Northem States Power Company i
Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 l
l j
i April 12,1996 Monticello Technical Specification 6.7.A.3 l
US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 I
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthlv Operatina Report for March.1996 l
I in accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics i
for the Monticello Nuclear Generating Plant for the Month of March is provided.
Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.
O RoA Roger O Anderso Director Licensing and Management issues l
c:
Regional Administrator - Ill, NRC NRR Project Manager, NRC l
Sr Resident inspector, NRC State of Minnesota l
Attn: Kris Sanda J Silberg M00fTs' 9604220172 960331 3
PDR ADOCK 05000263 I
l R
PDR I
OPERATING DATA REPORT DOCKET NO.
50-263
)
l DATE 4-T-96 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 l
l OPERATING STATUS
] Notes j
l1. Unit Name 2.
Monticello
]
]
!2. Reporting period:
March
]
]
'3. Licensed Thermal Power (MWt) :
1670
]
]
i
- 4. Nameplate Rating (Gross MWe):
569
]
]
i
.5.
Design Electrical Rating (Net MWe):
545.4
]
]
l 6. Maximum Dependable Capacity (Gross MWe) :
564
]
]
- 7. Maximum Dependable Capacity (Net MWe) :
-~ 36
-]
]
5
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last l
Report, Give Reasons i
!9. Power Level To Which Restricted, If Any (Net MWe) :
N/A I
- 10. Reasons For Restrictions, If Any: __N/A
)
l THIS MONTH YR.-TO-DATE CUMULATIVE i
- 11. Hours In Reporting Period 744 2184 216985
- 12. Number Of Hours Reactor Was Critical 744.0 2184.0 177943.9
- 3. Reactor Reserve Shutdown Hours 0.0 0.0 940.7 f
- 4. Hours Generator On-Line 744.0 2184.0 175054.9 1 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal. Energy Generated (MWH) 991850 3285648 271338437
- 17. Gross Electrical Energy Generated (MWH) 331867 1115325 91745356
- 18. Met Electrical Energy Generated (MWH) 316848 1070007 87801379
- 19. Unit Service Factor 100.0%
100.0%
80.7%
$0. Unit Availability Factor 100.0%
100.0%
80.7%
$1. Unit Capacity Factor (Using MDC" Net) 79.5%
91.4%
75.5%
- 2. Unit Capacity Factor (Using DER Net) 78.1%
89.8%
74.2%
- 3. Unit Forced Outage Rate 0.0%
0.0%
3.4%
- 4. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each).
l
_ Refueling
.4/10/96 - 39 days i
i l
- 95. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 96. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
I i
i l
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello-DATE 4-1-96 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH OF March'
. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 463.
17 424.
I 2
460.
18 424.
3 458.
19 420.
4 456.
20 418.
5
- 452, 21
- 413, 6
451.
22 414.
7
,_450.
23 411.
l 8
445.
24 405.
l 9
444.
25 402.
i i
10
- 442, 26 396.11-440.
27 394.
12
- 437, 28 392.
13 435.
29 392.
l-14 430.
30 388.
15
- 430, 31 388.
l l
16 427.
INSTRUCTIONS i
on this format, list the average daily unit power level in MWe-Net for each l
day in the reporting month.
Compute to the nearest whole megawatt.
i I
i I
l-. -,
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 4-1-96 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH MAR 03-01-96 to Power coastdown.
03-31-96 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
l
O.-
i
.*O
+.
l i
- 'e 50-263 tJNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ~Monticello
{
UNIT NAME DATE _03-05-%
COMPLETED 8Y H. H. Paustian
~
i REPORT MONTH _ March _
TELEPHONE ~612/295-5151 I
t No.
Date Type Duration Reason Method LER System Coup.
Cause & Corrective (1)
(hours)
(2) of No.
Code Code Action to t
Shutdoun (4)
(5)
Prevent Recurrence (3) g i
e i
f None i
i 6
1 i
4 t
I r
i i
i i
i t
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manuet 805-1984(P805-D5)
B-Maintenance or Test 2-Manuet Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
L i