80-41/03X-l Report Date:.
10/1/80 Occurrence Date:
July 8, 1980 Facility:
Salem Generating Station -
Unit 1 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
No. 11 Safety Injection Pump Inoperable CONDITIONS PRIOR TO OCCURRENCE:
Mode 1, Reactor Power 100%
DESCRIPTION OF OCCURRENCE:
At 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />, during routine rounds, it was observed that water was in the gauge glass of No. 11 Safety Injection Pump lube oil cooler.
Action Statement 3.4.2.a was entered which required if one ECCS subsystem is inoperable, it must be restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in hot shutdown within the.next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:
Cooler Tube Failure ANALYSIS OF OCCURRENCE:
The Safety Injection Pump was removed from service and a pressure test performed to determine the cause of the water in-leakage.
It was determined a tube had failed.
CORRECTIVE ACTION
The failed tube was plugged and pressure tested satisfactorily.
The Safety Injection Pump was proved operable and the Action Statement terminated at 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />.
Because of the two recent failures of lube oil to service water coolers, a pressure test will be conducted on the other Safety Injection Pump and both Centrifugal Charging Pumps, which have similar type coolers, in the current outage to insure their integrity.
FAILURE DATA:
Pacific Pumps, Inc.
10 Stage Horizontal Centrifugal Prepared By J. M. Randolph Manager -
Sa~em Generating Station SORC Meeting No.
75-80 8 01ooao a~o
NRC FORM 366 (7-17)
U.S. NUCLEAR REGULATORY COMMISSION e
LICENSEE EVENT REPORT
- CONTROL BLOCK: ~I_* -'-~~_.._l~~-'---'IG) 1 6
(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
~
7 8 I NI JI s I GI s 1*1 IG)l.__o___.__I o__.l_-_._l_o_._l_o_._l _o...._l _o......... ! _o........ I ___.__I 0_1.__o__,IG)I 4 11 11 11 I 1 101 I
I G) 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T [TID 7
8
~~~~~~ ~©I 0 I 5 I 0 I o I 0 I 2 I 7 I 2 101 ° I 7 I 0 I 8 I 8 I 0 101 i Io I o I 1 I s I o 10 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
I During routine operation, it was determined at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> water had mixed with the lubricating oils in #11 Safety Injection Pump.
The pump was declared inoperable and Action Statement 3.5.2.a was entered (76-23, 77-34, 77-72, 79-68, 80-38).
[§))]
7 8 9
~
7 8
SYSTEM CODE IP I cl@
9 10
~
LER/RO LVENT YEAR
~
REPORT I 8 I 0 I NUMBER 21 22
CAUSE
CAUSE CODE SUBCOOE COMPONENT CODE
~@ ~@ I H IE I A IT IE Ix I@
11 12 13 18 SEQUENTIAL OCCURRENCE REPORT NO.
CODE I I 1014111 1......-1 lol3 I 23 24 26 27 28 29 COMP.
SUB CODE
~@)
19 REPORT TYPE L2U 30 VALVE SUBCODE
~@
20 l=:l 31 PRIME COMP.
REVISION NC.
LU 32 COMPONENT 80 ACTION FUTURE EFFECT SHUTDOWN
(:;:;\\
ATTACHMENT TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED NPRD-4 FORM :iUB.
SUPPLIER MANUFACTURER UJ@~@ ~@ ~ 10101°101 W@
33 34 35 36 3 7 40 41
~@) ~@ IP I 0 I 2 I 6 I@
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
42 43 44 47 I After pressure testing of the cooler, it was determined that a cooler tube had failed!.
The failed tube was plugged and retested satisfactorily.
The Action Statement was ITTIJ ITITl CITIJ terminated at 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />.
7 8
9 FACILITY f:jQ\\
STATUS
% POWER OTHER STATUS \\:::::,1
~
W@ I i I 0 I 0 !@I._ ___
NA __ ~
8 9
10 12 11 44 ACTIVITY CONTENT
(.:;;;\\
RELEASED OF RELEASE AMOUNT OF ACTIVITY '2_V [2liJ w @ lLJ@I NA 8
9 10 11 44 PERSONNEL EXPOSURES Q..
80 METHOD OF
~
DISCOVERY DISCOVERY DESCRIPTION (31
~GV.l ___
O~p..._..e=r~a~t~o~r--I=n~s.p_e_c~t~i~*o~n=-~~-----~__.
45 46 45 LOCATION OF RELEASE@)
NA 80 80 NUMBER r:;::;., TYPE DESCRIPTION~
[2J2J lo lo loj(0~@)~--~NA~~~~~~~--~~~~~~-~~-~~
7 8
9 11 12 13 80 PERSONNEL INJURIES Q
NUMBER DESCRIPTION6
~
lolo lo 1@).__~~~~~N_A~~~~~~~~-~~-~~~----~~~~--
7 8
9 11 12 LOSS OF OR DAMAGE TO FACILITY Q TYPE
DESCRIPTION
o.:::::;
80 NA
~w@
s 9
1~0~~~~~~~~~~~~~~~~~-~-~~-~~~~~~~~~~~~~~-~-~~~~-s~o 7
PUBLICITY
(.;:\\
ISSUED!,;";;\\ DESCRIPTION~
NRC USE ONLY [I[OJ w~
NA 1 1 1 1 1 1 1, 1 1, 1 1 ~
s 91
- a-~~~~~~~---~:.;.:.;;------~--------------'68 69 80 c; J. M. Randolph NAME OF PREPARER~---------------~-~
PHONE: __
6_0_9_-_9_3_5_-_o_9_9_8 ____ _
0 a.
<.!)
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000311/LER-1980-001-03, /03L-0:on 800522,when OL Received,Fire Barriers Were Open Due to Recent Removal of Electrical Cables,Pipes & Welding Cables.Cause Not Stated.Barriers Were Verified Sealed Prior to Core Load | /03L-0:on 800522,when OL Received,Fire Barriers Were Open Due to Recent Removal of Electrical Cables,Pipes & Welding Cables.Cause Not Stated.Barriers Were Verified Sealed Prior to Core Load | | | 05000311/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000272/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000272/LER-1980-001-03, /031-0:on 800101,axial Flux Difference Determined to Be Outside Target Band.Caused by Signal Output Failing High.Signal Isolator Was Replaced & Axial Flux Difference Monitor Recalibr | /031-0:on 800101,axial Flux Difference Determined to Be Outside Target Band.Caused by Signal Output Failing High.Signal Isolator Was Replaced & Axial Flux Difference Monitor Recalibr | | | 05000311/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000272/LER-1980-002-03, /03L-0:on 800104,discovered That Functional Tests of Power Range Neutron Flux Low Trip Setpoint When Greater than 25% Power Had Not Been Performed Since 1976.Caused by Lack of Procedures for Tests | /03L-0:on 800104,discovered That Functional Tests of Power Range Neutron Flux Low Trip Setpoint When Greater than 25% Power Had Not Been Performed Since 1976.Caused by Lack of Procedures for Tests | | | 05000311/LER-1980-002-03, /03L-0:on 800526,during Routine Surveillance, Emergency Diesel 2B Could Not Be Fully Loaded.Caused by Three Pins Stuck in Fuel Injectors.Pins Were Unstuck & Diesel Tested Satisfactorily.Insp Order Has Been Initiated | /03L-0:on 800526,during Routine Surveillance, Emergency Diesel 2B Could Not Be Fully Loaded.Caused by Three Pins Stuck in Fuel Injectors.Pins Were Unstuck & Diesel Tested Satisfactorily.Insp Order Has Been Initiated | | | 05000272/LER-1980-002, Forwards LER 80-002/03L-0.Previous Transmittal Included Incorrect LER Attachments | Forwards LER 80-002/03L-0.Previous Transmittal Included Incorrect LER Attachments | | | 05000272/LER-1980-003-03, /03L-0:on 800203,air Particulate Detector Pump Seized,Rendering Detector Inoperable.Caused by Normal Degradation of Pump.Pump Replaced | /03L-0:on 800203,air Particulate Detector Pump Seized,Rendering Detector Inoperable.Caused by Normal Degradation of Pump.Pump Replaced | | | 05000272/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000311/LER-1980-003, Has Been Cancelled | Has Been Cancelled | | | 05000272/LER-1980-004, Forwards LER 80-004/03X-1.Detailed Event Analysis Encl | Forwards LER 80-004/03X-1.Detailed Event Analysis Encl | | | 05000311/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000311/LER-1980-004-03, /03L-0:on 800610,during Routine Surveillance,Both Safety Injection Pumps Were Made Operable at Less than 312 F in Rcs.Caused by Lack of Procedure to Limit Max Number of Operable Safety Pumps | /03L-0:on 800610,during Routine Surveillance,Both Safety Injection Pumps Were Made Operable at Less than 312 F in Rcs.Caused by Lack of Procedure to Limit Max Number of Operable Safety Pumps | | | 05000272/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000311/LER-1980-005-03, /03L-0:on 800622,during Preparation for Heatup, Position Indication & Mechanical Operation of Pressurizer Overpressure Protection Valves Gave False Indication & Failed to Reseat.Possibly Caused by Foreign Matl in Valve | /03L-0:on 800622,during Preparation for Heatup, Position Indication & Mechanical Operation of Pressurizer Overpressure Protection Valves Gave False Indication & Failed to Reseat.Possibly Caused by Foreign Matl in Valve | | | 05000272/LER-1980-005-03, /03L-0:on 800117,containment Pressure Allowed to Increase Above Limit.Design Change 1EC-0474,not Incorporated,Would Have Raised Alarm Setpoints on Containment Particulated Monitors.Setpoints Readjusted | /03L-0:on 800117,containment Pressure Allowed to Increase Above Limit.Design Change 1EC-0474,not Incorporated,Would Have Raised Alarm Setpoints on Containment Particulated Monitors.Setpoints Readjusted | | | 05000311/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000311/LER-1980-006-03, /03L-0:on 800625,residual Heat Removal Pump Was Discovered to Have Been Previously Improperly Assembled. Caused by Either Personnel Error or Procedural Inadequacy. Pump Inspected,Repaired & Reassembled | /03L-0:on 800625,residual Heat Removal Pump Was Discovered to Have Been Previously Improperly Assembled. Caused by Either Personnel Error or Procedural Inadequacy. Pump Inspected,Repaired & Reassembled | | | 05000272/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000311/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000272/LER-1980-006-03, /03L-0:on 800123,power Was Lost to Meteorological Tower Instruments.Caused by Faulty Backup Power Inverter. Inverter Does Not Have Automatic Transfer Switch as Originally Designed | /03L-0:on 800123,power Was Lost to Meteorological Tower Instruments.Caused by Faulty Backup Power Inverter. Inverter Does Not Have Automatic Transfer Switch as Originally Designed | | | 05000311/LER-1980-007-03, /03L-0:on 800709,during Normal Operations,Motor Bearing Thermocouple for 21 Containment Fan Coil Unit Indicated High.Caused by Normal Wear on Bearing.Bearing Replaced in Kind & Fan Coil Unit Tested Satisfactorily | /03L-0:on 800709,during Normal Operations,Motor Bearing Thermocouple for 21 Containment Fan Coil Unit Indicated High.Caused by Normal Wear on Bearing.Bearing Replaced in Kind & Fan Coil Unit Tested Satisfactorily | | | 05000311/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000272/LER-1980-007, Forwards LER 80-007/03X-2.Detailed Event Analysis Encl | Forwards LER 80-007/03X-2.Detailed Event Analysis Encl | | | 05000272/LER-1980-007-03, /03X-1:on 800128,design Deficiency Found in Demineralized Water Supply Check Valve to Auxiliary Feedwater Storage Tank 1DR7.Caused by Failure to Include Valve in Piping Spec Break.Valve Seismically Qualified | /03X-1:on 800128,design Deficiency Found in Demineralized Water Supply Check Valve to Auxiliary Feedwater Storage Tank 1DR7.Caused by Failure to Include Valve in Piping Spec Break.Valve Seismically Qualified | | | 05000311/LER-1980-008-03, /03L-0:on 800710,during Routine Containment Entries,Entry Into Action Statement 3.6.1.3 Resulted from Excessive Leak Rate.Caused by Gaskets Being Moved from Seating Surface Due to Improper Operation.Gaskets Reseated | /03L-0:on 800710,during Routine Containment Entries,Entry Into Action Statement 3.6.1.3 Resulted from Excessive Leak Rate.Caused by Gaskets Being Moved from Seating Surface Due to Improper Operation.Gaskets Reseated | | | 05000272/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000272/LER-1980-008-03, /03L-0:on 800129,maint Was Performed on Inboard Containment pressure-vacuum Relief Valve lVC6 Using nonsafety-related Procedures & Nonqualified Parts.Caused by Omission on List of safety-related Control Valves | /03L-0:on 800129,maint Was Performed on Inboard Containment pressure-vacuum Relief Valve lVC6 Using nonsafety-related Procedures & Nonqualified Parts.Caused by Omission on List of safety-related Control Valves | | | 05000311/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000311/LER-1980-009-03, /03L-0:on 800709,during RCS Heatup,Steam Generator Flow & Pressure Channel Response Inadequate.Bistables Placed in Tripped Mode.Caused by Closed Isolation Valve from Main Steam Piping Preventing Normal Operation.Valve Opened | /03L-0:on 800709,during RCS Heatup,Steam Generator Flow & Pressure Channel Response Inadequate.Bistables Placed in Tripped Mode.Caused by Closed Isolation Valve from Main Steam Piping Preventing Normal Operation.Valve Opened | | | 05000272/LER-1980-009, Forwards Updated LER 80-009/03X-2 | Forwards Updated LER 80-009/03X-2 | | | 05000311/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000272/LER-1980-009-03, Small Leak Found in Telltale Drain 6 in Spent Fuel Pit.Caused by Leaking Welded seams.Half-round Channels Welded Over Leaking Welds | Small Leak Found in Telltale Drain 6 in Spent Fuel Pit.Caused by Leaking Welded seams.Half-round Channels Welded Over Leaking Welds | | | 05000272/LER-1980-010-03, /03L-0:on 800206,while Reviewing Procedure,Found That,During Load Test on Manipulator Crane Prior to Fuel Movement on 790425,test of 3,220 Lbs Performed Instead of 3,250 Lbs Per Tech Spec.Procedure Will Be Revised | /03L-0:on 800206,while Reviewing Procedure,Found That,During Load Test on Manipulator Crane Prior to Fuel Movement on 790425,test of 3,220 Lbs Performed Instead of 3,250 Lbs Per Tech Spec.Procedure Will Be Revised | | | 05000272/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000311/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000311/LER-1980-010-03, /03L-0:on 800709,during RCS Heatup at 1,700 Psig, Channels I & II for Pressure Indication Failed to Respond. Caused by Broken Fuse Cap on Channel I & Improper Valve Lineup on Channel Ii.Fuse Cap Replaced & Valve Opened | /03L-0:on 800709,during RCS Heatup at 1,700 Psig, Channels I & II for Pressure Indication Failed to Respond. Caused by Broken Fuse Cap on Channel I & Improper Valve Lineup on Channel Ii.Fuse Cap Replaced & Valve Opened | | | 05000311/LER-1980-011-03, /03L-0:on 800710,during Routine surveillance,2C Vital Bus Undervoltage Trip Relay Failed to Meet Spec.Caused by Variation in Ambient Conditions Resulting in Relay Trip Setpoint Changing from Preset Mode.Relay Reset | /03L-0:on 800710,during Routine surveillance,2C Vital Bus Undervoltage Trip Relay Failed to Meet Spec.Caused by Variation in Ambient Conditions Resulting in Relay Trip Setpoint Changing from Preset Mode.Relay Reset | | | 05000272/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000311/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000272/LER-1980-011-03, /03L-0:on 800212,during Air Lock Leakage Test, Found Leakage Above Tech Spec Limit.Caused by Gasket Being Jarred from Seating Channel.Gasket & Seating Surface Cleaned.Gasket Reinstalled | /03L-0:on 800212,during Air Lock Leakage Test, Found Leakage Above Tech Spec Limit.Caused by Gasket Being Jarred from Seating Channel.Gasket & Seating Surface Cleaned.Gasket Reinstalled | | | 05000311/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000272/LER-1980-012-03, /03L-0:on 800205,air Particulate Detector Was Declared Inoperable When Shear Pins & Microswitch Failed. Caused by Normal Degradation of Pins & Probable Bump of Switch by Personnel.Pins Replaced & Switch Repaired | /03L-0:on 800205,air Particulate Detector Was Declared Inoperable When Shear Pins & Microswitch Failed. Caused by Normal Degradation of Pins & Probable Bump of Switch by Personnel.Pins Replaced & Switch Repaired | | | 05000272/LER-1980-012, Forwards LER 80-012/03L-0 | Forwards LER 80-012/03L-0 | | | 05000311/LER-1980-012-03, /03L-0:on 800713,during Routine Surveillance, Auxiliary Feedwater Pump 23 Found Inoperable.Caused by Jammed Control Valve Linkage Due to Loose Nut.Linkage Set Free,Nut Installed & Pump Tested Satisfactorily | /03L-0:on 800713,during Routine Surveillance, Auxiliary Feedwater Pump 23 Found Inoperable.Caused by Jammed Control Valve Linkage Due to Loose Nut.Linkage Set Free,Nut Installed & Pump Tested Satisfactorily | | | 05000272/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000311/LER-1980-013-03, /03L-0:on 800714,during Routine tour,21 & 22CS6 Spray Header Isolation Valves Were Found Cleared & Tagged in Closed Position.Caused by Facilitation of Performance of Surveillance Test After Which Valves Were Not Repositioned | /03L-0:on 800714,during Routine tour,21 & 22CS6 Spray Header Isolation Valves Were Found Cleared & Tagged in Closed Position.Caused by Facilitation of Performance of Surveillance Test After Which Valves Were Not Repositioned | | | 05000311/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000272/LER-1980-013-03, /03L-0:on 800227,during Routine Surveillance,Temp Maintained by Heat Trace Circuit 603 Found to Be 142 F Instead of 145 F.Caused by Pipe Insulation Erosion.Heat Tracing Repaired & Piping Reinsulated | /03L-0:on 800227,during Routine Surveillance,Temp Maintained by Heat Trace Circuit 603 Found to Be 142 F Instead of 145 F.Caused by Pipe Insulation Erosion.Heat Tracing Repaired & Piping Reinsulated | |
|