ML15280A120

From kanterella
Revision as of 19:34, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Notice of Availability of the Shine Final EIS Cover Letter
ML15280A120
Person / Time
Site: SHINE Medical Technologies
Issue date: 10/16/2015
From: Wrona D J
NRC/NRR/DLR/RERGUB
To: Piefer G
SHINE Medical Technologies
Moser M R
Shared Package
ML15280A111 List:
References
DLR-15-0461
Download: ML15280A120 (4)


Text

G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015

Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Piefer:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRC's public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.

As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safe ty issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:

  • SHINE's Environmental Report;
  • the NRC staff's consultation with Federal, State, and local agencies;
  • the NRC staff's independent environmental review; and
  • the NRC staff's consideration of public comments.

A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov

. Sincerely,

/RA/ David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation

Docket No. 50-608

Enclosures:

1. Final EIS
2. Federal Register Notice

cc w/ encls: Distribution List

1. Package:

ML15280A111

2. Letter:

ML15280A120

3. Federal Register Notice: ML15280A139 4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
  • concurrence via e-mail Letter to G. Piefer from D. Wrona dated October 16, 2015

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

DISTRIBUTION

E-MAIL: PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY
Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

Kirsten Cutler, Ph.D. National Security and International Affairs Office of Science and Technology Policy Executive Office Building 1650 Pennsylvania Avenue Washington, DC 20503 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585

Paul Schmidt Manager Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659

Eric P. Heggelund Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 TRTR Newsletter University of Florida Department of Nuclear Engineering Sciences 202 Nuclear Sciences Center Gainesville, FL 32611

Mark Freitag City Manager

P.O. Box 5005 Janesville, WI 53547-5005

Bill McCoy 1326 Putnam Avenue Janesville, WI 53546

Alfred Lembrich 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546

G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015

Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Piefer:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRC's public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.

As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safe ty issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:

  • SHINE's Environmental Report;
  • the NRC staff's consultation with Federal, State, and local agencies;
  • the NRC staff's independent environmental review; and
  • the NRC staff's consideration of public comments.

A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov

. Sincerely,

/RA/ David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation

Docket No. 50-608

Enclosures:

1. Final EIS
2. Federal Register Notice

cc w/ encls: Distribution List

1. Package:

ML15280A111

2. Letter:

ML15280A120

3. Federal Register Notice: ML15280A139 4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
  • concurrence via e-mail Letter to G. Piefer from D. Wrona dated October 16, 2015

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

DISTRIBUTION

E-MAIL: PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY
Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

Kirsten Cutler, Ph.D. National Security and International Affairs Office of Science and Technology Policy Executive Office Building 1650 Pennsylvania Avenue Washington, DC 20503 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585

Paul Schmidt Manager Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659

Eric P. Heggelund Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 TRTR Newsletter University of Florida Department of Nuclear Engineering Sciences 202 Nuclear Sciences Center Gainesville, FL 32611

Mark Freitag City Manager

P.O. Box 5005 Janesville, WI 53547-5005

Bill McCoy 1326 Putnam Avenue Janesville, WI 53546

Alfred Lembrich 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546