ML17309A555

From kanterella
Revision as of 11:05, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Transmits Requested Changes to 940513 Lar,Revising TS Section 6.0, Administrative Controls & Ack Set of Revised TS Requirements Discussed in LAR Which Will Be Reviewed by NRC at This Time,Per 940803 Telcon W/Nrc
ML17309A555
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/27/1994
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A791 List:
References
NUDOCS 9409290181
Download: ML17309A555 (11)


Text

Fmxaa.X~rV i(ACCELERATED RIDSPROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9409290181 DOC.DATE:

94/09/27NOTARIZED:

YESDOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

ProjectDirectorate I-3

SUBJECT:

Transmits requested changesto940513LAR,revising TSSection6.0,"Administrative Controls"

&acksetofrevisedTSrequirements discussed inLARwhichwillbereviewedbyNRCatthistime,per940803telconw/NRC.DISTRIBUTION CODE:AOOIDCOPIESRECEIVED:LTR IENCLLSIZE:TITLE:ORSubmittal:

GeneralDistribution NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

05000244RECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERN:FILECENTER0ARCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3EXTERNAL:

NOACCOPIESLTTRENCL1111111111111011RECIPIENT IDCODE/NAME PD1-3PDNRR/DE/EELB NRR/DRPWNRR/DSSA/SRXBOC/LFDCBNRCPDRCOPIESLTTRENCL111111111011NOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEIVASTE!CONTACTTIIEDOCUMENTCONTROLDESK,ROOMPI-37(EXT.504-2083)TOELlih!INATEYOURNAlIEPRO~IDISTRIBUTION LISTSI'ORDOCI;MENTS YOUDON"I'EED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR14ENCL12 ANDROCHESTER GASANDELECI1CCORPORAT1ON

~89EASTAVENUE, ROCHESTER, N.Y1d6d9-OOOI ROBERTCMECREOYVicePresident September 27,1994CinnaNudearProduction AREACODE7165'.27OOU.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555

Subject:

Application forAmendment toFacilityOperating LicenseUpgradeofAdministrative ControlsSection6.0Rochester Gas&ElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244

References:

a.LetterfromR.C.Mecredy,RG&E,toA.R.Johnson,NRC,

Subject:

Application forAmendment toFacilityOperating License,UpgradeofAdministrative ControlsSection6.0,datedHay13,1994.b.LetterfromR.C.Hecredy,RG&E,toA.R.Johnson,NRC,

Subject:

Conversion toImprovedTechnical Specifications, datedFebruary28,1994.

DearHr.Johnson,

Rochester GasandElectric(RG&E)previously submitted aLicenseAmendment Request(LAR)whichproposedtorevisetheGinnaStationTechnical Specifications (TS)Section6,Administrative Controls(Ref.a).OnAugust3,1994,aconference callwasconducted betweentheNRCandRG&EatwhichtimeseveralchangestotheLARwererequested bytheNRC.Thisdocumenttransmits therequested changesandacknowledges thesetofrevisedTSrequirements discussed intheLARwhichwillbereviewedbytheNRCatthistime.Theremaining TSchangeswillbedeferreduntiltheconversion oftheentireGinnaStationTSduringtheTechnical Specification Improvement Program(Ref.b).Thefollowing changesasdiscussed inAttachment AtoReference aarebeingrequested atthistime:ta.SectionC.1,changeiv(exceptfortheproposeddeletionofGinnaTS6.8.1.f).

ttb.SectionC.2,changesi,ii(exceptfortheproposeddeletionofTS6.2.2.band6.2.2.c),

iii,iv,v,vii(revisethesubmittal ofRadiological EffluentReleaseReportfromsemiannual toannualonly),ix,andx.c.SectionC.3,changesiv,vi,andvii.i>pitpP'Q's1409290181

'st40927PDRADOCK05000244p fIPp%~\~-WI d.SectionC.4,changev.e.SectionC.7,changesiiiandv.Thesechangesarereflected intheenclosedAttachment 8andCtothisletter.SimilartoReference a,Attachment Bprovidesthemarked-up GinnaStationTSwhichdocuments therequested changeswhileAttachment CprovidestheproposednewTSfollowing thechanges.Sincetheabovechangesareonlyasubsetofthoseoriginally requested inReference a,severaladditional changesarenownecessary toensureacompletespecification.

Theseadditional changesandtheirjustification areprovidedinAttachment A.Theremaining justification ofchanges,safetyevaluation, andnosignificant hazardsandenvironmental considerations providedinAttachment AofReference aremainunchanged.

WerequestthatuponNRCapproval, thisapplication shouldbeconsidered effective immediately andimplemented within60days,oruponNRCapprovalandimplementation ofthegAProgramchanges,whichever islater.Verulyyours,RobertC,MecredSubscribed andsworntobeforemeonthis27thdayofSeptember 1994.NaryublicMDFX634Attachments NsrhRPinessgsg~~NNROECOUNY@g,xc:Mr.AllenR.Johnson(MailStop14DI)PWRProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector Ill>>IIgI'EgE~f..ml4NqdaP~

Hr.GeneEckholtNorthernStatesPowerCompanyPrairieIslandNuclearGenerating PlantRoute2Welch,HN55089Hr.ThomasHalanowski Wisconsin ElectricPower231WestMichiganMilwaukee, WI53201Hs.SherryBernhoftWisconsin PublicServiceP.O.Box19002700NorthAdamsGreenBay,WI54307-9002 Mr.JackStringfellow SouthernNuclearOperating CompanyP.O.Box129540Inverness CenterParkwayBirmingham, AL35201Hr.LeeBushCommonwealth EdisonCompanyZionNuclearStation101ShilohBoulevard Zion,IL60099 C~I!5"lIr ATTACHMENT AJustification ofChangesThejustification forallchangestothecurrentGinnaStationTSareprovidedinAttachment A,SectionCtotheletterfromR.C.Mecredy,RGKE,toA.R.Johnson,NRC,

Subject:

Application forAmendment toFacilityOperating License,.UpgradeofAdministrative ControlsSection6.0,datedMay13,1994.Thejustification foradditional changesnotdiscussed intheMay13,1994letterareprovidedbelow:RevisedtheTableofContentstosupporttherequested changes.I2.3.Thefollowing specifications havebeenrevisedtoprovideafootnotewhichallowsforanalternate titletobedesignated forthespecified position:

a.TS6.2.l.b,6.7.band6.7.d-SeniorVicePresident, Production andEngineering.

b.TS6.4.1-DivisionTrainingManagerc.TS6.13.1-HealthPhysicist Specifying management positions bytitlewithinthetechnical specifications createsalicenseeandNRCburdenwhentitlesarechangedorresponsibilities areshifted.ThecurrentGinnaStationTS6.2.l.arequiresthat"linesofauthority, responsibility, andcommunication shallbeestablished anddefinedfromthehighestmanagement levelsthroughintermediate levelstoandincluding allPlantmanagement positions."

Thefootnoterequiresthatthealternate titlesbespecified intheUpdatedFinalSafetyAnalysisReport(UFSAR)andthatallthetechnical specification requirements applytothealternate title.ThetitleoftheSeniorVicePresident, Production andEngineering hasalsobeenrevisedtoSeniorVicePresident, CustomerOperations.

Thisisanindividual's titlechangeonly.ThisSeniorVicePresident continues tohavecorporate responsibility foroverallPlantnuclearsafetyandischairmanoftheoffsitereviewfunction(i.e.,NuclearSafetyAuditandReviewBoard).ThefootnotefortheSeniorVicePresident, CustomerOperations furtherspecifies thattheuseofanalternate titleforthispositionmustbeperformed inaccordance with10CFR'0.54(a)(3).

Theresponsibilities ofkeyorganization positions, including theSeniorVicePresident, Production andEngineering arespecified intheGinnaStationgAProgram.SincechangestothegAProgramarecontrolled by10CFR50.54(a)(3),

equivalent controlisprovided.

TS6.2.2.aand6.2,2,dandTable,6.2-1 wereremovedfromthetechnical specifications sincetheyduplicate currentregulations asspecified in10CFR50.54(k),

(1),and(m).However,thefollowing shiftcrewrequirements asspecified inTSTable6.2-1arenotcontained withinthecurrentregulations andmustbeaddedtoTS6.2.2:a.Anauxiliary operatorwithfuelinthereactor,b.Asecondauxiliary operatoraboveColdShutdown, and.9409290181 I(ii, 4,5.c.AShiftTechnical Advisor(STA)aboveColdShutdown.

Inaddition, theexception providedinTSTable,6.2-1withrespecttounexpected absencesofon-dutyshiftcrewmemberswasalsoaddedtoTS6.2.2.Also,TS6.2.2.band6.2.2.carerevisedconsistent withNUREG-1431(ITS5.2.2.b).

TS6.13.1wasrevisedtoreplace"healthphysicist" with"radiation protection" inthoseplaceswherehealthphysicist wasagenericreference sincethisdepartment iscurrently identified asradiation protection.

Specificfunctions performed byahealthphysicist werenotrevised.Thisisnotatechnical change.Asubmittal dateofHay1ofeachyearwasselectedfortheRadioactive EffluentReleaseReportsince10CFR50.36aonlyrequiresanannualsubmittal butdoesnotidentifyaspecificsubmittal date.ThelastRGEEsubmittal.

ofthisreportwasonAugust30,1994.Therefore, thenextreportonMay1,1995islessthantherequiredannualsubmittal frequency andisconsistent withthesubmittal dateoftheAnnualRadiological Environmental Operation Report(TS6.9.1.3).Acrossreference tothejustification ofeachproposedchangeisprovidedintheleftmarginofeachGinnaStationTSthathasbeenchangedbyuseofacirclecontaining sectionnumbersfromeitherAttachment A,SectionCoftheHay13,1994letter(e.g.,C.l.iv)ortheabovejustifications (e.g.,A.1).