05000325/LER-1979-083-03, /03L-0:on 791024,reading on Torus Level Instrument 1-CAC-LT-3342 Was Six Inches Low.Caused by Inaccurate Calibr Resulting from Debris in Sight Glass.Calibr Instruction Revised to Include Cleaning of Sight Glass

From kanterella
Revision as of 01:22, 4 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 791024,reading on Torus Level Instrument 1-CAC-LT-3342 Was Six Inches Low.Caused by Inaccurate Calibr Resulting from Debris in Sight Glass.Calibr Instruction Revised to Include Cleaning of Sight Glass
ML19256F097
Person / Time
Site: Brunswick 
Issue date: 11/14/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19256F095 List:
References
LER-79-083-03L-01, LER-79-83-3L-1, NUDOCS 7911210429
Download: ML19256F097 (2)


LER-1979-083, /03L-0:on 791024,reading on Torus Level Instrument 1-CAC-LT-3342 Was Six Inches Low.Caused by Inaccurate Calibr Resulting from Debris in Sight Glass.Calibr Instruction Revised to Include Cleaning of Sight Glass
Event date:
Report date:
3251979083R03 - NRC Website

text

U.S. NUCLEAR REGULATORY COMMISSION NRC PORM 366 87 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIREO INFORMATION) 1 6

foTil IN lC lB lE lP l1 l@l0 l0 l-l0 l0 l0 0 l0 l-l0 l0 lgl4l1l1l1l1lgl l

g 7

8 9 LlOENSEE CODE 14 15 LICENSE NUMBER 25 25 LICEN4E T ' PE 40 57 CAT $8 CON'T L h l 0l5 l 0l -l Ol 3l 2l 5 @ l ll Ol 2l 4l 7l 9 @ l l

l l

l l

l@

$ouRCE 7

8 60 61 OOCK ET NUMB ER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h Lo_Ld l During a normal surveillance tour of the Reactor Building, the auxiliary operator Al noticed that the torus level instrument 1-CAC-LT-3342, on the remote shutdown panel, l

was reading six inches low.

o 4

l Io TTI l i

LE LsJ l l

O 7

l F51T1 i Technical Specification 3.3.5.2, 6.9.9.b l

80 OE CODE SUSC DE COMPONENT CODE SUS DE SU E

lIl E l@ W@ l A l@ l Il Nl S l Tl Rl U l@ {Q lZ g o

9 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION EVENT YEAR REPORT NO.

CODE TYPE NO.

@,a'E R/R0l 71 ol

- l 0 8l 3l y

l0l3 l Lj g

l0l L

uNEj a

21 22 23 24 26 27 28 22 30 31 J2 K N AC N

ON PL NT ME HOURS 22 S8 i POR 8.

SUPPLIER MANUPAC RER l X l@lC l@

l Z l@

l Zl@

l 0] 0l 0l l

Qg l Y [g l3Alg l R 3 l 6 l 9 lQ 33 34 3%

36 37 40 41 42 4

44 47 CAU3E DESCRIPTION AND CORRECTIVE ACTIONS i

O l CAC-LTI-3342 had been calibrated inaccurately due to an erroneous sight glass reading. l The temporarv sight glass contained debris. The sight glass was replaced and the

]

i i g

instrument was recalibrated and returned to service. The calibration instruction has; yl been revised to include a check of the sightglass for cleanliness before calibration l L'E l begins and to verify sighe glass level before and after calibration.

(Cont'd) l 80 7

8 9 STA

% POWER OTHER STATUS 015 O RY DISCOVERY DESCRIPTION NA l

lAlglOperatorSurveillance l

Q W @ l0l0l0l@l A T1VITY CO TENT nELEASE AMOUNT OP ACTIVITY LOCATION OP RELEASE M d @D OP RE' EASE [,Z,,,,,,j@ l NA l

l NA l

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUV8E R TYPE

DESCRIPTION

NA l

ITT71 l 0101 Ol@W@l So PERSO~~E'L,~3u'4 ES oESCRiPfiON@

t )7 /Q lu (

suuSER I

' J

'l / J W l 0l 0 0l@l NA 7

8 9 11 12 80 LOSS OF OR DAMAGE TO PACILITY TYPE

DESCRIPTION

lZ l@l NA t 9 7

8 9 10 7911210 # 9 NaC uSe ONov ISSUEf@l DESCRIPTION N

NA l

llllllllllllll 2 o 68 69 80 ~.

7 8 9 to 919 l*57 05?1

);

A. C. Tollison, Jr.

PHONE:

NAME OF PREPARER

LER CONTINUATION -- RO# 1-79-83 Facility: BSEP Unit #1 Event Date 10-24-79 An Engineering Work Request has been written to install a permanent sight glass.

13/$ J94 h

e