Notice of Availability of the Shine Final EIS Cover Letter
ML15280A120
Person / Time
Site: SHINE Medical Technologies
Issue date: 10/16/2015
From: David Wrona
NRC/NRR/DLR/RERGUB
To: Piefer G
SHINE Medical Technologies
Moser M
Shared Package
ML15280A111 List:
References
DLR-15-0461
Download: ML15280A120 (4)


Text

G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Piefer:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRCs public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.

As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:

  • SHINEs Environmental Report;
  • the NRC staffs consultation with Federal, State, and local agencies;
  • the NRC staffs independent environmental review; and
  • the NRC staffs consideration of public comments.

G. Piefer A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosures:

1. Final EIS
2. Federal Register Notice cc w/ encls: Distribution List
1. Package: ML15280A111
2. Letter: ML15280A120
3. Federal Register Notice: ML15280A139
4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
  • concurrence via e-mail OFFICE LA:DLR PM:RERB:DLR PM: DPR OGC BC:RERB:DLR NAME IBetts MMoser SLynch MYoung DWrona DATE 10/ 9 /15 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15 Letter to G. Piefer from D. Wrona dated October 16, 2015

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:

Eric P. Heggelund Jim Costedio Environmental Analysis and Review Licensing Manager Specialist SHINE Medical Technologies, Inc. State of Wisconsin 2555 Industrial Drive Department of Natural Resources Monona, WI 53713 3911 Fish Hatchery Road Fitchburg, WI 53711 Kirsten Cutler, Ph.D.

National Security and International Affairs TRTR Newsletter Office of Science and Technology Policy University of Florida Executive Office Building Department of Nuclear 1650 Pennsylvania Avenue Engineering Sciences Washington, DC 20503 202 Nuclear Sciences Center Gainesville, FL 32611 Randy Howell National Nuclear Security Administration, Mark Freitag NA-212 City Manager U.S. Department of Energy P.O. Box 5005 1000 Independence Ave SW Janesville, WI 53547-5005 Washington, DC 20585 Bill McCoy Paul Schmidt 1326 Putnam Avenue Manager Janesville, WI 53546 Radiation Protection Section Wisconsin Department of Health Services Alfred Lembrich P.O. Box 2659 541 Miller Avenue Madison, WI 53701-2659 Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546

G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Piefer:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRCs public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.

As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:

  • SHINEs Environmental Report;
  • the NRC staffs consultation with Federal, State, and local agencies;
  • the NRC staffs independent environmental review; and
  • the NRC staffs consideration of public comments.

G. Piefer A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosures:

1. Final EIS
2. Federal Register Notice cc w/ encls: Distribution List
1. Package: ML15280A111
2. Letter: ML15280A120
3. Federal Register Notice: ML15280A139
4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
  • concurrence via e-mail OFFICE LA:DLR PM:RERB:DLR PM: DPR OGC BC:RERB:DLR NAME IBetts MMoser SLynch MYoung DWrona DATE 10/ 9 /15 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15 Letter to G. Piefer from D. Wrona dated October 16, 2015

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:

Eric P. Heggelund Jim Costedio Environmental Analysis and Review Licensing Manager Specialist SHINE Medical Technologies, Inc. State of Wisconsin 2555 Industrial Drive Department of Natural Resources Monona, WI 53713 3911 Fish Hatchery Road Fitchburg, WI 53711 Kirsten Cutler, Ph.D.

National Security and International Affairs TRTR Newsletter Office of Science and Technology Policy University of Florida Executive Office Building Department of Nuclear 1650 Pennsylvania Avenue Engineering Sciences Washington, DC 20503 202 Nuclear Sciences Center Gainesville, FL 32611 Randy Howell National Nuclear Security Administration, Mark Freitag NA-212 City Manager U.S. Department of Energy P.O. Box 5005 1000 Independence Ave SW Janesville, WI 53547-5005 Washington, DC 20585 Bill McCoy Paul Schmidt 1326 Putnam Avenue Manager Janesville, WI 53546 Radiation Protection Section Wisconsin Department of Health Services Alfred Lembrich P.O. Box 2659 541 Miller Avenue Madison, WI 53701-2659 Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546