ML12363A047
From kanterella
Revision as of 11:51, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12363A047 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 12/10/2012 |
From: | Tamburro J G Canberra Industries |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML12363A047 (4) | |
Similar Documents at Salem | |
---|---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML17081A4532017-03-20020 March 2017
[Table view]Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16196A0652016-07-0909 July 2016 Part 21 Report - Nonconformance on Struthers-Dunn Relay for Psge Nuclear LLC ML16162A6792016-06-0808 June 2016 Part 21 Report - Nonconformance on Struthers-Dunn Relay for PSEG Nuclear LLC ML16139A8312016-05-13013 May 2016 Part 21 Notification - Potential Defect Applicable to Hytork XL1126 Pneumatic Actuators ML16126A1112016-04-29029 April 2016 National Technical Systems (Nts) Request for Extension, for Potential Part 21 on Safety Clip, Siemens Part Number 401-158 ML16098A4452016-03-22022 March 2016 Part 21 Notification - Sense and Transfer Module Resistive Short ML16112A2102016-03-14014 March 2016 National Technical Systems - Potential Part 21 on Siemens 401-158 Safety Clip, Per Wolf Creek, Salem, and Arkansas Nuclear One ML15146A0222015-05-0707 May 2015 Qualtech Np - Potential 1O CFR Part 21 Notification on Struthers Dunn Relays ML15134A0182015-05-0707 May 2015 Part 21 Report Regarding Struthers Dunn Relays with Contact Resistance Greater than One Ohm ML15089A4352015-03-27027 March 2015 Part-21 Notification - Sense and Transfer Module Resistive Short ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14197A2812014-07-15015 July 2014 Part 21 Report - Potential Failure of Reactor Coolant Pump Turning Vane Bolts ML14197A2742014-07-14014 July 2014 Notification of the Potential Existence of Defects Pursuant to 10CFR Part 21 ML14113A3702014-04-18018 April 2014 Part 21 - Thomas and Betts Printed Circuit Boards ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML14085A0132014-03-19019 March 2014 Part 21 Report Re Defects & Non-Compliance of Thomas and Betts Printed Circuit Boards in Which the Power Supplies Incorrect Strap Installed on the Trasformers of Cyberex P/N ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12363A0472012-12-10010 December 2012 Part 21 Report Re Failure to Comply with Certain PSEG Specifications as Required by PSEG Purchase Order ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12003A2242011-12-22022 December 2011 Baldor Electric Co. Notification of Nuclear Nonconformance Event No. 47425 ML11318A0232011-11-10010 November 2011 Notification of Part 21 Report Re Motor Power Leads Undersized ML11228A0862011-08-0101 August 2011 Submittal of 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0102, Rev. 0, Air Start Motors with Friction-Clutch Inertia Drives ML11136A2172011-05-12012 May 2011 U-Rings Fabricated with Incorrect Material ML1027701052010-09-29029 September 2010 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40 ML1027704172010-09-29029 September 2010 Dresser Masoneilan, 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40 ML1011002252010-04-14014 April 2010 United Controls International, Faulty Modulation Index Control Circuit Board Used in a Power Supply ML0930304542009-10-23023 October 2009 Hilti, Inc., Potential Delivery of Nonconforming Washers, and Affected Utilities or Plants Are Pilgrim, Brunswick, Arizona Public Service, and Waterford 3 ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0733103812007-11-21021 November 2007 Notification of Potential Part 21 Report Welding of Safety Related Components ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0706402532007-02-27027 February 2007 Notification of Potential Part 21 Re Chiller Copper Sleeve Cracks Leading to Slow Refrigerant Discharge ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0626204942006-09-15015 September 2006 Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed LR-N04-0475, 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 22004-11-0101 November 2004 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 2 LR-N04-0376, 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station2004-08-20020 August 2004 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station LR-N04-0377, 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms2004-08-20020 August 2004 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms 2017-03-20 |
Retrieved from "https://kanterella.com/w/index.php?title=ML12363A047&oldid=441741"