ML13224A247

From kanterella
Revision as of 13:55, 4 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Millstone, Units 1, 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, and Isfsis, Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program -
ML13224A247
Person / Time
Site: Millstone, Surry, North Anna, 07200055, 07200021  Dominion icon.png
Issue date: 08/06/2013
From: Blasioli P A
Dominion, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
13-126B
Download: ML13224A247 (3)


Text

.1Dominionr' Dominion Resources

Services, Inc.Innsbrook Technical Center5000 Dominion Boulevard, 2SE, Glen Allen, \'A 23060Safeguards Information August 6, 2013Re: 10 CFR 50.5410 CFR 72.186U.S. Nuclear Regulatory Commission Attention:

Document Control DeskWashington, D.C. 20555-0001 Serial No.:NL&OS/MAE:

Docket Nos.:DOMINION NUCLEAR CONNECTICUT, INC.VIRGINIA ELECTRIC AND POWER COMPANYMILLSTONE POWER STATION UNITS 1, 2, AND 3 License Nos.:NORTH ANNA POWER STATION UNITS I AND 2SURRY POWER STATION UNITS I AND 2AND ASSOCIATED ISFSIsSUBMITTAL OF SECURITY PLAN, TRAININGAND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN,AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)SECURITY PROGRAM -REVISION 1813-126BRO50-245/336/423 50-338/339 50-280/281 72-2/16/47/55/56 DPR-21/65 NPF-49NPF-4/7DPR-32/37 SNM-2501/2507 Pursuant to 10 CFR 50.54(p)(2) and 10 CFR 72.186(b),

Revision 18 of Millstone, North Annaand Surry's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, andIndependent Spent Fuel Storage Installation Security Program is provided as an enclosure tothis letter. This plan became effective August 3, 2013. The changes that were made to theplan did not decrease the safeguards effectiveness of the plan.The enclosed material contains Safeguards Information as defined by 10 CFR 73.22 and itsdisclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of1954, as amended.If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Sincerely, Paul A. BlasioliDirector Nuclear Protection Servicesand Emergency Preparedness for Dominion Nuclear Connecticut, Inc.Virginia Electric and Power CompanyClassified By:Name: Dan CriswellTitle: COORD NUCLEAR SECURITY PROGRAMSOrganization:

Nuc. Protection Services/

DominionEffective Date: July 31, 201311Unauthorized Disclosure Of Safeguards Information Will BeISubiect To Civil And Criminal Sanctions IINOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THEENCLOSURE, THIS LETTER IS "DECONTROLLED."

Safeguards Information 0 KSSZ(vncc> ý,

Safeguards Information Serial No. 13-126BSec., T&Q, and Conting.

Plan Submittal Page 2 of 3Enclosure (Safeguards Information)

Commitments made by this letter: Nonecc: U. S. Nuclear Regulatory Commission, Region IAttn.: Regional Administrator 2100 Renaissance Blvd.Suite 100King of Prussia, PA 19406-2713 U. S. Nuclear Regulatory Commission, Region IIAttn.: Regional Administrator 245 Peachtree Center Ave., NE, Suite 1200Atlanta, Georgia 30303-1257

Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. J. M. Goshen (Without Enclosure)

NRC Project ManagerU. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2MOne White Flint North11555 Rockville PikeRockville, MD 20852-2738 Ms. J. Davis (Without Enclosure)

NRC Project ManagerU. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2MOne White Flint North11555 Rockville PikeRockville, MD 20852-2738 Mr. S. J. Giebel (Without Enclosure)

NRC Project Manager Millstone Unit 1U. S. Nuclear Regulatory Commission Mail Stop T-8 F5Two White Flint North11545 Rockville PikeRockville, MD 20852-2738 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THEENCLOSURE, THIS LETTER IS "DECONTROLLED."

Safeguards Information Safeguards Information Serial No. 13-126BSec., T&Q, and Conting.

Plan Submittal Page 3 of 3Ms. N. S. Morgan (Without Enclosure)

NRC Project Manager Millstone Units 2 & 3U. S. Nuclear Regulatory Commission Mail Stop 0-8-C 2AOne White Flint North11555 Rockville PikeRockville, MD 20852-2738 Ms. K. R. Cotton (Without Enclosure)

NRC Project Manager SurryU. S. Nuclear Regulatory Commission Mail Stop 0 8G-9AOne White Flint North11555 Rockville PikeRockville, MD 20852-2738 Dr. V. Sreenivas (Without Enclosure)

NRC Project Manager North AnnaU. S. Nuclear Regulatory Commission Mail Stop 0 8G-9AOne White Flint North11555 Rockville PikeRockville, MD 20852-2738 Ms. L. A. Kauffman (Without Enclosure)

NRC Inspector 2100 Renaissance Blvd.Suite 100King of Prussia, PA 19406-2713 NRC Senior Resident Inspector (Without Enclosure)

Millstone Power StationNRC Senior Resident Inspector (Without Enclosure)

North Anna Power StationNRC Senior Resident Inspector (Without Enclosure)

Surry Power StationNOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THEENCLOSURE, THIS LETTER IS "DECONTROLLED."

Safeguards Information