|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 2024-09-04
[Table view] Category:License-Operator
MONTHYEARML24213A1412024-07-31031 July 2024 Requalification Program Inspection ML24263A1162024-01-0808 January 2024 Final Qa/Related Forms ML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23257A1732023-09-14014 September 2023 Requalification Program Inspection ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21258A3552021-09-16016 September 2021 Requalification Program Inspection ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML19289D0132019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NMP1L3288, Fitness-for-Duty Response to Request for Information2019-07-0101 July 2019 Fitness-for-Duty Response to Request for Information ML19154A5672019-06-0303 June 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations 2024-07-31
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24263A1162024-01-0808 January 2024 Final Qa/Related Forms ML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18333A0182018-11-25025 November 2018 Initial Operator Licensing Operating Test Approval ML18088A7262018-05-21021 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18117A2102018-04-26026 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18088A7172018-03-29029 March 2018 Final Outlines (Folder 3) ML18088A7282018-03-29029 March 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) 2024-01-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713 August 11, 2016 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - NINE MILE POINT NUCLEAR STATION, UNIT 1
Dear Mr. Hanson:
In a telephone conversation on August 5, 2016 between Mr. T. Fish, Senior Operations Engineer, and Mr. G. Elkins, Operations Training Manager, arrangements were made for the administration of licensing examinations at Unit 1 during the week of February 6, 2017. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of January 2, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by the week of November 7, 2016. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by the week of December 5, 2016. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the Commission NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
B. Hanson Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Website at http://www.nrc.gov/reading-rm/adams.html#web-based-adams.
B. Hanson Thank you for your cooperation in this matter. Mr. Elkins has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.
Sincerely,
/RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63
cc: Distribution via ListServ
B. Hanson Thank you for your cooperation in this matter. Mr. Elkins has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63 cc: Distribution via ListServ Distribution w/enclosures (via e-mail) DDorman, RA DLew, DRA MScott, DRP Pelton, DRP RLorson, DRS ADimitriadis, DRP ARosebrook, DRP KKolaczyk, DRP, SRI GStock, DRP, RI ATrudell, DRP, AA JBowen, RI OEDO RidsNrrPMNineMilePoint Resource RidsNrrDorlLpl1-1 Resource DRS Master Exam File (C. Bixler) (w/concurrences) DOCUMENT NAME: G:\DRS\Operations Branch\FISH\NMP1 Feb 2017 150dayexamltr.docx ADAMS PKG: ML16210A438 ADAMS ACCESSION NO.: ML16225A390 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME T Fish DE Jackson DATE 08/11/16 08/11/16 OFFICIAL RECORD COPY