Information Notice 1996-40, Defciencies in Material Dedication and Procurement Practices and in Audits of Vendors
I
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON D.C. 20555-0001
October 7, 1996
NRC INFORMATION NOTICE 96-40, SUPPLEMENT 1: DEFICIENCIES IN MATERIAL
DEDICATION AND
PROCUREMENT PRACTICES
AND IN AUDITS OF VENDORS
Addressees
All holders of operating licenses or construction permits for nuclear power reactors.
Purpose
The U.S. Nuclear Regulatory Commission (NRC) is issuing this supplement to correct an
inspection date that was incorrectly reported in Attachment I to Information Notice (IN) 96-40
and to discuss further the applicability of the material dedication concerns identified in IN 96-
40 to the individual suppliers identified in Attachment I to that notice. It is expected that
recipients will review the information for applicability to their facilities and consider actions, as
appropriate, to avoid similar problems. However, suggestions contained in this information
notice supplement do not constitute NRC requirements; therefore, no specific action or
written response is required.
Background
On July 25, 1996, the NRC issued IN 96-40 to alert addressees to deficiencies in
commercial-grade-item dedication practices used by manufacturers and suppliers of material
to NRC licensees under the rules of Appendix B to Part 50 of Title 10 of the Code of Federal
Regulations (10 CFR). The information notice included a summary of NRC inspection
findings and a listing of the material manufacturers and suppliers inspected.
Discussion
1.
Attachment I to IN 9640 gave the NRC inspection date for Cardinal Industrial
Products, Las Vegas, Nevada, as November 29-December 1, 1995. The correct date
of this inspection is November 29-December 1, 1994.
2.
The series of inspections described in IN 96-40 was specifically designed to assess
the current dedication practices for commercial-grade-items and ASME Code material
upgrading practices in the nuclear industry. The inspections also assessed the
licensee oversight of these practices. The inspections were initiated in early 1994 and
concluded by mid-1995, after the inspectors had determined that a sufficient cross- section of material vendors had been inspected to draw reasonable
9610010230
OO
LAr>o+e
/e'//5-/cf
IN 96-40, Supp. 1 October 7, 1996 conclusions about current material supply practices under the rules of the ASME Code
and under the quality assurance requirements of 10 CFR Part 50, Appendix B.
3.
There was no effort to compare or rank the vendors inspected during this series of
NRC inspections. The concerns identified on page 2 of the IN are a summary of
findings on all of the vendors inspected, and it should not be assumed that these
findings are applicable to each of the vendors inspected. The specific inspection
findings for each of the vendors are discussed in the respective inspection reports, which are available in NRC's Public Document Room and have been published in
NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report."
4.
Although the NRC had inspected material suppliers before the start of this inspection
series, no attempt was made to include historical data in IN 96-40 since the main
purpose of the series was to characterize current industry practice. The earlier
inspections generally had a different or more narrow scope and did not cover the
same program areas. The exclusion of any suppliers inspected earlier from the
vendors listed in Attachment 1 to the IN should not be viewed as an indication that the
commercial-grade-item dedication practices of these suppliers were found to be
superior to those of the companies identified in the IN.
This information notice requires no specific action or written response. If you have any
questions about the information in this notice, please contact the technical contacts listed
below.
f>
Thomas T. Martin, Director
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical Contacts: Uldis Potapovs, NRR
(301) 415-2959 E-mail: uxpenrc.gov
Larry Campbell, NRR
(301) 415-2976 E-mail: llc~nrc.gov
Attachment: List of Recently Issued NRC Information Notices
A 1
111
I
Attachment
IN 9640, Supp. 1
October 7, 1996 LIST OF RECENTLY ISSUED
NRC INFORMATION NOTICES
Information
Date of
Notice No.
Subject
Issuance
Issued to
96-52
92-68, Supp. 1
96-51
96-50
96-49
96-48
Cracked Insertion
Rods on Troxler
Model 3400 Series
Portable Moisture
Density Gauges
Potentially Sub- standard Slip-On,
Welding Neck, and
Blind Flanges
Residual Contamina- tion Remaining in
Krypton-85 Handling
System After Venting
Problems with
Levering-In Devices
in Westinghouse
Circuit Breakers
Thermally Induced
pressurization of
of Nuclear Power
facility Piping
Motor-Operated Valve
Performance Issues
Recordkeeping, Decommis- sioning Notifications for
Disposals of Radioactive
Waste by Land Burial
Authorized Under Former
10 CFR 20.304, 20.302, and Current 20.2002
Zinc Plating of Hardened
Metal Parts and Removal
of Protective Coatings
in Refurbished Circuit
Breakers
09/26/96
09/16/96
09/11/96
09/04196
08/20/96
08121/96
08/19196
08/12/96
All U.S. Nuclear Regulatory
Commission portable gauge
licensees and vendors
All holders of OLs or CPs
for nuclear power reactors
All material licensees
for nuclear power plants
All holders of OLs or CPs
for nuclear power reactors
All holders of OLs or CPs
for nuclear power reactors
All U.S. Nuclear Regulatory
Commission licensees
All holders of OLs or CPs
for nuclear power reactors
96-47
96-46
is
IN 96-40, Supp. 1 October 7, 1996 conclusions about current material supply practices under the rules of the ASME Code
and under the quality assurance requirements of 10 CFR Part 50, Appendix B.
3.
There was no effort to compare or rank the vendors inspected during this series of
NRC inspections. The concerns identified on page 2 of the IN are a summary of
findings on all of the vendors inspected, and it should not be assumed that these
findings are applicable to each of the vendors inspected. The specific inspection
findings for each of the vendors are discussed in the respective inspection reports, which are available in NRC's Public Document Room and have been published in
NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report."
4.
Although the NRC had inspected material suppliers before the start of this inspection
series, no attempt was made to include historical data in IN 96-40 since the main
purpose of the series was to characterize current industry practice. The earlier
inspections generally had a different or more narrow scope and did not cover the
same program areas. The exclusion of any suppliers inspected earlier from the
vendors listed in Attachment 1 to the IN should not be viewed as an indication that the
commercial-grade-item dedication practices of these suppliers were found to be
superior to those of the companies identified in the IN.
This information notice requires no specific action or written response. If you have any
questions about the information in this notice, please contact the technical contacts listed
below.
ottrirl slgned by Ban K. Grimes
vAJ
Thomas T. Martin, Director
`I
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical Contacts: Uldis Potapovs, NRR
(301) 415-2959 E-mail: uxp@nrc.gov
Larry Campbell, NRR
(301) 415-2976 E-mail: llc@nrc.gov
Attachment: List of Recently Issued NRC Information Notices
- See previous concurrence Tech Editor has reviewed & concurred on 09/03/96 DOCUMENT NAME:G:XNICl0VENDORIN\\9640REV
To receive a copy of this document, Indicate In the box: "C" a Copy without enclosures "E" a Copy with
Ms "N'
No copy
OFFICE
TECH CONTS
PSIB
T
BC:PECB
D: DXKIAI I
NAME
UPotapovs*
RMGallo*
AEChaffee*
LCampbell*
DATE
09/06/96
09/06/96
09/19/96 M/7z.-96 l
09/06/96
.
_
OFFICIAL RECORD COPY
IN 96-40, Supp. I
September xx, 1996 3.
There was no effort to compare or rank the vendors inspected during this
series of NRC inspections. The concerns identified on page 2 of the IN
are a summary of findings on all of the vendors inspected, and it should
not be assumed that these findings are applicable for each of the
vendors inspected. The specific inspection findings for each of the
vendors are discussed in the respective inspection reports, which are
available in NRC's Public Document Room and have been published in
NUREG-0040, "Licensee Contractor and Vendor Inspection Status Report.,
4.
Although the NRC had inspected material suppliers before the start of
this inspection series, no attempt was made to include historical data
in IN 96-40, since the main purpose of the series was to characterize
current industry practice. The earlier inspections generally had a
different or more narrow scope and did not cover the same program areas.
The exclusion of any suppliers inspected earlier from the vendors listed
in Attachment 1 to the IN should not be viewed as an indication that the
commercial-grade-item dedication practices of these suppliers were found
to be satisfactory or superior to those of the companies identified in
the IN.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contacts listed below.
Thomas T. Martin, Director
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical Contacts: Uldis Potapovs, NRR
Larry Campbell, NRR
(301) 415-2959
(301) 415-2976 E-mail: uxp~nrc.gov
E-mail: llc@nrc.gov
Attachment: List of Recently Issued NRC Information Notices
- See previous concurrence
DOCUMENT NAME:G:\\NICK\\VENDORIN\\9540REV
To receive a copy of ts document, Indicate In the box: 'C' - Copy without enclosures 'E'
- Copy with enclosures 'N
-
No copy
OFFICE
l
PSIB
_
D:DRPMl
NAME
UPotapovs*
RMGallo*
AEChaffee
TTMartin
LCampbell*
DATE
09/06/96
09/06/96
09/Ic1/96
09/ /96
09/06/96 N_
_l
OFFICIAL RECORD COPY
4twf}
IN96-40, Supp. 1 September xx, 1996 3.
There was no effort to compare or rank the vendors inspected during this
series of NRC inspections. The concerns identified on page 2 of the IN
are a summary of findings on all of the vendors inspected, and it should
not be assumed that these findings are applicable for each of the
vendors inspected. The specific inspection findings for each of the
vendors are discussed in the respective inspection reports, which are
available in NRC's Public Document Room and have been published in
NUREG-0040, 'Licensee Contractor and Vendor Inspection Status Report.,
4.
Although the NRC had inspected material suppliers before the start of
this inspection series, no attempt was made to include historical data
in IN 96-40, since the main purpose of the series was to characterize
current industry practice. The earlier inspections generally had a
different or more narrow scope and did not cover the same program areas.
The exclusion of any suppliers inspected earlier from the vendors listed
in Attachment 1 to the IN should not be viewed as an indication that the
commercial-grade-item dedication practices of these suppliers were found
to be satisfactory or superior to those of the companies identified in
the IN.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contacts listed below or the Office of Nuclear Reactor
Regulation project manager.
Thomas T. Martin, Director
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical Contacts: Uldis Potapovs, NRR
Larry Campbell, NRR
(301) 415-2959
(301) 415-2976 E-mail: uxptnrc.gov
E-mail: llc3@nrc.gov
Attachment: List of Recently Issued NRC Information Notices
- See previous concurrence
DOCUMENT NAME:G:\\NICK\\VENDORIN\\9540REV
To ncelvo a copy of this document, Indicate In the box: TC - Copy without enclosures 'E' - Copy with enclosures 'N'
No copy
OFFICE
lI
IPSIB
l
BC:PECB
l1 DP
NANE
UPotapovs*
RMGallo*
AEChaffee
TTMartin
LCampbell*
DATE
09/06/96
09/06/96
09/ /96
09/ /96
09/06/96 DC
OFICA REODCP
IN96-40, Supp. 1 September xx, 1996 3.
There was no effort to compare or rank the vendors inspected during this
series of NRC inspections. The concerns identified on page 2 of the IN
are a summary of findings from all of the vendors inspected and it
should not be assumed that these findings are applicable for each of the
vendors inspected. The specific inspection findings for each of the
vendors are discussed in the respective inspection reports which are
available in the NRC's Public Document Room and have been published in
NUREG-0040, 'Licensee Contractor and Vendor Inspection Status Report.,
4.
Although NRC had inspected material suppliers before the start of this
inspection series, no attempt was made to include historical data in IN 96-40, since the main purpose of this inspection series was to
characterize current industry practice. The earlier inspections
generally had a different or more narrow scope and did not cover the
same program areas. The exclusion of any earlier-inspected suppliers
from the vendors listed in Attachment 1 to the IN should not be viewed
as an indication that the commercial grade item dedication practices of
these suppliers were found to be satisfactory or superior to those of
the companies identified in the IN.
This information notice requires no specific action or written response. If
you have any questions about the information in this notice, please contact
the technical contacts listed below or the Office of Nuclear Reactor
Regulation project manager.
Thomas T. Martin, Director
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical Contacts: Uldis Potapovs, NRR
Larry Campbell, NRR
(301) 415-2959
(301) 415-2976 E-mail: uxp~nrc.gov
E-mail: llc3@nrc.gov
E.Nick Fields, NRR
(301) 415-1173 E-mail: enf~nrc.gov
Attachment: List of Recently Issued NRC Information Notices
DOCUMENT NAME:G:\\NICK\\VENDORIN\\9540REV
To receive a copy of Wis document. Indicate in
the box: 'C' - Copy without enclosures 'E' - Copy with enclosures '
- No copy
OFFICE
lC.
BC:PECB
D:DRPM l
NAME
UPotapovsL*,_
RMG
AEChaffee
TTMartin
LCampbell1 A
ENFields
U
DATE
09/6/96
09/; /96
09/ /96
09/ /96
09/ /96 OFFICIAL RECORD COPY