Monthly Operating Rept for Oct 1992 for Monticello Nuclear Generating Plant
ML20116H246
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/31/1992
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9211130014
Download: ML20116H246 (5)


Text

_

Northem States Power Company 414 theolic4 Mall Minneapolis Mnnesota 5$4011927 Telephone (012) 330 6500 November 9, 1992 Monticello Technical Specifications Section 6.7.A,3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20S55 MONTICELLO NUCLEAR CENERATINC l'IANT Docket No. 50-263 License No. DPR 22 Monthly Operating Report Oc toberJ22 Attached is t.he Monthly Operating Report for October, 1992 for the Monticello Nuclear Gene ing Plant.

}

Tiomas M Parker Manager Nuclear Support Service TMP/jlk c:

Director, Office of Resource Management Regional Administrator III, NRC NRR Project Manager, NRC NRC Reside".t Inspector State of Minnesota - Kris Sanda Attachment 13000a 9211f30014 921031

/

PDR ADOCK 05000263

,/ l}

R PDR

y____

l

_ OPERATING' DATA REPORT DOCKET NO.

50-263 DATE

. 11

.2-92.

COMPLETED BY

.H. H. Paustian TELEPHONE 612/295-5151 i

OPERATING STATUS 0

D

) Notes

-)

1. Unit Name :

Monticello

)

}

12. Reporting periode.

October.

}

)

3. Licensed Thernal Power (MWt) :

1670 1

)

1

4. Nameplate Rating (Gross MWe):

569

)

)

5.-Design Electrical Rating (Net MWe):

545.4 J

)

'6. Maximum Dependable Capacity (Gross MWe): __564

)

-1 j

7. Maximum Dependable Capacity (Net MWe):

536' J-

)

s

-8._If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

j i

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

__N / A, y

f THIS MONTH YR.-TO-DATE

' CUMULATIVE -;

lll'. Hours In Reporting Period 745:

7320-187057 J12. Number Of Hours Reactor Was Critical 745.0 7102.3.

_ 150520.7

13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7

'14. Hours Generator On-Line 745.0 7064.3'

'147812.2;

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0'
16. Gross Thermal Energy Generated (MWH) 1238758 11727105 227260682-i

'17.. Gross Electrical Energy Generated (toiH ) 417381 3928594 76818439:

18. Net Electrical Energy Generated (MWH) 401722 3771023' 73473241

'19. Unit Service Factor 100.0%-

96.5%

79.0%

.20. Unit' Availability Factor 100.0%

96.5%

79.0%.

21 _ Unit Capacity Factor (Using MDC-Net}

100.6%

96.1%

73.3%

~

.)

22.- Unit Capacity Factor (Using DER-Net) 98.9%

94.5%

72.0%

"23. Unit ~ Forced Outage Rate 0.0%

1.0%;

3DB%:

24. Shutdowns Scheduled Over Next 12 Months (7ype, Date, and Duration of:Each)-
Refueling Outage - 1/27/93 - fi days

~

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A' R26. Units In Test Status (Prior to Connercial Operation): N/A Forecast Achieved 1 q

INITIAL CRITICALITY

.o

. INITIAL ELECTRICITY 4

COMMERCIAL OPERATION a.;

o 1

h r

+

[

u.

..n.

a

-a

....a.

., _. :. _n, _ _. 2..

n.

AV; RAGE DAILY UNIT-POWER LEVEL

-l i

DOCKET NO.. 50-263 i

UNIT Monticello DATE 11-2-92 i

COMPLETED BY

11. 11.. - Paus tian TELEPliONE 612/295-5152

.l

-MONTli OF October 3

DAY AVERAGE DAILY i>OWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-Net)

(MWe-Het) 1 537._.

17 543..

2-540._ _-

18

_$37, l.:

3 539.

19

542,
4 536.-

20 539.

5 539. ___

21_

._544.

6 540.-

22 542.

7 541.

23

,538.

8

538, 24 543.

4 9

-542.

25 540, _

.1

-10 540.

26-

536, a

i 11 549._

27 538:

12-

536, 28:

536.

]

13 542.

29' 5 3 3. --

14 542.

30 532.

15 541.

31 530.

16 541.

INSTRUCTIONS

,On-this format, list the average:dailyJunit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l.:

... ~

.~

NARRATIVE

SUMMARY

OF OPEiiAT'i!M EXPERIE!JCE DOCKET 110.

50-263 DATE 11-2-92 COMPLl:TED BY li, 11. Paustian TEl.E P11011E 612/295 5151 MOtJTil OCT 10-1-92 to Power operation.

Cycle 15 coastdo1,ri started on 10-25-92.

10-30-92 Note: Power operat ion def ined c.a erasentially 100't of rated power e< cept for weekend load drops for specified nurveillance teating.

MUT SB1mXT=76 AND POVER FIDUCR0tG DOCKET NO. 50-263 UtGT NAME Monticello DATE 71-02-92 C0t'PLETED BT H. H. Pab.stian REPORT M& mi _ _0ctober _

TELEPHotE, 312/295-5151 -

i-No.

Date Type Duration Reason Method LER System Cause & Corrective (1)

(hours)

(2).

of No.

Code e

Action to l Shutdown (4)

(5)

Prevent Recurrence 13) l None 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test -

2-Manual Scram C-Refueling 3-Automatic Scram 5

tor Restriction 4-Other (Explain)

IEEE Standard 803A-1983 rator Training & Licenso Examination F

'nistrative CM)perational Error (Erplaf a)

H-Other (Explain) 1 l

..