ML040340697

From kanterella
Jump to navigation Jump to search
Connecticut, Inc. Millstone Power Station Units 1, 2 and 3 Physical Security Plan, Revision 46
ML040340697
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/27/2004
From: Grecheck E
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
04-014
Download: ML040340697 (2)


Text

.. '73$1:'

RN 1.4 Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road A-:i VDominion-

1"INP )'

'4 Waterford. CT 06385 January 27, 2004 U.S. Nuclear Regulatory Commission Serial No.04-014 Attention: Document Control Desk NL&OS/MAE: R0 Washington, D.C. 20555-0001 Docket Nos. 50-245/336/423 License Nos. DPR-21/65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1, 2 AND 3 PHYSICAL SECURITY PLAN, REVISION 46 Pursuant to 10 CFR 50.54(p)(2), Dominion Nuclear Connecticut, Inc. (DNC) is submitting revised pages to the Physical Security Plan for Millstone Power Station associated with Revision 46 (Attachment 1). This plan revision became effective December 12, 2003. A description of the changes is provided in Attachment 2. We have determined that these changes do not decrease the safeguards effectiveness of the plan. contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Attachments (Original and three copies)

Commitments made by this letter: None ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED. /11

cc: U. S. Nuclear Regulatory Commission (two copies)

Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 Mr. R. Prince (w/o Atts.)

NRC Inspector Millstone Power Station Unit 1 Mr. S. M. Schneider (w/o Atts.)

NRC Senior Resident Inspector Millstone Power Station Mr. D. G. Holland (w/o Atts.)

NRC Project Manager Millstone Power Station Unit 1 Mr. R. M. Pulsifer (w/o Atts.)

NRC Senior Project Manager Millstone Power Station Unit 2 Mr. V. Nerses (w/o Atts.)

NRC Senior Project Manager Millstone Power Station Unit 3 ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.