DCL-2019-521, Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant20 August 2019Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant
ML16048A21810 November 2015Compress Air Energy Storage (Caes)
ML15160A2361 July 2015Enclosures Drawing/Map for All DCPP (2015) Environmental Report
ML16048A20530 June 2015Storm Water Pollution Prevention Plan
DCL-2015-525, Marine Mammal Stranding Report (Sea Lion)27 May 2015Marine Mammal Stranding Report (Sea Lion)
ML14364A26522 December 2014License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4Annual Radiological Environmental Operating Report
License Renewal
Environmental Justice
Fatality
ML14364A26622 December 2014License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4Earthquake
Environmental Justice
ML14364A26922 December 2014License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4Boric Acid
Grab sample
Coatings
Incorporated by reference
Aging Management
License Renewal
Biofouling
Environmental Justice
DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 422 December 2014License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4License Renewal
Earthquake
Environmental Justice
Exclusive Use
DCL-2014-523, Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion)17 June 2014Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion)
DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant17 April 2014Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant
ML16048A28631 December 2013CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2
DCL-13-045, Annual Nonradiological Environmental Operating Report30 April 2013Annual Nonradiological Environmental Operating Report
DCL-12-042, 2011 Annual Nonradiological Environmental Operating Report30 April 20122011 Annual Nonradiological Environmental Operating Report
ML16048A2147 March 20112010 Air Emission Inventory ReportCoatings
DCL-2010-505, 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant28 January 20112010 Annual Sea Turtle Report for Diablo Canyon Power Plant
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys7 January 2011Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area7 January 2011Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study AreaEarthquake
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area7 January 2011Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-37 January 2011Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3Probabilistic Risk Assessment
Earthquake
DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization7 January 2011Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization
DCL-11-005, Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys7 January 2011Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic SurveysEarthquake
Weak link
ML1101404147 January 2011Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area
ML1101404127 January 2011Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys
ML1101404207 January 2011Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3Probabilistic Risk Assessment
Earthquake
ML1101404087 January 2011Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study AreaEarthquake
ML1101404257 January 2011Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization
ML16048A28431 December 2010CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2
DCL-10-124, Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage27 October 2010Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal StageSafe Shutdown
Ultimate heat sink
Hydrostatic
Coatings
Frazil ice
Veliger
License Renewal
Earthquake
Control of Heavy Loads
Biofouling
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish31 December 2009Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish
ML11166A15331 December 2009Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish
DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock31 December 2008Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat ShockVeliger
Biofouling
ML11166A15131 December 2008Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat ShockVeliger
Biofouling
ML16050A29222 August 2008Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2
ML16050A29122 August 2008Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2
DCL-2008-508, Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure15 February 2008Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure
DCL-2008-504, 2007 Annual Sea Turtle Report29 January 20082007 Annual Sea Turtle Report
DCL-2007-535, National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure9 August 2007National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure
DCL-07-049, Annual Nonradiological Environmental Operating Report26 April 2007Annual Nonradiological Environmental Operating Report
DCL-2006-511, Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 200527 February 2006Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 2005Grab sample
DCL-05-002, Appendix a, Rupture Process of the 2003 San Simeon Earthquake.30 November 2004Appendix a, Rupture Process of the 2003 San Simeon Earthquake.Earthquake
DCL-04-071, Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake7 June 2004Update to the Seismicity Evaluation of the December 22, 2003 San Simeon EarthquakeEarthquake
ML03125007525 April 2003Annual Nonradiological Environmental Operating Report
ML02295030415 October 2002ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, Table 4.3-1 - Section 8.2.2High winds
Tornado Missile
Time to boil
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Finite Element Analysis
Annual Radioactive Effluent Release Report
Earthquake
Control of Heavy Loads
Fuel cladding
Environmental Justice
Scaffolding
DCL-02-051, 2001 Annual Radiological Environmental Operating Report30 April 20022001 Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Met Tower
Annual Radiological Environmental Operating Report
ML02030039821 December 2001Part 1 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data ReportsCoatings
ML02030041121 December 2001Part 2 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports, Photographs of Core Boxes
ML02030043321 December 2001Part 3 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Attachment 1: Field Boring Logs in ISFSI Study AreaHigh winds
Reverse polarity
ML02030044217 December 2001Part 4 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Data Report D: Trenches in the ISFSI Study Area
ML02031000917 December 2001Data Report F: Field Discontinuity Measurements, Diablo Canyon ISFSI, Book 3 of 4