ML15037A540

From kanterella
Revision as of 19:10, 1 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Project Manager Change for the License Renewal of Diablo Canyon Power Plant, Units 1 and 2, (TAC Nos. MF4019 and MF4020)
ML15037A540
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/24/2015
From: Wittick B D
License Renewal Projects Branch 2
To: Halpin E D
Pacific Gas & Electric Co
Wentzel M J, 415-6459
References
TAC MF4019, TAC MF4020, FOIA/PA-2016-0438
Download: ML15037A540 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 24, 2015 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 SUBJECT: PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (TAC NOS. MF4019 AND MF4020) Dear Mr. Halpin: This letter provides notification of a change to the Environmental Project Manager assigned to the Diablo Canyon Power Plant, Units 1 and 2, license renewal review. Effective February 6, 2015, Mr. Michael Wentzel will be the Environmental Project Manager for Diablo Canyon Power Plant, Units 1 and 2. All correspondence for the Project Manager associated with the environmental review for Diablo Canyon Power Plant, Units 1 and 2, license renewal should be sent to:

Mr. Michael Wentzel, Environmental Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Wentzel may be reached at (301) 415-6459 or by e-mail at michael.wentzel@nrc.gov. Sincerely, /RA/ Brian D. Wittick, Chief Reactor Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Listserv February 24, 2015 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 SUBJECT: PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (TAC NOS. MF4019 AND MF4020) Dear Mr. Halpin: This letter provides notification of a change to the Environmental Project Manager assigned to the Diablo Canyon Power Plant, Units 1 and 2, license renewal review. Effective February 6, 2015, Mr. Michael Wentzel will be the Environmental Project Manager for Diablo Canyon Power Plant, Units 1 and 2. All correspondence for the Project Manager associated with the environmental review for Diablo Canyon Power Plant, Units 1 and 2, license renewal should be sent to:

Mr. Michael Wentzel, Environmental Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Wentzel may be reached at (301) 415-6459 or by e-mail at michael.wentzel@nrc.gov. Sincerely, /RA/ Brian D. Wittick, Chief Reactor Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275; 50-323 cc: Listserv DISTRIBUTION: ADAMS Accession No. ML15037A540 *concurred via email OFFICE LA:DLR* PM:RPB2:DLR BC:RPB2:DLR NAME IBetts MWentzel BWittick DATE 2/23/15 2/24/15 2/24/15 OFFICIAL RECORD COPY Letter to E. Halpin from B. Wittick, dated February 24, 2015 SUBJECT: PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (TAC NOS. MF4019 AND MF4020) DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource --------------------- MWentzel BWittick RPlasse YDiaz-Sanabria SLingam SUttal, OGC JLindell, OGC EWilliamson, OGC THipschman, SRI JReynoso, RI GMiller, RIV NO'Keefe, RIV DMcIntyre, OPA VDricks, OPA WMaier, RIV JWeil, OCA RRihm, EDO