ML17222A776

From kanterella
Revision as of 16:38, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Environ Operating Rept.
ML17222A776
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/31/1988
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17222A775 List:
References
NUDOCS 8905020311
Download: ML17222A776 (9)


Text

FLORIDAPOWER&LIGHTCOMPANYST.LUCIEUNITNO.2ANNUALENVIRONMENTAL OPERATING REPORT(FPL-88)APRIL198989050203ii 890427RPNUPDRADQCK05000389'

-

ANNUALENVIRONMENTAL OPERATING REPORTI.Introduction TheSt.LuciePlantUnit2Environmental Protection Plan(EPP)requiresthesubmittal ofanannualreportforvariousactivities attheplantsiteincluding thereporting onseaturtlemonitoring

programs, andothermattersrelatedtoFederalandStateenvironmental permitsandcertifications.

Thisreportfulfillsthesereporting requirements.

II.SeaTurtleMonitoring andAssociated Activities Aquaticandterrestrial seaturtlemonitoring programstosatisfySections4.2.1(BeachNestingSurveys),

4.2,3(StudiestoEvaluateand/orMitigateIntakeCanalMortality) and4.2.5(CaptureandRelease,Program)isconcurrently submitted inaseparatereport-(AB-596)preparedbyAppliedBiology,Inc.Studiestoevaluateand/ormitigateintakeentrapment requiredbySection4.2.2oftheEPPhavebeenpreviously performed.

Afinalreportwassubmitted totheOfficeofNuclearReactorRegulation onApril18,1985.Withsubmittal ofthatreport,theEPPrequirement wasfulfilled andwillnotbereaddressed inthisorfuturereports.FPLwillrequestmodification ofcertainsectionsoftheEnvironmental Protection Planrelatedtoseaturtleprograms, toreflectimplementation andsatisfaction ofthoserequirements whichhavebeencompleted asdescribed above.

0 Requirements forreporting onthestatusofalightscreentominimizeturtledisorientation asrequiredbySection4.2.4oftheEPPisongoing.TheAustralian Pinelightscreenlocatedonthebeachdunebetweenthepowerplantandtheocean,isroutinely surveyedtodetermined itsoverallvitality.

Thetreelineissurveyedforanygapsoccurring fromtreemortality whichwouldresultinunacceptable lightlevelsonthebeach.Treesarereplacedasnecessary tomaintaintheintegrity oftheoveralllightscreen.III.OtherRoutineReportsThefollowing itemsforwhichreporting isrequiredarelistedbysectionnumberfrom.theEnvironmental Protection Plan(EPP):5.4.1.(a)EPPNONCOMPLIANCES ANDCORRECTIVE ACTIONSTAKEN4Nononcompliances underEPPSection5.4.1(a)weredetermined tohaveoccurredduring1988.5.4.1~(b)STATIONDESIGNANDOPERATION CHANGESTESTSANDEXPERIMENTS AFFECTING THEENVIRONMENT Noplantsiteactivities weredetermined tobereportable underSection5.4.1(b)during1988.

5.4.1(c)NONROUTINE REPORTSSUBMITTED TOTHENRCFORTHEYEAR188IN~~ACCORDANCE WITHEPPSUBSECTION 5.4.2:1.Reportconcerning anexceedance oftheNPDESPermitlimitations ofpHandmaximumflowfortheUnit1SewageTreatment Plant;reportedtotheNRConMarch23,1988.2.Reportconcerning anNPDESviolation forlatereporting ofmaximumoncethroughcoolingwatertemperature exceedance; reportedtoNRConMay16,1988.3.Reportconcerning anexceedance ofthemaximumtimeallowedbytheNPDESPermitforchlorination oftheoncethroughcoolingwatersystem;reportedtotheNRConAugust15,1988.4.Reportconcerning thedischarge ofneutralization basinwaterwhichexceededtheNPDESPermitlimitation; reportedtotheNRConDecember14,1988.5.Submittal ofanNPDESPermitmodification requesttoEPA;reportedtotheNRConDecember19,1988.Thefollowing reportsweresubmitted totheNRCfortheyear1988forinformational purposesalthoughnotrequiredunderprovisions ofEPPsubsection 5.4.2:

1.Seaturtleactivities reportdatedMayll,1988forthefirstquarter1988.2.Seaturtleactivities reportdatedAugust15,1988forthesecondquarter1988.3.Seaturtleactivities reportdatedOctober24,1988forthethirdquarter.1988.4.Seaturtleactivities reportdatedJanuary24,1989forthefourthquarter1988.

ktrtkI~