Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-220, Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With L-99-203, Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With L-99-177, Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With L-99-161, Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With L-99-133, Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With L-99-113, Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With L-99-088, Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With L-99-061, Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With L-99-036, Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With L-99-001, Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With L-98-305, Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With L-98-285, Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With L-98-254, Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With L-98-235, Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With L-98-207, Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2 L-98-189, Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2 L-98-160, Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2 L-98-129, Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2 L-98-107, Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2 ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2 L-98-037, Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2 L-98-009, Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2 L-97-310, Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2 L-97-288, Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2 L-97-252, Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2 L-97-235, Monthly Operating Repts for August 1997 for St Lucie1997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie L-97-212, Monthly Operating Repts for July 1997 for St Lucie1997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie L-97-178, Monthly Operating Repts for June 1997 for St Lucie1997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie L-97-146, Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2 L-97-129, Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2 ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2 ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2 ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2 L-97-009, Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2 L-96-325, Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2 ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 L-96-251, Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2 L-96-225, Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2 L-96-202, Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2 L-96-182, Monthly Operating Repts for June 1996 for St Lucie Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2 L-96-145, Monthly Operating Repts for May 1996 for St Lucie Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2 L-96-122, Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 21996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2 ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for Slp ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2 ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie L-96-012, Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 21995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2 L-95-331, Monthly Operating Repts for Nov 1995 for St Lucie1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie L-95-299, Monthly Operating Repts for Oct 1995 for St Lucie1995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie L-95-280, Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 21995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4921999-10-12012 October 1999 Safety Evaluation Accepting Licensee 990831 Request for Relief from Certain Provisions of ASME B&PV Code,Section XI, Contained in Third 10-year Interval ISI Program for Plant, Unit 1 05000335/LER-1999-004-01, :on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With1999-10-0707 October 1999
- on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With
ML17241A4801999-10-0404 October 1999 Safety Evaluation Supporting Amend 104 to License NPF-16 ML17241A4771999-10-0404 October 1999 Safety Evaluation Authorizing Licensee Relief Request 25, from ASME B&PV Code,Section Xi,Requirements for Certain ISI of Reactor Pressure vessel-to-nozzle Welds at Plant,Unit 2, Contained in Second 10-year Interval ISI Program for Unit 2 L-99-220, Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With ML17241A4661999-09-23023 September 1999 SER Accepting Proposed Changes to Radiological Emergency Plan,For Plant,Unit 1 & 2 ML17241A4631999-09-23023 September 1999 SER Accepting Request for Relief from Certain Provisions of ASME Boiler & Pressure Vessel Code,Section Xi,Contain in Second 10-year Interval Inservice Insp Program for Plant, Unit 2 ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr L-99-203, Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With ML17241A4421999-08-18018 August 1999 Safety Evaluation Supporting Amend 163 to License DPR-67 ML17241A4331999-08-10010 August 1999 SER Accepting Licensee Relief Request RR-04,proposed Alternative to Code Requirement Pursuant to 10CFR50.55a(a)(3)(i) ML17241A4291999-08-0202 August 1999 Safety Evaluation Accepting Request for Relief 14 for Second 10-Yr Interval ISI Plan for St Lucie,Unit 2 L-99-177, Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With ML17241A4261999-07-29029 July 1999 Safety Evaluation Supporting Relief from ASME Code Requirements Related to Inservice Insp Program Second 10-year Interval for Unit 2 05000389/LER-1999-007, :on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With1999-07-16016 July 1999
- on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With
ML17241A4211999-07-16016 July 1999 SER Accepting Response to GL-95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Unit 2 ML17241A4181999-07-15015 July 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for St Lucie Plant,Unit 1 05000389/LER-1999-006, :on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With1999-07-0606 July 1999
- on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With
05000389/LER-1999-005, :on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With1999-07-0606 July 1999
- on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With
ML17241A4071999-07-0202 July 1999 Safety Evaluation Supporting Amends 162 & 103 to Licenses DPR-67 & NPF-16,respectively 05000389/LER-1999-004, :on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With1999-06-30030 June 1999
- on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With
L-99-161, Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3851999-06-24024 June 1999 Safety Evaluation Supporting Alternative to Requirements of ASME Code,Section XI ML17241A3781999-06-18018 June 1999 Safety Evaluation Concluding That for Requests for Relief 1,2,3,9,12,14 & 15,FP&L Proposed Alternatives to Code Requirements Provide Acceptable Level of Quality & Safety & Recommends Proposed Alternatives Be Authorized 05000335/LER-1999-002-01, :on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With1999-06-0404 June 1999
- on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With
L-99-133, Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With ML17241A3421999-05-25025 May 1999 Safety Evaluation Supporting Amends 161 & 102 to Licenses DPR-67 & NPF-16,respectively ML17241A4001999-05-21021 May 1999 Safety Evaluation Supporting Draft Amends to Licenses DPR-67 & NPF-16,respectively ML17241A3261999-05-0606 May 1999 Safety Evaluation Supporting Amend 101 to License NPF-16 05000389/LER-1999-003, :on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With1999-05-0606 May 1999
- on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With
L-99-113, Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With ML17229B0941999-04-0808 April 1999 Safety Evaluation Supporting Amend 100 to License NPF-16 05000389/LER-1999-002, :on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With1999-04-0707 April 1999
- on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With
05000335/LER-1999-001-01, :on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With1999-04-0707 April 1999
- on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With
ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines L-99-088, Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With ML17241A3721999-03-31031 March 1999 SER for Environmental Qualification of Terry Turbine Woodward Governor Controls for Unit 1.Staff Recommends This Matter Not Be Pursued Further Unless Far Greater Safety Significance Can Be Established ML17355A2791999-03-26026 March 1999 Safety Evaluation Concluding That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 for Plants ML17229B0661999-03-16016 March 1999 Safety Evaluation Granting Relief from ASME Code Insp Requirements Re Inservice Testing Program,Third 10-yr Interval 05000389/LER-1999-001, :on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With1999-03-10010 March 1999
- on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With
L-99-061, Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 05000335/LER-1998-002, :on 980105,CIS Bistable in Bypass Resulted in Condition Prohibited by Tss.Caused by Personnel Error. Restored Channel C of ESFAS Containment Isolation Signal to Operable Status1999-02-18018 February 1999
- on 980105,CIS Bistable in Bypass Resulted in Condition Prohibited by Tss.Caused by Personnel Error. Restored Channel C of ESFAS Containment Isolation Signal to Operable Status
L-99-036, Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 05000335/LER-1998-009, :on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With1999-01-20020 January 1999
- on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With
ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept ML17229A9811999-01-0505 January 1999 Safety Evaluation Supporting Amend 159 to License DPR-67 05000389/LER-1998-010, :on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With1999-01-0404 January 1999
- on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With
L-99-001, Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With ML17229A9501998-12-31031 December 1998 Rev 4 to SL2-FE-0198, Slp Unit 2 SAR for Initial Application of Pac & Npac 1999-09-30
[Table view] |