ML12124A337
From kanterella
Revision as of 23:37, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12124A337 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 04/30/2012 |
From: | Becker J R Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
DCL-12-042 | |
Download: ML12124A337 (6) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Environmental Report
MONTHYEARDCL-2019-521, Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant2019-08-20020 August 2019
[Table view]Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant ML16048A2182015-11-10010 November 2015 Compress Air Energy Storage (Caes) ML15160A2362015-07-0101 July 2015 Enclosures Drawing/Map for All DCPP (2015) Environmental Report ML16048A2052015-06-30030 June 2015 Storm Water Pollution Prevention Plan DCL-2015-525, Marine Mammal Stranding Report (Sea Lion)2015-05-27027 May 2015 Marine Mammal Stranding Report (Sea Lion) ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 DCL-2014-523, Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion)2014-06-17017 June 2014 Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion) DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant2014-04-17017 April 2014 Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant ML16048A2862013-12-31031 December 2013 CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2 DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-12-042, 2011 Annual Nonradiological Environmental Operating Report2012-04-30030 April 2012 2011 Annual Nonradiological Environmental Operating Report ML16048A2142011-03-0707 March 2011 2010 Air Emission Inventory Report DCL-2010-505, 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant2011-01-28028 January 2011 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-32011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization DCL-11-005, Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys2011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys ML1101404142011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area ML1101404122011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys ML1101404202011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 ML1101404082011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area ML1101404252011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization ML16048A2842010-12-31031 December 2010 CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2 DCL-10-124, Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage2010-10-27027 October 2010 Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish2009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish ML11166A1532009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock2008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML11166A1512008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML16050A2922008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2 ML16050A2912008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2 DCL-2008-508, Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure2008-02-15015 February 2008 Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure DCL-2008-504, 2007 Annual Sea Turtle Report2008-01-29029 January 2008 2007 Annual Sea Turtle Report DCL-2007-535, National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure2007-08-0909 August 2007 National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure DCL-07-049, Annual Nonradiological Environmental Operating Report2007-04-26026 April 2007 Annual Nonradiological Environmental Operating Report DCL-2006-511, Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 20052006-02-27027 February 2006 Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 2005 DCL-05-002, Appendix a, Rupture Process of the 2003 San Simeon Earthquake.2004-11-30030 November 2004 Appendix a, Rupture Process of the 2003 San Simeon Earthquake. DCL-04-071, Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake2004-06-0707 June 2004 Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake ML0312500752003-04-25025 April 2003 Annual Nonradiological Environmental Operating Report ML0229503042002-10-15015 October 2002 ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, Table 4.3-1 - Section 8.2.2 DCL-02-051, 2001 Annual Radiological Environmental Operating Report2002-04-30030 April 2002 2001 Annual Radiological Environmental Operating Report ML0203003982001-12-21021 December 2001 Part 1 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports ML0203004112001-12-21021 December 2001 Part 2 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports, Photographs of Core Boxes ML0203004332001-12-21021 December 2001 Part 3 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Attachment 1: Field Boring Logs in ISFSI Study Area ML0203004422001-12-17017 December 2001 Part 4 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Data Report D: Trenches in the ISFSI Study Area ML0203100092001-12-17017 December 2001 Data Report F: Field Discontinuity Measurements, Diablo Canyon ISFSI, Book 3 of 4 2019-08-20 Category:Letter MONTHYEARIR 05000275/20230042024-02-0909 February 2024
[Table view]Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09 |
Retrieved from "https://kanterella.com/w/index.php?title=ML12124A337&oldid=453428"