Northem States Power Company 414 theolic4 Mall Minneapolis Mnnesota 5$4011927 Telephone (012) 330 6500 November 9, 1992 Monticello Technical Specifications Section 6.7.A,3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20S55 MONTICELLO NUCLEAR CENERATINC l'IANT Docket No. 50-263 License No. DPR 22 Monthly Operating Report Oc toberJ22 Attached is t.he Monthly Operating Report for October, 1992 for the Monticello Nuclear Gene ing Plant.
}
Tiomas M Parker Manager Nuclear Support Service TMP/jlk c:
Director, Office of Resource Management Regional Administrator III, NRC NRR Project Manager, NRC NRC Reside".t Inspector State of Minnesota - Kris Sanda Attachment 13000a 9211f30014 921031
/
PDR ADOCK 05000263
,/ l}
R PDR
y____
l
_ OPERATING' DATA REPORT DOCKET NO.
50-263 DATE
. 11
.2-92.
COMPLETED BY
.H. H. Paustian TELEPHONE 612/295-5151 i
OPERATING STATUS 0
D
) Notes
-)
- 1. Unit Name :
Monticello
)
}
- 12. Reporting periode.
October.
}
)
- 3. Licensed Thernal Power (MWt) :
1670 1
)
1
- 4. Nameplate Rating (Gross MWe):
569
)
)
5.-Design Electrical Rating (Net MWe):
545.4 J
)
'6. Maximum Dependable Capacity (Gross MWe): __564
)
-1 j
- 7. Maximum Dependable Capacity (Net MWe):
536' J-
)
s
-8._If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
j i
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
__N / A, y
f THIS MONTH YR.-TO-DATE
' CUMULATIVE -;
lll'. Hours In Reporting Period 745:
7320-187057 J12. Number Of Hours Reactor Was Critical 745.0 7102.3.
_ 150520.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
'14. Hours Generator On-Line 745.0 7064.3'
'147812.2;
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0'
- 16. Gross Thermal Energy Generated (MWH) 1238758 11727105 227260682-i
'17.. Gross Electrical Energy Generated (toiH ) 417381 3928594 76818439:
- 18. Net Electrical Energy Generated (MWH) 401722 3771023' 73473241
'19. Unit Service Factor 100.0%-
96.5%
79.0%
.20. Unit' Availability Factor 100.0%
96.5%
79.0%.
21 _ Unit Capacity Factor (Using MDC-Net}
100.6%
96.1%
73.3%
~
.)
22.- Unit Capacity Factor (Using DER-Net) 98.9%
94.5%
72.0%
"23. Unit ~ Forced Outage Rate 0.0%
1.0%;
3DB%:
- 24. Shutdowns Scheduled Over Next 12 Months (7ype, Date, and Duration of:Each)-
- Refueling Outage - 1/27/93 - fi days
~
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A' R26. Units In Test Status (Prior to Connercial Operation): N/A Forecast Achieved 1 q
INITIAL CRITICALITY
.o
. INITIAL ELECTRICITY 4
COMMERCIAL OPERATION a.;
o 1
h r
+
[
u.
..n.
a
-a
....a.
., _. :. _n, _ _. 2..
n.
AV; RAGE DAILY UNIT-POWER LEVEL
-l i
DOCKET NO.. 50-263 i
UNIT Monticello DATE 11-2-92 i
COMPLETED BY
- 11. 11.. - Paus tian TELEPliONE 612/295-5152
.l
-MONTli OF October 3
- DAY AVERAGE DAILY i>OWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-Net)
(MWe-Het) 1 537._.
17 543..
2-540._ _-
18
_$37, l.:
3 539.
19
- 542,
- 4 536.-
20 539.
5 539. ___
21_
._544.
6 540.-
22 542.
7 541.
23
,538.
8
- 538, 24 543.
4 9
-542.
25 540, _
.1
-10 540.
26-
- 536, a
i 11 549._
27 538:
12-
- 536, 28:
536.
]
13 542.
29' 5 3 3. --
14 542.
30 532.
15 541.
31 530.
16 541.
INSTRUCTIONS
,On-this format, list the average:dailyJunit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l.:
... ~
.~
NARRATIVE
SUMMARY
OF OPEiiAT'i!M EXPERIE!JCE DOCKET 110.
50-263 DATE 11-2-92 COMPLl:TED BY li, 11. Paustian TEl.E P11011E 612/295 5151 MOtJTil OCT 10-1-92 to Power operation.
Cycle 15 coastdo1,ri started on 10-25-92.
10-30-92 Note: Power operat ion def ined c.a erasentially 100't of rated power e< cept for weekend load drops for specified nurveillance teating.
MUT SB1mXT=76 AND POVER FIDUCR0tG DOCKET NO. 50-263 UtGT NAME Monticello DATE 71-02-92 C0t'PLETED BT H. H. Pab.stian REPORT M& mi _ _0ctober _
TELEPHotE, 312/295-5151 -
i-No.
Date Type Duration Reason Method LER System Cause & Corrective (1)
(hours)
(2).
of No.
Code e
Action to l Shutdown (4)
(5)
Prevent Recurrence 13) l None 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test -
2-Manual Scram C-Refueling 3-Automatic Scram 5
tor Restriction 4-Other (Explain)
IEEE Standard 803A-1983 rator Training & Licenso Examination F
'nistrative CM)perational Error (Erplaf a)
H-Other (Explain) 1 l
..