MONTHYEARIR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) IR 05000334/20240102024-08-20020 August 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000334/2024010 and 05000412/2024010 IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) 2024-08-05
[Table view] |
Text
.!eFF REoa{J,s- -%".? d, *, ,?'inriffiUNITED STATESNUCLEAR REGULATORY COMMISSION REGION I21OO RENAISSANCE BLVD.. SUITE lOOKING OF PRUSSIA, PA 1940G2713 November 3, 2015Mr. Christopher HynesManager of TrainingFirstEnergy Nuclear Operating CompanyBeaver Valley Power StationP.O. Box 4Shippingport, PA 1 5077-0004
SUBJECT:
SeptembeT9, 2015, NRCGENERIC FUNDAMENTALS EXAMINATION RESULTS FOR BEAVER VALLEY POWER STATION, UNIT 2(COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROMPUBLIC)
Dear Mr. Hynes:
On September 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) administered thegeneric fundamentals examination (GFE) section of the written operator licensing examination to an employee of your facility.
The applicant passed the exam. Enclosed with this letter are acopy of the final answer key, the grading results for your facility, and a copy of the individual examination answer sheet for the employee.
Please forward the results to the individual alongwith the copies of his respective answer sheet.A copy of the PWR GFE and the answer key are available for your review on the NRC's websiteapproximately 60 days following the examination administration date at:http://www.nrc.qov/reactors/operator-licensinq/qeneric-fundamentals-examinations/past-exams. htmllf you have any questions concerning the examination, please contact me at 610-337-5306.
Operations BranchDivision of Reactor SafetyDocket No. 50-412Enclosures (Non-Public):
'l . September 2015, NRC GFE Grade Reportfor Beaver Valley, Unit 22. lndividual NRC Examination Answer Sheetscc w/o enclosures:
Distribution via ListServ Mr. Christopher HynesManager of TrainingFirstEnergy Nuclear Operating CompanyBeaver Valley Power StationP.O. Box 4Shippingport, PA 15077-0004
SUBJECT:
September 9, 2015, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FORBEAVER VALLEY POWER STATION, UNIT 2(coVERLETTERPUBLlcLYAVAlLABLE,ENcLoSURESWlTHHELDFRoMPUBLIc)
Dear Mr. Hynes:
on september g,2015, the u.s. Nuclear Regulatory commission (NRC) administered the genericfundamentals examination (GFE) section of the writien operator licensing examination to an employee ofyour facility.
The applicant passed the exam. Enclosed with this letter are a copy of the final answeri<ey, the giading results for your facility, and a copy of the individual examination answer sheet for theemptoyeE.
pleise forward ihe results to the individual along with the copies of his respective answersheet.A copy of the PWR GFE and the answer key are available for your review on the NRC's websiteapproiimately 60 days following the examination administration date at:lf you have any questions concerning the examination, please contact me at 610-337-5306.
SincerelY,
/RA/Donald E. Jackson, ChiefOperations BranchDivision of Reactor SafetYDocket No. 50-412Enclosures (Non-Public):
- 1. September2015, NRC GFE Grade Reportfor Beaver ValleY, Unit 22. lndividual NRC Examinalion Answer Sheetscc w/o enclosures:
Distribution via ListServDOCUMENT NAME:ADAMS PACKAGE IG:\DRS\Operations Branch\GFE\2015\BV2 09-09-GFE Resultsltr'docx NOPACKAGE NO.: ML15083A149 fl sulst neviewfl Non-Sensitive tr Sensitive gtrPublicly Available Non-Publicly Available OFFICERI/DRS/OB RIiDRS/OB NAMECBixler . I z/DEJackson fiDATE10/08/15[/3/15OFFICIAL RECORD
.!eFF REoa{J,s- -%".? d, *, ,?'inriffiUNITED STATESNUCLEAR REGULATORY COMMISSION REGION I21OO RENAISSANCE BLVD.. SUITE lOOKING OF PRUSSIA, PA 1940G2713 November 3, 2015Mr. Christopher HynesManager of TrainingFirstEnergy Nuclear Operating CompanyBeaver Valley Power StationP.O. Box 4Shippingport, PA 1 5077-0004
SUBJECT:
SeptembeT9, 2015, NRCGENERIC FUNDAMENTALS EXAMINATION RESULTS FOR BEAVER VALLEY POWER STATION, UNIT 2(COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROMPUBLIC)
Dear Mr. Hynes:
On September 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) administered thegeneric fundamentals examination (GFE) section of the written operator licensing examination to an employee of your facility.
The applicant passed the exam. Enclosed with this letter are acopy of the final answer key, the grading results for your facility, and a copy of the individual examination answer sheet for the employee.
Please forward the results to the individual alongwith the copies of his respective answer sheet.A copy of the PWR GFE and the answer key are available for your review on the NRC's websiteapproximately 60 days following the examination administration date at:http://www.nrc.qov/reactors/operator-licensinq/qeneric-fundamentals-examinations/past-exams. htmllf you have any questions concerning the examination, please contact me at 610-337-5306.
Operations BranchDivision of Reactor SafetyDocket No. 50-412Enclosures (Non-Public):
'l . September 2015, NRC GFE Grade Reportfor Beaver Valley, Unit 22. lndividual NRC Examination Answer Sheetscc w/o enclosures:
Distribution via ListServ Mr. Christopher HynesManager of TrainingFirstEnergy Nuclear Operating CompanyBeaver Valley Power StationP.O. Box 4Shippingport, PA 15077-0004
SUBJECT:
September 9, 2015, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FORBEAVER VALLEY POWER STATION, UNIT 2(coVERLETTERPUBLlcLYAVAlLABLE,ENcLoSURESWlTHHELDFRoMPUBLIc)
Dear Mr. Hynes:
on september g,2015, the u.s. Nuclear Regulatory commission (NRC) administered the genericfundamentals examination (GFE) section of the writien operator licensing examination to an employee ofyour facility.
The applicant passed the exam. Enclosed with this letter are a copy of the final answeri<ey, the giading results for your facility, and a copy of the individual examination answer sheet for theemptoyeE.
pleise forward ihe results to the individual along with the copies of his respective answersheet.A copy of the PWR GFE and the answer key are available for your review on the NRC's websiteapproiimately 60 days following the examination administration date at:lf you have any questions concerning the examination, please contact me at 610-337-5306.
SincerelY,
/RA/Donald E. Jackson, ChiefOperations BranchDivision of Reactor SafetYDocket No. 50-412Enclosures (Non-Public):
- 1. September2015, NRC GFE Grade Reportfor Beaver ValleY, Unit 22. lndividual NRC Examinalion Answer Sheetscc w/o enclosures:
Distribution via ListServDOCUMENT NAME:ADAMS PACKAGE IG:\DRS\Operations Branch\GFE\2015\BV2 09-09-GFE Resultsltr'docx NOPACKAGE NO.: ML15083A149 fl sulst neviewfl Non-Sensitive tr Sensitive gtrPublicly Available Non-Publicly Available OFFICERI/DRS/OB RIiDRS/OB NAMECBixler . I z/DEJackson fiDATE10/08/15[/3/15OFFICIAL RECORD