ML17263A754

From kanterella
Revision as of 13:30, 18 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 20 to QA Program for Operation, Addressing Comments Provided by NRC During 940803 Telcon W/Respect to LAR Associated W/Administrative Controls Section 6.0 of TS, Dtd 940513
ML17263A754
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/16/1994
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A755 List:
References
NUDOCS 9408190180
Download: ML17263A754 (17)


Text

PR.IC3R.IEY1ACCELERATEDRIDSPROCESSING)REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9408190180DOC.DATE:94/08/16NOTARIZED:NODOCKETFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RohesterG05000244AUTH.NAMEAUTHORAFFILIATIONMECREDY,R.C.RochesterGas6ElectricCorp.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)PDISTRIBUTIONCODE:Q004DTITLE:QATopicalReport,NOTES:LicenseExpdateinCOPIESRECEIVED:LTRLENCLQSIZE:Change,Amendment,orCorrespondence(D'Iaccordancewith10CFR2,2.'109(9/19/72).

SUBJECT:

ForwardsrevisedQualityAssuranceProgramforStationOperation.I+cket/Utili005000244RRECIPIENTIDCODE/NAMEJOHNSON,ARPEB01INTERNAL:DRS/RGN1DRS/RGN3EXTERNAL:DMB/OSSNRCPDRCOPIESLTTRENCL11111111221111RECIPIENTIDCODE/NAMEDRS/RGN2DRS/RGN4OC/LFDCBRGN1FILEIHSCOPIESLTTRENCL111,1'11111TY'0CUNNOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.S04-2083)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSI'ORDOCUMENTSYOUDON"I'EED!TOTALNUMBEROFCOPIESREQUIRED:LTTR13ENCL13

'II ROCHESTERGASANDELECTRICCORPORATION~89EASTAVENUE,ROCHESTER,N.Y.ld6d9-0001AREACODE716546-2700ROBERTCMECREDYVicePresidentClnnaNuclearProductionAugust16,1994U.S.NuclearRegulatoryCommissionDocumentControlDeskAttn:AllenR.JohnsonProjectDirectorateI-3Washington,D.C.20555

Subject:

RevisedSubmittalofQualityAssuranceStationOperationRochesterGas&ElectricCorporationR.E.GinnaNuclearPowerPlantDocketNo.50-244Programfor

References:

a.LetterfromR.C.Mecredy,RG&E,toA.R.Johnson,NRC,

Subject:

"RevisedSubmittalofQualityAssuranceProgramforStationOperation,"datedMay16,1994.b.LetterfromR.C.Mecredy,RG&E,toA.R.Johnson,NRC,

Subject:

"ApplicationforAmendmenttoFacility,OperatingLicense,UpgradeofAdministrativeControlsSection6.0,"datedMay13,1994."c~LetterfromA.R.Johnson,NRC,toR.C.Mecredy,RG&E,

Subject:

"ReviewofProposedAmendmenttoTechnicalSpecification6.5.1,'PlantOperationsReviewCommittee(PORC)Function,'.E.GinnaNuclearPowerPlant-RequestforAdditionalInformation(TACNo.M83569)",datedNovember12,1992.

DearMr.Johnson,

Inaccordancewith10CFR50.54(a)(3),enclosedisrevision20totheQualityAssurance(QA)'rogramforStationOperation.Thisrevision20supersedesinitsentirety,theproposedrevision20assubmittedonMay16,1994(Ref.a.).ThissubmittaladdressesallcommentsprovidedbytheNRCduringaconferencecallheldwithRG&EonAugust3,1994withrespecttotheLicenseAmendmentRequest(LAR)associatedwiththeAdministrativeControlsSection6.0oftheTechnicalSpecifications(Ref.b).Inaddition,theNRCcommentsprovidedinReferencec.arealsoaddressedwithintheenclosedrevision20asrequestedduringtheAugust3rdconferencecall.1I9408190180940816PDRADOCK05000244-=-P-------WAR

\PIj Whilethepreviouslyproposedrevision20totheQAProgramissupersededbytheencloseddocument,onlycertainsectionshavechanged.ThesechangesaresummarizedbelowbyQAProgramSectionnumber:a.Section1-ReferencestoANSI/ANS3.1-1987andANSI/ANS3.2-1988areprovided.b.Section2-AdditionaldetailsconcerningthePORCandNSARBareprovided.ThisincludesprovidingspecificrequirementsforthePORCconsistentwithTechnicalSpecification6.5.1andaddressingNSARBmemberqualificationsandrecordkeepingrequirements.c.Section6-Adescriptionofanewprocedurechangereviewprocessisprovided.ThechangestotheQAProgramaredescribedintheattachedSynopsisofChanges(Attachment1)andintheenclosedprogramrevision.Attachment1alsoprovidesthebasisforconcludingthattherevisedprogramcontinuestosatisfythe10CFR50,AppendixBcriteriaanddoesnotreducethescopeofthequalityassuranceprogram.Changesmadetorevision19oftheQAProgramforStationOperationaredenotedbyasinglerevisionbarintheleftmargin.Attachment2isacopyoftheenclosurewithchangeshighlightedorstruckout.WerequestthatuponNRCapproval,theQAProgramchangesshouldbeconsideredeffectiveimmediatelyandimplementedconcurrentwiththeimplementationofthetechnicalspecificationchangesbeingrequestedinReferencea.Verytrulyyours,RobertC.MecreMDFE625xc:Mr.AllenR.Johnson(MailStop14D1)PWRProjectDirectorateI-3Washington,D.C.20555U.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA19406GinnaSeniorResidentInspector ATTACHMENT1SnosisofChanesSection1ualitAssuranceProramReferencestoNRCRegulatoryGuide1.33,Revision2,RegulatoryPositions1,3,and5aonlywasaddedtosupporttheLicenseAmendmentRequest(LAR)relatedtoreformattingtheAdministrativeControlsSectionofTechnicalSpecifications.RegulatoryPositions3and5awithrespecttoANSIN18.7-1976,Sections4.3.2and4.3.4,arerelatedtochangesdiscussedbelowwhileRegulatoryPosition1relatestotheLARwhichproposestouseRevision2ofAppendixAtoRegulatoryGuide1.33insteadofRevision0(TechnicalSpecification6.8.1.a).ReferencestoANSI/ANS3.1-1987,Section4.7,andANSI/ANS3.2-1988,Sections4.2and4.3,werealsoaddedtosupportchangesdiscussedinSection2below.ThesestandardswereaddedsincetheycontainPORCandNSARBrequirementsnotprovidedinearlierANSIN18.7editions.ThischangerequiresNRCapprovalpriortobeingimplemented.Section2OranizationThedescriptionofthereviewandauditorganizationalunitsshowninFigure2-6isexpandedsincetheseitemsarebeingrelocatedfromTechnicalSpecificationstotheQAProgram.AreferencetoANSI/ANS3.2-1988Section4.3isnowprovidedfortheonsitereviewfunction(i.e.,thePlantOperationsReviewCommittee)andANSIN18.7-1976,Sections4.3.2and4.3.4,andANSI/ANS3.1-1987Section4.7fortheoffsitereviewandauditfunction(i.e.,theNuclearSafetyAuditandReviewBoard).ANSIN18.7-1976isanNRCendorsedstandardwhileANSI/ANS3.1-1987andANSI/ANS3.2-1988arenot.However,theseANSIstandardsprovideequivalentormoreconservativerequirementsthanthosecurrentlylistedinTechnicalSpecifications(TS).Section2nowincludestherequirementsunderwhichthePORCandNSARBarecomposedandfunction.TheserequirementswererelocatedfromtheTechnicalSpecifications.SeveralrequirementsweremodifiedinordertoconformtotheANSIStandardsortocreateamoreefficientreviewandauditorganizationalunit.ThesechangesdonotresultinanyreductioninthelevelofdetailorsafetycurrentlyincludedintheTechnical,Specifications.Wheredifferencesdoexist,justificationispresentedbelow.Thesedifferencesaremarkedwithanasterisk(*).ItemizedbelowiseachexistingTechnicalSpecificationin6.5.1and6.5.2anditsrelationshiptotheQAProgram.ReferencestotheQAProgramparagraphsrefertotheendofSection2oftheProgramdocument.(PleasenotethattheseparagraphnumbersareremovedinAttachment2.)

ATTACHMENT1SnosisofChanesTS6.5.1.1-TheessenceofthiscurrentspecificationisincludedintheQAProgramparagraph2.Paragraphs1.and2.weretakendirectlyfromANSIStandardN18.7-1976,Section4~*TS6.5.1.2-RG&EsubmittedanLARdatedMarch23,1992requestingthatthetitlesofPORCpersonnelbereplacedwithfunctionalareasunderPORCreview.ThiswouldallowPORCmembertitlechangesaslongasthefunctionalareasaremaintained.TheNRCrespondedtothisLARinaletterdatedNovember12,1992requestingadditionalinformationregardingthenumberofPORCmembers.InmovingtherequirementstotheQAProgram,paragraph3.,thefunctionalareasofthePORCareincluded.ThesefunctionalareashavebeenchosentoagreewiththecurrentPORCfunctionsasperformedbythepersonnelwhosetitlesarelistedintheTechnicalSpecifications.ThenumberofregularmembersisnowlistedintheQAProgram,paragraph4,asaminimumof5andmaximumof9(8functionalareaspluschairman).ThisresolvesthecommentinNRCletterdatedNovember12,1992.ThenumberoffunctionalareasdelineatedintheQAProgramis8.ThecurrentTechnicalSpecificationslisttheTitlesof12individuals.Thisdifferenceisnotareductioninsafety,becausethefunctionalareasnecessarytoperformadequatereviewsbyPORCareencompassed.3.4~5.TS6.5.1.3-ThisrequirementisincludedintheQAProgram,paragraph4.TS6.5.1.4-ThisrequirementisincludedintheQAProgram,paragraph4.*TS6.5.1.5-ThisrequirementisincludedintheQAProgram,paragraph3.and4.TheQAProgramstatesthatthequorumsizemeetsANSI/ANS3.2-1988,Section4.3,whichrequiresaquorumconsistingofachairmanoradulyappointedalternateandamajorityoftheremainingmembersortheirdulyappointedalternates.Inaddition,paragraph4.oftheQAProgramrequiresthatthenumberofalternateswillnotexceedaminorityofthenumbermakingupthequorum.ThiscombinationofrequirementsmeetsboththeANSIstandardandthecommentmadebytheNRCinaletterdatedNovember12,1992thatifthenumberofmembers"isnotafixednumber,thenthequorumrequirementofSection6.5.1.5shouldberevisedtoreflectthestaffpositionthatthequorumshouldbeamajorityoftheregularmembers."ProcedureA-205,willimplementthisQAProgramrequirement.

ATTACHMENT1SnosisofChanes6.TS6.5.1.6-ThisspecificationcoversthePORCscopeofreview.TheQAProgramrequiresthatthePORCscopeofreviewmeetANSI/ANS3.2-1988,Section4.3.1.IncitingthisANSIStandard,notallofthespecificitemsinthe,existingSpecificationareindividuallylisted,however,thePORCscopeofreviewisnotreduced.Additionalinformationisprovidedinitems7.through15.below.7~*TS6.5.1.6a,b,d-TheANSIStandardrequiresthatthePORCreviewallsafetyevaluationsrequiredunder10CFR50.59.RG&E'ssafetyevaluationprocessrequiresanassessmentorscreeningofallplantchangestodeterminetheirsafetysignificanceandtheneedtoperformawrittensafetyevaluation.10CFR50.59encompasseschangestothefacility,changestoprocedures,andtestsandexperiments.Therefore,incitingtheANSIStandard,PORCreviewofthesubjectareasspecifiedinTS6.5.1.6.a,b,anddareencompassed.Withrespecttoprocedurechanges,manyprocedurechangesareeditorialorinconsequentialandhavenosafetysignificance.Therefore,itisappropriatetoemployaprocesswherebyanindependenttechnicalreviewisperformedoftheproposedprocedurechange.Aqualifiedandindependentreviewer,appointedbyPORCorthePlantManager,willalsoconductareviewoftheproposedprocedurechangetodetermineitspotentialsafetysignificanceandtheneedforaPORCreview.TheabsenceofsuchanindependentreviewessentiallyforcesPORCtoconductareviewofallproposedprocedurechangesthathavenosignificance,insteadofthegroupofthosechangesthatpotentiallymayimpactsafety.Allchangesthatreceiveawrittensafetyevaluationunder10CFR50.59arerequiredtobereviewedbyPORC.Othersmaynotresultinanimpactonsafetyandawrittensafetyevaluation,butareselectedforPORCreviewbytheindependentandqualifiedreviewer.Theremainingchangeshavenosafetysignificance,areeditorialorinconsequentialanddonotrequirePORCreview.ThisprocessisdescribedintheQAProgram,Section6.

ATTACHMENT1SnosisofChanesTS6.5.1.6.c-ThisrequirementisincludedintheQAProgram,paragraph3(Section4.3.1ofANSI/ANS3.2-1988).TS6.5.1.6.e-Thisrequirementisparagraph3(Section4.3.1NotificationoftheSeniorViceEngineering,andtheChairman,paragraph7intheQAProgram.includedintheQAProgram,ofANSI/ANS3.2-1988).President,ProductionandNSARBisencompassedbyTS6.5.1.6.f-Thisrequirementisincludedinparagraph1.oftheQAProgram.TS6.5.1.6.g-Thisrequirementisincludedinparagraph2.oftheQAProgram.Figure2.6oftheQAProgramalsoshowsthatPORCisoverseenbyNSARB.*TS6.5.1.6.h-IndependentreviewofthePlantSecurityPlanisrequiredby10CFR50.54(p)(3)and10CFR73.55(g)(4)anddoesnotneedtobeseparatelyidentifiedintheQAProgramconsistent.withGenericLetter93-07.*TS6.5.1.6.i-IndependentreviewoftheRadiationEmergencyPlanisrequiredby10CFR50.54(t)anddoesnotneedtobeseparatelyidentifiedintheQAProgramconsistentwithGenericLetter93-07.*TS6.5.1.6.j-ThisrequirementisincludedinSection6oftheQAProgramunderthescopeofprocedurechanges.Theperiodicreviewofimplementingproceduresisaddressedwithinplantprocedures.Theprocessdescribedunderitem7abovewouldencompassthisrequirement.TS6.5.1.6.k-ThisrequirementisincludedintheQAProgram,paragraph3(Section4.3.1ofANSI/ANS3.2-1988).*TS6.5.1.6.l-PeriodicreviewoftheFireProtectionProgramandimplementingproceduresisrequiredbytheQAProgramTable18-1,AuditList.Reviewsoffireprotectionprocedurechangesareperformedinconjunctionwiththeprocessofplantprocedurechangereviewasdiscussedunderitem7above.AsdefinedbytheFireProtectionProgram,changestotheProgramhavingsafetysignificancerequireawrittensafetyevaluationunder10CFR50.59andwouldthereforereceivePORCreviewconsistentwithANSI/ANS3.2-1988,Section4.3.1.TheQAProgramparagraph6.and7.requirethatsafetyevaluationsbe'orwardedtotheChairman,NSARB.

ATTACHMENT1SnosisofChanes17~18.TS6.5.1.7-ThisrequirementisincludedintheQAPrograminparagraph6.TS6.5.1.8-ThisrequirementisincludedintheQAPrograminparagraph3and7.19.20.TS6.5.2.1-ThefunctionalareasrequiredforNSARBreviewandauditaredescribedintheQAProgram,paragraph8.(ANSI/ANS3.1-1987,Section4.7).*TS6.5.2.2-TherequirementsareincludedintheQAProgram,paragraph8.,withtheexceptionthattherequirementforatleastonequalifiednon-companyaffiliatedtechnicalconsultant(TS6.5.2.2.c)isnotincluded.ANSIN18.7-1976,Section4.3.2.1requiresnolessthan5personswithnomorethanaminorityfromtheonsiteoperatingorganizationanddoesnotrequireanon-companyaffiliatedconsultant.ANSI/ANS3.1-1987,Section4.7statesthat"ifsufficientexpertiseisnotavailablefromwithintheownerorganization,independentreviewsshallbesupplementedbyuseofoutsideconsultantsorotherqualifiedorganizations."SincethefunctionalareasinwhichtheNSARBmustbecompetenthasnotbeenreduced,thischangeisnotareductioninsafety.TheneedforanoutsideconsultantisapreviousStandardTechnicalSpecificationrequirementwhichhassincebeendeletedasownerorganizationshavegainedexperienceandexpertise.21.*TS6.5.2.3-AlimitonthenumberofalternatesparticipatinginNSARBactivitiesisnotspecifiedinSection4.3.2.1ofN18.7-1976.SincethefunctionalareasinwhichNSARBmustcontaincompetencehasnotbeenreduced,andtheANSIStandardrestrictstheuseofalternatesto"legitimateabsencesofprinciples",thischangeisnotareductioninsafety.22.TS6.5.2.4-ThequalificationrequirementsofNSARBmembersisincludedintheQAProgram,paragraph8.QualificationsofmembersmeetANSI/ANS3.1-1987,Section4.7exceptasnotedforthefunctionalareasofnuclearpowerplantoperationsandnuclearengineering.TheQAProgramrequires8yearsexperienceforthesefunctionalareas,whichisconsistentwiththeexistingTechnicalSpecification6.5.2.4.a.and6.5.2.4.b.Forallotherfunctionalareas,theQAProgramisconsistentwiththeexistingTechnicalSpecifications.Therefore,thereisnoreductioninthelevelofdetailorqualificationsforNSARBmembersintheQAProgramascomparedtotheexistingTechnicalSpecifications.

f ATTACHMENT1SnosisofChanes23.TS6.5.2.5-ThisrequirementisincludedintheQAProgram,paragraph8(N18.7-1976,Section4.3.2.2.).24.*TS6.5.2.6-TheQAProgram,paragraph8.,isconsistentwiththeexistingTechnicalSpecificationswiththeexceptionthatanon-companyaffiliatedtechnicalconsultantisnotrequiredinthequorum.Requiringthiswouldnotbeconsistentwiththechangemadeasdiscussedunderitem20above,sinceanon-companyaffiliatedtechnicalconsultantisnolongerarequiredmemberofNSARB.Forthesamereasonsasinitem20,thischangeisnotareductioninthelevelofsafety.25.TS6.5.2.7.a-h-TheserequirementsandincludedintheQAProgramparagraph8.(N18.7-1976,Section4.3.4).26.27.*TS6.5.2.7.i-TherequirementforNSARBtoreviewthePORCmeetingminutesisnotspecifiedinthescopeofreviewunderANSIN18.7-1976.ThisrequirementisalsonotcontainedinImprovedTechnicalSpecifications(i.e.,NUREG-1431).SincetheNSARBisrequiredtoreviewthesameitemsrelatedtonuclearsafetyasthePORCinANSIN18.7-1976,eliminationofthisrequirementisnotareductioninsafety.ThePORCdoessubmitmeetingminutestotheSeniorVicePresidentProductionandEngineeringandtheChairman,NSARBforinformationasstatedintheQA,Program,paragraph7.*TS6.5.2.8-TheseTechnicalSpecificationsarediscussedundersynopsisofchangesforSection18andarealsocoveredintheQAProgramparagraph8.28.TS6.5.2.9-ThisrequirementisincludedintheQAProgramunderresponsibilitiesofSeniorVicePresident,Production&Engineering.29.TS6.5.2.10-TherecordrequirementsofNSARBactivitiesareincludedintheQAProgram,paragraph9.30.TS6.5.2.11-,Section6oftheQAProgramrequiresproceduresforeachdepartmentresponsibleforanactivity.ProceduresgoverningNSARBactivitiescurrentlyexist.ThisisalsoaddressedinANSIN18.7-1972,Section4.2.1.

ATTACHMENT1SnosisofChanesThespecificreferencetoSection6.0oftheTechnicalSpecificationswasalsodeletedandreplacedwith"AdministrativeControlssection"tosupportexpectednear-termtechnicalspecificationchangeswhichwillrenumbermostsections.ThischangeprovidesequivalentreferencetothelocationofPlantManagerresponsibilitiesasdelineatedwithinTechnicalSpecifications.Theabovechangestosection2requireNRCapprovalpriortobeingimplemented.AnotherchangetotheorganizationreassignsrecordsmanagementanddocumentcontrolactivitiesfromtheTechnicalServicesDivisiontoQualityPerformanceDepartment.(seeSection17)Section3DesinControlThereferencetoreviewofplantmodificationsbytheonsiteandoffsitereviewgroupsasrequiredbyTechnicalSpecifications6.5.1.6and6.5.2.7isdeleted.ThechangestoSection2whichinsertedareferencetoANSIN18.7-1976andANSI/ANS3.2-1988adequatelyaddressesthereviewofsignificantproposedplantchangesaspartofthereviewresponsibility.ThisrequiresNRCapprovalpriortoimplementation.Section5InstructionsProceduresandDrawinsReferencestoRevision2ofNRCRegulatoryGuide1.33,AppendixAwasaddedtosupporttheLicenseAmendmentRequest(LAR)relatedtoreformattingtheAdministrativeControlsSectionofTechnicalSpecifications.ThisLARproposestouseRevision2ofAppendixAtoRegulatoryGuide1.33insteadofRevision0(TechnicalSpecification6.8.1.a).Revision2isaNRCstaffendorseddocument.ThischangerequiresNRCapprovalpriortoimplementation.Section6DocumentControlRequirementsforthereviewandapprovalprocessandtemporarychangeprocessforplantprocedureshavebeenclarifiedwithreferencetotheguidelinesofANSIN18.7-1972,Sections5.4and5.5.Reviewofplantproceduresisperformedasdescribedunderitem7ofSection2above.Fortemporarychangestoprocedures,theQAProgramincludesthesamerequirementsascurrentlyinTechnicalSpecification6.8.3.SincethedesignatedindependentandqualifiedreviewermeetstheequivalentqualificationsofaPORCmember,thatindividualconstitutesoneofthe"twomembersofplantmanagementstaff"referredtoinTS6.8.3.b.TheShiftSupervisoristhesecondmember.Therefore,thischangedoesnotresultinareductioninsafety.ANSIN18.7-1972furtherstates ATTACHMENT1SnosisofChanesthateachprocedureshallbereviewedandapprovedpriortoinitialuseandretainstheprovisionsforfurtherreviewofprocedureshavingsafety-significanceforanyunreviewedsafetyquestion.Theimplementationoftheserequirementsaredelineatedinplantprocedures.ThischangerequiresNRCapprovalpriortoimplementation.DocumentControlresponsibilitieshavebeenreassignedfromtheTechnicalServicesDivisiontotheGinnaNuclearProductionDivision.Section11TestControlThespecificreferencetoSection4.0oftheTechnicalSpecificationswasdeletedtosupportexpectednear-termtechnicalspecificationchangeswhichwillrenumbermostsections.TheremovalofthisspecificreferenceisacceptablesincetherequirementforaGinnaStationsurveillancetestprogram"asrequiredbyTechnicalSpecifications"providessufficientguidancewithoutreducinganycommitment.TherequirementforthePORCtoreviewtestprocedures,andforthePlantManagertoapprovethetestprocedureswasdeletedconsistentwiththebasisforchangestoSection6aspresentedaboveandrecognitionthatthissectionincludesreviewsoftestprocedurebyresponsibletechnicalpersonnel.QualityPerformancereviewwasdeletedfromthissectionasitisredundanttoaSection2responsibilityfortheNuclearAssurancesub-section.Section17ualitAssuranceRecordsAreferencetomaintainingplantoperatingrecordsasrequiredinSection6.10ofTechnicalSpecificationsisbeingdeletedfromboththissectionandTechnicalSpecifications.TheexistingrecordretentioncommitmenttoANSIN45.2.9aslistedinSection1(i.e.,RegulatoryGuide1.88)providesequivalentrequirements.AreferencetoANSIN45.2.9isinsertedinthissectionforclarificationoftheGinnaStationrecordextent.Inaddition,10CFR20,Sub-partL,and10CFR50.71requiretheretentionofcertainrecordsrelatedtotheoperationofthenuclearplant.TherecordsmanagementresponsibilitieshavebeenreassignedfromtheTechnicalServicesDivisiontotheQualityPerformanceDepartment.

r~ATTACHMENT1SnosisofChanesSection18AuditsThissectionrelocatesfromTechnicalSpecificationSection6.5.2.8,toQAProgramTable18.1,thespecificlistingofrequiredaudits,notclearlyaddressedelsewhere,andtheirfrequency.Auditrequirementsarenecessarytosatisfy10CFR50,AppendixB,CriterionXVIII.TherelocationoftheauditrequirementsfromthetechnicalspecificationsdoesnotresultinareductioninanycommitmentsincechangestotheQAProgramarecontrolledby10CFR50.54.AllauditrequirementscurrentlycontainedinSection6.5.2.8ofTechnicalSpecificationsarelistedinTable18.1exceptforthefollowing:1~TS6.5.2.8.e-AuditoftheRadiationEmergencyPlanisrequiredby10CFR50.54(t).ConsistentwithGenericLetter93-07,frequencyanduniquerequirementsaredescribedintheRadiationEmergencyPlan.Section18makesreferencetothisaudit.2~TS6.5.2.8.f-AuditoftheStationSecurityPlanisrequiredby10CFR50.54(p)(3),10CFR73.56(g)(2)and10CFR73.55(g)(4).ConsistentwithGenericLetter93-07,frequencyanduniqueauditrequirementsaredescribedintheSecurityPlan.Section18makesreferencetothisaudit.3~TS6.5.2.8.m-AuditsofotherfacilityoperationsconsideredappropriatebyNSARBortheSeniorVicePresident,ProductionandEngineeringisnolongerspecificallyidentified.AsshownonFigure2-1,NSARBandQualityPerformancereportstotheSeniorVicePresident,ProductionandEngineering.Figure2-6alsoshowsthatQualityPerformancereportstoNSARBregardingauditactivities.SinceasectionofQualityPerformance(i.e.,QualityAssurance)performsallaudits,thereissufficientauthoritytorequest,additionalauditsasdeemednecessary.Also,ANSIN18.7-1976,Section4.3.4,item(5)allowsNSARBtoreview"anymatterinvolvingsafeoperationofthenuclearpowerplant".ThesechangesrequireNRCapprovalpriortoimplementation.

1~