Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 February 11,1997 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for January,1997 in accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of January is provided.
Please contact Sam Shirey, Sr. Licensing Engineer, at (612) 295-1449 if you require further information.
N
/
Roger O Anderson l
Director Licensing and Management issues l
c:
Regional Administrator-lil, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg I
9702200369 970131 DR ADOCK 05000263 PDR 200015
o 4
OPERATING DATA REPORT a
DOCKET NO.
50-263 DATE 2-3-97 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
j
- 1. Unit Name Monticello
]
]
- 2. Reporting period:
January
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
- 4. Nameplate Rating (Gross MWe):
576.5
]
]
- 5. Design Electrical Rating (Net MWe):
552.9
]
]
- 6. Maximum Dependable Capacity (Gross MWe) : 571.5
)
]
- 7. Maximum Dependable Capacity (Net MWe) :
543.5
]
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last 4
Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 744 224329
- 12. Number of Hours Reactor Was Critical 744.0 744.0 184136.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 744.0 744.0 181060.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
- 16. Gross Thermal Energy Generated (BOGI) 1236845 1236845 281108756
- 17. Gross Electrical Energy Generated (10 61) 429717 429717 95103232 i
- 18. Net Electrical Energy Generated (MWH) 414859 414859 91019168 4
- 19. Unit Service Factor 100.0%
100.0%
80.7%
- 20. Unit Availability Factor 100.0%
100.0%
80.7%
4
- 21. Unit Capacity Factor (Using MDC Net) 102.6%
102.6%
75.7%
- 22. Unit Capacity Factor (Using DER Net) 100.9%
100.9%
74.4%
- 23. Unit Forced Outage Rate 0.0%
0.0%
3.4%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_ Refueling, 1/9/98-2/11/98, 34 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
2G. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 4
k a
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello-DATE 2-3-97 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH OF January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 561.
17 559.
2 561.
18 560.
3 560.
19 560.
4 560.
20 559.
5 560.
21 561.
6 560.
22 559.
7 493.
23 560.
8 553.
24 561.
9 559.
25 560.
10 558.
26 560.
11 561.
27 560.
12 558.
28 560.
13 562.
29 561.
14 559.
30 560.
15 560.
31 560.
16 559.
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
)
c.
UNIT SHlfrD0VNS AND POVER REDUCTIONS DOCKET NO.
50-263 i
UNIT NAME Monticello i
DATE 02-03-97 i
COMPIETED BY H. H. Paustian REPORT MONTH January TELEPHONE-612/295-5151 -..
+
l l
r t
No.
Jate Duration Reason Method LER System Comp.
Cause & Corrective Ty(pe (hours)
(2) of No.
Code Code Action to 1)
Shutdown (4)
(5)
Prevent Recurrence (3)
None i
i r
)
h 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explai'.f H-Other (Explain) m.
m wm.u...
s i
l NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 2-3-97 1
COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH JAN 01-01-97 to Power operation.
01-31-97 i
a 4
3 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
i 4