Category:Letter type:DCL
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System 2024-09-09
[Table view] Category:Annual Operating Report
MONTHYEARML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 ML23318A2092023-09-13013 September 2023 Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 1 (Main Report) ML23318A2082023-09-13013 September 2023 Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 2 (Exhibits) DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 ML23037A8312022-09-28028 September 2022 Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume II - Exhibits ML23037A8302022-09-28028 September 2022 Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume I - Main Report ML23041A3772022-06-30030 June 2022 Independent Safety Committee Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations July 1, 2021-June 30, 2022 DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-19-078, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20182019-10-0303 October 2019 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2018 DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-18-032, Summary Report of 10 CFR 50.59. Changes, Tests, and Experiments, for the Period of January 1, 2016, Through December 31, 20172018-04-18018 April 2018 Summary Report of 10 CFR 50.59. Changes, Tests, and Experiments, for the Period of January 1, 2016, Through December 31, 2017 DCL-17-075, Transmittal of 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20162017-09-0606 September 2017 Transmittal of 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2016 DCL-16-105, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20152016-10-18018 October 2016 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-16-046, Summary Report of 10 CFR 50.59, Changes, Tests, and Experiments, for the Period of January 1, 2014, Through December 31, 20152016-04-18018 April 2016 Summary Report of 10 CFR 50.59, Changes, Tests, and Experiments, for the Period of January 1, 2014, Through December 31, 2015 ML15117A6572015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 3 of 5 ML15117A6622015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 5 of 5 ML15117A6602015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 4 of 5 DCL-15-046, 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 52015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 5 ML15117A6562015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 2 of 5 DCL-13-077, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20122013-07-30030 July 2013 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2012 DCL-13-058, Annual Commitment Change Summary Report2013-05-30030 May 2013 Annual Commitment Change Summary Report DCL-13-029, Annual Radiological Environmental Operating Report2013-04-30030 April 2013 Annual Radiological Environmental Operating Report DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-13-042, Submittal of 2012 Annual Radioactive Effluent Release Report2013-04-30030 April 2013 Submittal of 2012 Annual Radioactive Effluent Release Report DCL-13-022, Annual Report of Occupational Radiation Exposure for 20122013-03-12012 March 2013 Annual Report of Occupational Radiation Exposure for 2012 DCL-12-117, 2011 Annual Commitment Change Summary Report2012-11-20020 November 2012 2011 Annual Commitment Change Summary Report DCL-12-070, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20112012-07-19019 July 2012 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2011 DCL-12-040, 2011 Annual Radioactive Effluent Release Report2012-04-30030 April 2012 2011 Annual Radioactive Effluent Release Report ML1120101782011-07-19019 July 2011 Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 DCL-11-082, Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20102011-07-19019 July 2011 Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 DCL-11-082, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20102011-07-19019 July 2011 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 ML11129A0852011-04-28028 April 2011 2010 Annual Radiological Environmental Operating Report DCL-11-049, 2010 Annual Radioactive Effluent Release Report, in Accordance with 10 CFR 50.36a(a)(2) and Section 5.6.32011-04-28028 April 2011 2010 Annual Radioactive Effluent Release Report, in Accordance with 10 CFR 50.36a(a)(2) and Section 5.6.3 DCL-11-051, 2010 Annual Nonradiological Environmental Operating Report2011-04-28028 April 2011 2010 Annual Nonradiological Environmental Operating Report ML1111807472011-04-28028 April 2011 2010 Annual Nonradiological Environmental Operating Report DCL-11-050, Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report2011-04-28028 April 2011 Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report DCL-10-055, Units, 1 and 2, 2009 Annual Commitment Change Summary Report2010-05-19019 May 2010 Units, 1 and 2, 2009 Annual Commitment Change Summary Report DCL-10-043, Submittal of 2009 Annual Radiological Environmental Operating Report2010-04-28028 April 2010 Submittal of 2009 Annual Radiological Environmental Operating Report DCL-10-039, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period January 1, 2008, Through December 31, 20092010-04-19019 April 2010 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period January 1, 2008, Through December 31, 2009 DCL-10-034, Annual Report of Occupational Radiation Exposure for 20092010-03-26026 March 2010 Annual Report of Occupational Radiation Exposure for 2009 DCL-2009-523, 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I0182482009-06-11011 June 2009 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248 DCL-09-031, Submittal of 2008 Annual Commitment Change Summary Report2009-05-0707 May 2009 Submittal of 2008 Annual Commitment Change Summary Report DCL-09-029, 2008 Annual Radiological Environmental Operating Report2009-04-24024 April 2009 2008 Annual Radiological Environmental Operating Report DCL-08-061, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2007, Affect Peak Cladding Temperature (PCT) Calculations2008-07-23023 July 2008 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2007, Affect Peak Cladding Temperature (PCT) Calculations DCL-08-031, Transmittal of 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period of January 1, 2006, Through December 31, 20072008-04-17017 April 2008 Transmittal of 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period of January 1, 2006, Through December 31, 2007 ML0729107542007-10-22022 October 2007 2006 Rulemaking Annual Report DCL-07-071, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20062007-07-23023 July 2007 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2006 2023-09-13
[Table view] Category:Environmental Report
MONTHYEARML24240A0232024-09-20020 September 2024 Environmental Scoping Summary Report for Diablo Canyon License Renewal DCL-2019-521, Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant2019-08-20020 August 2019 Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant ML16048A2182015-11-10010 November 2015 Compress Air Energy Storage (Caes) ML15160A2362015-07-0101 July 2015 Enclosures Drawing/Map for All DCPP (2015) Environmental Report ML16048A2052015-06-30030 June 2015 Storm Water Pollution Prevention Plan DCL-2015-525, Marine Mammal Stranding Report (Sea Lion)2015-05-27027 May 2015 Marine Mammal Stranding Report (Sea Lion) DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 DCL-2014-523, Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion)2014-06-17017 June 2014 Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion) DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant2014-04-17017 April 2014 Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant ML16048A2862013-12-31031 December 2013 CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2 DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-12-042, 2011 Annual Nonradiological Environmental Operating Report2012-04-30030 April 2012 2011 Annual Nonradiological Environmental Operating Report ML16048A2142011-03-0707 March 2011 2010 Air Emission Inventory Report DCL-2010-505, 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant2011-01-28028 January 2011 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant ML1101404252011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-32011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization ML1101404202011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 DCL-11-005, Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys2011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys ML1101404142011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area ML1101404122011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys ML1101404082011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area ML16048A2842010-12-31031 December 2010 CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2 DCL-10-124, Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage2010-10-27027 October 2010 Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage ML11166A1532009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish2009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock2008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML11166A1512008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML16050A2912008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2 ML16050A2922008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2 DCL-2008-508, Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure2008-02-15015 February 2008 Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure DCL-2008-504, 2007 Annual Sea Turtle Report2008-01-29029 January 2008 2007 Annual Sea Turtle Report DCL-2007-535, National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure2007-08-0909 August 2007 National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure DCL-07-049, Annual Nonradiological Environmental Operating Report2007-04-26026 April 2007 Annual Nonradiological Environmental Operating Report DCL-2006-511, Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 20052006-02-27027 February 2006 Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 2005 DCL-05-002, Appendix a, Rupture Process of the 2003 San Simeon Earthquake.2004-11-30030 November 2004 Appendix a, Rupture Process of the 2003 San Simeon Earthquake. DCL-04-071, Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake2004-06-0707 June 2004 Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake ML0312500752003-04-25025 April 2003 Annual Nonradiological Environmental Operating Report ML0229503042002-10-15015 October 2002 ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, Table 4.3-1 - Section 8.2.2 DCL-02-051, 2001 Annual Radiological Environmental Operating Report2002-04-30030 April 2002 2001 Annual Radiological Environmental Operating Report ML0203003982001-12-21021 December 2001 Part 1 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports ML0203004112001-12-21021 December 2001 Part 2 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports, Photographs of Core Boxes ML0203004332001-12-21021 December 2001 Part 3 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Attachment 1: Field Boring Logs in ISFSI Study Area ML0203200472001-12-17017 December 2001 Data Report I: Rock Lab Test Data (Geo Test Unlimited) Diablo Canyon ISFSI 2024-09-20
[Table view] |