05000400/LER-1997-002-01, Fowards LER 97-002-01,IAW 10CFR50.73.Rev Provides Addl Corrective Actions Taken to Address Low Temps in Area of Mfiv

From kanterella
Revision as of 05:59, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fowards LER 97-002-01,IAW 10CFR50.73.Rev Provides Addl Corrective Actions Taken to Address Low Temps in Area of Mfiv
ML18016A482
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/09/1998
From: Donahue J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A483 List:
References
HNP-97-226, NUDOCS 9807160280
Download: ML18016A482 (2)


LER-1997-002, Fowards LER 97-002-01,IAW 10CFR50.73.Rev Provides Addl Corrective Actions Taken to Address Low Temps in Area of Mfiv
Event date:
Report date:
4001997002R01 - NRC Website

text

UA.LKM'lJK,X REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9807160280 DOC.DATE: 98/07/09 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION DONAHUH;J.W.

Carolina Power Sc Light Co; RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Contxol Desk)

SUBJECT:

Fowards LER 97-002-01,IAW 10CFR50.73.Rev provides addi

corrective actions

taken to address low temps in area of MFIV.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Application for permit renewal filed.

DOCKET 05000400 05000400(

RECIPIENT ID CODE/NAME PD2-1 PD COPIES RECIPIENT LTTR ENCL 'D CODE/NAME 1

1 FLANDERS,S COPIES LTTR ENCL 1

1 INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HOHB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2 FILE 01 1

1 1 '1' 1

1 1

1 1

1' 1

1 1

AEOD CENTER NRR DE ELB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB 2

2 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: L ST LOBBY WARD NOAC POORE,W.

NRC PDR

,1 1

1 1

1 1

LITCO BRYCEiJ H 1

1 NOAC QUEENER,DS 1

1 NUDOCS FULL TXT 1

1 NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE HASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO DESK (DCD)

ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

Carolina Power 8a Light Company Harris Nuclear Plant P.O. 8ox 165 New HillNC 27562

- JUL 09 1998 U.S. Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 Serial: HNP-97-226 10CFR50.73 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 LICENSEE EVENT REPORT 97-002-01 Sir or Madam:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed revision to Licensee Event Report 97-002 is submitted.

This revision provides additional corrective actions taken to address the low temperatures in the area of the Main Feedwater Isolation Valves.

Sincerely, J.. Donahue Director of Site Operations Harris Plant MV Enclosure c:

Mr. J. B. Brady (HNP Senior NRC Resident)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. V. L. Rooney (NRC - NRR Project Manager) 5413 Shearon Harris Road New HillNC

'P807 i60280

'tt80709'DR ADOCK 05000400 S

PDR