Summary of Public Meeting with Technical Specifications Task Force Draft Regulatory Issue Summary (Ris), NRC Staff Position on the Relationship Between Gds (General Design Criteria) Requirements and Technical Specification Operability
ML13190A438
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/25/2013
From: Michelle Honcharik
Licensing Processes Branch (DPR)
To: Anthony Mendiola
Licensing Processes Branch (DPR)
Honcharik M
Shared Package
ML13197A453 List:
References
Download: ML13190A438 (4)


Text

July 25, 2013 MEMORANDUM TO: Anthony Mendiola, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Michelle C. Honcharik, Senior Project Manager

/RA/

Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF AUGUST 8, 2012, PUBLIC MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE RE: DRAFT REGULATORY ISSUE

SUMMARY

(RIS), NRC STAFF POSITION ON THE RELATIONSHIP BETWEEN GDC [GENERAL DESIGN CRITERIA]

REQUIREMENTS AND TECHNICAL SPECIFICATION OPERABILITY On August 8, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff met with the Technical Specifications Task Force (TSTF) representatives to discuss and seek public comment on the Draft RIS, NRC Staff Position on the Relationship Between GDC Requirements and Technical Specification Operability (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML12137A346). The meeting was held at NRC offices in Two White Flint North, 11545 Rockville Pike, Rockville, Maryland 20852. A list of the meeting attendees is enclosed.

The meeting notice dated July 25, 2012, is available in the ADAMS under Accession No. ML12207A211.

The draft RIS clarifies the NRC staffs position on the relationship between the GDC for nuclear power plants and technical specification operability. In addition, the RIS clarifies the process for addressing non-conformances with GDC as incorporated into a plants current licensing basis.

After a short discussion on the NRC staffs position that the RIS does not establish any new positions, the industry agreed. There was no disagreement with the content of the RIS, but there will most likely be formal industry comments submitted in response to the Federal Register Notice (that provided the Draft RIS) requesting additional clarity on the current definition of operability and why it is being reemphasized in this RIS. The discussion also focused on issues contained in NRC Inspection Manual Chapter (IMC) Part 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components."

The NRC staff indicated there will be a future workshop to discuss industry concerns with IMC Part 9900.

There were no questions received from the public.

Project No. 753 cc w/ encl: See next page

Package - ML13197A453; Summary - ML13190A438; Draft RIS - ML12137A346; Notice - ML12207A211; *Concurred by e-mail NRC-001 OFFICE PLPB/PM PLPB/LA STSB/BC PLPB/BC PLPB/PM NAME MHoncharik DBaxley RElliott*

(MHoncharik for)

AMendiola (HCruz for)

MHoncharik DATE 07/18/2013 07/18/2013 07/25/2013 07/25/2013 07/25/2013

Technical Specifications Task Force Mailing List cc:

Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Brian Mann E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com Richard A. Loeffler Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 E-mail: richard.loeffler@xenuclear.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com

ENCLOSURE Attendees at the draft RIS, NRC Staff Position on the Relationship between Requirements and Technical Specification Operability Meeting August 8, 2012 Name Organization Robert Elliott NRC/Office of Nuclear Reactor Regulation (NRR)/Division of Safety Systems (DSS) /

Technical Specifications Branch (STSB)

Carl Schulten NRC/NRR/DSS/STSB Kristy Bucholtz NRC/NRR/DSS/STSB Theodore Tjader NRC/Office of New Reactors Regulation (NRO)

Brian Mann Technical Specifications Task Force (TSTF)

Tony Browning TSTF Rick Loeffler TSTF Rob Slough TSTF Jana Bergman Scientech Jeff Thomas Duke Energy Larry Nicholson NextEra Jim Andruchek Westinghouse Robert Wanczyk Entergy - Vermont Yankee Ken Nicely Exelon Wendy Croft TSTF Greg Howard Exelon Jerry Bonanno NEI Lisa Williams Energy Northwest David Pelton NRR/DPR/PGCB Terry Beltz NRC/NRR/Division of Operating Reactor Licensing (DORL)

Ned Tyler Constellation Nuclear Kevin Witt NRC/NRR/Japan Lessons Learned Directorate (JLD)

Thomas Alexion NRC/NRR/Division of Policy and Rulemaking (DPR)/Generic Communications Branch (PGCB)

Peter Bamford NRC/NRR/DORL Kenneth Schrader PG&E John Jolicoeur NRC/NRR/DPR/Licensing Processes Branch (PLPB)

Michelle Honcharik NRC/NRR/DPR/PLPB Steve Myers STP Nancy Chapman Bechtel