Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-219/81-08
ML20040A884
Person / Time
Site: Oyster Creek
Issue date: 01/07/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Phyllis Clark
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML20040A885 List:
References
NUDOCS 8201220271
Download: ML20040A884 (2)


Text

_

&Jy'

.

.

m o'

i

?O m)fj

J U 0 7 jyn v

J

$

I

&

l Docket No. 50-219 h4>

.

Jersey Central Power and Light Company O

N i

ATTN:

Mr. Philip R. Clark

/rF iQ,..

V N/C"n C

Vice President - Nuclear f2 [h

i

/S

GPU Nuclear

-

l k

IO8

  1. .~

100 Interpace Parkway

3

s Gentlemen:

J

Subject:

In.pection No. 50-219/81-08

.

l-Tnis refers to your letter dated October 26, 1981, in response to our j

letter dated September 24, 1981.

Thank you for informing us of the corrective and preventive actions documented in your letter. With regard to Violation A, we understand that inservice

!

testing of the Reactor Building Closed Cooling Water (RBCCW) and Service i

Water System (SWS) pumps is not currently being conducted in compliance j

with the ASME Code due to the lack of adequate flow measuring instrumentation.

j Also, the testing of the Containment Spray (CS) pumps does not evaluate

'

inlet pressure due to the lack of available instrumentation. We understand that you plan to install the needed permanent instrumentation during the

,

1982 refueling outage and will then implement revised testing procedures which will complete your schedule for achieving conformance with the Inservice

.

Testing Program Requirements. This understanding is based on discussions

!

between Mr. Laggart of your staff and Mr. Rekito of this of fice on December 4

)

and 23, 1981.

Regarding Violation B, Example 2, at the time of the inspection, j

the pipe weld end preps were bare without any protection. We do not agree that storage on a pallet alone provides protection in accordance with the

l standard.

Since the pipe sections are required to be covered, capped or i

plugged (see example 1), this protection should be designed to include

!

physical protection of the weld end preps. These actions and the others

documented in your letter will be examined during future inspections of I

your licensed program.

l

!

If our understanding of your planned actions is not in accordance with the

,

actual plans and actions being implemented, please contact this office.

i

j Your cooperation with us is appreciated.

i

Sincerely, i

il

..

Original Signec Jy: g, d

- --

8201220271 820107 j

PDR ADOCK 05000219 G

PDR Thomas T. Martin, Director

,

i Division of Engineering and Technical

{

Ch b

Inspection RI:bdfIf i

RI:DETI R-I RI:DETI I:0ETI Petrone/[dmg Rek tp#

Capht p Ebp Bettenhausen O\\

jb

!

1/4/82 C 86/

i VT/# L

0F:ICIAL RECORD COPY j/

..

.-

-

..

_

.

.

- -

.. -

.

.

Jersey Central Power & Light Co.

cc:

M. Laggart, Licensing Supervisor J. Knubel, BWR Licensing Manager Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Jersey bcc:

Region I Docket Room (with concurrences)

\\

!

0FFICIAL RECORD COPY