Informs That as Outlined in 950807 Telcon,Listed Info Included Into Procedure FFD-8,Rev 4 Effective 950808,as Addl C/A in Order to Resolve FFD Testing Procedure Deviation from 950213 Response to NOV Dtd 950113
ML17309A587
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/14/1995
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508230364
Download: ML17309A587 (3)


Text

PRIORITY (ACCELERATED RZDS PROCESSING)

SUBJECT:

Informs that as outlined in 950807 telcon,listed info included into procedure FFD-8,Rev 4 effective 950808,as addi C/A in order to resolve FFD testing procedure deviation from 950213 response to NOV dtd 950113.DISTRIBUTION CODE: A022D COPIES RECEIVED:LTR I ENCL 0 SIZE:<2 TITLE: Fitness for Duty Program: Blind Performance Test/Other NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

I 05000244 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9508230364 DOC.DATE: 95/08/14 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 P AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

INTERNA RECIPIENT ID CODE/NAME PD1-1 P NRR DRPM/PSGB RGNl COPIES LTTR ENCL RECIPIENT ID CODE/NAME JOHNSON,A NRR/DRPM/PERB NUDOCS-ABSTRACT COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D 0 N NOTE TO ALL"RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 vP AND ROCHESTER GAS AND ELECTRIC CORPORATION

~89 FASTAVENUE, ROCHESTER, N.Y ldbd9-0001 ARFA COOE716 Sd6.27M ROBERT C.MECREDY Vice President Nuclear Operotions August 14, 1995 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-1 Washington, D.C.20555

Subject:

Fitness for Duty Program Additional Corrective Actions R.E.Ginna Nuclear Power Plant Docket No.50-244 Ref.(a): R&f.(b): Letter from R.C.Mecredy (RGit'E)to Allen R.Johnson (NRC),

Subject:

Reply to a Notice of Violation, dated February 13, 1995 NRC Inspection Report 50-244/94-028 (Notice of Violation) dated January 13, 1995

Dear Mr.Johnson:

As outlined in a conference call between RGGE (R.Mecredy, J.Widay, L.Hauck, R.Teed, J.Peters)and the NRC (G.Smith, J.Joyner, D.Limroth, E.King)on August 7, 1995, the following information has been'included into procedure FFD-8, Rev.4 effective 8/8/95, as additional corrective action.This revision was necessary in order to resolve a fitness for duty testing procedure deviation from our response to the NOV, Reference (a), concerning testing for backshift personnel.

Reference (b)documented the NRC Notice of Violation.

Wordin in FFD-8 Rev.4"If a backshift worker is selected for a random drug and alcohol test, the test will be conducted before the worker's shift ends.Conducting the test.before the shift ends will avoid predictability in the time of testing.However, if the worker is not available, the worker will be tested during the next scheduled work shift." Ver ruly ours, Robert C.Mecre 2wC2 r Q 95082303M 950814 PDR ADOCK 05000244 9 PDR GAHi391 xc: Mr.Allen R.Johnson (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector