ML12233A176
From kanterella
Revision as of 18:20, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12233A176 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 08/28/2012 |
From: | Markley M T Plant Licensing Branch IV |
To: | O'Grady B J Nebraska Public Power District (NPPD) |
Wilkins L E | |
References | |
TAC ME7021 | |
Download: ML12233A176 (16) | |
Similar Documents at Cooper | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML22111A1382022-05-13013 May 2022
[Table view]Proposed Inservice Testing Alternative RS-01, Revision 0 NLS2020053, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-042020-08-26026 August 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-04 NLS2019034, 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 22019-06-28028 June 2019 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 2 ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 NLS2018029, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-032018-05-16016 May 2018 Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-03 NLS2017032, 10 CFR 50.55a Request Number RI-21, Revision 12017-03-29029 March 2017 10 CFR 50.55a Request Number RI-21, Revision 1 ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML12313A1112013-01-22022 January 2013 Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12233A1762012-08-28028 August 2012 Relief Request Nos. RV-07, Revision 0, and RV-01, Revision for Fourth 10-Day Inservice Inspection Interval Regarding Weld Overlay Repair NLS2011085, Relief Request from Certain Inservice Testing Code Requirements2011-08-24024 August 2011 Relief Request from Certain Inservice Testing Code Requirements ML1101205402011-02-18018 February 2011 Relief Request RI-36 for Alternative Weld Overlay Repairs for the Fourth 10-Year Inservice Inspection Interval ML1022204492010-10-0808 October 2010 Request for Relief No. RI-04 for the Fourth 10-Year Inservice Inspection Interval Regarding Inspection of Reactor Vessel Nozzle-to-Vessel Shell Welds ML1009703402010-04-26026 April 2010 Relief, Relief Request No. RV-06 from Certain Inservice Testing Requirements Related to Valves in the Control Rod Drive System, for Fourth 10-Year IST Interval NLS2010013, Request Relief from Certain Inservice Inspection (ISI) Code Requirements2010-02-0505 February 2010 Request Relief from Certain Inservice Inspection (ISI) Code Requirements NLS2010014, Request Relief from Certain Inservice Inspection Code Requirements2010-02-0505 February 2010 Request Relief from Certain Inservice Inspection Code Requirements NLS2009038, Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 02009-06-18018 June 2009 Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 0 ML0821304832008-08-15015 August 2008 Request for Relief No. Ri - 35 for Fourth Year Inservice Inspection Interval Regarding Weld Overlay Repair ML0802302882008-02-0606 February 2008 Request for Relief No. RI-29, Revision 1, for Fourth 10-Year Inservice Inspection Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds ML0631802502006-12-0505 December 2006 Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Vessel Code, Relief Request No. RI-06, Revision 3, for Weld HMC-BB-1 ML0630402412006-11-0303 November 2006 Correction to and Clarification on Safety Evaluation - Risk Informed Inservice Inspection Program for the Fourth 10-Year Interval; Relief Request No. RI-34 ML0628500512006-10-23023 October 2006 Risk-Informed Inservice Inspection Program for Fourth 10-Year Interval; Relief Request No. RI-34 ML0626202782006-10-13013 October 2006 Fourth 10-year Interval Inservice Inspection Request for Relief No. RI-15, Examination of Peripheral Control Rod Drive Housing Welds ML0625400642006-10-11011 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief RI-02 ML0622602032006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-04 ML0622601952006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-02 ML0622602172006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-06 ML0622602202006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-11 ML0623405482006-09-0808 September 2006 Relief, Request for Relief No. RI-13 Fourth 10-Year Interval Inservice Inspection ML0405603182004-02-25025 February 2004 Code Relief-RP-06-IST, Core Spray Pump CS-P-B, MB6821 NLS2003120, Inservice Testing Program Relief Request RP-06, Revision 22003-11-25025 November 2003 Inservice Testing Program Relief Request RP-06, Revision 2 ML0309003842003-03-31031 March 2003 Relief, Inservice Testing of All Pumps as Required by Asme/Ansi OMA-1988, Part 6, Paragraph 6.1, MB6822 2022-05-13 Category:Safety Evaluation MONTHYEARML23334A2012024-01-0303 January 2024
[Table view]Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20255A2172020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20077L3392020-03-19019 March 2020 Proposed Inservice Inspection Alternatives RP5-02 and RI5-02 ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML19079A0702019-05-0707 May 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4384; EPID No. L-2014-JLD-0046) ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML18183A3252018-07-31031 July 2018 Requests for Relief Associated with - the Fifth 10-year Inservice Inspection Interval Program (CAC Nos. MG0175 Through MG0179; Epids L-2017-LLR-0062 Through L-2017-LLR-0066) ML18064A1022018-03-22022 March 2018 Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026) ML17226A0322017-09-20020 September 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16048A3402016-02-24024 February 2016 Request for Inservice Inspection Program Alternative RP5-01 for Implementation of Code Case N-795 ML16042A3262016-02-24024 February 2016 Request for Relief RR5-01, Alternative Weld Overlay Repair for a Dissimilar Metal Weld Joining Nozzle to Control Rod Drive End Cap in Lieu of Specific ASME Boiler and Pressure Vessel Code Requirements ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML14365A0932015-01-13013 January 2015 Correction to Safety Evaluation Dated December 12, 2014, Regarding Amendment No. 249, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13263A1532013-10-0707 October 2013 Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13143A3452013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12313A1112013-01-22022 January 2013 Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval 2024-01-03 Category:Letter MONTHYEARML23334A2012024-01-0303 January 2024
[Table view]Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03 |
Retrieved from "https://kanterella.com/w/index.php?title=ML12233A176&oldid=448537"