Relay Calibration Problem| ML031180261 |
| Person / Time |
|---|
| Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill, Crane |
|---|
| Issue date: |
07/01/1985 |
|---|
| From: |
Jordan E L NRC/IE |
|---|
| To: |
|
|---|
| References |
|---|
| IN-85-049, NUDOCS 8506260654 |
| Download: ML031180261 (3) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill, Crane |
|---|
Category:NRC Information Notice
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:05000000]] OR [[:Zimmer]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] OR [[:Skagit]] OR [[:Marble Hill]] OR [[:Crane]] </code>. |
SSINS NO.: 6835IN 85-49UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF INSPECTION AND ENFORCEMENTWASHINGTON, D.C. 20555July 1, 1985IE INFORMATION NOTICE NO: 85-49: RELAY CALIBRATION PROBLEM
Addressees
- All nuclear power reactor facilities holding an operating license (OL) or aconstruction permit (CP).
Purpose
- This information notice provides information on a potentially significantproblem pertaining to relay orientation during calibration and operation. Itis expected that recipients will review the information for applicability totheir facilities and consider actions, if appropriate, to preclude a similarproblem occurring at their facilities. However, suggestions contained in thisinformation notice do not constitute NRC requirements; therefore, no specificaction or written response is required.Discussion:South Carolina Electric and Gas Company, at the Summer nuclear power plant,recently discovered that there was a significant error in the calibration ofseveral E-7000 series Agastat time-delay relays. The licensee's procedure forreplacement of Agastat timing relays did not require calibration of theserelays in the installed position. During relay replacement, these time-delayrelays were "bench" calibrated in a horizontal position, then field mounted ina vertical orientation. Subsequent time-delay measurements determined that thedelay times of the installed devices were as much as 30% greater than thatestablished during "bench" calibration.Licensee investigation of this anomaly determined that the manufacturer's datasheet for installation and operation of these relays identifies a potential forthe observed calibration error. This data sheet states that a dial calibrationerror may result if the device is mounted horizontally without the manufacturer'ssupplied horizontal operation options. Because these relays were mountedvertically at this facility, the potential for error as a result of horizontal"bench" calibration was overlooked. Because of this oversight, the licensee'srelay replacement procedure did not specify device orientation during calibration.Several of these relays were functionally arrayed (sequentially or in parallel)in safety-related applications, such as in the emergency diesel generator under-voltage start circuitry. The above identified time-delay error went undetectedfor a period of approximately 4 months for some of these relays. This occurredbecause the licensee's replacement procedure specified only an operational orfunctional postmaintenance test of the system containing the relays. This methodof testing did not detect the individual relay time-delay calibration errors.8506260654 I- ,IN 85-49July 1, 1985 The licensee has subsequently revised their relay calibration procedures tocalibrate or check the calibration of relays after mounting in place, wherepractical. The procedures were also revised to ensure "bench" calibrationsare performed in the same orientation as mounted, where applicable. Personnelinvolved in relay calibration have received training on the revised procedures.No specific action or written response is required by this information notice.If you have any questions about this matter, please contact the RegionalAdministrator of the appropriate NRC Regional Office or this office.44a DirectorDivisio f Emergency Preparednessand Engineering ResponseOffice of Inspection and Enforcement
Technical Contact:
H. Bailey, IE(301) 492-9006Attachment: List of Recently Issued IE Information Notices
Attachment 1IN 85-49July 1, 1985LIST OF RECENTLY ISSUEDIE INFORMATION NOTICESInformation Date ofNotice No. Subject Issue Issued to85-4885-4785-4685-4585-4485-4385-4285-41Respirator Users Notice:Defective Self-ContainedBreathing Apparatus AirCylindersPotential Effect Of Line-Induced Vibration On CertainTarget Rock Solenoid-OperatedValvesClarification Of SeveralAspects Of Removable Radio-active Surface ContaminationLimits For Transport Packages6/19/856/18/856/10/85Potential Seismic Interaction 6/6/85Involving The Movable In-CoreFlux Mapping System Used InWestinghouse Designed PlantsAll power reactorfacilities holdingan OL or CP, research,and test reactor,fuel cycle andPriority 1 materiallicenseesAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdingan OLAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdingan OLAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdingan OL or CPAll power reactorfacilities holdinga CPEmergency CommunicationSystem Monthly TestRadiography Events At PowerReactorsLoose Phosphor In Panasonic800 Series Badge Thermo-luminescent Dosimeter (TLD)ElementsScheduling Of Pre-LicensingEmergency PreparednessExercises5/30/855/30/855/29/855/24/85OL = Operating LicenseCP = Construction Permit
|
|---|
|
| list | - Information Notice 1985-01, Continuous Supervision of Irradiators (10 January 1985)
- Information Notice 1985-02, Improper Installation and Testing of Differential Pressure Transmitters (11 January 1985)
- Information Notice 1985-03, Separation of Primary Reactor Coolant Pump Shaft and Impeller (15 January 1985)
- Information Notice 1985-04, Inadequate Management of Security Response Drills (17 January 1985)
- Information Notice 1985-05, Pipe Whip Restraints (23 January 1985)
- Information Notice 1985-06, Contamination of Breathing Air Systems (23 January 1985, Topic: Spent fuel rack)
- Information Notice 1985-07, Contaminated Radiography Source Shipments (29 January 1985)
- Information Notice 1985-08, Industry Experience on Certain Materials Used in Safety-Related Equipment (30 January 1985)
- Information Notice 1985-09, Isolation Transfer Switches and Post-Fire Shutdown Capability (31 January 1985, Topic: Safe Shutdown)
- Information Notice 1985-10, Posttensioned Containment Tendon Anchor Head Failure (6 February 1985, Topic: Stress corrosion cracking)
- Information Notice 1985-11, Licensee Programs for Inspection of Electrical Raceway and Cable Installations (11 February 1985)
- Information Notice 1985-12, Recent Fuel Handling Events (11 February 1985, Topic: Eddy Current Testing)
- Information Notice 1985-13, Consequences of Using Soluble Dams (21 February 1985, Topic: Hydrostatic)
- Information Notice 1985-14, Failure of a Heavy Control Rod (B4C) Drive Assembly to Insert on a Trip Signal (22 February 1985)
- Information Notice 1985-15, Nonconforming Structural Steel for Safety-Related Use (22 February 1985)
- Information Notice 1985-16, Time/Current Trip Curve Discrepancy of ITE/Siemens-Allis Molded Case Circuit Breaker (27 February 1985)
- Information Notice 1985-17, Possible Sticking of Asco Solenoid Valves (1 March 1985)
- Information Notice 1985-18, Failures of Undervoltage Output Circuit Boards in the Westinghouse-Designed Sold State Protection System (7 March 1985)
- Information Notice 1985-19, Alleged Falsification of Certifications and Alteration of Markings on Piping, Valves, and Fittings (11 March 1985)
- Information Notice 1985-20, Motor-Operated Valve Failures Due to Hampering Effect (12 March 1985)
- Information Notice 1985-21, Main Steam Isolation Valve Closure Logic (18 March 1985)
- Information Notice 1985-22, Failure of Limitorque Motor-Operated Valves Resulting from Incorrect Installation of Pinion Gear (21 March 1985)
- Information Notice 1985-23, Inadequate Surveillance and Postmaintenance and Postmodification System Testing (22 March 1985)
- Information Notice 1985-24, Failures of Protective Coatings in Pipes and Heat Exchangers (26 March 1985, Topic: Ultimate heat sink, Coatings)
- Information Notice 1985-25, Consideration of Thermal Conditions in the Design and Installation of Supports for Diesel Generator Exhaust Silencers (2 April 1985, Topic: Coatings)
- Information Notice 1985-26, Vacuum Relief System for Boiling Water Reactor Mark I and Mark II Containments (2 April 1985, Topic: Coatings)
- Information Notice 1985-27, Notifications to the NRC Operations Center and Reporting Events in Licensee Event Reports (3 April 1985, Topic: Coatings)
- Information Notice 1985-28, Partial Loss of AC Power and Diesel Generator Degradation (9 April 1985, Topic: Coatings, Overspeed)
- Information Notice 1985-30, Microbiologically Induced Corrosion of Containment Service Water System (19 April 1985, Topic: Hydrostatic, Coatings, Biofouling)
- Information Notice 1985-31, Buildup of Enriched Uranium in Ventilation Ducts and Associated Effluent Treatment Systems (19 April 1985, Topic: Coatings)
- Information Notice 1985-32, Recent Engine Failures of Emergency Diesel Generators (22 April 1985, Topic: Coatings)
- Information Notice 1985-33, Undersized Nozzle-To-Shell Welded Joints in Tanks and Heat Exchangers Constructed Under the Rules of the ASME Boiler and Pressure Vessel Code (22 April 1985)
- Information Notice 1985-34, Heat Tracing Contributes to Corrosion Failure of Stainless Steel Piping (30 April 1985, Topic: Hydrostatic)
- Information Notice 1985-35, Failure of Air Check Valves to Seat (30 April 1985, Topic: Loss of Offsite Power)
- Information Notice 1985-35, Failure of Air Check Valves To Seat (30 April 1985, Topic: Loss of Offsite Power)
- Information Notice 1985-37, Chemical Cleaning of Steam Generators at Millstone 2 (14 May 1985, Topic: Feedwater Heater, Eddy Current Testing)
- Information Notice 1985-38, Loose Parts Obstruct Control Rod Drive Mechanism (21 May 1985)
- Information Notice 1985-39, Auditability of Electrical Equipment Qualification Records at Licensees Facilities (22 May 1985)
- Information Notice 1985-40, Deficiencies in Equipment Qualification Testing and Certification Process (22 May 1985)
- Information Notice 1985-43, Radiography Events at Power Reactors (30 May 1985, Topic: High Radiation Area, Scaffolding)
- Information Notice 1985-44, Emergency Communication System Monthly Test (30 May 1985, Topic: Health Physics Network)
- Information Notice 1985-46, Clarification of Several Aspects of Removable Radioactive Surface Contamination Limits for Transport Packages (10 June 1985)
- Information Notice 1985-47, Potential Effect of Line-Induced Vibration on Certain Target Rock Solenoid-Operated Valves (18 June 1985)
- Information Notice 1985-48, Respirator Users Notice: Defective Self Contained Breathing Apparatus Air Cylinders (19 June 1985, Topic: Hydrostatic)
- Information Notice 1985-49, Relay Calibration Problem (1 July 1985)
- Information Notice 1985-50, Complete Loss of Main and Auxiliary Feedwater at a PWR Designed by Babcock & Wilcox (8 July 1985, Topic: Overspeed trip, Overspeed)
- Information Notice 1985-51, Inadvertent Loss or Improper Actuation of Safety-Related Equipment (10 July 1985)
- Information Notice 1985-52, Errors in Dose Assessment Computer Codes and Reporting Requirements Under 10 CFR Part 21 (10 July 1985, Topic: Basic Component)
- Information Notice 1985-53, Performance of NRC-Licensed Individuals While on Duty (12 July 1985)
- Information Notice 1985-54, Teletherapy Unit Malfunction (15 July 1985)