MONTHYEARIR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML24081A1532024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves 2024-09-27
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 18, 2013 James E. Lynch Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 -REVIEW OF THE 2012 STEAM GENERATORTUBE INSPECTION REPORT FOR REFUELING OUTAGE 27 (TAC NO. MF0080)
Dear Mr. Lynch:
By letter dated November 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12326A857),
Northern States Power Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Prairie Island Nuclear Generating Plant (PINGP),
Unit 2. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call concerning the 2012 SG tube inspections at PINGP, Unit 2, in a letter dated May 14, 2012 (ADAMS Accession No. IVIL 12128A415).
The NRC staff has completed its review and concludes that the licensee provided the information required by their technical specifications.
No additional follow up is required at this time. The staff's review of this report is enclosed.
If you have any questions regarding this matter, please contact me at (301) 415-4037.
Sincerely, Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 . Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-306
Enclosure:
Review of 2012 Steam Generator Tube I nspection Report cc w/encl: Distribution via ListServ UNITED STATES NUCLEAR REGULATORY COMMISSION REVIEW OF 2012 STEAM GENERATOR TUBE INSPECTION REPORT FOR REFUELING OUTAGE 27 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 DOCKET NO. 50-306 By letter dated November 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12326A857),
Northern States Power Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Prairie Island Nuclear Generating Plant (PINGP),
Unit 2. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call concerning the 2012 SG tube inspections at PI NGP, Unit 2, in a letter dated May 14, 2012 (ADAMS Accession No. ML 12128A415).
PINGP, Unit 2, has two Westinghouse Model 51 SGs .. Each SG contains 3388 mill-annealed Alloy 600 tubes. Each tube has a nominal outside diameter of 0.875 inches and a nominal wall thickness of 0.050 inches. The tubes were roll-expanded into the tubesheet at both ends for approximately 2.75 inches, i.e., they are expanded for only a fraction of the tubesheet thickness and are considered partial depth hard-rolled tubes. The tubes are supported by a number of . carbon steel tube support plates. The original anti-vibration bars were removed and replaced.
The row one and two tubes were subjected to an in-situ thermal stress relief in May 2000. Many tubes have been roll-expanded into the tubesheet above the original factory roll expansion to permit flaws below these re-rolled locations to remain in service.
In addition to the depth-based tube repair criteria, the licensee is also authorized to apply the voltage-based tube repair criteria for predominantly axially-oriented outside diameter stress corrosion cracking (OOSCC) at the tube support plate elevations.
Although authorized to implement the voltage-based repair criteria, the licensee has not found it necessary to implement these criteria since few, if any, indications subject to this repair criteria have been identified at Unit 2. In addition, the licensee is authorized to leave flaws within the tubesheet region in service, provided they satisfy the F*/EF* repair criterion. The major cause of degradation within the tubesheet region is primary water stress corrosion cracking at the roll transition zones. Secondary side intergranular attack and OOSCC have also been observed at this location.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective
- actions, such as tube plugging, taken in response to the inspection findings.
The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the faU of 2013. Enclosure
-2 Based on a review of the information
- provided, the NRC staff concludes that the licensee provided the information required by the technical specifications.
In addition, the staff concludes that there are no technical issues that warrant follow-up action at this time, since the inspections appear to be consistent with the objective of detecting potential tube degradation and that inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
James E. Lynch September 18, 2013 Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota 1717 Wakonade Drive East Welch. MN 55089-9642 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 -REVIEW OF THE 2012 STEAM GENERATOR TUBE INSPECTION REPORT FOR REFUELING OUTAGE 27 (TAC NO. MF0080)
Dear Mr. Lynch:
By letter dated November
- 16. 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12326A857).
Northern States Power Company (the licensee) submitted information summarizing the results of the 2012'steam generator (SG) tube inspections at Prairie Island Nuclear Generating Plant (PINGP) Unit 2. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call co'ncerning the 2012 SG tube inspections at PINGP, Unit 2. in a letter dated May 14, 2012 (ADAMS Accession No. ML12128A415).
The NRC staff has completed its review and concludes that the licensee provided the information required by their technical specifications.
No additional follow up is required at this time. The staff's review of this report is enclosed.
If you have any questions regarding this matter, please contact me at (301) 415-4037.
Sincerely, IRA! Thomas J. Wengert.
Senior Project Manager Plant licensing Branch 111-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No.
Review of 2012 Steam Generator Inspection Report cc w/encl: Distribution via listServ DISTRIBUTION:
PUBLIC LPL3-1 RlF RidsNrrDorlLpl3-1 Resource RidsNrrLAM Henderson Resource RidsNrrDeEsgb Resource
- AJohnson, NRR RidsRgn3MailCenter Resource KKarwoski, NRR GKulesa, NRR RidsAcrsAcnw
_ MailCTR Resource RidsNrrPMPrairielsland Resource ESGB/BC LPL3-1/BC LPL3-1/PM II NAMIE I TWengert MHenderson SRohrer GKulesa*
n TWengert DATE 09/12113 09/12113 09/12/13 07/26/13 09/18/13
- via memo dated 7/26/13 OFFICIAL RECORD COPY