l Docket No. 50-219 h4>
.
Jersey Central Power and Light Company O
N i
ATTN:
Mr. Philip R. Clark
/rF iQ,..
V N/C"n C
Vice President - Nuclear f2 [h
i
/S
GPU Nuclear
-
l k
IO8
- .~
100 Interpace Parkway
- g%g?ts Parsippany, New Jersey 07054
3
s Gentlemen:
J
Subject:
In.pection No. 50-219/81-08
.
l-Tnis refers to your letter dated October 26, 1981, in response to our j
letter dated September 24, 1981.
Thank you for informing us of the corrective and preventive actions documented in your letter. With regard to Violation A, we understand that inservice
!
testing of the Reactor Building Closed Cooling Water (RBCCW) and Service i
Water System (SWS) pumps is not currently being conducted in compliance j
with the ASME Code due to the lack of adequate flow measuring instrumentation.
j Also, the testing of the Containment Spray (CS) pumps does not evaluate
'
inlet pressure due to the lack of available instrumentation. We understand that you plan to install the needed permanent instrumentation during the
,
1982 refueling outage and will then implement revised testing procedures which will complete your schedule for achieving conformance with the Inservice
.
Testing Program Requirements. This understanding is based on discussions
!
between Mr. Laggart of your staff and Mr. Rekito of this of fice on December 4
)
and 23, 1981.
Regarding Violation B, Example 2, at the time of the inspection, j
the pipe weld end preps were bare without any protection. We do not agree that storage on a pallet alone provides protection in accordance with the
l standard.
Since the pipe sections are required to be covered, capped or i
plugged (see example 1), this protection should be designed to include
!
physical protection of the weld end preps. These actions and the others
documented in your letter will be examined during future inspections of I
your licensed program.
l
!
If our understanding of your planned actions is not in accordance with the
,
actual plans and actions being implemented, please contact this office.
i
j Your cooperation with us is appreciated.
i
Sincerely, i
il
..
Original Signec Jy: g, d
- --
8201220271 820107 j
PDR ADOCK 05000219 G
PDR Thomas T. Martin, Director
,
i Division of Engineering and Technical
{
Ch b
Inspection RI:bdfIf i
RI:DETI R-I RI:DETI I:0ETI Petrone/[dmg Rek tp#
Capht p Ebp Bettenhausen O\\
jb
!
1/4/82 C 86/
i VT/# L
0F:ICIAL RECORD COPY j/
..
.-
-
..
_
.
.
- -
.. -
.
.
Jersey Central Power & Light Co.
cc:
M. Laggart, Licensing Supervisor J. Knubel, BWR Licensing Manager Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Jersey bcc:
Region I Docket Room (with concurrences)
\\
!
0FFICIAL RECORD COPY