05000293/LER-1979-030-03, /03L-0 on 790725:motor Control Ctr Breaker of Globe Valve MOV-1001-36B Tripped on Overload After Valve Given Signal to Open.Caused by Shear in Valve Stem Guide Key.Stem Clamps Drilled in Place & Tapped for Set Screws

From kanterella
Revision as of 10:20, 3 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0 on 790725:motor Control Ctr Breaker of Globe Valve MOV-1001-36B Tripped on Overload After Valve Given Signal to Open.Caused by Shear in Valve Stem Guide Key.Stem Clamps Drilled in Place & Tapped for Set Screws
ML19261E509
Person / Time
Site: Pilgrim
Issue date: 08/16/1979
From: Fulton J
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19261E506 List:
References
LER-79-030-03L, LER-79-30-3L, NUDOCS 7908280533
Download: ML19261E509 (2)


LER-1979-030, /03L-0 on 790725:motor Control Ctr Breaker of Globe Valve MOV-1001-36B Tripped on Overload After Valve Given Signal to Open.Caused by Shear in Valve Stem Guide Key.Stem Clamps Drilled in Place & Tapped for Set Screws
Event date:
Report date:
2931979030R03 - NRC Website

text

LICENSEE EVENT HEl>0itT CONTROL DLOCK: l l

l l

l l

lh (PLEASE PalNT Oil TYPE ALL HEQUtitED INFODMATIOfH i

e

'o lil l M l A lP lP lS l ll@l 0 l 0 l 0 l 0 l0 l Oj 0l 0 l 0 l 0 l 0 lgl4 l 1l 1l 1l 1lg[

l lg 8 9 L10t r45LL COOL 14 lb LICLNSL FJVMHLfl 2:a 2G LILLtdbL 1YPL JO bl LAI bu CON'T

"$E [QQ 0l 5 l 0 l - l 0 l 2 l 9 l3 gj 0 l 7 l ]2 5 [ 7 l 9 l@l 0l 8 l 1l 6 l 7 l 9 l@

D S

LU 61 DOGr.[1 PJU'/til il LA 63 LVL*?' DAT C 14 7b f 4LPOf ti DAIL 4;U EVENT DESCntPTIOri AND PHODACLE CONSEQUENCES btO lO ly j l On July 25,19',9 while placing the "13" RJiR loop in su7pression pool cooling, MOV-1001-36B was given a signal to open and its motor control center i3reaker tripped on overload. y o

3 g

Surveil 1 n

, l ance testing was conducted for one containment cooling subsystem inoperabic

, and the breaker overload trip was investigated. It was discovered that the valve stem g

p guide key had sheared.

0 7 l o

a I

I BD t,0 551 E M

CAUSE

CAUSE

' C OY P.

VAtyE CODE CODE SUBCODE COMPONENT CODE SUDCODE SUBCODE O

9 lC lF @ l El@ l X l@ l Vl Al L lV lE lX l@ ]@ lD lg 8

9 10 11 12 IJ 18 19 20 5t OUE N11 AL OCCUit RE NCE f tF FOllT REVISION ggn TVE NT YE AR fit POftT tJO.

CODE 1YFE NO.

O,g,rg.ng I7I91

[--J l o I 31 o f l/l 10 13 I IL I l -J l

I

_ 21 22 23 24 26 27 28 2) 30 38 32 1 AKL t

'A 1

O PL T

i 14 HOURS 22 S Of 811 f f i L D.

PPLIE i P.1 A r F,

1 ifH [Ajg{34rjg l35Z lg

[ Zj @

l 0J0l0l j lY [g lN @

l A lg l 2 l2 0 l0 l@

33 33 3/

40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h o i SEE ATTACHMENT y

I i

i i

3 l

~

TIT 1I I

S 9 60 51 L5 4 POWER OTHER ST A1US Of C E Y DISCOVC HY DESCHIPilON W@ l 1l 0l 0j@l Q l A lgl N.A.

i s

OPERATIONAL EVENT l

  • Aa,vuv Coba

'S b I LzJ @ ! zi@l AMOUNTOF ACUVnv @ l ' LOCADON OF RELC ASE @

HMi ASE D OF HE U Asf N.A.

l N.A.

l 8 D 10 11 44 4b FEFISONNI L E xrosuHES ts J I

NUMBEH 1YPE DE SCHIPTION

_1TJ 10 l o l o l@l z !@l N.A.

l PC DSONNE L INJU ilES l

NUYlit ft DEScniPTION

] l0l0l0l@l i

N.A.

l 11 9 Ii 1.'

LOS

  • OR DAMAGE 10 FACillTY E3

=

D,sc""

" ^-

70082805 %

Tl LzJ@l I

.9

,o Punt ici1 Y l.sUto NHC tlSI' ONLY B LNjh. OLTLfHPTION l

N A-l l l l l l l l l l l l l l l, g g to 6B 09 14 -a John M. ruiton

_. _ nn o

MOST0!! EDTSO!1 C0!!pAf:Y PILCR111 liUCLEAR POUER STAT'IO!!

DOCI:l:7 f 0.

50-293 Attachment to LER 79-030/03L-0 The failure of the valve gufde stem key on MOV 1001-36B on July 25, 1979 was the fourth such failure sinct. July of 1974.

The three previous failures occurred to the key on MOV 1001-36A.

Date of Failure Report 7/31/74 U.0. 9 6/20/77 LER - 024/03L 7/27/79 LER - 028/03L An investigation was conducted to determine the cause of these failures.

Meetings

_ _wcre held with the manufacturer of the valves (Anchor / Darling) and the manufacturer

.of the operators (Limitorque)

MOV 1001-36A&B are 12"-300 lb. globe valves.

The stem is restrained from ro-tating by a stem clamp. The clamp is affixed to the stem by a \\" square steel key. The shear forces on the key were calculated and proved to be marginal for this application. The contention was verified by telephone conversations with a Field Service Engineer for Anchor / Darling.

A search of all Pilgrim's nuclear class valves was made to de'termine the extent of this problem. This search revealed two additional globe valves supplied by Anchor / Darling which have a similar design. These valves are MOV 1001-16A&B which are 18"-300 lb. globes. The stem clamp is affixed to the stem by two 5/8" set screws drilled 60 degrees apart. A check of the maintenance files indicated no failures on ~these valves.

Action has been initiated to implement corrective action. Alternative solutions were evaluated. It has been decided to drill the stem clamps in place and tap them for two set screws. This fix is the simplest and most cost effective of thoce evaluated. These modifications will be monitored to judge their effectiveness.

- - ~ '

=