'LII'OIIE1 49 SUPPLY SYSTEM CONTROLLER INFORMATtON GENERAL DATA SHEET PAGE of ET NOo RESPONSIBl E CONTROLLER (LOCATION)

ALL 0AM 0 PM ORILL TIME HOURS HOURS ASSOCIATEO WITH MESSAGES INFORMATION APPI IES TO PLANT LAB AND HP CENTER DATA INDEX DATA SHEET ITEM Sa Source Term by Time 8 Nuclide Sb Deposition of Radioiodines

-TG Building Sc*~Deposition of Radioiodines

-Field Team Samples Sd~Atmospheric Sample Data-Drywell (PASS)Se**Atmospheric Sample Data-Computer Printout (PASS)Sf*," Liquid Sample Data (PASS)Sg~Liquid Sample Data Printout (PASS)Sh**Dose Rates, Contamination Level 8 PASS Room Conditions Sj**Whole Body Count Data 7c 4j Field Team Air Sample Results (Refer to Field Team Data)Air Sample Results, TG Building (DPM)with In Plant Area Dose Rates Air Sample Results, TG Building (Concentrations) with In Plant Area Dose Rates Not Submi tted wi th July Submi ttal as Radi oi odine deposition determination is not a listed objective.

    • Not submitted with July Submittal as PASS is not a listed objective.

966.15222 R I Il&2I DRILL NO+Exercise-90

%A~Hl'ICTOa~\'LIC tallCR 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK at SHKKT NOe RKSPONSIBLK CONTROLLKR (LOCATION)

TSC,)IJOAC, and HP Center VALID FOR TIMES OF)QAM 7'00 TO RKAL TIMK'PM 16)00 QAM QPM 0 00 DRILL TIME TO HOURS HOURS ASSOCIATED WITH MESSAC ES INFORMATION APPLIES TO PLant Lab and HP Center Oats Source Term by Time Source Term tor TG Building by Time B Nuclide T i meld 10)11 10:15 10)20 10:25 10)30 10:35 10940 10)45 10:50 10:55 11:00 11)05 Huclide'ci/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uci/cc uCi/cc uCi/cc uCi/cc uCi/cc KrBSm Kr85 Kr87 Kr88 Xe131m Xe133m Xe133 Xe135m Xe135 Xe137.Xe138 5.87E-03 3.12E-04 1.33E-02 1.89E-02'l.65E-04 2.37E-03 5.73E-02 1.04E-02 7.47E-03 4.19E-02 4.54E-02 2.58E-03 1.40E-03 5.53E.04 2.02E-04 7.34E.05 2.74E-OS 2.54E-04 2.98E-04 2.56E-04 2.02E 04 1.60E-04 1.29E-04 1.04E-02 1.17E-02 9.60E-03 7.25E-03 5.46E-03 4.23E-03 1.52E-02 1.75E.02 1.47E-02 1.14E.02 8.79E-03 6.98E-03 1.35E-04 1.58E-04 1.36E.04 1.07E-04 8.45E-05 6.84E-05 1.93E-03 2.26E.03'l 94E-03 1 53E-03 1.21E-03 9.75E-04 4.67E-02 5.48E-02 4.70E-02 3.72E-02 2.93E.02 2.37E-02 7.09E-03 6.64E.03 4.54E 03 2.86E-03 1.80E-03 1'6E-03 6.04E-03 7.03E-03 5.98E-03 4.69E.03 3.66E-03 2.94E-03 1.66E-02 7.90E-03 2.75E-03 8.82E-04 2.82E-04 9.26E-OS 3.04E-02 2.79E.02 1.87E-02 1.16E-02 7.14E-03 4.52E-03 1.05E-OS 1.08E.04 3.37E-03 5.70E-03 5.70E-OS 8.12E-04 1.97E-02 7.72E-04 2.43E-03 3.13E-OS 2.95E-03 3.98E-06 B.BOE-OS 2.63E-03 4.56E-03 4.65E-05 6.63E.04 1.61E-02 5.03E-04 1.97E-03 1.04E-OS 1.88E-03 1.48E-06 7.08E.OS 2.02E-03 3.59E-03 3.74E 05 5.32E-04 1.30E.02 3.23E-04 1.57E-03 3.39E.06 1.19E-03 5.41E 07 1.97E-07 5.62E-05 4.43E-OS 1.53E-03 1.'15E-03 2.80E-03 2.16E-03 2.97E.05 2.34E-05 4.23E-04 3.32E-04 1.03E.02 8.11E-03 2.04E-04 1.28E-04 1.24E.03 9.65E-04 1.09E-06 3.49E-07 7.37E-04 4.54E-04 l131 1132 l 133 l 134 l135 2.71E-03 3.94E-03 5.70E-03 6.18E-03 5.35E.03 2.21E-03 2.59E-03 2.22E-03 1.76E-03 1.39E.03 1.12E-03 3.14E-03 3 60E-03 3.01E 03 2.32E-03 1.79E 03 1.41E-03 4.63E-03 5.43E-03 4.64E-03 3.66E-03 2.88E-03 2.33E-03 4.7BE-03 5.25E-03 4.22E 03 3.12E-03 2.31E 03 1.75E-03 4.33E-03 5.04E-03 4.29E-03 3.36E-03 2.63E-03 2.11E.03 9.35E-04 1.15E-03 1.93E-03 1.36E.03 1.74E-03 7.63E-04 9.12E-04 1.57E-03 1.04E-03 1.41E-03 6.14E-04 7.15E-04 1.26E-03 7.85E-04 1.12E-03 4.88E-04 3.84E-04 5.54E-04 4.26E-04 1.00E.03 7.86E-04 5.84E-04 4.31E-04 8.86E-04 6.92E.04 TSmeI:@M HIicBidhi 11)10 11:20 11:30 11:40 11:50 12:00 12:10 12:30 12:40 12:50 13)00 13:10 uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc Kr85m Kr85 Kr87 Kr88 Xe131m Xe133m Xe133 Xe135m Xe135 Xe137 Xe138 7.09E-OB 3.46E-05 8.61E-04 1.65E-03 1.83E-OS 2.59E.04 6.33E.03 7.99E-05 7.47E-04 1.10E-07 2.77E-04 9.04E-09 2.07E-05 4.70E-04 9.51E-04 1.09E-05 1.55E-04 3.79E-03 3.04E-OS 4.40E-04 1.09E-OB 1.02E-04 1.13E-09 1.40E-10 1.70E-11 1.22E-OS 7.05E-06 4.04E-06 2.52E.04 1.34E-04 6.99E-OS 5.36E-04 2.98E-04 1.64E.04 6.43E-06 3.73E-06 2.13E-06 9.09E.OS 5.26E-05 3.01E-OS 2.22E.03 1.29E-03 7.37E-04 1.14E-05 4.19E-06 1.53E-06 2.54E-04 1.45E-04 8.14E 05 1.05E-09 1.00E-10 9.46E-12 3.65E-OS 1.29E 05 4.54E-06 2.06E-12 2.48E-13 2.30E.06 1.30E-06 3.62E-05 1.87E-05 8.96E-05 4.86E-OS 1.21E.06 6.84E-07 1.71E-OS 9.60E-06 4.19E-04 2.36E-04 5.52E-07 1.98E.07 4.55E-05 2.52E-OS B.BSE-13 8.22E-14 1.58E-06 5.45E-07 3.52E-15 4.18E-16 4.07E-07 2.27E-07 4.88E.06 2.48E-06 1.41E-05 7.51E-06 2.15E-07 1.19E-07 3.00E-06 1.67E-06 7.40E-OS 4.11E-OS 2.51E-OB 8.89E-09 7.64E-06 4.18E 06 6.98E-16 6.39E-17 6.40E-OB 2.18E-OB 4.93E.17 5.81E-18 1.26E.07 6.96E.OB 1.26E.06 6.35E-07 4.00E.06 2.13E-06 6.62E.OB 3.66E.OB 9.23E-07 5.10E-07 2.28E-05 1.26E-05 3.14E-09 1.10E-09 2.28E-06 1'4E-06 5.84E-18 5.31E-19 7.40E-09 2.50E-09 6.83E-19 3.84E-OB 3.20E-07 1.13E-06 2.02E-OB 2.81E-07 6.96E-06 3.87E-10 6.73E-07 4.83E-20 8.46E-10 l131 l 132 1133 l 134 1135 3.00E-04 3.24E-04 6.12E-04 3.15E-04 5.35E-04 1.79E-04 1.85E-04 3.65E-04 1.65E-04 3.15E-04 1~OSE-.04 6.10E-OS 3.50E-OS 1.03E-04 5.68E-OS 3.09E-OS 2.13E.04 1.23E-04 7.00E-OS 8.51E-05 4.32E-OS 2.17E-OS 1.82E-04 1.04E.04 5.84E-OS 1.99E-OS 1.12E-05 1.67E-05 8.97E-06 3.96E-05 2.22E-OS 1 ADOBE-05 5.35E-06 3.26E-OS 1.81E-05 3.51E-06 1.95E-06 2.54E-06 1.35E-06 6.89E.06 3.82E-06 1.29E-06 6.29E-07 5.48E-06 3.00E-06 1.08E-06 5.99E-07 7.10E-07 3.74E 07 2.11E-06 1.16E-06 3.06E-07 1.48E-07 1.63E-06 8.89E-07 3.31E-07 1.96E-07 6.36E-07 7.18E-OB 4.82E.07 Page 1 966 IS222 R'I (7.$2) o RILL No i Exerc i se-90 WA~HIWCTCW~C~LIC CCW~C 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET LK CONTROLLKR (LOCATION)

CR (Simulator)

PA OK of VA!IO POR TIMES OP)7)00 RKAL TIMK AM TO PM 16)00 CI AM ORILL.TIMK 0(00 HOURS 9)00 HOURS ASSOCIATKO WITH MKSSAQKS lqh ,'k gI-'(~jpQf'f INPORMATION APPLIKS TO Plant Lab and HP Center Oata-iodine Plate Out/Oeposition in TGBui lding Percent Plate Out of 20K of total iodines in Curies Percent Percent Plate Out of 20K of total iodines in TGB in uCuries/cm 2 Time 8)00 8)30 9(00 9(30 9)55 1131 Curies 1132 1133 1134 1135 Plate Out Curies Curies Curies Curies of 20K Ho late out until 1045 hou 1131 1132 1133 1134 1135 uCi/cm 2 uCi/cm 2 uCi/cm 2 uCi/cm 2 uCi/cm 2 Ko late out until 1045 hours0.0121 days <br />0.29 hours <br />0.00173 weeks <br />3.976225e-4 months <br /> SCRAl(cI 10(00 10)05 10)10 10)11 10)12 10)13 10)14 10)15 10)20 10)25 9)55 A.H.and silver 8 Fuel F 10)30 10(45 2.46 11:00 4.93 11)15 9.85 11(30 9.85 11)45 9.84 2.80 5.60 11.20 10.38 9.62 5.06 10.11 20.22 20.05 19.89 2.95 5.90 11.80 9.68 7.94 4.48 0.25 8.95 0.50 17.90'1.00 17.44 0.95 16.98 0.91 1.29E-04 1.47E-04 2.58E-04 2.94E-04 5.16E.04 5.87E-04 5.16E-04 5.44E-04 5.16E-04 5.04E-04 2.65E.04 1.55E.04 2.35E-04 5.30E-04 3.09E-04 4.69E-04 1.06E-03 6.19E-04 9.38E-04 1.05E-03 5.07E.04 9.14E-04 1.04E.03 4.16E.04 8.90E 04 12)00 9.83 12215 9.82 12)30 9.81 12)35 9.81 12)45 9.80 8.92 8.26 7.66 7.38 7.10 19.72 19.56 19.40 19.32 19.24 6.52 5.35 4.39 3.99 3.60 16.54 16.11 15.69 15.49 15.29 0.87 0.83 0.80 0.79 0.78 5.15E-04 4.67E-04 5.15E-04 4.33E-04 5.14E.04 4.01E-04 5.14E-04 3.87E-04 5.14E-04 3.72E-04 1.03E-03 3.42E-04 8.67E-04 1.03E-03 2.80E-04 8.44E-04 1.02E-03 2.30E-04 8.23E-04 1.01E-03 2.09E.04 8.12E 04 1.01E-03 1.89E-04 8.01E-04 13(00 9.79 6.5S 13(15 9.78 6.10 13:30 9.78 5.65 13(45 9.77 5.24 19.08 2.95 18.92 2.42'18.76 1.99 18.61 1.63 14.89 14.50 14.13 13.76 0.75 0.73 0.71 0.69 5.13E-04 3.45E-04 1.00E-03 5.13E-04 3.20E-04 9.92E-04 5.12E-04 2.96E-04 9.83E-04 5~12E-04 2.75E-04 9.75E-04 1'5E-04 7.80E-04 1'7E-04 7.60E-04 1'4E-04 7.40E-04 8.54E-05 7.21E-04 14)00 9.76 4.86 14I15 9.75 4~50 14(30 9.74 4~17 14(45 9.73 3.87 18.45 1.34 18.30 1.10'18.15 0.90 18.00 0.74 13.40 13.05 12.72 12.39 0.67 0.66 0.64 0.63 5.11E-04 2.54E-04 9.67E-04 5.11E.04 2.36E.04 9.59E-04 5'0E-04 2.19E-04 9.51E-04 5.10E-04 2.03E-04 9.43E-04 7.01E-05 7.02E-04 5.75E-05 6.84E-04 4.72E-05 6.66E-04 3.87E-05 6.49E-04 15(00 9.72 3.58 17.85 0.61 12.06 0.62 5.10E-04 1.88E-04 9.35E-04 3.17E-05 6.32E-04 16(00 9.69 2.64 17.26 0.27 10.86 0.57 5.08E-04 1.39E'-04 9.05E-04 1.44E-05 5.69E-04 Page 1 999.19222 Rl (7%2)

DRILL NOo SHEET NOe wAIHI%OTOK O'ILIC tOINt1 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET RESPONSIBLE CONTROLLER (LOCATION)

PAOK ot VALID FOR TIMES OFs QAM TO AREAL TIME PM ASSOCIATKO WITH MKSSAOKS QAM TO HOURS Q PM DRILL TIME INFORMATION APPLIES TO HOURS INTENTIONALLY BLANK 90!15222 RI{7%2)

DRILL NO EXERCISE'0 9 ALL IIAIHIIIOTOS PI'LIC JOWC1 br'UPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET LER (LOCATION)

PAGE of VALID FOR TIMES OFI QAM REAL TIME 0700 ,M To 1600 ASSOCIATKD WITH MESSAGES CI AM DRILI TIME 0000 HOURS 0900 INFORMATION APPLIES TO HOURS SITUATIONAL EVENT DATA INDEX DATA SHEET ITEN 9a 9b 9c 9d e9f 9g 9h 9i 9x 9z Friends of Bi val ves Anti-Nuclear Protest Gr oup Friends of Bivalves Fence Climbing Activities Fire in the TSC-Controller Activities Emergency Center Operational Status during 30 Minute Recess.Fire Brigade Response-TSC Fire Hanford Fire Dept callout-Control Cell response Electrical Damage from Fire in TSC-Repairs by OSC Fire Control Panel Activation Reentry Team MSIV Repairs Sequence of Events for Rod Drop Accident The Unlikelihood of a Control Rod Drop Accident Iei I5222 RI (7 02)

DRILL NOo EXERCISE'90 IIASIIIIIC'Ioi

~I'I.IC i0%1'El 4S SUPPLY SYSTEM CONTROLLER INFORMAT(ON GENERAL DATA SHEET PAGE ot SHEET NO, RESPONSIBLE CONTROLLKR

{LOCATION) ga OSC VALID FOR TIMES OP I QAM REAL TIMK 0800 PM To 1030 ASSOCIATKD WITH MESSAGES QAM DRILL TIME 0100 HpUgs 0330 INPORMATION APPLIES TO FRIENDS OF BIVALVES ANTI-NUCLEAR PROTEST GROUP HOURS NOTE: A controller from the OSC will be assigned to monitor and direct, as needed, the following"Role-Play".

As r eferred to in the scenario script, an anti-nuclear activist group will be staged in the open area of the upper parking lot just to the north of the Visitors'enter, immediately to the east of the two-five gate.There will be approximately 10 individuals involved in the protest.The demonstrators, will, in actuality, be Supply System personnel'role-playing's activitists.

They will be dressed in international orange plastic'safety vests'abelled with: "EXERCISE'90" ROLE PLAYER IIF 0 BII The demonstrators will be carrying placards, signs or posters with various anti-nuclear sayings.They will be chanting miscellaneous slogans in much the same vein as is on the posters.NOTE: Availability permitting, we will attempt to set up a portable PA system with'pre-recorded'hants.

A Supply System flat or dump bed truck will be par ked facing gate 2-5.The Supply System insignia on the doors of the truck will be covered with paper.The paper covers will have a crude FRIENDS OF BIVALVES logo written on them.The front of the truck will have a"Ramming Device" attached.NOTE: In actuality, the truck and ramming device will be one of the Supply System snow plow vehicles.Should the activists be questioned by Supply System.authority, they will state they are legally demonstrating and will show copies of a"Court Order" and a"County Permit" for a public meeting on Supply System property.When the fence-climbing incident occurs, about 100 yards to the north, the demonstrators at gate 2-5 will disclaim any knowledge of it, but will be supportive of the'brothers'ho performed it.The fence-climbing incident will not be grounds for forcing disbandment of the demonstrators.

The demonstration will continue until about 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br />, or until exercise players go out to evacuate the activists from the radioactive steam release.NOTE: The plume, due to prevailing winds, will pass from the TG building Exhaust directly over the heads of the activists.

Evacuation actions on the part of both the role-playing demonstrators as well as the Exercise players will be'free-play'.

The demonstrators should freely evacuate, without'hassle', at this point in time.999 19222 Rl{7.$2)

DRILI NO+EXERCISE'90 WA~HIiolo!I PI'IIII'OWI1 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK 1 2 of SHF lOe RESPONSIBLE CONTROLLER (LOCATION) 9b CAS VALID FOR TIMES OFIEAL T,ME 0830 ASSOCIATED WITH MES5AOES PM To 0930'I cy I, 0AM 0130.TD 0230 DRILL TIME HOURS INFORMATION APPLIES TO FRIENDS OF BIVALVES FENCE CLIMBING ACTIVITIES HOURS NOTE: One or more Controllers from the OSC and from Security will be assigned to monitor and direct, as needed, the ,following"Role-Play".

Security is to be Lead Control.The Field Controller(s) and a Security Contr oiler inside the CAS are to be in direct radio or telephone contact while the following activities are transpiring.

It is recommended that Security personnel assume the role of the 3 people used as role players in this activity: As referred to in the scenario script, an anti-nuclear activist group will be staged in the open area of the upper parking lot just to the north of the Visitors'enter, immediately to the east of the two-five gate.There will be approximately 10 individuals involved in the demonstration.

There will be an additional three individuals involved in gaining access to the Plant Protected Area by simulating climbing the security fence immediately to the north of the main guar dhouse.These individuals will be dressed in the same manner as the 10 demonstrators in'international orange plastic safety vests labelled with"EXERCISE'90" ROLE PlAYER IIFOBII At 0827 hours0.00957 days <br />0.23 hours <br />0.00137 weeks <br />3.146735e-4 months <br /> the three individuals will approach the upper, eastside parking lot from the Power Plant Loop Road.They will be driving a pickup truck with an 8-10 foot ladder in the back.The pickup truck will be marked with"FRIENDS OF BIVALVES" logos on the doors similar to those described for the other truck on data sheet 9a.The individuals will, just prior to reaching the Guardhouse, stop their truck near gate two-nine.They will simulate leaning the ladder against the fence;This is to be accomplished by setting up the ladder just outside the fence's personnel exclusion zone imediately to the east of the fence.One of the three will simulate climbing over the fence into the Protected Area.This is to be accomplished by, in reality, resta in the'fence-climber'nside the Protected Area.When the simulated fence c imbing activity occurs, the CAS Controller will inform the CAS Operators of the indications they are receiving.

Should any security personnel or plant workers be in visual observation of the activity, the field controller(s) is/are to inform them of what they are'seeing'.It is not necessary that any of the witnesses be designated as Exercise players...Free p~ay in this will be allowed.Security Force responders, upon recieving direction from the CAS, wi 11 find the intruder marching around on the grass at the north-east corner of the General Service Building.The intruder will be carrying a sign with and anti-nuclear slogan.$$I5222 Rl I2%2)

DRILL NOo EXERCISE'90'Il*IHI'IOTO'.l

~CSlIC POIIl%4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE SHKET NO+RESPONSIBLE CONTROLLKR (LOCATION) 9b CAS'VALID FOR TIMES OF I REAL TIME0830 ASSOCIATED WITH MESSAGES AM 0930 CIAM DRILI TIME 0130 HOURs 0230 INI ORMATION APPLIES TO HOURS FRIENDS OF BIVALVES FENCE CLIMBING ACTIVITIES (CONT'D)The Security Force will not observe any signs of damage to plant property.The role player, if interrogated by Secur ity, is to fr eely state that he is a member of the"FRIENDS OF BIVALVES" and his intent in entering the Protected Area was to"Cause as much damage, both physical and political, as was possible", but nothing else.The role player should ad-lib his responses to the interrogation.

It is expected that this fence climbing activity will cause the PED to make an EAL decision of ALERT.Once the ALERT declaration is made and it appears that no more meaningful play is transpiring between the intruder and Security, the Lead Controller may terminate this activity and dismiss the three"FOB" role players.There is no intent to involve Local Law Enforcement Agencies in this activity anL the Benton County Sheriff will not respond.If any attempt is made to contact LLEA thru the CAS or the CR (Simulator), the respective controllers are to ensure that the calling personnel dial the'Control Cell'hone number.Control Cell controllers may state that,"All available units are tied up with traffic control due to a fire at Columbia Center.An officer will respond in approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />." 959 15222 Rl I7%2)

DRILL NOa EXERCISE'0 9c TSC 4S SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET NTROLLER (LOCATION)

I'AQ E VALID FOR TIMES OF: REAL TIME 0910 PM 0930 ASSOCIATED WITH MESSAQES@AM DRILL TIME 0210 HOURs 0230 INFORMATION APPLIES TO HOURS FIRE IN THE TSC-CONTROLLER ACTIVITIES CONTROLLERS NOTE: All controllers in the Technical Support Center are to perform the below listed activities as indicated.

These activities are to simulate an electrical fire in TSC lighting panels.The intent of this fire is to disrupt the operation of the TSC by degrading Plant monitoring and communication capabilities.

This should, ultimately, result in the TSC Director deciding to relocate the TSC in accordance with the appr opriate sections of PPM 13.10.3, TSC Operations

&Director Duties.PERfORM THE fOLLOWING:

BEFORE THE EXERCISE STARTS-1 urvey t e or 10 VAC appliances and machinery which would be used in the Exercise.Also locate TSC light switches..

2)Prepare signs for all identified items stating"This Unit No Longer Functions".

AT 0910 HOURS-gklg gk, g il.Tgg kkgk k k gk Announce to all TSC personnel that: " All rooms in the TSC are rapidly filling with dilute smoke.A smell of burning electrical insulation is permeating the atmosphere.

It is very dim;All lighting in the TSC has failed with the exception of emergency, battery powered lighting..(NOTE:

Gain the attention of the TSC player personnel, then all controllers are to repeat this several times in order to ensure that all TSC players hear and comprehend the symptoms they should be experiencing.)

2)Turn off the two way base control unit radio and place a sign on it stating"This Unit No Longer Functions".

3)Tape signs across the front of the CRT's for all computer monitors in the TSC stating"This Unit No Longer Functions".

4)Locate all telephones in the TSC which have an external speaker.Consider unplugging the 110 VAC supply to these phones.Tape"This Unit No Longer Functions" signs across the front of these phones.5)Locate the FAX machine.Tape a sign across the front.6)Turn off the Copy Machines and blueprint machines.Tape signs across the fronts or tops, as appropriate.

7)Perfor m similar actions for any other appropriate appliances or 110VAC machinery which may have been located in the earlier survey.CONTINGENT ACTIONS-ou d T personnel attempt to locate the fire, allow them to do so.Identify the smoking electrical panels to them, but state that they see no flames (The fire will not be active).Do not tell them what panels are burned...give them sym toms of what they would see, smell, feel so they may arrive at a ecision regarding damage and consequences.

90$15222 RI I7.e2I DRILL NOA E'90 19Aaulecvoe

~\'Llc toll an 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK ot SHKKT NOT RESPONSIBLE CONTROLLER (I OCATION)1 nters VALIO FOR TIMES OFa QAM REAL TIME 0950 TO ASSOCIATKO WITH MESSAOKS~AM DRILL TIME 0220 HOURS 0250 INFORMATION APPLIES TO HOURS EMERGENCY CENTER OPERATIONAL STATUS DURING 30 MINUTE RECESS ALL CONTROLLERS NOTE: It is permissible to shar e the entire contents of this data sheet with the players after a decision has been made by the TSC Director to evacuate/relocate the Technical Support Center.As was discussed in some length in'the Scenario script, a 30 minute recess f h 1 1 ill 9 h ld ug'Pdgtl h.Th d'approximately's stressed, because the actual.tsming of'he recess will be a judgement call based upon Exercise conditions and the decision by the TSC Director to evacuate/relocate the Technical Support Center after the fire has occurred.The decision for commencement of the recess is to be arrived at by joint consultation of the Lead Center Controllers on the Controller Net phone line.Once the decision is reached, each Lead Center Controller is to deliver messages as follow to his/her Center: ALL CENTERS: "A decision has been made by the TSC Director to relocate the pp C.Ap 1 f 1 91C ff pig 1 d the Simul ator at the PSF which, during thi s Exercise, is simul ating the emergency role of the Control Room.In order to allow TSC personnel time to reach the Simulator, a 30 minute recess from the Exercise will be allowed.Tl 1*111 d ffh TSC: "All pl ayers in the TSC are to rel ocate as directed by the TSC 0>rector.Those players who are directed to relocate to the Control Room are to go to the Simulator at the Plant Support Facility.A vehicle has been provided by the Exercise Controller organization and is outside the Main Guardhouse available to transport you to the PSF.Those players who are directed to report to centers other than the Control Room are to do so.If you are directed to report to any off-site center, for example at the EOF, it is the TSC Director's responsibility to ensure transportation; transportation will not be provided by the Controller organization." JIC: "Due to thi s emergency center's multi-agency makeup and its heavy interface with offsite agencies, the public and the media, no recess will be allowed.Should you need to find out data in.order to fulfill your emergency role, contact the appropriate Supply System emergency center.Per sonnel will be available to answer y'ou." ALL CENTERS EXCEPT JIC: "This recess is in effect only for Supply System emergency centers;County, State and Federal centers and agencies will be'blind'o this recess.Consequently, while the 30 minute recess is in effect, one controller and one player must stay on duty to perform'control cell'ommunications functions if, fo'r example, the JIC or outside agencies make inquiries.

All other'layers may'take a break'ntil the Exercise recon 90$IS222 RI (7 92)

DRILL NO, EXERCISE'90 ltA~HlhgOZO!h tttllt tOWSA 4N SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of 9e PONSIBLE CONTROLLER (LOCATION)

OSC 8 TSC VAl ID POR TIMKS OP: REAL TIMK 09 10 ASSOCIATKD WITH MESSAGES AM 0940 0AM DRILL TIME 0210 HOURs 0240 INPORMATION APPLIES TO MpURS PLANT FIRE BRIGADE-DAMAGE FINDINGS IN TSC FIRE CONTROLLER NOTE: This information is provided as guidance to the PET TC1'1Cgddgdhh1dgdhgdddgd upon their response to the el ectri cal fire in the TSC.The Controller/Evaluator is enjoined to present this data to the Fire Brigade gd h~T, 1.Thd allow them to come to their own conclusions regat ding the impact of damage found.The electrical fire will occur in the TSC at 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br />.At this time the SSS and EO's who~ill comprise the Fire Brigade should be in the Operations Support Center in a'standby status'ue to the ongoing ECL of ALERT from the security incident which has earlier occurred.It is expected that the Fire Brigade will be alerted by the Plant Fire Alarm and a call from the Control Room (Simul ator)wi thin two minutes (0912 hour0.0106 days <br />0.253 hours <br />0.00151 weeks <br />3.47016e-4 months <br /> s)of the fire'occurance.

The Fire Brigade should arrive at the TSC by, no later than, 0920 hour0.0106 days <br />0.256 hours <br />0.00152 weeks <br />3.5006e-4 months <br /> s.Upon their arrival, the PET Controller/Evaluator is to provide them with the following symptoms: 1)A strong odor of burnt electrical insulation permeates the TSC.As they enter the mechanical equipment room, the odor becomes inordinately strong.The HVAC is non-functional (loss of MC-7AB).2)The TSC is dim...Only battery-backed emergency lighting is functioning.

3)No 110 VAC powered equipment/appliances within the TSC are functioning (refer to Data Sheet 9c for details).4)The doors/cover plates have charred paint and show signs of overheating on MC-7AB.5)Inspection of the above MC will reveal no active fire.6)Inspection of the above MC will reveal severe melting of the internal wiring, circuitry, busses and 0/L devices.The charred wires, in many cases, extend into the conduits (thus requiring replacement of much wire, vice merely reterminating it).7)Should they inspect transformer TR-TSC-2, they will find it cold and non-functional.

No outwardly apparent cause for its failure will be shown.90~15222 RI (7&2)

DRILL NO+EXERCISE'0 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAOK of SHKKT NO+RESPONSIBLE CONTROLLER (LOCATION) 9f Control Cell, TSC&CR (Sim)VALIO POR TIMES OP.REAL TIME 0910 ASSOCIATKO WITH MESSAOES AM 0920 QAM o<<LL>>ME 0210 HOURS 0220 INPORMATION APPLIES TO HouRS HANFORD FIRE DEPARTMENT CALLOUT-CONTROL CELL RESPONSE CONTROLLER NOTE: The following is a brief discussion of the anticipated response by player personnel, primarily CR[Sim]personnel, to a fire in the TSC as regards notification of the Hanford Fire Department (HFD).This discussion is provided to aid per sonnel in the Control Cell in their response if called by the CR[Sim].After the discussion, a desired response is given.The response may be'tailored'y the Control Cell, within reason, depending on how the CR[Sim]couches the notification.

The Hanford Fir e Depar tment is notified in two ways when there is a fire within WNP-2: 1)Below panel FCP-l, in the CR, a HFD"ALERT BUTTON" is located.Manual initiation of this button sends a WNP-2 fire alarm to the fire station at the 300 area (See a subsequent data sheet for panel outlines and details).The alarm is sent via coded microwave transmission.

In the case of the simulator, this button is not connected to anything.Control Room[Sim]personnel will initiate an alarm in the Exercise when so directed by either the Shift Manager or the Control Room Supervisor.

2)In addition to the alarm button described above, the Control Room Supervisor has the capability to directly call HFD from his telephone control console.When the fire in the TSC is confirmed, the CRS would be expected to make a call.It is to this telephone call that the Control Cell must respond.'ONTROL CELL RESPONSE: Upon receiving a call from the CR (Sim)notifying the HFD (Control Cell)of a fire in the TSC, the Control Cell is to respond that,"An en ine unit is bein dis atched immediately with an ex ected ETA of 13 minutes.FIFTEEN MINUTES AFTER THE ABOVE CALL, the Control Cell is to call back to the CR (Sim)stating that,"The En ine unit ori inally dis atched to WNP-2 has had en ine failure.The next nearest unit is at the Area vehicle re air acility or reventive maintenance.

It wi be at least 40 minutes until this unit can be manned, dis atched and arrive at WNP-.he Contro Cell will go on to ask, Is it any ion er necessary to dis atch a unit in li ht of this delay?As stated in the Scenario script, HFD will not play in the Exercise.No further action will be taken to simulate fire department activities after the above messages have been completed.

i6$I52ZZ Rl I7&S)

DRILL NOo IIASHI'ROTOR PC~LIC tOWCi 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET LLKR (I OCATION)PAGE 1 I 2 VALID FOR Tl KS OF: PAM REAL TIMK PM TO ASSOCIATKD WITH MESSAQKS PAM TO DRILL TIME 0230 KpURs 0500 INFORMATION APPLIES TO KOURS ELECTRICAL DAMAGE FROM FIRE IN TSC-REPAIRS BY OSC CONTROLLER NOTE: It is expected that, prior to the declaration of General g g g d i d d d id.d g dgd iii g di d to form up a Reentry Team to evaluate and to repair the damage to MC-7AB and to TR-TSC-2.After the General Emergency Declaration, this activity will take low, or perhaps no, priority and may be cancelled.

BEFORE THE EXERCISE: Details on the Loads for MC-7AB are available on drawing E-970.The Controller assigned to monitor OSC activities on this task should familiarize him(her)self with these loads and with the physical layout and internal details of the MC some time prior to the Exercise.DURING THE EXERCISE: The TSC staff, after relocation, will begin to consider repairs to the electrical damage.They will contact the OSC and direct that a Reentry Team be formed to evaluate and r epair damage.It is expected they will initially contact the OSC for this at approximately 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />.The Reentry Team will for m up and go to the TSC in accordance with PPM 13.10.9 and PPM 13.10.12.Upon their entry into the TSC, the Reentry Team Controller is to provide them with the following symptoms: 1)A strong odor of burnt electrical insulation permeates the TSC.As they enter the mechanical equipment room, the odor becomes inordinately strong.The HVAC is non-functional (loss of MC-7AB).2)The TSC is dim...Only battery-backed emergency lighting is functioning.

3)No 110 VAC powered equipment/appliances within the TSC are functioning (refer to Data Sheet 9c for details)~4)The doors/cover plates have charred paint and show signs of overheating on MC-7AB.5)Inspection of the above MC will reveal no active fire.6)Inspection of the above MC will reveal severe melting of the internal wiring, circuitry, busses and 0/L devices.The charr ed wires, in many cases, extend into the conduits (thus requiring replacement of much wire, vice merely reterminating it).7)Should they inspect transformer TR-TSC-2, they will find it cold and non-functional.

No outwardly apparent cause for its failure will be shown.)0$I$222 R'I IT%2)

DRILL NOd SE'90 WAIHIWOIOW

~CAllC tOWCA 4J SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE 2 2 of SHKET NOd RESPONSIBLE CONTROl LER (LOCATION)

VALID FOR TIMES OF I Q AM RKAL TIMK PM I200 TO ASSOCIATKD WITH MESSAGES 0AM TO DRILL TIME 0230 HOURS 0500 INFORMATION APPLIES TO HOURS ELECTRICAL DANGE fROM FIRE IN TSC-REPAIRS BY OSC NOTE: The Reentry Team Controller will be expected to be sufficiently fame liar with the NC to provide further symptoms in response to queries from the Reentry Team as they'examine'he inter i or of the NC.The d tt t t d d td~t, dtli The Team would be expected to report these findings back to the OSC.The OSC will prepare a repair plan and will go about locating parts and tools to effect the repairs.The Reentry Team Controller, as well as Controllers monitoring repair preparation effort activities in the OSC should indicate to player personnel that they will be expected to perform all activities necessary to'effect-the repairs'hort of actually placing tools or hands on the equipment to be repaired.$8$I$222 Rl 7$2 RILL NO EXERCISE'0 le SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAG E of 1 2 HEET NOo RESPONSIBLE CONTROLLER (LOCATION) 9h CR (Simulator)

ALI R TIMES OF1 tEAL TIME 1010 Q PM 1600 SSOCIATED WITH MESSAGES 0AM QPM DRILL TIME HOURS INFORMATION APPLIES TO HOURS SITUATIONAL DATA FIRE CONTROL PANEL ACTIVATION On the subsequent page of this Data Sheet are reproductions of Fire Control Panels FCP-l, FCP-2 and'FCP-3 with appropriate TG Bldg fire alarms annotated..

In each case, the-annotated alarms come in as the Turbine Bldg is heated by the steam escaping from the"A" NSL rupture.For the sake of simplicity, the alar ms are to activate in three separate groups or sequences, labelled"A","B"&"C".Sequence"A" 8"C" are to be activated by Simulator'Triggers't 1010 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.84305e-4 months <br />...Sequence"B" may activate a few minutes later (say 1012 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.85066e-4 months <br />)on a third Simulator'Trigger'.

The sequence"A" 8"8" alarms are to stay , activated until the Players manage to close the NSIV or until about 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> (When MSIV is closed by DEFAULT).I~SINULATOR CONTROLLER NOTE: The"Fire Pump Running" alarms are to be set up on a separately controlled

'Trigger'Sequence"C")from the other fire alarms.The Fire Pump Running alarm is not to be reset (Trigger Cancelled) until the Crew takes action to dispatch an EO to the pumps to shut them down.S.IS222 RI P 82)

WAIHICOTOO Ff~Llc FOWt1 SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET DRILL NO, EXERCISE'90 SHKKT NOv VALID FOR TIMES OFI QAM REAL TIME 1010 ,M To 1600 ASSOCIATKD WITH MESSAGES RESPONSIBLE CONTROLLER (LOCATION) 9h CR (Simu1ator) 0AM DRILl.TIME HOURS INFORMATION APPLIES TO SITUATIONAL DATA FIRE CONTROL PANEL ACTIVATION PAGK 2of2 0 HOURS rs 41st n 441~Ts Slat n cola Col, W 4~I 41.40~~I).Osa~yd w~14 cl iio Teasel Tsesl fn noestc F fs IC 411y Cl 411&TC 414y 51 CIIW Col.40~1)-11 Csl cerrs>>r 41~1.11,)aai 4'ly Toyliyn cora rs~loy 0 OCTA Ts troy n Cna 41~44~ll 11 5 1 4rrc oar 41~45 4 44 41, 1 Il,)~a1 41y noose free nosacf I Fret nNOLC foe 10 tlat tl IOIA tC Ilg D)L<IC IIiy tl TOT&41.W 444 41.41)41~W41)11 4044r 444 Ic Q$IQ+CSI 41 nocasf I Flat rraosrsnor Taro 1orca 51ee of TC slit Tlnslt f lac Ttssl Flt teeccor nie 4eccor tris tl itl)4 cat&0 erl<r>>D Asses co>>oral Ano nocscf F la 4oclor llis 0$01<4>>eral Ana~soccer 4114 Cl 5))A Ca>>eral Ano ICC 4aae~c 51t.o Css nese Ane ca Coal~I ICC 1as toaster~114 0 Cl IiW several Tna Ana 4oryser 4 Dee Tassl f le nsssc f1tC nccscc Frtf Isocsc FI~Taalsc I Fla novas I Frt nNOL I Fts TIOLOL I FlsC lscasst I Flic taac cor t14y n 40410.$e tl c)IW Toes Ano Cl~IT%00 Cas tsal facet Oa~vesco I a~~~tl O4NI Tle 4 0 esIR 4>>lr>>l 1e 4)v I LCA>>sr Ane Coaeril Wsc Area II ove~Cl ocr&Ivlssa>>ar Area 11~s~s 0 ssyw 44 Caco l 5aeal~4 secs 4v I yeast area TIOOLC FltC nOOLC I fIIC I>>asst FIIC TIOOLC I Frsf TaotsLC I FIIC TIOSLf Srt tasvasto lliy n csw 4al~Iona alas 1oes lasvaico slit 50 1%C>>I~sa laavasle llis CI$01<tl Coacrol laos Dvecs fl 545 Csssal calicos toes 4 Ano 0$)IW Tecaal Csl teafars Caesar Isola Alen Coa Lnl 4os Iacsse Toot 5ys noc>>L Frtf Is>>asst fist fcf I 401.I noew flee nojscc Iltt nocscc I srst nOLOLC I fisc I~float Wa f>>ll 5la noes Fief Dele>>5ony 5ye$1 TC Illy 0 WIN Lese Ol1 5eev 4 Frat Delete 5oray 5ys It fC lliy 0~il&frees Oil rs I noessf Frat Iwc Floe tys I TC Illy Cl ail&loller 4>>s nolNL FlsC 41o>>5any 5ys Dere>>Carer Iys$)A 14 Iliy 0$)S IC lilt tl col<tnccor eel<4sccor Feei 4 4 Feei ae~Tscascf frat lsosct slat Isel nn 5ya 1 I~In 5ye)4 Tc~'Ioy cl eel&Tc lliy tl cele Deca Tecsw Fvsa 511 Jol Alr C)ecl 1a 1a 4 Wt Ftn 5rs)4 IC slay 0 col&5cs Jot Alr c)nc sa~lwt rln 5T~4 Ts~'Iea fl 441<Wacs 5loa af Coveevler WL fly>>5ys 5 Dele>>5enr 5ys TC sloe 0 4il 0 54!C Iliy Cl Isola 51ae of eel%1)5eal Ca>>et>>sar OSI av nacscc 0 ac nosss r Lac noose F1tc Teals F la nosacc I slee nolscc I Fltf t floe 5ye 4 seine Iorar 5ys~Iot n Sale SS 14 Iny n Wsl 44 III'~011'osorvolr se WL Fifo 5ys 4 TC lliy 0 aIIW Conlnr 41~,~I I AA Colge 5rragfys III>cer Irc"Pile'N~'Terat 4ere IC I144 0 IOIW Csr 5yslos I Cac I crr Destroy noLOLC rr~nccotc nsr Tsoslc I Fnc TC 414I 0 IOIW Cor Iyscos)1>>o Ical ncssLC I nsc 41a>>5arey 5ys iy'loca Ivaaarc 4lr filler Dolt Iacascc flat nccscf I FI~f Delays Ieroy 5ys 51 sale)net I Ital ncssL~Tlocslr f of nccscc I fltc ncssLC I nsc nccscc I frat Iscaolc I fisc I Dele>>Iaror tys I 54 Iss~Lnw Iasn t>>lo>>5orey tys 0 1ala IFSLS It JO 41e>>5fnr cya 40 laclea IOW 140 Oslo>>torey 5ys sl Dorsal Aaa Fvr yfrs nnI Dele>>5yny 5ys Dele>>5eroy 5ys I 41 senal 4a Fvr 4)41~IITvt lyss nm Ttise noascc f nt noose t f 1st ncascf I FI~1 noessc stat nOLOLC I FraC nocssf I flat Dlnel Dvaalat FF FI Coacr>>liar/

Ia Sao Feel SF fl Lav fin ye la~nestle fvaa 4aalat C ff f.la raver fallen fr~IA Lo Ciao Frees/fall Frf Il~sva Ssaa I fry Ts~ever Sellers Ir F tl Le Live fressl Sell ICeaersI Al era leal~I coo 10 FF-F.IOI Ilesel Avaslay fr~101 Cia Lrel I er 4 Tae Sell Ff I 101 FF~1st 1sa A>>la Co>>eral Fsva Dvaatay Ff~1st~ever Sall>>>>ff~1st La Ciao frees/Fell Ff Wear Teat Lev Level ff f 110 soa 411 Caalnl IF I 110 Coacrollaa'a Sao nll SF I 110 OI>>el 4aasaf I F5F I TC lliy Cl 4ll Ireval~Slf t IC Iliy Cl 41'InvST~FIF)Tc lliy CI cil Tnva I~Flf 4 IC slit Cl 4il Tnval~FIF 5 TC 4114 tl 4ll Tnval~fly.t rs ircy n 40 IrevSI~fly I 44vaale 414y 11 ily Travel~SIF~Or 4115 CI 455'Iroval~F5r~DC slit Cl 455 Travel~1SIF 10 I DC Illy 0 i55 Travel~I~ARW f T ICFC rrlssrr Cvari se>>se f revel~COC 5ys DI/Lo ff I I CA~ros~or Tif WL Ores Tnva I~SF I 144 1st Dfn ff Oecoclor Ceacrol I er Trews I~r LSeit nro C~S frever 969 15222 RI (7%2)

RILL NOo VA SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PAGE of HEET Oo~ALI OR TIMES OF'EAL TIME RESPONSIBLE CONTROLLER (LOCATION)

T am QAM QPM 1600 QAM QPM TO DRILI TIME 0330 HoURs 0900 HOURS ASSOCIATED WITH MESSAGES INFORMATION APPLIES TO REENTRY TEAM REPAIRS TO NS-V-28A (oAo 0/B NSIV)Upon determination of the failure to isolate on the part of the Main Steam Isolation Valves on the"A" Main Steam Line, the players might be expected to take the following actions: o Manually close the valves from the RMS's on P-602 o Isolate and bleed off the air supply to the outboard MSIV, NS-V-28A.o Isolate and bleed off the nitrogen supply to the inboard NSIV, MS"V"22A.o Deenergize the electrical supply to the solenoid valves associated with the air/nitrogen supplies to each MSIV.o Make a Main Steam Tunnel entry to attempt to determine the reason why, at least, the Outboard valve will not close...The Controller should not dissuade the Players from attempting this.Area radiation readings will be provided the players as per the Data Sheets in Tab 4 of the Exercise Package.The TSC/OSC staffs would additionally be expected to come up with some sort of tooling to attempt to'Jack-Closed'he stuck-open MSIV in the MS tunnel.This is, typically, Power-Pak type hydraulic jacks and a structural steel str ongbacking arrangement to the power-paks an anchor against the NSIV.CONTROLLER NOTE: The Controller assigned to monitor these Reentry Team Act>vities)s to maintain close contact with the Lead Simulator Controller as 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> approaches for the following reasons: 1)If the Reentry Team is successful in closing the MSIV, then the Simulator must drop radiation readings and also change status lights for the,MSIV.2)At 1600 Hours, if the Reentry Team is unsuccessful, the Simul ator wil 1 DEf AULT the MS I V'to the cl osed posi ti on...i.e-"the MSIV's will drift closed by themselves".

As earlier stated in the main scenario script, the only one of the above actions to be successful is the dispatch of a Reentry Team with some sort of tooling to force closed the MSIV..Both the Inboard and Outboard MSIV's will be found to be mechanically hung up due to improper reassembly during R-4 outage.The Reentry Team Controller is to allow'free-play', within reason, by the Players as they set out to accomplish this task.The Controller is not to allow.'real-world entry'nto the Steam Tunnel, but is to allow the players to go about setting up to accomplish al'1 but the entry actions/post-entry actions...e.g.-The Controller should expect the OSC staff and Reentry Team to physically locate and move the necessary tools and logistical support items to the Main Steam Tunnel entryway in the Rx Bldg.IS 15222 Rl I7.$2)

>RILL NO EXERCISE'90 wA SUPPI Y SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET PACK of HEET NOo RESPONSIBLE CONTROLLER II OCATI N)9x CR (Sim)iALID FOR TIMES OF'AM REAL TIMK g PM'SSOCIATED WITH MESSAGES 0AM DRILL TIME HOURS INFORMATION APPLIES TO HOURS SEQUENCE OF EVENTS FOR ROD DROP ACCIDENT o Reactor is operating at 50$rod density pattern.o RIIM is out of ser vice.o RSCS fails.o Two maximum worth control rod blades become decoupled from their CRD's.o Operator selects and withdraws the control rod'drive of the first decoupled rod along with the other control rods assigned to the RSCS group.o First decoupled control rod sticks in the fully inserted position.o Operator selects and withdraws the control rod drive of the second decoupled r od along with the other control rods assigned to the RSCS group.o Second decoupled control rod sticks in the fully inserted position.Approximate Ela sed Time Event LT 1 second LT 1 second LT 5 seconds First control rod becomes unstuck and drops to the drive position at a rate of 3.11 ft/sec.Reactor goes on a positive period.The resultant thermal and physical surge knocks loose second rod and it drops as well.Initial power increase is terminated by the Doppler coefficient.

APRM 120K power signal scrams reactor.Scram terminates accident.68 15222 Rl{7-82)

DRILL NO+EXERCISE'0 9z ALL CENTERS NASNIWCTOA tV~LIC PO1I'lI 4W SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET LK (LOCATION)

PAGF ol VALID FOR TIMES OF: QAM REAL TIMK N/A PM ASSOCIATED WITH MESSAGES 0AM HOURS o N/A DRILL TIME INFORMATION APPLIES TO HOURS THE UNLIKELIHOOD OF A CONTROL ROD DROP ACCIDENT The design of the drive and its coupling uses high quality materials and it receives stringent quality control and testing procedures appropriate to other equi pment typical ly 1 i sted in the WNP-2 guali ty Class I, safety related list.Tests conducted by General Electric under both simulated reactor conditions and conditions more extreme than those encountered in actual service have shown that the dr iye (or coupling)will retain its integrity even after thousands of scram cycles.Tests also show that the drive and coupling do not fail when subjected to forces 20 times greater than that which can be achieved in a r eactor.The Rod Sequence Control System (RSCS)limits the worth of any control rod which could be dropped by regulating the withdrawal sequence.This system prevents the movement of an out-of-sequence rod in the 100-75K rod density range, and from the 75K rod density point to the present power level the RSCS will allow only banked position mode rod withdrawals or insertions.

The Rod Worth Minimizer (RWM)system will provide the same protection as the RSCS if the RSCS were not functioning and the RWN was.The Termination of thi s ex cur sion is accompli shed by automatic safety features of inherent shutdown mechnisms.

Therefore, no operator action during the excursion is required.Although nor mal plant instrumentation and controls are assumed to function, no credit for their operation is taken in the analysis of this event.Sticking of the control blade in its fully inserted position is highly unlikely because each blade is equipped with rollers that make contact with the nearly flat fuel channel walls, travelling in a gap of approximately 1/2 inch clearance.

Since a control blade weighs approximately 186 pounds, even if it separates from its drive, gravity forces would tend to make the blade follow its drive movement as if it were connected.

Control blade friction can be detected by settling differential pressures less than 30 psid and insertion differential pressures greater than 15 psid.90$l5222 R1 I7 IS)

ORILL NO.SHEET NOe Ik SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET CISE'90 RESPONSIBLE CONTROLLER (LOCATION)

LL CENTERS PAGE"~VALID FOR TIMES OFc QAM TO REAL TIME I'M N/A ASSOCIATKO WITH MKSSAOKS 0AM oRILL TIME N/A HOURS N/A INI ORMATION APPLIES TO HOURS THE UNLIKELIHOOD OF A CONTROL ROD DROP ACCIDENT The control rod drive/control blade separation does not, of itself,'roduce any unplanned or uncontrolled perturbation on normal plant operation that requires immediate operator action.This is is not of immediate reactor safety consequence as is the Loss Of Coolant Accident (LOCA).In most cases, if such a separation occurred, it is expected that the blade would not stick, but rather follow its drive movement.The separation would be detected by no neutron monitoring response during rod movement or at the next fully withdrawn stroke where the ability to withdraw to the overtravel position would signal separation since the blade bottoms on a seat and prevents withdrawal to the overtravel position if connected.Thus, this drive could be inserted and declan ed inoperative in accordance with the technical specifications until the next refueling outage where it could be repaired.However, for this analysis, it is presumed that the separated blade somehow sticks at the fully inserted position.This assumption sets up a condition whereby, if the drive were withdrawn, the stuck blade could later fall to its drive position and cause a rod drop reactivity insertion accident.The consequences of a rod drop are mitigated by controlling the intial conditions.

This is analogous to controlling Average Planar Linear Heat Generation Rate (APLHGR, pronounced

'Apple-Hugger')

to mit~.gate the consequences of a LOCA.900 1$222 Rl I7 02)

DRILL Noo 1IAAN5%OTO\

iL'LIC i011CA 4P SUPPLY SYSTEM CONTROLLER INFORMATION GENERAL DATA SHEET FAG E Exercise 90 rco.RESPONSIBLE CONTROLLER (LOCATION) of 10 Control Cell VAI ID FOR TIMES OF1 QAM 0800 Q PM 1200 QAM Q PM DRILI.TIME TO HOURS HOURS ASSOCIATED WITH MESSAGES See Control Cell Addendum INFORMATION APPLIES TO Control Cell Telephonic Queries A.Data Hmi 10 a-i.10)-y 10 z-ap 10 ag-.bh 10 bi-bx 10 by-c 10 co-dd 0800-0830 0830-0900 0900-0930 0930-1000 1000-1030 1030-1100 1100-1130 (State, Fa)(Counties/ck, du, dw, dx, ec, ed, eg, eh, ei)(State-ga thru gk)(County-ct, cw, cx, cy, cz, da-c, dv, dy, dz)(State-ha thru hr)10de-dt 1130-1200 (County-de-f, dm-t, ea-b, ee-f, e])(State-ia thru iz)8 Rumor.'~5g mba 0930-1000 Protestors are coming to Plant 2 from all across the United States 0830-0900 Armed terrorists have attacked Plant 2 10r, s, t 10ag, ar, as 1030-1100 Terrorists have caused a radiation release at Plant 2 10cq, ch, ci 1100-1130 Plant 2 is being abandoned because of danger of a meltdown 10co, cp, cq 1130-1200 Run on banks and grocery stores 10iw 969 IS229 RI (7%9)

INTENTIONALLY BLANK DRILL ND.Exercise 90 (Section IIG)WASHINGTON PUBLIC POWER SUPPLY SYSTEM CONTROLLER INFORMATION CRITICAL POINTS of ITEM REAL DRILL RESPONSIBLE PERSON 1)Briefing of Simulator crew and SSS/EO prior to exercise start, covering shift turnover sheets.0700 0000 Simulator Scenario Controller 2)Demonstration gains access to Protected Area.0827 0127 OSC Lead Controller 3)Default message to declare Alert.4)Electrical fire in TSC.Terminal dis-plays, fax, two way radios, and normal lighting simulated lost.0855 0155 0910 0210 TSC Lead Controller TSC Lead Controller 5)Default message to relocate TSC if not already done by free play.6)Control rod drops occur causing fuel damage and scram.7)MSIVG on Main Steam Line"A" fail to isolate.0940 0240 TSC Lead Controller 0955 0255 Simulator Scenario Controller i 0958 0258 Simulator Scenario Controller

)Main Steam Line rupture in TGB.9)Default message of thyroid dose pro-)ected greater than 5 REM at 1.2 miles, General Emergency is to be declared: 1010 0310'imulator Scenario Controller 1045 0345 TSC Lead Controller 10)MSIVs on"A" loop defaulted closed (if not already successfully closed by TSC/OSC free play).1400 0700 Simulator Scenario Controller INTENTIONALLY BLANK SECTION IIH MAPS AND EQUIPMENT EXERCISE 90 (See Data Sheets)

INTENTIONALLY BLANK PART III EVALUATOR/CONTROLLER INSTRUCTIONS EXERCISE 90 CONTENTS CONTROLLED DISTRIBUTION Predrili Checklist General Evaluator/Controller Instructions Special Evaluator/Controller Instructions Critique Worksheets Evaluator Logs I I I-A-1 III-8-1 I I I-C-1 I I I-D-1 I I I-E-1 CONTROLLED DISTRIBUTION INTENTIONALLY BLANK DRI Oo exercise 90 (Section IIIA)DIRKCTOR Ron Chitwood ACTION ALTKRNATK DRILL DIRKCTOR Bob Mogle WASHINGTON PUBLIC POWER SUPPLY SYSTEM DRILL DIRECTOR PREDRILL CHECKLIST ot INITIALS o Meeting schedules distributed.

o Meeting rooms scheduled.

o Controller/evaluator assignments completed.

o Controller/evaluator training completed.

o Scenarios issued/logged.

o Controller/evaluator briefings completed.

o Lead controller packages issued.o Player briefings completed.

o Prepositioned role players identified and briefed.o Props acquisitioned and in place.Commissary arrangements (meals/donuts/coffee) completed.

o Communication checks of simulator equipment completed.

o Simulator (CR)logbook, FNFs, NRC event notification forms in place in simulator.

o Fax machine in place at Simulator.

o Key switch communication permissive from control room to simulator completed.

o Special player"Pager Duty Roster" to EOFCC.o Controller assembly role call and controller network phone number verifications.

o Synchronization of clocks and watches.o Management permission obtained to begin.o Predrill checklist completed.

INTENTIONALLY BLANK SECTION III B GENERAL EVALUATOR/CONTROLLER INSTRUCTIONS EXERCISE 90*.~All!~~J~:

U d th p i i f th d\11i exercise director, the following will normally be accomplished prior to the drill/exercise:

2.Completion of the scenario package.Arrangements for required facilities, including for the larger drills and the exercises, use of the simulator.

3.4.Validation run of the scenario on the simulator, and the loading of scenario data on the graphics display system emulator.Scheduling of pre-and post-drill/exercise meetings with evaluators/

controllers and players, and evaluator/controller training for those not certified.

5.6.Procurement of props, realistic staging of casualty areas and brief-ings of any role players.However, neither actual plant operations, security or personnel safety are to be jeopardized.

Administrative and logistical arrangements, e.g., pager carrier duty roster revisions, controller and simulator communications set up, coffee and doughnuts contract, etc.B.Pre r 1 v 1 r normally be a series of three meetings: 1: There wi 1 1 A drill/exercise package issue and overview meeting will be con-ducted for all evaluators/controllers; such things as objectives, limitations, schedules, evaluator/controller assignments, scenario introduction, the organization of scenario forms, messages, antici-pated responses, general data sheets, critical points, and special evaluator/controller instructions will be covered.2.Evaluator/controller team breakout sessions will be conducted for all evaluators/controllers covering such things as specific messages, data input, event evaluation assignments, team communications, docu-mentation and other coordination matters.3.If required, a casualty scene inspection wi 1 1 be conducted for specified evaluators/controllers that will accompany players, such as the PET and OSC reentry teams, that will respond to the scenes of scenario personnel and equipment casualties.

Use of props/mock-ups, other portrayal of the casualties, likely routes of travel, antici-pated player response actions and portrayal of such situational dependent items as fire and rad data will be covered in detail.

To maximize the training value of the drill/exercise, a predrill/exercise briefing will be conducted for players, generally covering Part I of the drill/exercise package.An excerpt, consisting of Part I, can be issued as a handout.Topics should include: intro-duction, ob)ectlves and limitations, schedule, player positions to be activated, instructions for players, any recent procedural changes-and any special coordination matters.Initial Plant Conditions may be disseminated at this time.2.Informal table top drills may also be conducted prior to a drill/exercise to review center/team operations, procedures, etc.How-ever, specifics on the particular drill/exercise scenario are not to be compromised.

D.Dr 11/i v 1 i n n 1.Scenario Inputs: Scenario messages and data will be provided to the players by con-trollers in as realistic a manner as possible.For example, a controller may call the Shift Manager and role-play as the BPA dispatcher with a scenario message;a controller may provide simu-lated radiation readings to a reentry team HP technician from a scenario package data sheet if commensurate with the type and scale setting of the instrument being used.Controllers do not provide conclusions, they furnish simulated sensory inputs, e.g., if the portrayed emergency condition actually existed, what'would be seen, heard, smelt, etc'.Scenario Deviations:

a.b.Controllers seeing a need to modify the scenario should inform their team lead controller, who wi 11 contact the drill/exercise director.Only the drill/exercise director has the authority to start, stop or deviate the scenario.Scenario deviations, especially on the larger drills and the exercises are to be infrequent and only implemented'after thorough coordination, to include with any lead federal evaluators and lead offsite agency control-lers.The director is also responsible for arbitrating any)urisdictional or interagency disagreements which may occur during the drill/exercise.

3.Performance Evaluation:

a.Player task performance must be closely monitored by evaluators, as well as controllers as long as it does not interfere with their controller functions.

Action taken should be compared with anticipated responses and procedural guidance.Evaluator logs are to be used to record observations.

Center/team docu-mentation should also be checked to purify the chronology of events and for correctness.

b.Interference by evaluators/controllers with player actions should be minimized, with questioning restricted to slack times and the immediate critique session right after the drill/exercise, with the following major exceptions:

o Safety-Evaluators/controllers will immediately intervene to prevent or mitigate any unsafe condition or act.o Major scenario deviation-If the players depart from the anticipated responses to the extent that a successful run of the scenario, and meeting of the drill/exercise objec-tives, is jeopardized.

IL~.I'I'.-th-ptlf ing to prevent repeating incorrect task performances.

c~The reasons for incorrect task performances must be captured for proper preparation of the drill/exercise critique.This normally requires thorough questioning of the individual(s) involved.l.Immediate In-Center Critique Sessions: Conducted in the center by the lead controller immediately after the drill/exercise, this informal session will be used to provide the players with feedback, ensure Center Director/Manager is aware of his/her responsibility to return center/team equipment to readiness state, resolve issues, complete any informal training and ascertain any systematic reasons behind unfavorable observations.

For some findings it may be necessary to conduct a category 3 Root Cause Analysis (RCA)persuant to PPM 1.3.48.The key is to determine the"why" of each unfavorable observation involving personnel error that indicates a problem with the system, e.g., improper procedural step, poor personnel selection for the position, ambiguous training, etc.Lead Controllers are to collect all logs, After-Action Reports, and administrative paper work for delivery at the formal critique session.2.Formal Critique Work Session: Normally conducted the day after the drill/exercise, this session involves two phases: a~Team breakout sessions for all evaluators/controllers, during which observations are discussed, researched with players and drafted up on the critique work sheets in several categories; favorable and unfavorable observations, time-line inputs and answers to specific evaluation questions.

Necessary RCA's with the players will be completed at this time to assure a reason for each unfavorable finding is ascertained involving system-atic induced personnel error.Final team/center documentation and CARs wi 11 be prepared for submission by the Lead Controller.

1 i i in.

b.A lead controller session at which team inputs are discussed and submitted, appropriate observations consolidated, assign-ments are made for any required follow-on actions and issues are identified and categorized for the written critique.Again, key players may be requested to be present.3.Written Critique: The drill/exercise director wi 11 disseminate a written critique usually within 30 days of the drill/exercise.

The critique will normally consist of: Qz~[-Chronology:

A time line of the major scenario and player response activities.

QZ1~-Assessment of Drill/Exercise Objectives:

An enumeration of any of the objectives that were not met and the reasons.~~-Favorable Observations:

Any noted display of special initiative or judgement meeting one of the two following definitions:

o Exceptional Performance

-A display of initiative or judgement that exceeds procedural requirements to mitigate emergency conditions.

j o Noteworthy Performance

-A display of procedural initiative or judgement that is performed with a high degree of efficiency to mitigate an emergency condition.

~P~g: Corrective Action Records: Unfavorable findings divided by severity as defined below, as well as by those already closed out (normally involving isolated personnel errors)and those still requiring action (normally involving needed equipment, procedure, software, training, etc., fixes).In categorizing the severity of drill/exercise findings, the poten-tial significance of the concern under investigation should not be minimized by the possibly limited scope of the scenario.The con-cern should be extrapolated out to determine the potention total impact under a worse case real event situation:

a.b.c~f~~~: Observed inadequacies that preparedness is not adequate to provide reasonable assurance for the health and safety of the public, and/or that of emergency workers.F\di hi h h impact but do not'dversely impact the health and safety of the general public or of emergency workers.1 i Findings which do not have an adverse impact on health and safety, but would enhance an organiza-tion's level of emergency preparedness.

III-B-4

~r.V-Informational Observations:

Major points that warrant con-sideration but do not meet the criteria for unfavorable findings, e.g., efforts directed by a center staff did not appear to be in the most efficient sequence.These do not require resolvement or track-ing.For cri tiques of exercises and the larger drills, the critique may simply make reference to a separate report disseminating infor-mational observations to interested parties.~P rid-Participants:

A listing of all recorded participants who are to recieve credit for the activity.~VU-Minority Opinion-In the unlikely event some evaluators/

controllers take exception to the content of the report, their minority opinion wi 11 be stated here.III-B-5 INTENTIONALLY BLANK SECTION III C SPECIAL EVALUATOR/CONTROLLER INSTRUCTIONS EXERCISE 90 A./~TER Players at all of the different emergency centers are to interact with one another as if the simulated situations actually exist.However, communications that would be initiated to individuals and agencies not actually playing in the drill, e.g.,'BPA, Hanford Patrol, National Weather Service, etc., are to be made to controllers in the control cell who will role play the parts.B.2.3.g~r~i~qg: Lead controllers at each of the emergency centers will be linked by telephones set aside for that purpose.This will be used for drill/exercise control coordination, such as to resolve problems or make needed scenario deviations.

A'control communica-tions listing is attached.~P~r~JsJ~ign:

For additional players the current players want to use who would ngf normally be at the plant under the given drill conditions, inject a one-hour response delay time before the additional player(s)are allowed to be used.RD 2.3.Evaluator log forms are at the"Evaluator Logs" tab.Also, you may write observations on the message forms, anticipated

.response forms or data sheets.T~: Accurate times are important.

Call Time at a 9-1-844-1212 to set your watch to the official drill time.Player and Controller/Evaluator listings at Part I for your center should be documented for"credit" purposes.Special attendance records should be signed by each player during the drill/exercise.These records are to be turned in at the formal critique work sessions.C.C8LTI~QII:

t I'h\k\th~I\d work session schedule.2.3.Controller Communications Listing Control Cel 1 Operations Evaluator/Controller Sessions 4.5.Players Briefing Drill/Exercise Root Cause Determination Process.

INTENTIONALLY BLANK ATTACHMENT 1, SECTION III C CONTROLLER COMMUNICATIONS LISTING EXERCISE 90 r/P i i Jill N m r Plant SIM EOF OSC-Lead Controller TSC-Lead.Controller CAS-Lead Controller Control Room (Simulator)

Lead Controller Lead Scenario Controller SSDC-Controller EOFCC-Controller OACC-Controller TDC-Controller MUDAC-Lead Controller HP Center-Controller Ken Hannah S.Scammon DS Cornagey TBD Jim Landon Yvonne Derrer TBD TBD Rich Hoifgramm Yern Shockley TBD Actual Control Room-Controller TBD 377-2278 377-2730 377-2310 377-2809 377-8091 377-8769 377-8181 377-8228 377-8071 377-8092 377-8191 (PA Page)Drill Command Center Drill Director Drill/Exercise Coordinator Control Coordinator Ron Chitwood Bob Mogle TBD 377-8178 377-8178 377-8178 Head quarters JIC-Lead Controller Public Info Telephone Team Evaluator TBD TBD Richard Romanelli 372-5860 Media Telephone Team Evaluator.TBD Control Cell-Lead Controller Don Mannion TBD 372-5873 III-C-A-1 ATTACHMENT 1, SECTION III C (Continued)

CELLULAR PHONES FIELD TEAM CONTROLLER PHONE NUMBERS OF RESPECTIVE VEHICLES PHONE¹948-0485 948-0484 948-0483 LICENSE¹C58462 C58614 C58468 NOTE: CONTROLLERS CALL MUDAC AT 377-8191 For use of controllers only (see following exceptions).

In an emergency or failure of radios during drill/exercise, the cellular phones could be used by players.Cost is expensive; limit use to necessary only.Controllers need to have hands on training (10 minutes)III-C-A-2 ATTACHMENT 2, SECTION III C CONTROL CELL OPERATIONS EXERCISE 90 A QBHB6L The control cell is made up of"phone talkers" or controllers, whose function it is to role-play as the various agencies and individuals not activated for the drill/exercise, but with whom the players would normally interface.

Communications are initiated both ways.For example, a MUDAC player may need to call the National Weather Service for a weather fore-cast.Instead he should contact the control cell where a controller, role-playing as a forecaster, would read from a data sheet the"canned" drill weather.Also,.controllers may call the emergency centers to input scenario messages.B.C.The control cell should represent only those organizations or individuals not activated for the drill/exercise.

Those activated.

are limited to: 1.All Plant emergency centers 2.The EOF , 3.The Headquarters/JIC 4.State and Benton/Franklin Counties'OCs 5.Limited portions of DOE participation PHN T 1.Outgoing calls: For telephone messages being called to the activated organizations:

a.Be sure to read the messages and time line completely so that you can improvise realistically, if necessary.

Players may be asking you questions and you may have the information, already in the data sheets.b.C.Change the name on the message if necessary to reflect the correct gender.Special messages, and revisions, may be assigned/made by the Control Cell lead controller.

d.Do not skip, delete or improvise important messages without the knowledge of the Control Cell lead controller.

III-C-8-1 e.Record actual responses in the space provided in a legible manner.These responses wi 11 be reviewed later by the players.At anytime that it seems appropriate, you may ask to be called back.Be prepared to respond if someone does get back to you.2.Incoming Calls: a.Try to keep the incoming call phones clear of other traffic.b.Portray the called agency/individual as realistically as possible.3.Telephone Numbers: a.JIC Media Response Team b.JIC Public Information Team 375-5100 372-5011 III-C-B-2 ATTACHMENT 3, SECTION III C EVALUATOR/CONTROLLER SESSION OUTLINES EXERCISE 90 A.Package Issue and Orientation:

At this session for all evaluators and controllers, the Drill/Exercise Director or Coordinator should cover the following portions of the scenario package: 1.Ob]ectives Tab: Section I A, Ob]ectives and Limitations:

Drill/Exercise scope and objectives and limitations, with emphasis on center/team applicability.

2.Schedule Tab: Section I B, Schedule: Schedule of evaluator/

controller sessions and drill/exercise day team reporting times.3.Participants Tab: a.Section I C, Players Positions:

Location in book.b.Section I D, Evaluators/Controllers:

Introduction of lead con-trollers and any necessary clarification of assignments.

c.Section I F, Player/Observer Instructions:

The fact they are being provided to the players and the content of Attachment A, Telephone Use Instructions.

4.Scenario Tab: a.Section II A, Introduction to Scenario: An overview.b.Section II C, Time-Line Summary: Combined with the introduc-tion overview.c.Section II D, Scenario Forms: Format only.d.Section II E, Scenario Messages and Anticipated Responses:

Section organization and a pertinent message/anticipated response example.e.Section II F, General Data Sheets: Section organization and a pertinent data sheet series example.5.Critical Points Tab: Section II G, Critical Points: A highlight of the responsibilities.

6.Maps/Equipment Tab: Skip.7.Predri 11 Checklist Tab: Skip.III-C-C-1 8.Evaluator/Controller Instructions Tab: a.Section III B, General Evaluator/Controller Instructions:

General content.b.Section III C, Special Evaluator/Controller Instructions:

General content, including that of attachments.

B.Team Scenario Breakout Sessions: Lead Controllers should cover: l.Any message input and response evaluation responsibility assignments.

2.Specifics on how dril'1/exercise controller data is to be presented.

3.Individual assignments for the recording of critique worksheet listed time-line inputs, and evaluation of critique worksheet specified evaluation questions.

4.Assignments regarding player accou0tabi 1ity and drill/exercise docu-mentation requirements.

5.Drill/exercise day controller/evaluator team member reporting time(s)and location(s).

6.Intra-and inter-team communications and any other coordination matters.7.Arrangements for the casualty scene inspection (if appropriate).

8.A table-top drill on message input, data presentation, response evaluation, drill/exercise documentation and team communications.

C.Casualty Scene Inspections:

Attended by PET and OSC reentry team and other controllers as appropriate, the lead Scenario Controller along with the lead OSC Controller should cover: 1.Specifics on exactly how the equipment and personnel casualties are to be presented to the players, with examination of any mock-ups, etc.2.Likely player routes of travel and responses to the situations.

3.Any coordination matters.D.Final All Controller Scenario Coordination Session: The Drill/Exercise Director/Coordinator will cover any last-minute revisions and other control coordination matters with all controllers.

E.Immediate In-Center Critique Session: Conducted in the center immedi-ately after the drill/exercise, the lead or center controllers will: 1.Brief on tentative unfavorable findings as recorded by the evalu-ators and controllers.

III-C-C-2 2.3.4.Question players to determine the Root Cause Analysis (RCA)"why" of any tentative unfavorable finding involving improper personnel performance with the"why" not already identified, or arrange for the questioning of involved personnel during the critique.Also, responsibilities for the conduct of Category 3 root cause analyses may be assigned.Provide explanations to the players on the scenario and events in answer to their queries.Provide any needed direction on center/team area and equipment restoration.

Assure completion and collection at end of drill/exercise of center/team documentation, e.g., After Action Reports, etc.Arrange for the inclusion of any key players deemed appropriate in the critique work sessions.F.Team Critique Breakout Hork Sessions: Attended by all evaluators/

controllers and appropriate key players;lead controllers will: Lead discussions on each finding and make assignments for writing them up.2.3.4.Assure proper procedural research is conducted with players for each unfavorable finding, answering all, who, what, where, when, conse-q.\1tl f~h.Assure coordination with other evaluator/controller teams on find-ings that have potential impact elsewhere.

Have any outstanding root cause analyses completed.

Prepare team documentation for submission.

G.Lead Controller Critique Hork Session: Select members of the EP group, directed by the Drill/Exercise Director or Coordinator, wi 11: Conduct a discussion of team inputs, with emphasis on serious find-ings and those that have potential impact on more than one team.2.Assemble documentation from the teams.3.4.Identify like inputs from more than one team and consolidate where applicable.

Conduct any required follow on actions, e.g., root cause analyses interactions with players, for unfavorable findings originally thought not to need them."Reinforce this concept!III-C-C-3 5.Determine a severity of classification for each unfavorable finding.6.Develop CARs for the written critique package.Ensure player review/comments are obtained prior to final production of the critique package.I I I-C-C-4 ATTACHMENT 4, SECTION III C OUTLINE FOR PLAYER'S BRIEFINGS EXERCISE 90 The following portions of Section I of the drill/exercise package should be covered, orientated towards the players represented at the briefing, e.g., Plant, Security, EOF, etc.A.Drill/exercise scope and pertinent limitations.

B.Schedule Tab: Section I 8, Schedule: Schedule of player sessions.C.Participants Tab: Section I C, Players Positions:

Explanation.

D.Player Instructions Tab: 1.Section I F, Player/Observer Instructions:

Cover applicable por-tions as summarized below: Plant Plant Security EOF JIC 2.Section I F, Attachment Explanation.

E.Data Sheet la, Initial Plant 1,3,4 1,3,4 1, 2, 3 1, 2 A, Special Telephone Use Instructions:

Conditions

-Historical Data for all Players, III-C-D-1 INTENTIONALLY BLANK ATTACHMENT 5, SECTION III C DRILL/EXERCISE UNFAVORABLE OBSERVATION ROOT CAUSE ANALYSIS GUIDE EXERCISE 90 A.General: The cause of any incorrect~angl task performance(s) will be included for each unfavorable observation.

If simple questioning of the player(s)involved fails to identify the cause(s), then a Category 3 type root cause analysis (RCA)will be conducted by and evaluator/

controller in accordance with this guide and attached to the unfavorable observation.

'B.Process: l.Initiate the Root Cause Analysis Summary Sheet (Enclosure 1)by completing Section 1.0.2.Gather the information necessary to complete Section 2.0, Initial Information Collection.

By questioning of involved personnel, com-plete personal statements on Personal Statement Forms (Enclosure 2).3.Using the information gathered, determine root cause(s)of the problem by application of the basic root cause determination method (Section 3.0)as follows (do not hesitate to collect additional information if necessary to justify your findings):

a.For the problem being analyzed, determine if the primary cause is equipment, personnel, or procedures (Section A of the tree).5QT~: Although the root cause(s)may be determined to be related to only one of these primary categories, all three should be considered initially to ensure complete coverage.Nithout complete consideration of the three categories,~root cause(s)may not be identified.

b.For each area in Section A of the tree identified as a primary cause, determine which subcategory (Section B)led to the pri-mary cause.To do this, a list of questions (Section C)has been developed.

c~For any question in Section C of the tree which is answered"Yes", it is a root cause.Any root cause shall be circled for easy identification.

Limiting root cause(s)to those identi-fied in the tree will aid in the trending of similar problems.4.List in Section 4.0 the personnel who performed the RCA and the completion date.I I I-C-E-1 5.Attach the completed Root Cause Analysis Summary Sheet (Enclosure 1), accompanying Personal Statement Forms (Enclosure 2), and copies of any other relevant documentation, e.g., center/team logs, etc., to the unfavorable observation critique worksheet.

Enclosures:

1.Root Cause Analysis Summary Sheet 2.Personal Statement Form III-C-E-2 Drill/Exercise No.ENCLOSURE 1, ATTACHMENT 5, SECTION III C ROOT CAUSE ANALYSIS

SUMMARY

SHEET EXERCISE 90 1.0 Unfavorable Observation Number Name of Evaluator/Controller Initiating Analysis: 2.0 Initial Information Collection:

a.Any further description of the event/problem identified in the unfavorable observation:

b.Pertinent Data (Identify and ggZzh sources of data, e.g., center/team logs, procedure excerpts, personal statements, etc.III-C-E-3 INTENTIONALLY BLANK 3.0 BASIC ROOT CAUSE DETERMINATION Use the following Root Cause Tree" to guide you In determining the root causes(s)of the problem.The tree is intended to serve as a checklist which insures the nght questions are asked, and also limits the analysis of any problem to areas within our control.All Section A, 8, and C catagories should be considered in your analysis.If you answer)ses to any question in Sectiion C of the tree, it is a root cause.Circle any and all root cause(s).LTA Less than adequate>>GNKAt Soa CLOT~fir CENO ADNK$5fD NNISC Ilrt SAAIKAT Gaalf OS NC saoatas KATONNCL 8 NSTlllk TCN NANNACIINNS NkNICNAN(C DCSCKNGT EAA(a CWKKI DCSCKICT NTVNaatf 000 Vf Atkl CGNNUNCATCN TakNNO LTA NANLGt NOIT~AOGAANS LTA LTA SKGUCATCN LTA aOOILC>>TAIN SKC~a(ALOI ICT ANTICDNIOI LAKLNG LTA E~~OGN N51AVSSlkltr C(W IDOLS ll A lo>>OS IKNT(aao ALCATINCS~ao LIGNTNO Noav ENVVIONINNT OAkWING(SI LTA Ttlaoaakf DEVCE NOT AOKIVCO aaaf~Nlf GNGN LTA~AtvcNTalarc ANTENINX LTA TICVOII IC't 10 a aotaco Icf avaaatft oa CCWVtNOIT 10 lat lrlOI DO N7T ANNI A SAOCt DINE COPED STaraako TtANNGLOGV IKN U5to ACSCA 1 DAO(NOI SCIISOWCO NC Stkot Too ICNO NOOT CNVIQOIC IC NESQIGC NGGNSLITC IC Ntaat Ga NE INOO A VLL LNC 5 VC NIL NlSSOI TOOSAST 1 ka(kaklTSIS I'I l TaSK SCAKVNCO~NAEOUENTLT TAKNNO NG(NNL CIC TAADNKI Slfallat lf a ACCINltW lTA TtSTNO LTA CGNTKeKI TAADNC I IA CAkWNGS NOT CONTAOLLCO CakWNGS NOT INDATCO KASGNNCL ACG(ANT IIAIIT IKIT DEIwco GGAAt CTNC ACIKN NOT AN(E VENTED wow(saalcct ITA No SLAWKNO No 5GICDULSC KAINNO SCNE(NANO NG(WSLETt IT A OS NINA GC INNV NAECTCN CVStAW50IIT OVCAOGNT>>A NOT TNOUGIO'10 a Acovaco No 1 NNITf N oa CGNSLCTLO SGNIAI CGINUSNO ICat TNAN (NC ACTCN SEA SICS NOON(KKISS Saaa SAOSOIO DC IKN Covla IIC OTUATCN GALSIVGS L1 A EOVNNENTLA Lla Nsf avcfrorc AICCVGVS LAATS LTA IAATNLC AAtk MltSKN(tt Dklat(WSVILTIGN WAGNO T~ENCA 5tOUCNCC GS 5ICS$WKNO S ACT 5 IINOANA TON WKWO NNN.~~Ik NI III-C-E-4 INTENTIONALLY BLANK 4.0 RCA Performed by: a.Name of evaluator/controller completing the summary sheet: b.Any other evaluators/controllers who contributed:

c.Completion date: III-C-E-5 INTENTIONALLY BLANK 1.Player Name: Drill/Exercise No.ENCLOSURE 2, ATTACHMENT 5, SECTION III C PERSONAL STATEMENT FORM EXERCISE 90 2.Emergency Center/Team:

3.Emergency Position: 4.Time of Event: 5.Location of Event:*6.How did the event actually happen?7.What led up to the event?8.What other work was going on in the area or on the system?9.Explain if anything was wrong with the machinery, equipment, materials, or tools.Unfavorable Observation 0 RCA Attachment III-C-E-6 f INTENTIONALLY BLANK 10.Explain if anything was wrong with the procedure, layout, or work instructions.

ll.Describe the way.in which human error may have been involved.12.Comments or remarks: 13.Nhat suggestions would you have to prevent recurrence of this event?I I I-C-E-7.

INTENTIONALLY BLANK QRIU NO w*$HlicTO'x~\'Llc powcR 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PAC E Exercise 90 (Section IIID)ASSIGNEQ I QCATIQN ction Contents E ATOR NAME ORCANI?ATION Document Check-In Log Attendance Record Favorable Observation Unfavorable Observation Time-Line Worksheet Evaluation Questions Sample Unfavorable Observation 968 15250 RZ (144)

~~~INENTIONLLY BLNK ORILL NQ Exercise 90 (Sheet A)EO Q cument Check-In Log KVALUATQR NAME~~~WASNIWOTO'X

~\'LIC tOWSA 4N SUPPLY SYSTEM CONTROLLER/CRITIQVER INFORMATION CRITIQVE WORKSHEETS QRCANIZATION PACK Of Evaluator/

Controller Team Sheet B: Atten-ance Record Sheet C: Favorable Obser-vation<Optiona>>Sheet D: Unfavor-ablee Obser-vation Sheet E: Time Line Hork-sheet Sheet F: Evalua-Player ation After Ques-Action tions Reports Center/Team Documen-tation CR OSC TSC CAS SSDC SDC EOFCC OACC TDC MUDAC F TEAMS HPC JIC ST EOC CO EOC CONT CELL 968.15250 R2 (1~i INTENTIONALLY BLANK ORILL NO Exercise 90 (Sheet 8)ED I OCA ON tendance Records EVALUATOR NAME WASHIXCTO'0 tI'LIC I'OwCR 4i SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS 0 CANIZATION PAGE See Attachment 968 15250 R2 ll44)

INTENTIONALLY BLANK WA5HINOTON FUILIC FOWCN 44 SUPPLY SYSTEM ATTENDANCE RECORD CONTROILRRS/EVALUATORS DRILL/EX ID'ATE'ENTER:

NAME (PRINT)SIGNATURE SOC.SEC.NO.CENTER/POSITION EVALUATED REMARKS 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Instructors Signature Comments 968.24065 0 80)

I INTENTIONALLY BLANK WA5lllNOTOH tUILIC TOWAll 44 SUPPLY SYSTEM ATTENDANCE RECORD PIAYERS DRILUEX ID: DATE: CENTER'AME (PRINT)SIGNATURE SOC.SEC.NO.EMERGENCY POSITION TITLE REMARKS 10 12 13 14 15 16 17 18 19 20 21 23~24 25 26 Instructors Signature Comments 96'.24068 0 I90)

INTENTIONALLY BLANK ORIEL NOo Exercise 90 (Sheet C)NFO I OCATION WAIHISCIO'5

~I~LIC JOWL%43 SUPPLY SYSTEM CONTROLLER/CR ITIQUER INFORMATION CRITIQUE WOR KSHEETS vorable Observation for (Center/Team):

EVAI VATOR NAMC ORGANIZATION (Office hone)Observation:

968-15250 R2 ll~l INTENTIONALLY BLANK OR ILL NO Exercise 90 (Sheet D)%ASNIIO'IOA

~O~1IC IOWE1 43 SUPPLY SYSTEM CONTROLLER/CR ITIQU ER INFORMATION CRITIQUE WORKSHEETS PAGE ot favorable Observation for (Center/Team):

EVALUATOR NAME ORGANIZATION (Office hone)(Number): A.Relevant Objectives (from Section IA): B.Findings (who, what, when, where, consequences, violation):

ALL MUST BE COMPLETED.

7~7~~~7~7~T D D'7~C.Cause(s)(from Basic Robot Cause Determination at Section IIIC): NHY~'.Feedback (complete for yy~Zg3.performance category):

1.Involved person(s)briefed on findings: Yes;No.2.Root cause analysis attached: Yes;No.968.15250 R2 ll~l INTENTIONALLY BLANK DRII I NO WASHIXCTOPt tl'LIC tOWCR 43 SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS Exercise 90 (Sheet E)ot AS KD LOCATION e Line Horksheet for: Control Room (CR)(Simulator)

KVALUATOR NAME O GANIZATION J (Office phone)Drill/Exercise start Plant-PA announcement completed.

EAL recognized by PED.Declared by PED.Crash call completed.

Alerting tone sounded.UE Plant PA announcement completed.

PA announcement of hazards.NRC notification completed.

EAL recognized by PED.Declared by PED.Crash call completed.

Alerting tone sounded.ALERT Plant PA announcement completed.

NRC notification completed.

Information Coordinator arrived.Control Room communicator arrived.EAL recognized by PED.Declared by PED.Crash call completed.

Alerting tone sounded.SAE Plant PA announcement completed.

NRC notification completed.

Information Coordinator arrived.Control Room communicator arrived.Other items warranting input (if applicable)

SM/PED passed control to on-call PED.Announced PED change over to on-call PED.Entire Protected Area controlled evacuation order Plant PA announcement completed.

Simulator staff secured from drill/exercise.

968'T525l782

{1 I I~~~INTENTIONALLY BLANK ORII L NO Exercise 90 (Sheet E)A NEQ I OCATION ll'45HIAC50'X

~I'ILIC tOWCA 4P SUPPLY SYSTEM CONTROLLER/CR ITIQUER INFORMATION CRITIQUE WORKSHEETS PACE Li e Horksheet for: OSC EVAI VATOR NAME ORCANIZATION (Office phone)(If applicable):

Item Alert Plant PA announcement completed.

OSC declared activated.

First reentry team dispatched from OSC to (specify area and task)'ntire Protected Area controlled evacuation Plant PA announcement completed.

OSC staff initial habitability monitoring in center.OSC dispatched reentry team to measure rad readings tn protected area..Communications support personnel arrived from EOF.OSC staff secured from drill/exercise.

Other items warranting input (If applicable):

PET direction and control (relieved CR).HP PASS sample called for.HP PASS team dispatched.

Extra Emergency Response Organization members dispatched to PSF (simulated

-sent back to work).Accountability computer run requested.

Accountability computer printout in OSC.Initial accountability declared complete.HP PASS sample taken.HP PASS analyses complete.968 15250 R2 tl~l INTENTIONALLY BLANK 0 RILL NO Exercise 90 (Sheet E)A$NEO LOCATION WASH I!lOTOY tl'SSIC tOw SA 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE Line Horksheet for: TSC EV UATOR NAME ORCANIZATION (Office phone)TSC declared acti.vated.

On-call PED assumed control from SM/PED.On-call PED announced assumption of PED from SM over PA.EAL recognized by PED.Declared by PED.Crash call completed.

Alerting tone sounded.SAE PA announcement completed.

NRC notification completed.

EAL recognized by PED.Declared by PED.Crash call completed.

Alerting tone sounded.Plant PA announcement completed.

NRC notification completed.

Declared by PED.Crash call completed.

Plant PA announcement completed.

PED and RM declared emergency phase terminated.

TSC secured from drill/exercise.

Other items warranting input (if applicable):

PED passed RM duties to on-call EOF RM.PA announcement of RM duties relieved.PED informed of habitability status of PAP/CAS.PED ordered movement of perimeter/CAS staff.PED informed of completion of establishment of road blocks.(simulated

-sent back to work).P F 966.15250 R2 (144)

~~~INTENTIONALLY BLANK OR ILJ NO Exercise 90 (Sheet E)P NEO I OCATION ltASHISOZO'X JI'SIC POWCR 43 SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE Li Horksheet for: CAS EVALUATOR NAME 0 CANIZATION (Office phone)(If applicable):

Liam Unusual Event radio announcement completed.

Alert radio announcement completed.

Site Area Emergency radio announcement completed.

General Emergency radio announcement completed.

De-escalation of emergency radio announcement completed.

OSC reentry team measured dose rates in CAS.CAS staff secured fram the exercise.Other items warranting input (is applicable):

968 15250 RZ ll~l INTENTIONALLY BLANK ORILl NOo Exercise 90 (Sheet E)A EO QCA WASH I'%C10'5~I'LIC POw<R 4J SUPPLY SYSTEM CONTROLLER/CR ITIQUER INFORMATION CRITIQUE WORKSHEETS PACE e Line Horksheet for: Supply System Decision Center (SSDC)EVAI VATQR NAME ORGANIZATION (Office phone)JJzp (If applicable):

EOF declared activated.'n-call RH assumed command from PED.PA announcement that EOF is operational.

PA announcement of hazards.PA announcement that EOF RH has assumed the RH duties.PA announcement of classification changes.Aware of Protected.

Area Evacuation (specify type):.Exclusion area evacuation ordered by RH.SSDC secured from drill/exercise.

Other items warranting input: PED and RH declared emergency phase completed.

968-15250 82 l1~l INTENTIONALLY BLANK ORII L NO Exercise 90 (Sheet E)A EO LOCATION WASH I'%Cl0%tV~SIC POWSA 43 SUPPLY SYSTEM CONTROLLER/CRIT!OVER INFORMATION CRITIQUE JYORKSHEETS PACE Li H rksheet for Secvrity Decision Center (SDC)EVALUATOR NAME 0 CANIZATION (Office phone)(If applicable):

None.Other items warranting inpUt.968-15250 R2 (1~)

INTENTIONALLY BLANK ORIEL NO+xercise 90 (Sheet E)WASH IXCTO'%I OLIC tOWt%4P SUPPLY SYSTEM CONTROLLER/CR)TIQUER INFORMATION CRITIQUE WORKSHEETS me Line Horksheet for: EOF Communication Center (EOFCC)EV I VATOR NAME ORCANIZATION (Office phone)Qgp (If applicable):

Simulated call for fire trucks.Crash calls completed.

Part IIA responders identified.

Part IIB responders identified.

EOF PA announcement completed.

Part III notifications.

completed.

Crash calls completed.

Part IIA responders identified.

Part IIB responders identified.

EOF PA announcement completed.

Part III notifications completed.

Crash calls completed.

Part IIA responders identified.

Part IIB responders identified.

EOF PA announcement completed.

Part III notifications completed.

Part IV notifications completed.

Crash calls completed.

Part IIA responders identified.

Part IIB responders identified.

EOF PA announcement completed.

Part III notifications completed.

Part IV notifications completed.

968.15250 R2 Ilail ORII L NO Exercise 90 (Sheet E)ASSICNCD LOCATION WASHliOTOS tI'LIC tOlett 43 SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS ACE Time Line Horksheet for: EOF Communication Center (EOFCC)EVALUATOR NAME Continued 0 RCANIZATION (Office phone)Crash calls completed.

Part IIA responders identified.

Part IIB responders identified.

EOF PA announcement completed.

Part III notifications completed.

Part IV notifications completed.

EOF secured from exercise.Other items warranting input.968 15250 R2 l144l DRIL I NO+Exercise 90 (Sheet E)AASHIXCTO~

~V~LIC tOwEA 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS ime Line Horksheet for: MUDAC VAI VATOR NAME 0 CANIZATION (Office phone)Qmp (If applicable):

HUDAC activated.

State MUDAC staff arrived.DOE-RL MUDAC staff arrived.First Supply System field team dispatched from MUDAC.Last Supply System field team dispatched from HUDAC.Contact with State Field Teams.First MUDAC dose pro)ection completed.

Plume definition achieved by MUDAC staff.First dose pro]ection map submitted by HUDAC staff to REH.First field team status map submitted by MUDAC staff to REH.Need for KI evaluated.

KI recommendation (Yes/No)to REM.P Other items warranting input: MUDAC secured from drill/exercise.

968 15250 R2 ll~l INTENTIONALLY BLANK ORILL NO Exercise 90 (Sheet E)'AASNIXC'I0'5

~I'1IC POWCI 43 SUPPLY SYSTEM CONTROLLER/CR ITIQUER INFORMATION CRITIQUE WORKSHEETS PAGE GNEO I OCATION ime Line Horksheet for: Technical Data Center (TDC)EVALUATOR NAME 0 GANIZATION (Office phone)TDC activated.

Other items warranting input: TDC secured from drill/exercise.

968.15250 R2 l1~)

INTENTIONALLY BLANK DRILLS NOo Exercise 90 (Sheet E)L, C ION II'ASNIWClON

~I'OLlC POWCA 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE ime Line Worksheet for: Offsite Agency Coordination Center (OACC)EVAI UATOR NAME 0 CANIZA ION (Office phone)OACC activated.

Other items warranting input: OACC secured from drill/exercise.

968.15250 R2 11i INTENTIONALLY BLANK QRILL NOo Exercise 90 (Sheet E)WASllliCTO'4 tl'FLIC POWCA 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS ime Line Horksheet for: Field Teams EVALUATOR NAME ORCANI?ATION (Office phone)Lima (If applicable):

2m Table B.l field team members present (6).First field team ready for deployment.

Last field team ready for deployment.

First field team reading above background at (specify Grid location)River Evac Field Team at Leslie Groves Park.First air sample ordered.First air sample results reported to HUDAC.Contamination boundaries established.

Last field team secured from the drill/exercise.

Other items warranting input: 968-15250 R2 I 1~)

INTENTIONALLY BLANK DRILL NO xercise 90 (Sheet E)NED I OCATION WASNI'MoIOI

~TILIC JOWKI 43 SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CR ITIOUE WOR KSHEETS PACK 1me Line Horksheet for: HP Center (HPC)VALUATOR NAME O CANIZATION (Office phone)HPC activated.

HPC secured from the drill/exercise.

Other 1tems warranting input:.968 15250 R2 ll~l INTENTIONALLY BLANK OR ILL NO xercise 90 (Sheet E)NEO I OCATION wA$NISCToi tosllc towsi 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE.Time Line Worksheet for: JIC EVALUATOR NAME ORCANIZA ION (Office phone)JIC activation order g1ven.JIC declared activated.

JIC Media telephone team phone lines opened.JIC Public Information team phone lines opened.First news conference started.News releases (list t1me distribut1on MIIIglpM and ma)or contents, e.g., phone team telephone numbers, classification, PAD identity of man down): JIC phone teams secured from drill/exercise.

JIC secured from dri1 1/exerci se.Other items warranting input: 968.15250 RZ l1~)

INTENTIONALLY BLANK DRILL NOe xercise 90 (Sheet E)NED I OCATION'wA$NIxoTox Fl'Llc powco 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE ime Line Horksheet for: Counties EOC EV LVATOR NAME ORCANIZA ION (Office phone)Imp (If applicable):

Counties declaration of emergency signed.Counties EOC secured from drill/exercise.

Other items warranting input: 968 15250 RZ ll~)

INTENTIONALLY BLANK 0 RILL NO Exercise 90 (Sheet E)%4$HliCTOY tt'SLIC tOWCA 4j SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS e PACE GNEO I OCATION Time Line Horksheet for: State EOC EVALUATOR NAME 0 CANIZATION (Office phone)(If applicable):

Liam State declaration of emergency signed.State EOC cell secured from drill/exercise.

Other items warranting input: 968.15250 RZ ll~)

I9~0>0'+0+>"~INTENTIONALLY BLANK ORILL NO WASHIWCS0%

PI'LIC tOW SA 43 SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE xercise 90 (Sheet E)CNEO I OCATION Time Line Norksheet for: Control Cell EVALUATOR NAME ORGANIZA ION (Office phone)(If applicable):

Lim First call completed to JIC media phone team.First call completed to JIC public information team First EBS broadcast completed (specify PAD)Control cell secured from drill/exercise.

Other items warranting input: 968.15250 R2 l1~)

INTENTIONALLY BLANK xercise 90 (Sheet F)W45IIIWCTO%

~I'LIC tOWC5 43 SUPPLY SYSTEM CONTROLLER/CR ITIQUER INFORMATION CRITIQUE WOR KSHEETS PACE.o1 iNEO I OCATION Evaluation Questions for: Control Room (CR)(Simulator)

VALUATOR NAME O CAN>raTiON (Office phone)A.Here operations free of shortcomings relative to the following objectives (negative responses should result in an Unfavorable Observation)?

1?2?2C3)?3?3C2)?3C3)?4 4C1)?4C2)?4C3)?6?10C1)?13?13C1)?16?35?Here INPO suggestions (from their February 3, 1989 drill assistance visit)heeded?l.Absences of the SH from the control room limited so he can provide more direction?

2.The STA used to provide oversight of plant status and to advise the CR staff'?3.A Control Room communicator assigned to assist the SM without distracting the STA from plant condition monitoring?

966.15250 R2{1~i INTENTIONALLY BLANK W45HIXClO'X tt'LIC I'OWCA 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER iNFORMATION CRITIQUE WORKSHEETS Exercise 90 (Sheet F)NEO I OCATION Evaluation Questions for: OSC EVALUATOR NAME 0 CANI EAT ION (Off i ce phone)ot Here operat1ons free of shortcomings relative to the following ob)ectives (negat1ve responses should result 1n an Unfavorable Observation)?

2?2C3)?3?3cl)?4?4cl)?4C2)?4C3)?5cl)?5C2)?6?16'?35?B.If appl1cable, were INPO suggestions (from their February 3, 1989 drill assistance visit)heeded?l.Reguired repair act1ons communicated clearly from the TSC, along with the appropriate sense of urgency'?2.Reports submitted to the TSC on condit1ons preventing response actions from being completed?

3.Reentry team format1on and dispatch t1me minimized by: The conduct of technical and rad briefings in parallel with other act1vi-ties, such as the gathering of tools, drawings and procedures, and the donning of anti-Cs?The use of staff not part of the teams being dispatched to help departees don their ant1-Cs and SCBAs?3.Some personnel dressed out prior to team formation?

Standby personnel moved to a staging area outside of the OSC?The use of abbrev1ated rad briefings for teams dispatched with a HP Tech?The spotting of high range dosimetry in the OSC?Noise controlled to a level that does not distract response personnel or inter-fere with commun1cations?

968 15250 RR Ilail INTENTIONALLY BLANK ORIU NOo Exercise 90 (Sheet F)j%45HIXCTO%

Pl'LIC POWCA 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PAGE oI valuation Questions for: TSC V LUATOR NAME (Office phone)0 R0 AN I EAT I 0 N A.'ere operations free of shortcomings relative to the following ob)ectives (negative responses should result in unfavorable observations)?

1?lcl)?2?2C3)?3?3C2)?3C3)?4?4C1)?4C2)?4C3)?5 7 5C2)?6?13?13C1)?16?26?35?B.Here INPO suggestions (from their February 3, 1989 dri.ll assistance vis1t)heeded?2.3.Required, repair act1ons communicated clearly to the OSC along with the appropriate sense of urgency?Follow up 1nitiated to assure response act1ons are progress1ng as expected?OSC reports rendered to the TSC on any cond1tions that prevent response act1ons from being completed?

968.15250 82 ll~)

INTENTIONALLY BLANK OR ILL NO xercise 90 (Sheet F)WA5HliCTO%

POOUC IONIAN 43 SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CR ITI QUE WOR KSHEETS PACE valuation Questions for: CAS EVALUATOR NAME ORCANIZATION (Office phone)Here operations free of shortcomings relative to the following objectives (negative responses should result in Unfavorable Observations)'

2?3?4 4C1)?4C2)?5?5C2)?6?6C1)?6C2)?13?16?26?35?968.15250 RZ l 1~)

INTENTIONALLY BLANK ORILL NOo Exercise 90 (Sheet F)NEO LOCATION=~~wA$NIxo'TO%~v~LIc powco 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE valuation Questions for: Supply System Deci s1on Center (SSDC)EVALUATOR NAME 0 CANIZAT ION (Office phone)Here operat1ons free of shortcomings relat1ve to the following ob)ectives (negative responses should result in Unfavorable Observations)?

1?lcl)?2?2C3)?3?4 4C1)?4C2)?4C3)?5?5C2)?6?13?13C1)?16?26?5 968 15250 82 ll~l INTENTIONALLY BLANK DRILLS NO Exercise 90 (Sheet F)WASNIXOT 0'5 PO~LIC POWCR 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACE valuation Questions for: Security Decision Center (SDC)EVALUATOR NAME 0 CANIZA ION (Office phone)Here operations free of shortcomings relative to the following objectives (negative responses should result in Unfavorable Observations)?

2?2C3)?3?4 4C2)?5 5C2)?6 13.?16 35 96B-15250 RZ (1~)

INTENTIONALLY BLANK PR ILL NOs xercise 90 (Sheet F)WASNL)GTOÃ

~V~LIC JOWCI 4P SUPPLY SYSTEM)CONTROLLER/CRITIQUER INFORMATION CRITIQUE WOR KSHEETS PACE I ot Evaluation Questions for: EOF Communication Center (EOFCC)KVALUATOR NAMK'".(OW'ce phone)Were operations free of shortcomings relative to the following ob)ectives (negative responses should result in Unfavorable Observations)?

1?lcl)?2?2C4)?4?4C1)?5?13?13C1)?

INTENTIONALLY BLANK ORIEL NOe Exercise 90 (Sheet F)NEO I.OCATION WASHISGTO'5 tl'SJIC POWCS 4P SUPPLY SYSTEM CONTROLLER/CR ITIQUER INFORMATION CRITIQUE WORKSHEETS PACE Evaluation Questions for: Offsite Agency Coordination Center (OACC)EVAI UATOR NAME 0 CANIZATION (Office phone)Here operations free of shortcomings relative to the following ob]ectives (negative responses should result in Unfavorable Observations)?

2?2C3)??4C1)?4C2)?5?'C2)?968 15250 R2 l1~)

INTENTIONALLY BLANK ORILL NOo xercise 90 (Sheet F)wA$HIxo'coN~\'Illc lowe%4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PAG E NEO LOCATION valuation Questions for: Technical Data Center (TDC)E ALVATOR NAME 0 GANIZATION (Office phone)Here operations free of shortcomings relative to the following objectives (negative responses should result in Unfavorable Observations)?

2?2C1)?2C3)?4?4C2)??5C2)?968.15250 RZ ll~l INTENTIONALLY BLANK ORILL NQ WASIIIACTOÃ PI SLIC tOW CA 43 SUPPLY SYSTEM, CONTROLLER/CRITIQUER INFORMATION:

CRITIQUE WORKSHEETS

'ACK xercise 90 (Sheet F)NKO LOCATION valuation Questions for: MUDAC KVALUATOR NAMK 0 R CAN I ZAT ION: (Office phone)Were operations free of shortcomings relative to the following ob]ectives (negative responses should result in Unfavorable Observations)?

1 2?ZC3)?3 4 4C2)?5 5C2)?6 7 8 10?13?13C1)?13C2)?16 968.15250 R2 l1~I INTENTIONALLY BLANK OR ILL NOe xercise 90 (Sheet F)WASHINGTO'V I'\'SLIC JOWEII 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACK NKO LOCATION Evaluation Questions for: HP Center (HPC)EVALUATOR NAMK 0 GANIZATION (Office phone)Were operations free of shortcomings relative to the following objectives (negative responses should result in Unfavorable Observations)?

2?2C3)?3?4?4C2)?5?6?8?16?968-15250 RZ ll~l INTENTIONALLY BLANK ORILL NOo ercise 90 (Sheet F).~~~~WASNIICTO'%

L'ILIC JOWCR 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS PACK CNEO LOCATION valuation Questions for: Field Teams EVALUATOR NAME)Once phone)Were operations free of shortcomings relative to the following ob)ectives (negative responses should result in Unfavorable Observations)?

2?.3?4 4C2)?5?6?6C3)?6C4)?7?8?16?968-15250 RR I 1~)

INTENTIONALLY BLANK ORILL NQo xercise 90 (Sheet F)WJISII I%Of OX~\'LIC JOWCA 4P SUPPLY SYSTEM CONTROLLER/CR IT IQU ER I 8 FORMATION CRITIQUE WORKSHEETS

'ACE I of CNEO LOCATION, Evaluation Questions for: JIC EVALUATOR NAME ORGANIZATION (Office phone)Here operations free of shortcomings relative to the following objectives (negative responses should result in Unfavorable Observations)?

2?2C3)?4?4C1)?4C2)?5?SC2)?13?14?14C1)?14C2)?14C3)?14C4)?14C5)?15?I4 c i,,P," j'I I I~968.15250 R2 I1~)

INTENTIONALLY BLANK wnssss.'sGToss et itic nowan 44 SUPPLY SYSTEM CONTROLLER/CRIT)

QUER INFORMATION CRITIQUE WOR KSHEETS xercIse 9b (Sheet F)Evajuatfon 5uest/ons for: State EOC PACK I of EVALUATOR ff AMK': '50%ce" phone)Here operations free of shortcomings relative to the following ob]ectives (negative responses should result in unfavorable Observations)?

2?4?5 SC2)?7?8?9?,.";~s aA>sf"~E.to'S 968-1S250 R2 ll~)

L>6~7 lt INTENTIONALLY BLANK xercise 95 (Sheet F)WA5HIVCTO'X rL'LIC JowIA 4P SUPPLY SYSTEM, CONTROLI ER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS

'ACE I vatuafIon questions for: Counties EOC EVALUATOR NAME: Mffce phone)Here operations free of shortcomings relative to the following ob)ectives (negative responses should result in unfavorable Observations)?

2?4 5 5C2)?11?12?12C1)?12C2)?12C3)?12C4)?18?18C1)?19?20,?g6'A.lf"."JARt!!)k",.'"Ãi ncc icocn On<t.qp>

INTENTIONALLY BLANK ercise 90 (Sheet F)WASH I'VOTO%PL~LIC JOW CS 4rP SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION:

CRITIQUE WOR KSHEETS PAGE oC GNEO LOCATION evaluation Questions for: Control Cell EVALUATOR NAME."(OW'ce phone)Here operations free of shortcomings relative to the following objectives (negative responses should result in Unfavorable Observations)?

4?13?14.?14C1)?15?a 8"~z"JIV ohio.1oooh Ro t1.Rdl JFt'rrtrttretetetrAIeerrrttererre M4eeeterrte I eretr'Iteeri4ett Steeererrrl eie e tr~t'"e,e,', etteer~et'e~~dee>>r r g ro<<Ct eP~~lot.qgtr'.

a~r.,fl'h'Ir.~r,-", re@=I T~, r 93f'9L<P9i.~>>

2".', 9" 9F'h'id"'ee J fl r., rid'Pret e (t d'Pe~g edge c"+)c.~,e'd'p AA e,r, e A erLcd,tr~.b':,re~~Lh t~, C Ce~re p lAO>~'t>~3hrreg'p)'r ll e4 INTENTIONALLY BLANK e g lC'Po56,e 93Pr.<tll r~e".g l"'GAr>~':: r.D<er~~'PG)waVWerWrrreaecwvswerrrarettweerttraeetteatrrrmeeerreerttre ow~<<~~et re eaeeawwae~~em teerrreveaerrrreeeeeeaacre tr WASII IIIOSOII~\~LIC IOWSR 4P SUPPLY SYSTEM.CONTROLLER/CRITIQUER INFORMATiON:

CRITIQUE WORKSHEETS

" Generic Drill/Exercise Example (Sheet G)Sample Unfavorable Observation for (Center/team):

MUDAC (Number): 3 EVALUATE tSAhM Tom Uatman A.Relevant Objective (from Section IA): (%face phone)8000 B.Findings<who, what, when, where, consequences, violation):

f r w w Cause(s)(from Basic Root Cause Determination at Section IIIC): D.Feedback (complete for personnel performance category):

1.Involved person(s)briefed on findings: Yes, No.2.Root cause analysis attached: Yes, No.

(NI el)i MTli~293fl Ir J JP 144 g f li~~~"~Q hi~'..i.~~9kb INTENTIONALLY BLANK WASHI ACTOR tL~I.IC rowC A 4rk SVPPLY SYSTEM, CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS

'eneric t)rill/Exercise Example (Sheet G)~ampIe UnVavorable Observation for (Center/team):

JIC (Number): 5 PAGE I oC EVAL.UATOf

+MFp tSVVce phone)5000 A.Relevant Ob]ective (from Section IA): B.Findings (who, what, when, where, consequences, violation):

r w'5~'hi"~K~C4 CK A~&>A.~W>>0 aL N'8 Y.'.JAROI1Y~1:H'f C.Cause(s)(from Basic Root Cause'Oetermination at Section IIIC): mm r D.Feedback (complete for personnel performance category):

1.Involved person(s)briefed on findings:~Yes, No.2.Root cause analysis attached: Yes,~No.OCR.166%fl O'P I1.Adl INTENTIONALLY BLANK WACNIACCOÃ tl~llC COWC1 4P SUPPLY SYSTEM CONTROLLER/CRITIQUER INFORMATION CRITIQUE WORKSHEETS

" Genericbr)11/Exerci se Exampl e (Sheet G)ample Unfavorable Observation for (Center/team):

OSC (Number): 17 PAGE I OC EVALUATQR NAME roger Heinz A.Relevant Objective (from Section IA)::$5Vce phone)2000 B.Findings (who, what, when, where, consequences, violation):

,,~'CC~" V~~~~~~~~Qf4~~ij CjL~Cause(s)(from Basic Root Cause Determination at Section IIIC): D.Feedback (complete for personnel performance category):

1.Involved person(s)briefed on findings: Yes,~No.2.Root cause analysis attached:~Yes, No.

INTENTIONALLY BLANK WASHINGTON PUBLIC POWER SUPPLY SYSTEM EVALUATOR LOG TIME EVENT COMMENT 968-16223 Rl Il<4)

INTENTIOt ALLY BLANK WASHINGTON PUBLIC POWER SUPPLY SYSTEM EVALUATOR LOG TIME EVENT COMMENT%g+gAe CSR 4.tM@a6%E I'AJ9>5"IA 6:"TP2~N.l 968.16223 R1 (1~)

INTENTIONALLY BLANK.

IV.SUPPORTING INFORMATION A.Co ies of Procedures to be Im lemented-Copies of implemented EPIPs will be made available to all controllers and evaluators.

B.Other Su ortin Information

-None.IV"A-1 INTENTIONALLY BUNK t IA-